CONSTRUCTION OF MADUNAGHAT WATER TREATMENT PLANT AND PATENGA BOOSTER PUMP STATION
ID Task Name Duration Start Finish
October November December January February 10/28 11/4 11/11 11/18 11/25 12/2 12/9 12/16 12/23 12/30 1/6 1/13 1/20 1/27 2/3 2/10 2/17 2/24 1 INTAKE SCHEDULE 102 days Sat 11/11/17 Tue 2/20/18 2 Zone-1 97 days Thu 11/16/17 Tue 2/20/18 3 Wall at -1.5 Level 1 day Thu 11/16/17 Thu 11/16/17 4 Wall at +0.8 Level 1 day Thu 11/30/17 Thu 11/30/17 5 Wall at +1.6 Level 1 day Wed 12/13/17 Wed 12/13/17 6 Slab at +1.8 Level 1 day Fri 12/29/17 Fri 12/29/17 7 Wall at +4.2 Level 1 day Sat 1/13/18 Sat 1/13/18 8 Wall at +6.3 Level 1 day Sun 1/28/18 Sun 1/28/18 9 Slab at +6.5 Level 1 day Tue 2/20/18 Tue 2/20/18 10 Zone-2 99 days Tue 11/14/17 Tue 2/20/18 11 Wall at -2.5 Level 1 day Tue 11/14/17 Tue 11/14/17 12 Wall at -0.3 Level 1 day Tue 11/28/17 Tue 11/28/17 13 Wall at +2 Level 1 day Sun 12/10/17 Sun 12/10/17 14 Wall at +4.3 Level 1 day Sat 12/23/17 Sat 12/23/17 15 Wall at +6.3 Level 1 day Fri 1/5/18 Fri 1/5/18 16 Slab at +6.5 Level 1 day Tue 2/20/18 Tue 2/20/18 17 Zone-3 71 days Sat 11/11/17 Sat 1/20/18 18 Wall at -3.6 Level 1 day Sat 11/11/17 Sat 11/11/17 19 Wall at -1.2 Level 1 day Mon 11/27/17 Mon 11/27/17 20 Wall at +1.2 Level 1 day Mon 12/4/17 Mon 12/4/17 21 Wall at +3.6 Level 1 day Tue 12/19/17 Tue 12/19/17 22 Slab at +4.5 Level 1 day Sat 1/20/18 Sat 1/20/18
Corporate Governance, Corporate Profitability Toward Corporate Social Responsibility Disclosure and Corporate Value (Comparative Study in Indonesia, China and India Stock Exchange in 2013-2016) .