Está en la página 1de 3

INDICAR LA LEY DE CONCESIONES ELCTRICAS Y EL DECRETO SUPREMO CON EL QUE FUE

APROBADO
===================================================================================
==
LEY N 25844 DECRETO SUPREMO N 009-93-EM
NORMA DGE DE ALUMBRADO DE VAS PUBLICAS
========================================
NORMA DGE 016-T-2/1996 A LA QUE LA REEMPLACE
LA FINALIDAD DE LAS LNEAS DE TRANSMISIN ES:
=============================================
-FUNCIN DE TRANSPORTE CUYO PROPSITO ES LLEVAR LA ELECTRICIDAD DE LAS CENTRALES
DE PRODUCCIN A LAS GRANDES ZONAS DE CONSUMO
-FUNCIN DE INTERCONEXIN NACIONAL QUE GESTIONA LA REPARTICIN DE LA OFERTA,
ORIENTANDO LA PRODUCCIN EN FUNCIN DE LA REPARTICIN GEOGRFICA Y TEMPORAL DE LA
DEMANDA
-FUNCIN DE INTERCONEXIN INTERNACIONAL PARA GESTIONAR LOS FLUJOS DE POTENCIA
ENTRE LOS PASES EN FUNCIN DE INTERCAMBIOS PROGRAMADOS.

COMO ESTN COMPRENDIDAS LAS REDES DE DISTRIBUCIN


=================================================
- SUBSISTEMA DE DISTRIBUCIN PRIMARIA
- SUBSISTEMA DE DISTRIBUCIN SECUNDARIA
- INSTALACIONES DE ALUMBRADO PUBLICO
- CONEXIONES
- PUNTO DE ENTRA O SUMINISTRO

CARACTERSTICAS DE UN SISTEMA DE DISTRIBUCIN


=============================================
- DEBE TENER MENOR COSTO INICIAL
- POSIBILIDAD DE AMPLIACIN A CUALQUIER PARTE DEL SISTEMA SIN SUSTITUCIN DE
MATERIAL
- BAJAS PERDIDAS DE ENERGA
- EFICIENTE SISTEMA DE PROTECCIN
- FACILIDAD DE MANTENIMIENTO
- FACILIDAD DE OPERACIN
- BAJA POTENCIA DE CORTOCIRCUITO
- EFICIENTE REGULACIN DE TENSIN HASTA EL ULTIMO PUNTO DEL CIRCUITO

CONTENIDO DEL PROYECTO DE SUBSISTEMA DE DISTRIBUCIN PRIMARIA


=============================================================
- MEMORIA DESCRIPTIVA
- ESPECIFICACIONES TCNICAS DE EQUIPOS MATERIALES DE MONTAJE
- PLANOS DE RECORRIDO DE LAS LNEAS DE TRANSMISIN
- PLANOS CON DETALLE DEL MONTAJE DE ESTRUCTURAS
- CLCULOS JUSTIFICATIVOS ELCTRICOS Y MECNICOS
- CRONOGRAMA DE OBRA Y PLAZO DE EJECUCIN
- METRADO Y PRESUPUESTADO

INDICAR LOS PLANOS NECESARIOS PARA UN PROYECTO DE DISTRIBUCIN SECUNDARIA


===========================================================================
- PLANOS DE RECORRIDO DEL SUBSISTEMA DE DISTRIBUCIN, DISTRIBUCIN DE ALUMBRADO DE
VAS PUBLICAS, CORTES TRANSVERSALES DE VAS CON INDICACIN DE LOS EJES Y POSTES,
CURVAS DE NIVEL, CUADRO RESUMEN DE LA MXIMA DEMANDA, PLANOS DE UBICACIN CON
COORDENADAS GEOGRFICAS, LEYENDA Y NOTAS.
- PLANOS CON DETALLE DE MONTAJE DE ESTRUCTURAS Y UNIDADES DE ALUMBRADO PUBLICO,
DETALLE DE SALIDA DE LOS CIRCUITOS DESDE TABLEROS HASTA SUBESTACIONES, RETENIDAS
FIJACIN DE POSTES PUESTA A TIERRA CONDUCTOS Y OTROS

INDICAR EL PROCEDIMIENTO PARA LA ELABORACIN DE UN PROYECTO HASTA SU APROBACIN


FINAL CON SUS TIEMPOS MNIMOS
===================================================================================
==========================
- SOLICITAR LA FACTIBILIDAD DE SUMINISTRO (5 DAS)
- SOLICITAR LA FIJACIN DEL PUNTO DE DISEO (15 DAS)
- ELABORACIN DEL PROYECTO (PRIMERA REVISIN 20 SEGUNDA REVISIN 15)
- SOLICITAR REVISIN DEL PROYECTO (20 Y 15 DAS)
- SOLICITAR APROBACIN DEL PROYECTO (15 DAS)

PARA LA REALIZACIN DE LAS PRUEBAS DE AISLAMIENTO EN UNA RED DE DISTRIBUCIN


PRIMARIA. INDICAR LOS NIVELES MNIMOS EXIGIDOS PARA REDES SUBTERRNEAS EN
CONDICIONES NORMALES ENTRE FASES Y ENTRE FASE Y TIERRA
===================================================================================
===============================
CONDICIONES NORMALES
ENTRE FASES 100 MO 50 MO
DE FASE A TIERRA 50 MO 20 MO
CONDICIONES HMEDAS
ENTRE FASES 50 MO 50 MO
DE FASE A TIERRA 20 MO 20 MO

QUE ES FACTOR DE CARGA, INDICAR TAMBIN SU REPRESENTACIN MATEMTICA


====================================================================
ES LA RELACIN ENTRE LA DEMANDA PROMEDIO EN UN INTERVALO DADO Y LA MXIMA DEMANDA
EN EL MISMO INTERVALO

INDICAR LOS TIPOS DE SISTEMAS DE DISTRIBUCIN PRIMARIA Y LAS DIFERENCIAS ENTRE


ELLOS
===================================================================================
=
- SISTEMA AISLADO 10 KV: ES UN SISTEMA DE TRES CONDUCTORES, AISLADO (SIN NEUTRO)
QUE SE DESARROLLA EN LAS ZONAS URBANAS CON REDES Y SUBESTACIONES PREDOMINANTEMENTE
TRIFSICOS. PUEDE ALIMENTAR CON LNEAS DE TRES FASES HASTA UN RADIO DE 10 A 15 KM.
- SISTEMA PUESTO A TIERRA 22.9/13.2 KV: ES UN SISTEMA DE CUATRO CONDUCTORES CON
NEUTRO MULTIATERRIZADO, QUE PERMITE DESARROLLAR LNEAS Y REDES TRIFSICAS,
MONOFSICAS Y CON RETORNO TOTAL POR TIERRA. ESTE SISTEMA PRESENTA UNA GRAN VENTAJA
PARA LA ELECTRIFICACIN RURAL, POR EL BAJO COSTO DE LNEAS Y SUBESTACIONES. SE
PUEDE ALIMENTAR CARGAS EN UN RADIO DE 30 A 50 KM EN FORMA ECONMICA.

CUALES SON LAS PRUEBAS PARA LOS SISTEMAS DE DISTRIBUCIN SECUNDARIA


===================================================================
- PRUEBA DE AISLAMIENTO
- PRUEBA DE CONTINUIDAD
- RESISTENCIA DE PUESTA A TIERRA
- CON EL SISTEMA ENERGIZADO, VERIFICAR ENCENDIDO DE LMPARAS, TENSIN Y SECUENCIA
DE FASES

CLASIFICACIN ELCTRICA PARA LA ELABORACIN DE PROYECTOS DE SUBSISTEMAS DE


DISTRIBUCIN SECUNDARIA SE BASA EN QUE RESOLUCIN DIRECTORAL
===================================================================================
==============================
RD N018-2002-EM/DGE

REQUISITOS PARA PRUEBAS DE VERIFICACIN EN REDES SECUNDARIAS


============================================================
- MEMORIA DESCRIPTIVA
- ESPECIFICACIONES TCNICAS
- PLANOS DE CONSTRUCCIN
- COPIA CERTIFICADA DEL PROTOCOLO DE PRUEBAS DE LOS TRANSFORMADORES DE POTENCIA
- PARA LOS SISTEMAS DE DISTRIBUCIN, EL INVENTARIO VALORIZADO Y COPIA DE LAS
FACTURAS
- PARA LOS SISTEMAS DE UTILIZACIN EN CASOS EXCEPCIONALES Y DEBIDAMENTE
JUSTIFICADOS.

QUE ES FACTOR DE DEMANDA Y SU REPRESENTACIN MATEMTICA


=======================================================
ES LA RELACIN ENTRE MXIMA DEMANDA DURANTE UN INTERVALO DE TIEMPO Y LA CARGA O
POTENCIA INSTALADA.

QUE ES EL FACTOR DE PERDIDAS Y SU REPRESENTACIN MATEMTICA


===========================================================
ES LA RELACIN QUE EXISTE ENTRE LA ENERGA TOTAL PERDIDA ENTRE LA ENERGA TOTAL QUE
SE PODRA PERDER. ES MENOR A UNO
FP = 0.3FC + 0.7 FC2

QUE ES EL FACTOR DE SIMULTANEIDAD Y SU REPRESENTACIN MATEMTICA


================================================================
RELACIN EXPRESADA COMO UN VALOR NUMRICO O COMO PORCENTAJE, DE LA POTENCIA
SIMULTANEA MXIMA DE UN GRUPO DE CLIENTES DURANTE UN PERIODO DETERMINADO, Y LA SUMA
DE SUS POTENCIAS INDIVIDUALES MXIMAS DURANTE UN PERIODO

SISTEMA TN
===========
EL NEUTRO DE LA FUENTE DE ENERGA ESTA CONECTADO A TIERRA. LAS MASA CONDUCTORAS DE
LA UTILIZACIN ESTN INTERCONECTADAS ENTRE S Y PUESTAS AL NEUTRO.
EXISTEN DOS SUBSISTEMAS, EL TN-C DONDE EL CONDUCTOR NEUTRO(N) Y EL CONDUCTOR DE
PROTECCIN (CP) SON UNO SOLO (CPN)

Y EL TN-S EN EL QUE AMBOS CONDUCTORES ESTN SEPARADOS (CP Y N).


ANTE FALLAS DE FASE A TIERRA LOS SISTEMAS TN-C Y TN-S GENERAN CORRIENTES MUY
ALTAS, LO CUAL TIENE LA DESVENTAJA DE AUMENTAR LOS RIESGOS DE INCENDIOS, DAOS A
LOS EQUIPOS Y DISTURBIOS ELECTROMAGNTICOS

SISTEMA TT
==========
EL NEUTRO DE LA FUENTE DE ENERGA ESTA CONECTADO A TIERRA. LAS MASA CONDUCTORAS DE
UTILIZACIN ESTN CONECTADAS ENTRE S Y PUESTAS A TIERRA EN UN SOLO PUNTO SEPARADO
DE LA PUESTA A TIERRA DEL NEUTRO DE LA FUENTE DE ENERGA.
ESTE SISTEMA POR LA SIMPLICIDAD DE SU IMPLEMENTACIN, ES EL MS UTILIZADO A NIVEL
MUNDIAL EN DISTRIBUCIN PBLICA EN BAJA TENSIN.

SISTEMA IT
==========
EL NEUTRO DE LA FUENTE DE ENERGA NO EST CONECTADO SLIDAMENTE A TIERRA, PUEDE
ESTAR TOTALMENTE AISLADO O UNIDO A TIERRA POR UNA IMPEDANCIA DE ALTO VALOR (NEUTRO
IMPEDANTE). LAS MASA DE LA UTILIZACIN ESTN:
INTERCONECTADAS ENTRE S Y PUESTAS A UNA TIERRA COMN
CONECTADAS A TIERRAS SEPARADAS