Alcantarillado sanitario

Pob(hab)= 1494
Dot= 75

1ro.Caudal Promedio

=(0.85)/86400

QM(LPS)= 1.10

2do. Factor de Harmon (H)

=1+14/(4+(/1000))

H= 3.68

3ro.Caudal maximo

Qmax= 3.307

=/
=(2/)(1

H= 3.68 3

Rango(H)= 1.8 3

Condicion USAR 3
4to.Caudal comercial

=7%

Qcom= 0.23 lps

5to. Caudal Institucional


_( )=

Qinst=7%

Qinst= 0.23 lps

6to. Caudal Industrial

=2%

_( )=
Qind= 0.066 lps

7mo. Caudal de infiltracion

Long. Sist.= 1051.77


Diam min= 150
=(2/)(1/3600)((. )/100)(( )/25)


_( )=

Qinfil= 0.035 lps

8vo. Caudal de Diseo

=+ inf + + +

Q dis= 3.87 lps


_(. )=(
CALCULO DE CAUDALES UNITARIOS

9no. Caudal Unitario Medio

Qmedio= 1.1

_(. )=(
Area total= 1.8638


_( )=/( )

qu medio= 0.59019208 lps/hab

10mo. Caudal Unitario Comercial

Qcomercial= 0.231
#comercios= 1


_( )=/(# )

qu com= 0.231 lps/com

11mo. Caudal Unitario Institucional

Qinstit.= 0.231
#comercios= 1


_( )=/(# .)

qu instit.= 0.231 lps/instit.

12mo. Caudal Unitario de Infiltracin

Qinfilt.= 0.035059
L. sistema= 1051.77


_(. )=(.)/(. )

qu infilt.= 3.33333E-05 lps/m


13mo. Caudal Unitario de Infiltracin

Qindust.= 0.06614063
# indust.= 1

_(. )=(.)/(# )

qu indust.= 0.06614063 lps/indust.


Pozo de Visita Elevacion Longitud
Longitud
entre
del Tramo
Desde Hasta Inicial Final Tramos
PVS-3 PVS-2 497.5 497.3 43.35 239.1
PVS-2 PVS-1 497.3 497 46.63 312.66
PVS-1 PTAR 497 496 100 310.03

Qmed
Area Local Area Tribut. Area Acum Qmed
Domest. Q max Q comer
(Ha) (Ha) (Ha) Domestico
Acum.
0.03 0.4453 0.4753 0.2805 0.2805 0.8416 0
0.03 0.73 1.2353 0.4485 0.7291 2.1872 0.231
0 0.63 1.8653 0.3718 1.1009 3.3027 0
Q instit Q infilt Q indust Q dis
0.231 0.0094 0 1.08
0 0.0214 0.066 2.74
0 0.0351 0.000 3.87
Pozo de Visita Diametro Elevacion
Longitud(m)
Desde Hasta min Inicial Final
PVS-3 PVS-2 43.35 150 497.5 497.3
PVS-2 PVS-1 46.63 150 497.3 497
PVS-1 PTAR 100 150 497 496

S. tuberia Qll Qd/QII Vd/Vll Y/D Rh/Rhll


0.67 18.0062 0.0601 0.5495 0.1662 0.407
0.64 17.6446 0.1551 0.7269 0.2668 0.6195
1.00 21.9980 0.1757 0.7521 0.2834 0.6523

Rugosidad material= 0.009


S. terreno
%
0.46
0.64
1

Rh T Vd Perdidas
0.0153 1 0.6 0.0040
0.0232 1.47 0.7 0.0067
0.0245 2.40 0.9 0.0112
Y0 0.72 X0 0.15
Y=? 0.72689 X 0.1553
Y1 0.733 X1 0.16
TABLA DE DISEO TOPOGRAFICO PARA LA RED
Pozo de Visita Diametro Elev.Tapa
Longitud(m)
Desde Hasta min Inicial Final
PVS-3 PVS-2 43.35 150 497.5 497.3
PVS-2 PVS-1 46.63 150 497.3 497
PVS-1 PTAR 100 150 497 496

Profundidad pozo= 1.5


Caida 0.03
TOPOGRAFICO PARA LA RED DE ALCANTARILLADO
Caida Elevacion corona Elevacion de invert
S. tramo Prof. Pozo
alcantarilla Arriba Abajo Arriba Abajo
0.67 0.290445 496 495.71 495.85 495.56 1.65
0.64 0.298432 495.68 495.38 495.529555 495.23 1.770445
1 1 495.4 494.35 495.201123 494.20 1.798877