Está en la página 1de 1

E=729,700 E=700,000 E=700,300 E=700,600 E=700,900 E=701,200 E=701,500 E=701,800

N.M.

568
2+.78
2+567

0
2+56
EP:

.21

0
2+545

54

PI
2+

:26
PT:
8
6.17
52

+56
: 2+
Mid
0
2+52

2
KM
PC: 2+507.13

2+500

2+480

PT: 2+469.82

2+460

54
1.
PI

44
:2

: 2+
4

13.26
id
M

PC: 2+4

2+380
83.15
0
44

11 0
2+400

8.36
PI

2+

PT: 2+3
:2

2+
35
5

: 2+
2+420

Mid
0
2+34

.07
PC: 2+333

2+320
PI
:2
2

2+180

0
16
2+

20
5.
15
2+ P

: 2+
20T:
.35

02+

id
PT: 2+299

M
PI:19

19
2+300

9.
61
0
2+14

0
1+82

1+84
2+
22
N=8'494,900

PC
0

: 2+
23
6

66.11
37.6

2.
87
1+8

: 2+2
1+

Mid:
PC

0
80
0

28

Mid
2+12

: 1+
0
86

2+
1+ 0

80

2+
6.
PC

32
: 2+

24
11

0
0.78

2+260
-

1+
PI:2

78
1+869.0
0 3

RC

0
PT:
2+
10
0

BU
1+880

PT
: 1+
77
AM

5.
60
T
1+76
0
2+

A
08
0

ER

PI:18
Mid: 1+753.04

ET A
1+900

2+
06
A RR PAT
C RA
PT 0
: 2+
0 47 05
1+74
0. 3.52
73

KE
: 1+

M
id
PC

: 2+
PC

04
1+920

6.
: 2+

59
KM

032+0
9.66 4
0
2+
0
72

1
00

:2
1+

PI
0

2+
7
1+936.3

02
PC:
0

0
1+94

PT
0
70

2+
: 1+
1+

00
99
65.00

0
3.63
0

: 1+9
96
1+

1+980
Mid
0
68
1+
PI:2
0

PI
:17
57
7.

KM 02+000
66
1+
PT:
0.75 0
66 66
: 1+
Mid
1+
.94
653
: 1+
PC

0
1+64

0
1+62

0
1+60

0
1+58

1+56
0 MATERIAL PARA LASTRADO - Km. 02 +100
.71
1+547
PT:

CARRETERA TAMBURCO - KERAPATA

PI:16
.86 0
1+54
Mid: 1+538

PC: 1+530.01

1+520
SECTOR DE SOCCOSHUAYCCO

ATA
1+500

POTENCIA DE CANTERA = 4189.50 m3 Efic. = 80%

RAP
1+480

-KE
N=8'494,600

1+460

CO
R
1+440

BU
AM
1+420

AT
1+400

ER
ET
1+380

RR
PT: 1+366.55

Mid: 1+358.9
1+360
5
PI:15

CA
PC: 1+35
1.34

-
1+340

1+320

"MEJORAMIENTO DE LA VIA DE ACCESO


1+300

AL SANTUARIO NACIONAL DEL AMPAY


UTILIZANDO ENZIMAS ORGANICAS 1+280

PT: 1+27
6.44

EN EL TRATAMIENTO SUPERFICIAL
PI:14

Mid: 1+268.91

PC: 1+261.38

1+260

DE LA CARRETERA."
1+240

PT: 1+230.31

1+22
0
M
id
: 1+
20
9.
89
9.46

1+
PC: 1+18

20

3
0

:1
PI
1+18
0

5.18
:12

PT: 1+18
PI

1+ Mid
16
0 : 1+
16
3.55

PC: 1+141.92

1+140
N=8'494,300

1+120

1+100

A
AT
1+080

RAP
KE
PT: 1+075.53

-
AY
8
060.9

AN
1+
Mid:

06
0
U
AH
PI:1

1+
44
6.
04
1

AS
: 1+
PC

R
CARRETER

TE
RE
0
04
1+

R
CA
0
02
1+

26 0
7. 00

A SAHUAN
99 +
0+ 1

PI:10
:
PT

91
84.
: 0+9
Mid

0+980
0

KM 01+000
00
1+

PC: 0+972.57
KM

0+960
AY - KERA

A
AT
0+940
AP
ER
-K
AY
PATA

0+920

AN
A
T
PA

W
SA
PT: 0+907.11
A
ER

A
Mid 0+900
: 0+8
96.17

ER
-K

PC
PI:9

: 0+

ET
88
5.
23
AY

0+

RR
88
0
AN

CA
U

TA
H

0+
PT: 86
0+ 0
SA

85
3.

KERAPA
30
Mid
: 0+

A
84
28.18

0.74 0
0+

ER
84
0+8
PC:
0
0+82

ET

:8
0

PI
0+80

RR
0
0+78

CA

-
5
0+780.8

CO
0+
PT:

76
N=8'494,000

0 A

UR
T

MB
PA
PI:7

Mid: 0+744.47

TA
0+740
A

A
ER

ER
9
708.0
: 0+

0
72
PC

0+

ET
- K

RR
0
70
0+

CA
0
68
0+

O
0
0+66

RC
0
0+64

5
633.5

PI

BU
: 0+

:6
PT

0
62
0+
5.52
61
: 0+
Mid
AM

0+600
PC: 0+597.50
AT

0+580
PT: 0+578.75
ER

Mi
d:
0+
56
2.0
1
0+
ET

56
0
PI:5
PC
: 0+
54
5.
28

RR
0+
54
0

CA
0+
52
0
0+
50
0
0+
48
0
PT

0+
:4

: 0+

46
PI

0
47
0.
06

Mid
: 0+
45
7.43

PC:
0+4
0+44 44.81
0

0+42
0

PT:
0+3 0+
400
97.62

Mid:
0+39
0.9
7
PC
: 0+
38
4.32
7
PI:2

0+
38
0

0+
36
0 SISTEMA DE CUADRILLADO: P. SAT "56
N=8'493,700

0+
34
0

M
id
: 0+
PT
: 0+
31
0+
32
6.66 0
DATUM: W ZONA: 18 S
30
8.
90
PC
: 0+
30
1.
15 0
0+
3 0

:3
PI
0+
28
0
0+
26
0
0+
24
0
0+
22
0

KM 00+000
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
0+
20
0
0+
18
0
0+
:2

16
PI

PT
: 0+
16

M
2.

id
16

: 0+
15
4.
59
PC
0+ : 0+
14 14
0 7.
02

MEJORAMIENTO DE LA VIA DE ACCESO AL SANTUARIO NACIONAL DEL AMPAY UTILIZANDO


0+

ENZIMAS ORGANICAS EN EL TRATAMIENTO SUPERFICIAL DE LA CARRETERA


12
0

0+
10
0
0

0+
00

08
0
0+
KM

0+
06
PT 0
: 0+
05
0

1.
0.0

45
00
BP000
: 0+

8.62

0.04
0+

00

0+
: 0+

Mid: 0+03

04
PC

0+020

SECTOR.: DISTR.: PROV.: DPTO.:


PI:1

SOCCOSHUAYCCO TAMBURCO ABANCAY APURIMAC

FECHA : ESC: REVISADO: DIB.:


PU-01
JUNIO-2016 SIN ESCALA

También podría gustarte