Está en la página 1de 16

CALCULO DE ARMADURA DE RESERVORIO

DATOS
ACERO MUROS
MEJORAMIENTO DEL SERVICIO DE AGUA
EXPEDIENTE POTABLE Y DISPOSICION SANITARIA DE ACERO VERTICAL = 1/2 Pulg.
EXCRETAS EN LOS SECTORES DE CENTRAL
LLAQTA, CHOJELA, KANCOLLANI, ALTO DIAMETRO = 1.270 Cms.
LLAQTA Y CERRO PORTEO, DISTRITO DE
CAPACHICA PUNO PUNO. AREA = 1.267 Cms2.
PESO = 0.994 Kg/ml
ACERO HORIZONTAL = 1/2 Pulg.
DIAMETRO = 1.270 Cms.
CARACTERISTICAS GEOMETRICAS AREA = 1.267 Cms2.
VOLUMEN RESERVORIO = 13.00 m3 PESO = 0.994 Kg/ml
ALTURA UTIL RESERVORI = 1.50 mts.
LADO UTIL RESERVORIO = 2.95 mts. ACERO LOSA DE TECHO
ESPECIFICACIONES ACERO HORIZONTAL = 1/2 Pulg.
CONCRETO f'c = 210 Kg/cm2 DIAMETRO = 1.270 Cms.
SOBRECARGA EN LOSA = 150 Kg/m2 AREA = 1.267 Cms2.
ACERO fy = 4,200 Kg/cm2 PESO = 0.994 Kg/ml
RESISTENCIA DEL SUELO = 1.69 Kg/cm2 ACERO LOSA DE FONDO
COEF. SISMICO = 0.12 ACERO HORIZONTAL = 1/2 Pulg.
RECUBRIMIENTO r = = 4.00 Cm DIAMETRO = 1.270 Cms.
fs = 2,100 Kg/cm2 AREA = 1.267 Cms2.
fc = 94.5 Kg/cm2 PESO = 0.994 Kg/ml

0.20 0.15 1.48

1.83

1.83

Sc Wc
SL 0.10
A' B'
0.30
WL NIVEL DE AGUA

S1

1.50
Ea

2.10 2.05 W1 0.5

1.10 Wa

A B

S2 0.20

0.10
C D

W2

0.28

0.92

1.09
CALCULOS

W1= Pc x V1 648.00 Kg
W2 = Pc x V2 878.40 Kg

Wa = Pa x Va 2220.00 Kg
WL = Pc x VL 391.20 Kg
Ws = Sc x A 244.50 Kg
S1 = 0,12 x W1 116.64 Kg
S2 = 0,12 x W2 158.11 Kg
SL = 0,12 x WL 70.42 Kg
Ss = 0,12 x Ws 52.81 Kg
Ea = 1,12 x 0,5 x Pa x H12 1890.00 Kg

VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB

V = Fh / A 1.42 Kg/cm2

Vc = 0,29 ( f'c )^1/2 4.20 Kg/cm2

V= 1.42 Kg/cm2 < Vc = 4.20 Kg/cmBIEN !!

CALCULO DE LA ARMADURA

ACERO VERTICAL CARA B'-B

MOMENTO MAXIMO EN LA BASE A-B

Mu 1280.59 Kg-mts.
d = t1 - r - D/2 10.37 Cms.

AREA DE ACERO
As1 = 84.70 Cms2
As2 = 3.40 Cms2 SE ASUME : 3.40 Cms2

CUANTIA = As / t1 x b 0.0023

CUANTIA MINIMA POR FLEXION 0.0012 < 0.0023 BIEN!!

USAR : 1 1/2 @ 0.30 mts.

ACERO HORIZONTAL B'B

ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018

As = P x b x t1 2.70 Cms2

USAR : 1 1/2 @ 0.30 mts.

ACERO EN LA ZAPATA

ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO

USAR : 1 1/2 @ 0.30 mts.

ACERO EN LA LOSA DE FONDO

P1 3825.936
P2 6337.44
P3 5754.24
P4 9644.83
P5 19713.60

LUEGO: WuD : 4260.23


WuL : 270.00
Wu : 4530.23
CALCULO DEL MOMENTO ULTIMO

Mu = 0,0513 * Wu * L2 2469.86 Kg--mts


d = t1 - r - D/2 15.37 Cms.

AREA DE ACERO
As1 = 126.20 Cms2
As2 = 4.40 Cms2 SE ASUME : 4.40 Cms2

CUANTIA = As / t1 x b 0.0022

CUANTIA MINIMA POR FLEXION 0.0012 < 0.0022 BIEN!!

USAR : 1 1/2 @ 0.25 mts.

ACERO EN LA LOSA DE TECHO

WuD = 2400 * t1 * 1,5 360


WuL = SC * 1,8 270
Wu = 630

CALCULO DEL MOMENTO ULTIMO

Mu = 0,0479 * Wu * L2 264.40 Kg--mts


d = t1 - r - D/2 5.50 Cms.
AREA DE ACERO
As1 = 45.47 Cms2
As2 = 1.31 Cms2 SE ASUME : 1.31 Cms2

CUANTIA = As / t1 x b 0.00131

CUANTIA MINIMA POR FLEXION 0.0012 < 0.0013 BIEN!!

Cms2

USAR : 1 1/2 @ 0.20 mts


3.65

0.15 0.30

0.20 0.15 TUB. FG 3/4"


@ 0,30 Mts.

0.15

1.75 UNIONES
ELECTROSOLDADAS

0.10

2.95

ESCALINES FG
VER DETALLE
DETALLE DE ESCALINES

BUZON 0,60 x 0,60 Mts.


TAPA SANITARIA METALICA

ESPECIFICACIONES TECNICAS
0.15 RESISTENCIA DEL CONCRETO f'c = 210 Kg/cm2

FLUENCIA DEL ACERO fy = 4200 Kg/cm2

0.20 TRASLAPE MINIMO DE VARILLAS = 30 cm

0.20 0.15 2.95 0.15 0.20

RESERVORIO APOYADO 13 M3
PLANTA
TAPA SANITARIA METALICA 1/2 @ 0.20 TUBERIA DE VENTILACION FG 2"
0,60 x 0,60 mts.

0.10



0.30

NIVEL DE AGUA

1/2 @ 0.30

1/2 @ 0.30 TARRAJEO C / IMPERMEABILIZANTE 1.80


1.50

1/2 @ 0.30


1/2 @ 0.25 PENDIENTE DE FONDO 1%

1/2 @ 0.30



0.20


0.075

0.98 SOLADO DE CONCRETO

0.20 0.15 2.95 0.15 0.20


RESERVORIO APOYADO
CORTE A-A
Dec-17
13 M3
CORTE A-A
Dec-17
1/2 @ 0.20

3.25

2 3/8

ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2

FLUENCIA DEL ACERO fy = 4200 Kg/cm2

TRASLAPE MINIMO DE VARILLAS = 30 cm

3.25 FONCODES
FONCODES
RESERVORIO APOYADO 13 M3
ARMADURA DE LOSA DE TECHO
Dec-17
FONCODES
FONCODES
M3
PLANILLA DE ARMADURA RESERVORIO 13 M3

ARMADURA LOSA DE TECHO LONGITUD VECES PESO

3.19

0.07 1/2 3.33 34.5 114.20

3.19

3/8 3.19 4 12.68

ARMADURA LOSA DE FONDO LONGITUD VECES PESO

1.33

0.17 1/2 1.50 52.67 78.70

3.59

1/2 3.59 17.11 61.06

ARMADURA DE MURO LONGITUD VECES PESO

0.11

1.96 1/2 2.18 47.33 102.57

0.15
3.10 1/2 6.65 14.00 92.54

1.63

PESO TOTAL EN Kg 461.75


HOJA DE METRADOS DE RESERVORIO

CAPACIDAD : 13 M3

PROYEC.: 0 EVALUADOR: 0
ITARIA DE EXCRETAS
EXPED.: EN LOS SECTORES DE CENTRAL LLAQTA, CHOJELA, KANCOLLANI, ALTO LLAQTA FECHA:
Y CERRO PORTEO, DISTRITO12/2/2017
DE CAPACHICA PUNO PUNO.

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL UNID.

6.00 RESERVORIO 13.00 M3


6.01 TRAZO Y REPLANTEO 1.00 3.65 3.65 13.32 13.32 m2
6.02 EXCAVACION MANUAL 1.00 3.65 3.65 0.80 10.66 10.66 m3
6.03 SOLADO DE CONCRETO E= 0.05 Mts. 1.00 3.65 3.65 13.32 13.32 m2
6.04 CONCRETO F'C= 175 KG/CM2 1.00 3.65 3.65 0.20 2.66 7.07 m3
2.00 3.25 0.15 1.80 1.76 m3
2.00 2.95 0.15 1.80 1.59 m3
1.00 3.25 3.25 0.10 1.06 m3
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 K 1.00 2.95 2.95 8.70 8.70 m2
6.06 ENCOFRADO Y DESENCOFRADO 4.00 3.25 1.90 24.70 54.64 m2
4.00 2.95 1.80 21.24 m2
1.00 2.95 2.95 8.70 m2
6.07 ACERO FY= 4,200 KG/CM2 1.00 461.75 461.75 461.75 kg
6.08 ESCALINES DE FIERRO GALVANIZADO 2.00 2.30 4.60 6.10 ml
5.00 0.30 1.50

6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 2.95 1.80 21.24 29.94 m2
1.00 2.95 2.95 8.70 m2
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 4.00 3.25 1.90 24.70 35.26 m2
1.00 3.25 3.25 10.56 m2
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. 1.00 1.00 1.00 unid
6.12 TUBERIA DE VENTILACION FG D= 2" 1.00 1.00 1.00 unid
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO 1.00 1.00 1.00 glb
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR 1.00 1.00 1.00 unid
6.15 PINTADO DE MUROS EXTERIORES 4.00 3.25 1.90 24.70 35.26 m2
1.00 3.25 3.25 10.56

TIEMPO DE EJECUCION DE OBRA

PARTIDA DESCRIPCION UNID METRADO RENDI. PERSONAL PERSONAL BASE TIEMPO

6.00 RESERVORIO 13.00 M3


6.01 TRAZO Y REPLANTEO m2 13.32 200.00 1.00 1.00 0.53 Hrs.
6.02 EXCAVACION MANUAL m3 10.66 3.00 1.00 5.00 5.68 Hrs.
6.03 SOLADO DE CONCRETO E= 0.05 Mts. m3 13.32 70.00 2.00 2.00 1.52 Hrs.
6.04 CONCRETO F'C= 175 KG/CM2 m3 7.07 9.00 2.00 2.00 6.28 Hrs.
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 K m2 8.70 70.00 2.00 2.00 0.99 Hrs.
6.06 ENCOFRADO Y DESENCOFRADO m2 54.64 10.00 1.00 5.00 8.74 Hrs.
6.07 ACERO FY= 4,200 KG/CM2 kg 461.75 250.00 1.00 1.00 14.78 Hrs.
6.08 ESCALINES DE FIERRO GALVANIZADO ml 6.10 15.00 1.00 1.00 3.25 Hrs.
6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 29.94 6.00 1.00 2.00 19.96 Hrs.
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 m2 35.26 10.00 1.00 2.00 14.11 Hrs.
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. und 1.00 5.00 1.00 1.00 1.60 Hrs.
6.12 TUBERIA DE VENTILACION FG D= 2" und 1.00 10.00 1.00 1.00 0.80 Hrs.
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO glb 1.00 10.00 1.00 1.00 0.80 Hrs.
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 10.00 1.00 1.00 0.80 Hrs.
6.15 PINTADO DE MUROS EXTERIORES m2 35.26 25.00 1.00 1.00 11.28 Hrs.

TIEMPO APROX. EJECUCION RESERVORIO. 11.39 Dias


VOLUMEN ALTURA LADO INTER VOLUMEN ASUMIDO
3.00 1.25 1.55 13.00 M3
4.00 1.25 1.80
5.00 1.25 2.00 ALTURA LADO
6.00 1.25 2.20 1.50 2.95
7.00 1.25 2.40
8.00 1.30 2.50
9.00 1.30 2.65
10.00 1.35 2.75
11.00 1.40 2.85
12.00 1.45 2.90
13.00 1.50 2.95
14.00 1.55 3.05
15.00 1.55 3.15
16.00 1.60 3.20
17.00 1.65 3.25
18.00 1.65 3.35
19.00 1.70 3.35
20.00 1.70 3.45
21.00 1.75 3.50
22.00 1.75 3.55
23.00 1.80 3.60
24.00 1.85 3.65
25.00 1.85 3.70
26.00 1.85 3.75
27.00 1.90 3.80
28.00 1.90 3.85
29.00 1.95 3.90
30.00 1.95 3.95
31.00 2.00 3.95
32.00 2.00 4.00
33.00 2.05 4.05
34.00 2.05 4.10
35.00 2.05 4.15
36.00 2.10 4.15
37.00 2.10 4.20
38.00 2.15 4.25
39.00 2.15 4.30
40.00 2.15 4.35
41.00 2.20 4.35
42.00 2.20 4.40
43.00 2.20 4.45
44.00 2.25 4.45
45.00 2.25 4.50
46.00 2.25 4.55
47.00 2.30 4.55
48.00 2.30 4.60
49.00 2.30 4.65
50.00 2.35 4.65
51.00 2.35 4.70
52.00 2.45 4.65
53.00 2.40 4.70
54.00 2.40 4.75
55.00 2.40 4.80
56.00 2.40 4.85
57.00 2.45 4.85
58.00 2.45 4.90
59.00 2.55 4.85
60.00 2.45 4.95