RA Bill -1 RA Bill -2

BOQ REF NO BOQ QTY Claimed in OR/SW17/0053 Claimed in OR/SW17/0054


A.1(a).01 1802 - -
A.1(a).05 4.325 - -
A.1(b).01 17 - -
A.1(b).05 0.041 - -
A.2(a).01 156 - -
A.2(a).08 0.509 - -
A.2(a).02 56 - -
A.2(b).01 2 - -
A.2(b).08 0.005 - -
A.3(a).01 16 - -
A.3(a).06 0.038 - -
E.1.02 809 - -
F.(ii).1(a).01 484 - -
F.(ii).1(a).05 1.16 - -
F.(ii).1(b).01 123 - -
F.(ii).1(b).05 0.296 - -
F.(ii).2(a).01 180 - -
F.(ii).2(a).08 1.16 - -
F.(ii).2(b).01 48 - -
F.(ii).2(b).08 0.296 - -
F.(ii).2(b).02 16 - -
F.(ii).3(a).01 16 - -
F.(ii).3(a).06 0.038 - -
F.(ii).3(b).01 4 - -
F.(ii).3(b).06 0.01 - -
E.1.01 4422 915 980
F (IV).1.01 2075 570 513
A.4 9.63
C.4 23.77
D.3 42.59
F(I).3 12.71
F(II).4 2.00
A.8(b) 01 262.65
A.8(c) 01 67.98
C.8.03 540.194
C.8.04 221.244
D.14.01 7.515
F(I).14.01 4.485
F(II).8(b) 01 529.935
F(II).8(c) 01 235.458
F(II).8(d) 01 171.804
F(III).8.03 667.749
F(III).8.04 382.079
A.6.01 174
A.12.06 56
B.19.01 30
C.7.01 467
C.12.06 139
D.11.01 501
F(I).11.01 299
F(II).6.01 248
F(II).11.06 90
F(III).7.01 132
F(III).11.06 48
F(V).19.01 120
H.5 80
E.4.11
E.4.13
F (IV).4.11
F (IV).4.13
D.6.01
D.6.02
D.6.03
F(V).7 (a)
F(V).7 (b)
F(V).8 (a)
F(V).8 (b)
C.1(a).02
C.1(a).08
C.1(b).02
C.1(b).08
C.2(a).02
C.2(a).11
C.2(b).02
C.2(b).11
C.3(a).02
C.3(a).08
E.1.03
F(III).1(a).02
F(III).1(a).08
F(III).1(b).02
F(III).2(a).02
F(III).2(a).11
F (IV).1.02
F (IV).1.03
D.10.01
D.10.02
F(I).10.1
F(I).10.2
H.14
A.9
B.3.02
C.9
D.9.01
D.9.02
F(I).9.1
F(I).9.2
F(II).9
F(V).3.02
F(V).11
H.15
RA bill -3 RA bill -4 RA bill -5
Claimed in OR/SW17/0060 Claimed in F22100000035 Claimed in F22100000036
540
1.929
17
0.02
156
0.208
46
2
0.0025
16
0.019
94
484
0.58
11
0.085
180
0.73
48
0.124
16
16
0.038
4
0.007
- 2,018.00
- 467.00
1.500
2.201
2.000
1.000
0.305
RA bill -6 RA bill -7 RA bill -8
Claimed in F22100000045 Claimed in 90181729 Claimed in F22100000051

8
25
25
8
2
2
15
24.998
5.018
24.864
14.559
84
30
30
116
75
185
45
90
45
40
20
70
50
11.79
52.003
10
30.34
RA bill -9 RA bill -10 RA bill -11
Claimed in F22100000052 Claimed in F22100000055 Claimed in F22100000061
60
0.146

200
10
6
84
2
5
4
13
322
0.786
300
0.967
175
0.427
10
0.034
32
0.071
275
572
0.275
101
100
0.244
150
146
RA bill -12 RA bill -13 RA bill -14
Claimed in F22100000056 Claimed in F22100000053 Claimed in F22100000054

36
15

35.9

14.993
185
71
12
79
12
8
1
1
100
73
15
88
1
10
15
13
Diff to be Claimed
1,262.00
2.40
-
0.02
-
0.30
10.00
-
0.00
-
0.02
715.00
-
0.58
112.00
0.21
-
0.43
-
0.17
-
-
-
-
0.00
509.00
525.00
8.13
21.57
40.59
11.71
1.69
254.65
42.98
515.19 35.9
213.24
5.52
2.49
514.94
210.46
166.79
642.89
367.52
90.00
26.00
-
351.00
64.00
316.00
254.00
158.00
45.00
92.00
28.00
50.00
30.00
R A BILL NO.14.
PAYMENT DETAILS OF M/S SWPL, SUPPLY BILL (PACKAGE-3, IPDS)

PARTICULARS
A Total of Supply price approved for payment
TOTAL
Basic Value (Total Approved price/118X100)
GST 18% on Basic

Payable as per clause 8.7.1 of LOA NO.


OPTCL/PMU/IPDS/LOA/SOUTHCO/03/104/2016/SUPPLY/41 dated
25.10.2016 (60% on Basic)

Add: GST 100%


Total Gross Value Passed for Payment
B Deductions:
Less: ITDS @ 2%
Less: Labour cess @ 1%
Less: LD deduction
Less : Mobilisation advance
Less : Entry tax

Less: Deduction 5% on Basic aginst letter no 4674 Dt.22.09.17 for GST

C Net amount passed for payment


O.14.
UPPLY BILL (PACKAGE-3, IPDS)
AMOUNT AMOUNT
(Rs) (Rs)
6,846,396
6,846,396
5,802,030
1,044,365

3,481,218
1,044,365
4,525,583

136,928
68,464
-
-
-

290,102
495,494
4,030,089
Schedule)
Design,
Engineering,
Manufacturing
, Assembly,
LOA No:
Inspection,
OPTCL/PMU
ODISHA POWER TRANSMISSION
(Pkg.- at
Testing CORPORATION LIMITED
03) in
/IPDS/LOA/S
Odisha under
manufacturer's
OUTHCO/03/
IPDS before
works Tender
104/2016/SUP
Despatch,
PLY/ 41 &
Packing
forwarding
and Supply of
the following
Date: 25th
materials as
October,2016
per technical
specification
n Indian Rupees)
and scope of
work.

SL.No.
1

A.
[Consisting of
but not limited
to theA.1(a)
following
items, subject
to site
A.1(a).01
requirement]
A.1(a).02

A.1(a).03

A.1(a).04
A.1(a).05

SOUTHCO: IPDS SCHEME Page 21 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

A.1(b)

A.1(b).01

A.1(b).02

A.1(b).03

A.1(b).04
A.1(b).05

A.2(a)

A.2(a).01

A.2(a).02

A.2(a).03
A.2(a).04
A.2(a).05
A.2(a).06
A.2(a).07
A.2(a).08

SOUTHCO: IPDS SCHEME Page 22 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

A.2(b).

A.2(b).01

A.2(b).02

A.2(b).03
A.2(b).04
A.2(b).05
A.2(b).06
A.2(b).07
A.2(b).08

A.3(a).

A.3(a).01

A.3(a).02
A.3(a).03
A.3(a).04
A.3(a).05
A.3(a).06

SOUTHCO: IPDS SCHEME Page 23 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

A.3(b).

A.3(b).01

A.3(b).02
A.3(b).03
A.3(b).04
A.3(b).05
A.3(b).06
A.4

A.5

A.6

A.6.01

A.6.02

A.6.03

A.7

A.7.01

SOUTHCO: IPDS SCHEME Page 24 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
A.7.02

A.7.03

A.7.04

A.7.05

A.7.06
A.7.07
A.7.08
A.7.09
A.7.10
A.7.11
A.7.12
A.7.13
A.7.14
A.7.15
A.7.16

A.8

A.8(a).01
A.8(a).02
A.8(a).03
A.8(a).04
A.8(b) 01
A.8(b) 02
A.8(b) 03

SOUTHCO: IPDS SCHEME Page 25 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
A.8(b) 04
A.8(c) 01
A.8(c) 02
A.8(c) 03
A.8(c) 04
A.8(d) 01
A.8(d) 02
A.8(d) 03
A.8(d) 04
A.8(e)

A.9

A.10

A.10.01

A.11
A.11.01
A.11.02

A.11.03

A.11.04
A.12

SOUTHCO: IPDS SCHEME Page 26 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
A.12.01
A.12.02
A.12.03
A.12.04
A.12.05

A.12.06

A.12.07

A.13
A.13.01
A.13.02
A.13.03

B.

B.1

B.1.01
B.1.02
B.1.03
B.1.04
B.1.05

SOUTHCO: IPDS SCHEME Page 27 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

B.2

B.3

B.3.01

B.3.02

B.3.03

B.3.04
B.3.05
B.3.06
B.3.07
B.3.08
B.3.09

B.4

B.4.01

B.4.02
B.4.03

SOUTHCO: IPDS SCHEME Page 28 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
B.4.04
B.4.05
B.4.06

B.4.07

B.4.08

B.5

B.6

B.7

B.8

B.9

B.9.01

B.9.02

SOUTHCO: IPDS SCHEME Page 29 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

B.10

B.11

B.12

B.12.01

B.12.02

B.13

B.14

B.15

B.16

B.17

SOUTHCO: IPDS SCHEME Page 30 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
B.17.01
B.17.02
B.17.03
B.17.04

B.18

B.18.01
B.18.02
B.18.03
B.18.04
B.19

B.19.01

B.20

B.20.01

B.20.02

B.20.03
B.20.04
B.20.05
B.20.06
B.20.07
B.20.08

SOUTHCO: IPDS SCHEME Page 31 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

B.21

B.22

B.23

B.23.01
B.23.02
B.23.03
B.23.04
B.23.05

B.24

B.24.01
B.24.02
B.24.03
B.24.04
B.24.05

B.25

SOUTHCO: IPDS SCHEME Page 32 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

B.26

B.27

B.28

B.29

B.29.01
B.29.02
B.29.03

B.30

B.30.01
B.30.02
B.30.03

B.31

B.31.01
B.31.02
B.31.03

SOUTHCO: IPDS SCHEME Page 33 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

B.32

B.33

B.33.01

B.33.02

B.34

B.35

B.36

B.37
B.37.01
B.37.02
B.37.03
B.37.04
B.37.05
B.37.06

B.38

SOUTHCO: IPDS SCHEME Page 34 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

B.39

C.1(a)

C.1(a).01

C.1(a).02

C.1(a).03

C.1(a).04

C.1(a).05

C.1(a).06

C.1(a).07
C.1(a).08
C.1(a).09

SOUTHCO: IPDS SCHEME Page 35 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

C.1(b)

C.1(b).01

C.1(b).02

C.1(b).03

C.1(b).04

C.1(b).05

C.1(b).06

C.1(b).07
C.1(b).08
C.1(b).09

C.2(a)

C.2(a).01

C.2(a).02

SOUTHCO: IPDS SCHEME Page 36 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

C.2(a).03

C.2(a).04

C.2(a).05

C.2(a).06

C.2(a).07

C.2(a).08

C.2(a).09

C.2(a).10
C.2(a).11
C.2(a).12

C.2(b)

C.2(b).01

C.2(b).02

SOUTHCO: IPDS SCHEME Page 37 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

C.2(b).03

C.2(b).04

C.2(b).05

C.2(b).06

C.2(b).07

C.2(b).08

C.2(b).09

C.2(b).10
C.2(b).11
C.2(b).12

C.3(a)

C.3(a).01

C.3(a).02

SOUTHCO: IPDS SCHEME Page 38 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

C.3(a).03

C.3(a).04
C.3(a).05
C.3(a).06
C.3(a).07
C.3(a).08
C.3(a).09

C.3(b)

C.3(b).01

C.3(b).02

C.3(b).03

C.3(b).04
C.3(b).05
C.3(b).06
C.3(b).07
C.3(b).08
C.3(b).09
C.4

SOUTHCO: IPDS SCHEME Page 39 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

C.5

C.6
C.6.01

C.6.02

C.6.03

C.6.04

C.6.05

C.6.06
C.6.07
C.6.08

C.6.09

C.6.10

C.6.11

C.6.12

C.6.13

C.6.14

SOUTHCO: IPDS SCHEME Page 40 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
C.7

C.7.01

C.7.02

C.7.03

C.8

C.8.01
C.8.01.(a)
C.8.01.(b)
C.8.02
C.8.02.(a)
C.8.02.(b)
C.8.03
C.8.03.(a)
C.8.03.(b)
C.8.04
C.8.04.(a)
C.8.04.(b)
C.8.05.01

C.8.05.02

C.8.05.03

C.8.05.04

C.8.05.05
C.8.05.06

SOUTHCO: IPDS SCHEME Page 41 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
C.8.05.07

C.8.05.08

C.8.05.09

C.9

C.10

C.10.01

C.10.02

C.11
C.11.01
C.11.02

C.11.03

C.11.04
C.12
C.12.01

SOUTHCO: IPDS SCHEME Page 42 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
C.12.02
C.12.03
C.12.04
C.12.05

C.12.06

C.12.07

D.

D.1

D.1.01

D.1.02

D.1.03

D.1.04
D.1.05
D.1.06
D.1.07
D.1.08
D.1.09

SOUTHCO: IPDS SCHEME Page 43 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
D.1.10
D.1.11

D.2

D.2.01

D.2.02

D.2.03

D.2.04
D.2.05
D.2.06
D.2.07
D.2.08
D.2.09
D.2.10
D.2.11
D.3

D.4

SOUTHCO: IPDS SCHEME Page 44 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
D.5

D.5.01

D.5.02
D.5.03
D.5.04
D.5.05

D.6

D.6.01
D.6.02
D.6.03
D.6.04
D.6.05
D.6.06

D.7

D.7.01
D.7.02
D.7.03
D.7.04

SOUTHCO: IPDS SCHEME Page 45 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
D.7.05
D.7.06
D.8
D.8.01
D.8.02

D.9.01

D.9.02

D.10.01

D.10.02

D.11

D.11.01
D.11.02
D.11.03
D.12

D.13

D.13.01
D.13.02
D.13.03
D.13.04

SOUTHCO: IPDS SCHEME Page 46 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
D.13.05
D.13.06
D.13.07

D.14

D.14.01
D.14.02
D.14.03
D.14.04
D.15
D.15.01
D.15.01(a)
D.15.01(b)

D.15.02

D.15.01(a)

D.15.01(b)

D.15.01(c)
D.16
D.16.01
D.16.02

D.16.03

D.16.04

SOUTHCO: IPDS SCHEME Page 47 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

D.17

E.

E.1

E.1.01

E.1.02

E.1.03

E.1.04

E.1.05

E.2

E.3
E.3.01

E.3.02

SOUTHCO: IPDS SCHEME Page 48 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

E.4

E.4.01
E.4.02
E.4.03
E.4.04
E.4.05
E.4.06
E.4.07
E.4.08
E.4.09
E.4.10
E.4.11
E.4.12
E.4.13

E.4.14

E.4.15

E.4.16

E.4.17

SOUTHCO: IPDS SCHEME Page 49 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
E.4.18
E.4.19

E.4.20

E.4.21
E.4.22
E.4.23

E.5

E.6.01

E.7

F.

F(I)

SOUTHCO: IPDS SCHEME Page 50 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(I).1

F(I).1.01

F(I).1.02

F(I).1.03

F(I).1.04
F(I).1.05
F(I).1.06
F(I).1.07
F(I).1.08
F(I).1.09
F(I).1.10
F(I).1.11

F(I).2

F(I).2.01

F(I).2.02

SOUTHCO: IPDS SCHEME Page 51 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(I).2.03

F(I).2.04
F(I).2.05
F(I).2.06
F(I).2.07
F(I).2.08
F(I).2.09
F(I).2.10
F(I).2.11
F(I).3

F(I).4

F(I).5

F(I).5.01

F(I).5.02
F(I).5.03
F(I).5.04
F(I).5.05

F(I).6

F(I).6.01

SOUTHCO: IPDS SCHEME Page 52 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(I).6.02
F(I).6.03
F(I).6.04
F(I).6.05
F(I).6.06

F(I).7

F(I).7.01
F(I).7.02
F(I).7.03
F(I).7.04
F(I).7.05
F(I).7.06
F(I).8
F(I).8.01
F(I).8.02

F(I).9.1

F(I).9.2

SOUTHCO: IPDS SCHEME Page 53 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(I).10.1

F(I).10.2

F(I).11

F(I).11.01
F(I).11.02
F(I).11.03
F(I).12

F(I).13

F(I).13.01
F(I).13.02
F(I).13.03
F(I).13.04
F(I).13.05
F(I).13.06
F(I).13.07

F(I).14

F(I).14.01
F(I).14.02
F(I).14.03
F(I).14.04

SOUTHCO: IPDS SCHEME Page 54 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(I).15
F(I).15.01

F(I).15.01(a)

F(I).15.02

F(I).15.02(a)

F(I).15.02(b)

F(I).15.02(c)

F(I).15.02(d)
F(I).16
F(I).16.01
F(I).16.02

F(I).16.03

F(I).16.04

F(II)

F(II).1(a)

SOUTHCO: IPDS SCHEME Page 55 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(II).1(a).01

F(II).1(a).02

F(II).1(a).03

F(II).1(a).04
F(II).1(a).05

F(II).1(b)

F(II).1(b).01

F(II).1(b).02

F(II).1(b).03

F(II).1(b).04
F(II).1(b).05

F(II).2(a)

F(II).2(a).01

SOUTHCO: IPDS SCHEME Page 56 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(II).2(a).02

F(II).2(a).03
F(II).2(a).04
F(II).2(a).05
F(II).2(a).06
F(II).2(a).07
F(II).2(a).08

F(II).2(b).

F(II).2(b).01

F(II).2(b).02

F(II).2(b).03
F(II).2(b).04
F(II).2(b).05
F(II).2(b).06
F(II).2(b).07
F(II).2(b).08

SOUTHCO: IPDS SCHEME Page 57 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(II).3(a).

F(II).3(a).01

F(II).3(a).02
F(II).3(a).03
F(II).3(a).04
F(II).3(a).05
F(II).3(a).06

F(II).3(b).

F(II).3(b).01

F(II).3(b).02
F(II).3(b).03
F(II).3(b).04
F(II).3(b).05
F(II).3(b).06
F(II).4

F(II).5

SOUTHCO: IPDS SCHEME Page 58 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(II).6

F(II).6.01

F(II).6.02

F(II).6.03

F(II).7

F(II).7.01

F(II).7.02

F(II).7.03

F(II).7.04

F(II).7.05

F(II).7.06

F(II).7.07

F(II).7.08
F(II).7.09
F(II).7.10
F(II).7.11
F(II).7.12
F(II).7.13
F(II).7.14

SOUTHCO: IPDS SCHEME Page 59 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(II).7.15
F(II).7.16
F(II).7.17
F(II).7.18
F(II).7.19
F(II).7.20
F(II).7.21
F(II).7.22
F(II).7.23
F(II).7.24

F(II).8

F(II).8(a).01
F(II).8(a).02
F(II).8(a).03
F(II).8(a).04
F(II).8(b) 01
F(II).8(b) 02
F(II).8(b) 03
F(II).8(b) 04
F(II).8(c) 01
F(II).8(c) 02
F(II).8(c) 03
F(II).8(c) 04
F(II).8(d) 01
F(II).8(d) 02
F(II).8(d) 03

SOUTHCO: IPDS SCHEME Page 60 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(II).8(d) 04
F(II).8(e)

F(II).9

F(II).10
F(II).10.01
F(II).10.02

F(II).10.03

F(II).10.04
F(II).11
F(II).11.01
F(II).11.02
F(II).11.03
F(II).11.04
F(II).11.05

F(II).11.06

F(II).11.07

F(III)

SOUTHCO: IPDS SCHEME Page 61 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(III).1(a)

F(III).1(a).01

F(III).1(a).02

F(III).1(a).03

F(III).1(a).04

F(III).1(a).05

F(III).1(a).06

F(III).1(a).07
F(III).1(a).08
F(III).1(a).09

F(III).1(b)

F(III).1(b).01

F(III).1(b).02

SOUTHCO: IPDS SCHEME Page 62 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(III).1(b).03

F(III).1(b).04

F(III).1(b).05

F(III).1(b).06

F(III).1(b).07
F(III).1(b).08
F(III).1(b).09

F(III).2(a)

F(III).2(a).01

F(III).2(a).02

F(III).2(a).03

F(III).2(a).04

SOUTHCO: IPDS SCHEME Page 63 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(III).2(a).05

F(III).2(a).06

F(III).2(a).07

F(III).2(a).08

F(III).2(a).09

F(III).2(a).10
F(III).2(a).11
F(III).2(a).12

F(III).2(b)

F(III).2(b).01

F(III).2(b).02

F(III).2(b).03

F(III).2(b).04

SOUTHCO: IPDS SCHEME Page 64 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(III).2(b).05

F(III).2(b).06

F(III).2(b).07

F(III).2(b).08

F(III).2(b).09

F(III).2(b).10
F(III).2(b).11
F(III).2(b).12

F(III).3(a)

F(III).3(a).01

F(III).3(a).02

F(III).3(a).03

F(III).3(a).04
F(III).3(a).05
F(III).3(a).06
F(III).3(a).07

SOUTHCO: IPDS SCHEME Page 65 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(III).3(a).08
F(III).3(a).09

F(III).3(b)

F(III).3(b).01

F(III).3(b).02

F(III).3(b).03

F(III).3(b).04
F(III).3(b).05
F(III).3(b).06
F(III).3(b).07
F(III).3(b).08
F(III).3(b).09
F(III).4

F(III).5

F(III).6
F(III).6.01

SOUTHCO: IPDS SCHEME Page 66 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(III).6.02

F(III).6.03

F(III).6.04
F(III).6.05
F(III).6.06

F(III).6.07

F(III).6.08

F(III).6.09

F(III).6.10

F(III).6.11

F(III).6.12

F(III).7

F(III).7.01

F(III).7.02

F(III).7.03

F(III).8

F(III).8.01
F(III).8.01.(a)

SOUTHCO: IPDS SCHEME Page 67 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(III).8.01.(b)
F(III).8.02
F(III).8.02.(a)
F(III).8.02.(b)
F(III).8.03
F(III).8.03.(a)
F(III).8.03.(b)
F(III).8.04
F(III).8.04.(a)
F(III).8.04.(b)
F(III).8.05.(a)

F(III).8.05.(b)

F(III).8.05.(C)

F(III).8.05.(D)

F(III).8.06.(a)

F(III).8.06.(b)

F(III).8.06.(C)

F(III).8.06.(D)

F(III).8.07

F(III).9

F(III).10
F(III).10.01

SOUTHCO: IPDS SCHEME Page 68 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(III).10.02
F(III).10.03
F(III).10.04
F(III).11
F(III).11.01
F(III).11.02
F(III).11.03
F(III).11.04
F(III).11.05

F(III).11.06

F(III).11.07

F(IV)

F (IV).1

F (IV).1.01

F (IV).1.02

F (IV).1.03

F (IV).1.04

F (IV).1.05

SOUTHCO: IPDS SCHEME Page 69 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F (IV).2

F (IV).3
F (IV).3.01

F (IV).3.02

F (IV).4

F (IV).4.01
F (IV).4.02
F (IV).4.03
F (IV).4.04
F (IV).4.05
F (IV).4.06
F (IV).4.07
F (IV).4.08
F (IV).4.09
F (IV).4.10
F (IV).4.11
F (IV).4.12
F (IV).4.13

SOUTHCO: IPDS SCHEME Page 70 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F (IV).4.14

F (IV).4.15

F (IV).4.16

F (IV).4.17

F (IV).4.18
F (IV).4.19

F (IV).4.20

F (IV).4.21
F (IV).4.22
F (IV).4.23

F (V)

F (V)

SOUTHCO: IPDS SCHEME Page 71 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(V).1

F(V).1.01
F(V).1.02
F(V).1.03
F(V).1.04
F(V).1.05

F(V).2

F(V).3

F(V).3.01

F(V).3.02
F(V).3.03
F(V).3.04
F(V).3.05
F(V).3.06
F(V).3.07
F(V).3.08

SOUTHCO: IPDS SCHEME Page 72 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(V).4

F(V).4.01

F(V).4.02
F(V).4.03
F(V).4.04
F(V).4.05
F(V).4.06
F(V).4.07

F(V).5

F(V).6

F(V).6.1

F(V).6.2

SOUTHCO: IPDS SCHEME Page 73 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(V).7 (a)

F(V).7 (b)

F(V).8 (a)

F(V).8 (b)

F(V).9

F(V).9.01

F(V).9.02

F(V).10

F(V).11

F(V).12

F(V).12.01

SOUTHCO: IPDS SCHEME Page 74 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(V).12.02

F(V).13

F(V).13.1

F(V).13.2

F(V).14

F(V).14.1

F(V).14.2

F(V).15

F(V).16

F(V).17

F(V).17.01

SOUTHCO: IPDS SCHEME Page 75 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
F(V).17.02
F(V).17.03
F(V).17.04

F(V).18

F(V).18.01
F(V).18.02
F(V).18.03
F(V).18.04
F(V).19

F(V).19.01

F(V).20

F(V).20.01
F(V).20.02
F(V).20.03
F(V).20.04
F(V).20.05
F(V).20.06
F(V).20.07
F(V).20.08

SOUTHCO: IPDS SCHEME Page 76 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(V).21

F(V).22

F(V).23

F(V).23.01
F(V).23.02
F(V).23.03
F(V).23.04
F(V).23.05

F(V).24

F(V).24.01
F(V).24.02
F(V).24.03
F(V).24.04
F(V).24.05

F(V).25

SOUTHCO: IPDS SCHEME Page 77 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(V).26

F(V).26.1(a)

F(V).26.1(b)

F(V).26.2(a)

F(V).26.2(b)

F(V).27

F(V).28

F(V).28.01
F(V).28.02
F(V).28.03

F(V).29

F(V).29.01
F(V).29.02
F(V).29.03

SOUTHCO: IPDS SCHEME Page 78 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(V).30

F(V).30.01
F(V).30.02
F(V).30.03

F(V).31

F(V).31.01

F(V).31.02

F(V).32

F(V).32.01

F(V).32.02

F(V).33

F(V).33.01(a)

F(V).33.01(b)

SOUTHCO: IPDS SCHEME Page 79 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

F(V).33.02(a)

F(V).33.02(b)

F(V).34

F(V).35

F(V).36
F(V).36.01
F(V).36.02
F(V).36.03
F(V).36.04
F(V).36.05
F(V).36.06

F(V).37

F(V).38

SOUTHCO: IPDS SCHEME Page 80 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

G.1

G.1.01

G.1.02
G.1.03
G.1.04
G.1.05
G.1.06
G.1.07
G.1.08

G.2

G.2.01

G.2.02

G.2.03
G.2.04

G.3

SOUTHCO: IPDS SCHEME Page 81 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

G.4

G.4.1

G.4.2

G.5

G.5.1(a)

G.5.1(b)

G.5.2(a)

G.5.2(b)

G.6

SOUTHCO: IPDS SCHEME Page 82 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
G.6.1

G.6.2

G.7

G.7.01
G.7.02
G.7.03
G.7.04

G.8

G.8.1
G.8.2

G.9

G.10

G.10.01
G.10.02
G.10.03
G.10.04
G.10.05

G.11

G.11.01
G.11.02

SOUTHCO: IPDS SCHEME Page 83 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
G.11.03
G.11.04
G.11.05

G.12

H.1

H.1.01

H.1.02
H.1.03
H.1.04
H.1.05
H.1.06
H.1.07
H.1.08
H.1.09

H.2

SOUTHCO: IPDS SCHEME Page 84 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
H.2.01

H.2.02

H.2.03
H.2.04

H.3

H.3.01
H.3.02
H.3.03
H.3.04

H.4

H.4.01
H.4.02

H.5

H.6

H.6.01(a)

SOUTHCO: IPDS SCHEME Page 85 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

H.6.01(b)

H.6.02(a)

H.6.02(b)

H.7

H.7.01

H.7.02

H.8

H.8.01
H.8.02
H.8.03
H.8.04
H.8.05

H.9

H.9.01
H.9.02
H.9.03

SOUTHCO: IPDS SCHEME Page 86 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
H.9.04
H.9.05

H.10

H.10.01
H.10.02
H.10.03

H.11

H.11.01
H.11.02
H.11.03

H.12

H.12.01
H.12.02
H.12.03

H.13

H.13.01

H.13.02

H.14

SOUTHCO: IPDS SCHEME Page 87 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

H.15

H.16

I.1.01
I.1.02

I.1.03

I.1.04

I.1.05

I.1.06

I.1.07

I.1.08

I.1.09

I.1.09.01

I.1.09.02
I.1.09.03

SOUTHCO: IPDS SCHEME Page 88 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
I.1.09.04
I.1.09.05
I.1.09.06
I.1.09.07
I.1.09.08
I.1.09.09
I.1.10

I.1.11

I.1.12

I.1.12.01

I.1.12.02

I.1.12.03

I.1.13

I.1.14

I.1.14.01

I.1.14.02

I.1.15
I.1.15.01
I.1.15.02

SOUTHCO: IPDS SCHEME Page 89 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
I.1.15.03

I.1.15.04
I.1.16

J.1

J.2

K
K.1
K.2
K.3
K.4

L
L.1
L.2
L.3

SOUTHCO: IPDS SCHEME Page 90 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
L.4

M
M.1
M.2
M.3
M.4

N
N.1
N.2
N.3
N.4

O.1

SOUTHCO: IPDS SCHEME Page 91 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1
P

P.1

Sixty Five Only)

Notes:

SOUTHCO: IPDS SCHEME Page 92 of 403 Price Schedule: Supply


n Indian Rupees)

SL.No.
1

anager (DDIP)
mited (OPTCL)

SOUTHCO: IPDS SCHEME Page 93 of 403 Price Schedule: Supply


ODISHA POWER TRANSMISSION COR
Electrification Works of SOUTHCO UTILITY (Pkg.- 03) in Odisha u

LOA No: OPTCL/PMU/IPDS/LOA/SOUTHCO/03/104/2016/ERECTION/ 40 Date: 2

Contractor's Name
Installation Services for Erection, Tesing and Commissioning including local Transportation at project site, Civil works, Design, Benfish IT Tower, 3
Contractor's equipment, temporary works, T&P, labour, Survey, Route Alignment, Erection, Testing and Commissioning at site for 31, G.N. Block, Salt
following materials as per technical specification, approved drawings and scope of work.
[Consisting of but not limited to the following items, subject to site requirement] (Erection Schedule)

Sl. No. Descripton Unit

2
1 3

A.
New 33 KV Lines Km
( consisting of but not limited to the following major materials)
A.1 Survey, route alignment & pole spotting, preparation of survey report with drawings Km

A.2.01 Excavation & back filling of pole pit (of depth 1/6th of pole length) in normal soil as per scope of work and specifications:

A.2.01(a) 11 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
A.2.01(b) 13 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 94 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Excavation & back filling of pole pit (of depth 1/6th of pole length) in soft rock where blasting is not required as per scope of work
A.2.02
and specifications:
A.2.02(a) 11 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
A.2.02(b) 13 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
Excavation & back filling of pole pit (of depth 1/6th of pole length) in hard rock where blasting is required as per scope of work and
A.2.03
specifications:
A.2.03(a) 11 Mt. long RS Joist 152x152 mm (0.5 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
A.2.03(b) 13 Mt. long RS Joist 152x152 mm (0.5 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
Erection of the Poles and prefabricated steel items for 33 KV overhead line by providing pole numbering as per scope of work and
A.3
specifications.

Erection of 11 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc.
A.3.01 made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per Nos.
technical specification and scope of work.(Over head Single Pole Structures)

A.3.02 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 11 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
A.3.03 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Over head Double Pole structures)

SOUTHCO: IPDS SCHEME Page 95 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

A.3.04 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 13 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
A.3.05 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Over head Double Pole structures)

A.3.06 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 11 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
A.3.05 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Over head Four Pole structures)

A.3.06 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

A.4 Excavtion for 33KV 'PC Type Tower' with all accessories and fittings.

A.4.01 Excavation and back Filling of tower pit in normal soil as per scope of work and specifications (3 towers) - 220cmt/tower Cmt.

Excavation and back Filling of tower pit in soft rock where blasting is not required as per scope of work and specifications: (1 tower) - 220
A.4.02 Cmt.
cmt/tower
A.5 Excavtion for 33KV 'PC+6 Type Tower' with all accessories and fittings.

SOUTHCO: IPDS SCHEME Page 96 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

A.5.01 Excavation and back Filling of tower pit in normal soil as per scope of work and specifications: (5 towers) - 220cmt/tower Cmt.

Excavation and back Filling of tower pit in soft rock where blasting is not required as per scope of work and specifications: (1 tower) -
A.5.02 Cmt.
220cmt/tower
A.6 Concreting for 33KV 'PC and PC+6 Type Towers'.
A.6.01 For PC type tower super structure - 4 Nos.
Cement concrete foundation using 1 part cement, 3 part sand, 6 part 20 mm size stone aggregate chips (1:3:6)-0.1cmt/tower as blinding
A.6.01(a) Cmt.
layer

A.6.01(b) Cement concrete foundation using 1 part cement, 1.5 part sand, 3 part 20 mm size stone aggregate chips (1:1.5:3)-88cmt/tower Cmt.

A.6.02 For PC+6 mtr type tower super structure - 6 Nos.


Cement concrete foundation using 1 part cement, 3 part sand, 6 part 20 mm size stone aggregate chips (1:3:6)-0.1cmt/tower as blinding
A.6.02(a) Cmt.
layer

A.6.02(b) Cement concrete foundation using 1 part cement, 1.5 part sand, 3 part 20 mm size stone aggregate chips (1:1.5:3)-88cmt/tower Cmt.

A.7 Erection and stringing of PC and PC+6 tower.


Erection of PC type tower super structure complete with 4 Nos GI 3-Meters LONG PIPE EARTHING (40mm dia.) as per scope of work
A.7.01 Nos.
and specifications
Erection of PC+6 mtr type tower super structure complete with 4 Nos GI 3-Meters LONG PIPE EARTHING (40mm dia.) as per scope of
A.7.02 Nos.
work and specifications

SOUTHCO: IPDS SCHEME Page 97 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
Stringing of river crossing span ( ( 3 nos of, 7/4.26 mm (100 mm Al. Area) - Dog conductors, 1 no of 7/3.15 earthwire along with hoisting
A.7.03 Km
of insulators fixing of all hardware and accessories)

A.8 Excavation & back filling of stay pit in following type of soils, as per scope of work and specifications:

A.8.01 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
A.8.02 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
A.8.03 Hard rock soil where blasting is required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

Erection of Stay Set (Galvanised) with 50x8 mm stay clamps, guy insulator (2 Nos.) Designation'C', anchor plate (300x300x8mm), Eye
A.9 bolts with 2 nuts, 1 No turn-buckles,G.I Thimble 2 Nos., 1.8 m long, 20 mm diameter solid GI stay rod & 7/4.00 mm dia (8.5Kg/Stay) GI Set.
stranded wire complete as per technical specification and scope of work.

A.9.01 concreting 1 part cement, 2 part sand, 4 part 20mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set (0.5mX0.5mX0.8m) Cmt

Excavation, concreting, Erection, Testing and Commissioning of Earthing arrangement as per technical specifications and scope of
A.10
work.
40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder,RCC Pit and other accessories complete.(Used at line
A.10.01 Set.
crossing, DP structure and other specific locations).
A.10.02 GI Earthing spike made of 20 mm dia. 2500 mm solid rod with clamp . Set.

SOUTHCO: IPDS SCHEME Page 98 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

A.10.03 6 SWG GI wire for earthing (for connection of all metallic material with,GI Pipe earth Electrode/GI Earth Spike/Rod Earth Electrodes) MT.

Erection, testing and commissioning of 33 kV polymer/porcelain insulator including their hardware fittings as per technical
A.11
specification and scope of work.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for Dog
A.11.1 Set.
Conductor in normal and moderately polluted area.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for Dog
A.11.2 Set.
Conductor in heavily polluted area.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for
A.11.3 Set.
WOLF Conductor in normal and moderately polluted area.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for
A.11.4 Set.
WOLF Conductor in heavily polluted area.

A.11.5 33 KV Polymer (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings Set.

A.11.6 33 kV Porcelaine Type Pin Insulator 10 KN for DOG conductor in normal and moderately poluted area. Set.
A.11.7 33 KV Polymer Disc insulator 70 KN along with 4 bolted suitable hardware fittings for WOLF conductor Set.
A.11.8 33 kV Porcelaine Type Pin Insulator 10 KN for WOLF conductor in normal and moderately poluted area. Set.
A.11.9 33 kV Porcelaine Type Pin Insulator 10 KN for DOG conductor in heavily poluted area. Set.
A.11.10 33 KV Polymer Pin insulator 10 KN along with suitable hardware fittings for DOG conductor Set.
A.11.11 33 kV Porcelaine Type Pin Insulator 10 KN for WOLF conductor in heavily poluted area. Nos.

SOUTHCO: IPDS SCHEME Page 99 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

A.11.12 33 KV Polymer Pin insulator 10 KN along with suitable hardware fittings for WOLF conductor Set.
A.11.13 33 KV porcelain Post Insulator with suitable hardware fittings for DOG conductor Set.
A.11.14 33 KV Polymer Post Insulator with suitable hardware fittings for DOG conductor Set.
A.11.15 33 KV porcelain Post Insulator with suitable hardware fittings for WOLF conductor Set.
A.11.16 33 KV Polymer Post Insulator with suitable hardware fittings for WOLF conductor Set.

Erection,paying out,tensioning, binding of conductor, tightening of stays, stringing, testing and commissioning of AAAC Conductor
A.12 of following sizes and by supplying & erecting of jointing sleeves, binding materials, PG clamps, bi-metallic conducors, C-wedge
connector, hardware etc as required as per scope of work and technical specifications

A.12.01 7/3.81 mm (80 mm Al. Area) - Racoon. (1 CKM.= 3 KM. Conductor Length) CKM.
A.12.02 7/4.26 mm (100 mm Al. Area) - Dog. (1 CKM.= 3 KM. Conductor Length) CKM.
A.12.03 19/3.15 mm (173 mm Al. Area) - Wolf. (1 CKM.= 3 KM. Conductor Length) CKM.
A.12.04 19/3.94 mm (232 mm Al. Area) - Panther. (1 CKM.= 3 KM. Conductor Length) CKM.

Erection, testing and Commissioning of 33KV, 200A, 25KA for 3 sec., 3-ph, 3 Pin type, Horizontal Mounting type, AB Switch along
A.13 with phase coupling shaft, operating rod,operating handle,4 -bolt type connector,Support Insulators, Base Channel, down Pipe, Arcing Set.
Horns etc. complete as per technical specifications, scope of works.

SOUTHCO: IPDS SCHEME Page 100 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

A.14 Erection, testing and Commissioning of UNDER GROUND RAILWAY CROSSING and NH CROSSING for 33 KV LINE

33 KV LINE FOR UNDER GROUND RAILWAY CROSSING and NH crossing BY 2 Nos (INCLUDING ONE SPARE) 3Cx300 Sqmm
XLPE Armoured Cable (0.120 KM each) USING 160 mm DIA HDPE PIPES (PE80 PN8 for underground laying and PE80 PN6 for pole
support), OUTDOOR HEAT SHRINKABLE CABLE JOINTING KITS, 33 KV Polymer Type LIGHTENING ARRESTOR STATION CLASS
A.14.01 Set.
10KA (6 NOS.), LUGS, 4 Nos GI 3-Meters LONG PIPE EARTHING (40mm dia.), 6 SWG GI WIRES, CABLE MARKERS, BI METALLICK
CLAMPS where required As REQUIRED AS PER TECHNICAL SPECIFICATIONS AND SCOPE OF THE WORK. ( Ref Drawing No :
REC/DDUGJY/11kV/02A, REC/DDUGJY/11kV/02B, REC/DDUGJY/11kV/2D & REC/DDUGJY/33kV/21 )

A.15 Mounting of Anti-Climbing device/Barbed Wire with Danger Board, complete as per technical specifications and scope of works . Set.

A.16 Erection and Mounting of Guarding Arrangement for Road/Line Crossing. ( Ref Drawing No : REC/DDUGJY/11kV/25) Set.

Total Erection Price (A)

B.
33/11 KV Substation Works - Partly Outdoor Substation (33 KV out door and 11 KV indoor) No.
( consisting of but not limited to the following major materials)

B.1 Civil works: Design, supply of all material, T&P, labour etc for the following civil works complete

SOUTHCO: IPDS SCHEME Page 101 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.1.01 Soil Investigation & Contour Survey of Substation area as per Technical Specification, & Scope of works PER S/S

B.2 Earth Filling & Site Levelling

Earth work in PSS site provided by employer for pits free from logs, stumps, roots, rubbish or any other ingredients likely to deteriorate
or affect the stability of the (0.5 meter filling considered size 50 mt. x 30 mt.) site surface including breaking the clods maximum to 60 mm.
B.2.01 CMT
cube, placing the earth in layers not exceeding 225 mm in loose thickness, rough dressing including cost of cutting and removing shrubs,
roots falling in borrow area all complete as per approved design, as per Technical Specification, approved Drawing & Scope of works

Design, engineering and construction of foundation for Power transformer considering original equipment manufacturer
B.3 recommendations including excavation of pit, shuttering,reinforcement, cement concreting including providing and erecting guiding
rail, wheel stopper etc as per Technical Specification & Scope of works. ( Ref Drawing No : 10001CIV0027/REV-04)

B.3.01 Excavation of pit for all power transformer as per scope of work and specifications.
B.3.01(a) Excavation of pit in normal soil as per scope of work and specifications. (3.5X2.4x2.1 mtr) CMT

B.3.01(b) Excavation of pit in soft rock where blasting is not required as per scope of work and specifications. (3X3X1.1 mtr) CMT

B.3.02 Cement Concreting for all power transformer as per scope of work and specifications.

SOUTHCO: IPDS SCHEME Page 102 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.3.02(a) PCC (1:3:6 ) per Tfr.(3.2X2.1X0.1 mtr) CMT


B.3.02(b) RCC ( 1:1.5:3 ) per Tfr. ((3*2.1*0.3)+(2*(.4*2.1*3)) m CMT
B.3.02(c) RRHG stone grouting with sand per Tfr.(3.2*2.1*.5 mtr.) for soil SBC < 10 MT CMT
B.4 Construction of 100kVA 33/0.4 kV station Trf. Plinth. ( Ref Drawing No : ODSSP/CIVIL/5/REV C)+B109
B.4.01 Excavation of pit for station Trf. for as per scope of work and specifications.
B.4.01(a) Excavation of pit in normal soil as per scope of work and specifications. (2.8*2.8*.75 mtr) CMT

B.4.01(b) Excavation of pit in soft rock where blasting is not required as per scope of work and specifications. (2.8*2.8*.75 mtr) CMT

B.4.02 Cement Concreting for station Trf. as per scope of work and specifications.
B.4.02(a) PCC (1:3:6 ) (2.5X2.5X0.075 mtr) CMT
B.4.02(b) RCC ( 1:1.5:3 ) (1.5X1.5X0.1 mtr) CMT
B.4.02(c) Brick Masonary work (2.5x2.5x1.675)+ (1.5X1.5X 0.5) - (0.5X0.5X0.5) m CMT
B.4.02(d) Cement Plastering (1:6) 20 mm thick (1.15x2.5x4)+(1.5x0.5X4) m Sq Mtr
B.4.02(e) Sand Filling (0.5 X 0.5 X0.5) m CMT

Design, Engineering, construction of Approach Road and foot path including bitumen carpeting, excavation and compacting etc. all
B.5
complete as per technical specification, scope of works. ( Ref Drawing No : REC/DDUGJY/33/11kV PSS/17)

B.5.01 3.75m wide approach Road Run/Mtr

SOUTHCO: IPDS SCHEME Page 103 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.5.02 1.5 mtr wide footpath Run/Mtr


B.6 Foundation of VCB & CT
B.6.01 VCB & CT. ( Ref Drawing No : REC/DDUGJY/33/11kV PSS/09)
B.6.01(a) Excavation of earth for VCB & CT.
B.6.01(b) Excavation of pit in normal soil as per scope of work and specifications.(2.15X1.975X0.575) m CMT

B.6.01(c) Excavation of pit in soft rock where blasting is not required as per scope of work and specifications.(2.15X1.975X0.575) m CMT

B.6.01(d) PCC 1:3:6 (1.95*2.15*.075) CMT


B.6.01(e) RCC :1:1.5:3 ((2*1.8*.2)+(1.725*1.3*.8)+(1.725*1.3*.38)) CMT
B.6.02 Foundation of 152x152 RS JOIST ( GI) (20 Nos.) ( Ref Drawing No : ODSSP/CIVIL/2/REV B-01)
B.6.02(a) Excavation of earth for 152*152 RSJ Pole.
B.6.02(b) Excavation of pit in normal soil as per scope of work and specifications.(1*1*1.775 mtr.) CMT

B.6.02(c) Excavation of pit in soft rock where blasting is not required as per scope of work and specifications.(1*1*1.775 mtr.) CMT

B.6.02(d) PCC (1:3:6) (1*1*.075 mtr.) CMT


B.6.02(e) RCC (1:1.5:3) (.6*.6*.15)+2*(.45*.45) CMT
B.7 Construction of Boundary Wall and Switch-Yard Wall

SOUTHCO: IPDS SCHEME Page 104 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Construction of Boundary Wall (50X30 mtr.)made of reinforced cement concrete foundation (Beam, column, footing), angle supports, brick
works, plastering including Barbed Wire Fencing on angle and one Gate per Substation, including Supply, Fabrication, Fixing including
B.7.01 R/Mtr
red oxide and aluminium painting all complete as per Technical Specification & Scope of works. ( Ref Drawing No
:REC/DDUGJY/33/11kV PSS/20A).

Construction of Switch-Yard Wall including Barbed Wire Fencing(40ftx40ft) on angle over the Boundary Wall and Gate per Substation,
B.7.02 including Supply, Fabrication, Fixing, Painting all complete as per detailed Technical Specification & Scope of works. ( Ref Drawing No R/Mtr
:REC/DDUGJY/33/11kV PSS/20B)

Design, engineering and construction of Control Room Building comprising of Panel room,Office Room,Store Room,Battery & Charger
Room,Customer Care Office, Office Toilet,Toilet and seprate security room,Service Portico etc as required of overall size 20mX10m,
including supply of construction materials, Labour, Cement, Reinforcement Steel, Frame Work, Excavation etc, all complete as per
B.8
technical specificatons and scope of work. Ref. Drg :
DDIP/CIVIL/1,DDIP/CIVIL/2,DDIP/CIVIL/3,DDIP/CIVIL/4,DDIP/CIVIL/5,DDIP/CIVIL/6,DDIP/CIVIL/7,DDIP/CIVIL/8,DDIP/C
IVIL/9 & DDIP/CIVIL/10.

B.8.(I) Switchgear Cum Control Room For Pile foundation in NON-FLOOD AREA (with SBC upto 10)

Boring and casting 300 mm dia single under reamed pile of 5.00 m. long with R.C.C. M-20 using 20 mm down graded chips with cost of
B.8.(I).01 all materials, labours, T&P etc. & all other machinaries required for the work etc.complete in all respect as per latest specification & Nos
direction of the Engineer in charge.

SOUTHCO: IPDS SCHEME Page 105 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders
except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and
B.8.(I).02 depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering Cum
(if required) with cost of labour,cess, hire & running charges of water pumps sundries , T & P & all other machinaries required for the
work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer
B.8.(I).03 including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest Cum
specification & direction of the Engineer in charge.

Providing and lying plain cement concrete of proportion (1:3:6) in foundation and plinths using approved quality cement , 40 mm. size
black hard crusher broken granite stone metal and screened, washed sharp sand for mortar of approved quality and from approved
quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not
exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all
B.8.(I).04 Cum
labours, cess, sundries, T&P & all other machinaries required for the work including shoring, shuttering and dewatering if required
including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in
charge.

SOUTHCO: IPDS SCHEME Page 106 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

K.B. Brick masonary in cement mortar (1:6) using the bricks of size 10" x 5" x 3" of crushing strength not less than 100 kg / centimetre
square with dimensional tolerance 3% after immersing the bricks for 6 hours in water before use including hoisting to required height
placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and
B.8.(I).05 curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machinaries scaffolding all labour T&P articles
required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the
Engineer-in-charge.

B.8.(I).05(a) Ground Floor Cum


B.8.(I).05(b) First Floor Cum

RCC work M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 200 Kg./ Sqcm.in 15
cm. cubes at 28 days after mixing and test conducted in accordance with I.S.456 and I.S 516 using 12 mm. to 20 mm. size black hard
crusher broken granite stone chips, screened and washed sharp sand for mortar of approved quality from approved quarry, to be mixed
in concrete mixture with approved quality cement including hoisting, lowering, laying and compacting concrete by using vibrators,
B.8.(I).06 watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads
wherever necessary including cost, conveyance, loading, unloading, royalties and taxes and cess of all materials, cost of all labours,
sundries, T&P & all other machinaries required for the work but excluding cost and conveyance of M.S. or Tor steel and binding wires
etc.complete in all respect as per latest specification & direction of the Engineer in charge.

SOUTHCO: IPDS SCHEME Page 107 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.8.(I).06(a) Pile cap & Grade beam Cum


B.8.(I).06(b) R.C.C. wall Cum
B.8.(I).06(c) Plinth Beam Cum
B.8.(I).06(d) Column & Beam- Ground Floor Cum
B.8.(I).06(e) Column & Beam- First Floor Cum
B.8.(I).06(f) Lintel Cum
B.8.(I).06(g) Fin Sqm
B.8.(I).06(h) 65mm thick R.C.C.Chajja Sqm
B.8.(I).06(i) Roof slab - Ground Floor Cum
B.8.(I).06(j) Roof slab - First Floor Cum
B.8.(I).06(k) Staircase Cum

SOUTHCO: IPDS SCHEME Page 108 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Cutting, Straightening coiled or bent up M.S. rods or Tor steel welding or jointing if necessary, bending, binding, tying the grills as
required for R.C.C. works, providing fan hooks where necessary and hoisting, lowering and placing in proper position according to
approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods or Tor steel and binding wires of 18 to
B.9.(I) 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in MT
charge (payment will be made according to the actual weight of M.S. rod / Tor steel consumed in the work and no separate payment will
be made towards weight of binding wires which is to be borne by the contractor at his own cost etc complete in all respect as per direction
of the Engineer-in-charge.

Supplying, fitting and fixing vitrified tile 60x60cm plain Ivory 8 to 10 mm thick in floors of approved make with application of
polymer modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of
B.10.(I) Sqm
approved quality including cost of all materials, takes labour T&P etc required for the work etc complete in all respect as per the
latest specification and direction of the Engineer-in-charge.

Supplying, fitting and fixing vitrified tile 60x60cm plain Ivory 8 to 10 mm thick in dado of approved make with application of polymer
modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved
B.11.(I) Sqm
quality including cost of all materials, takes labour T&P etc required for the work etc complete in all respect as per the latest specification
and direction of the Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 109 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying, fitting and fixing Floor tile of size 40cmx40 cm / 30cmx30cm in floors on 25mm thick bed of cement mortar 1:1 (1cement :
1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles of required thickness of approved quality
B.12.(I) Sqm
including cost of all materials, takes labour T&P etc required for the work.etc complete in all respect as per the latest specification and
direction of the Engineer-in-charge.

Providing fitting fixing Glazed /Ceramic tiles of size 20cmX30cm & 6.5 to 6.7mm thick of size up to 0.10sqm in wall dados skirting and
on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing
B.13.(I) Sqm
and polishing complete including cost of precast tiles etc complete in all respect as per the latest specification and direction of the
Engineer-in-charge.

Supplying, fitting and fixing 5"x2" size Dressed seasoned Sal wood chaukaths including cost, conveyance royality taxes of all materials.
B.14.(I) Cum
labour, all other machinaries, T & P articles required for the work complete in all respect as per the direction of the Engineer-in-Charge.

Supplying, fitting and fixing 30mm/32mm flush door shutter (Non-Sal hard wood frame fixed with 4mm BWR ply on both sides of
frame.including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P articles required for the work complete
B.15.(I) Sqm
in all respect as per the direction of the Engineer-in-Charge.

Providing and fixing of sliding windows of approved make to be febricated from roll formed sections made of pre-painted steel (base steel
as per IS-513 of 0.6 mm thick "D" quality, galvanized as per IS-277 with zinc of 120 Gm/ Sqm.) including cost conveyance royality taxes of
B.16.(I) Sqm
all materials. labour, all other machinaries, T & P articles required for the work complete in all respect as per the direction of the Engineer-
in-Charge. DOUBLE SHUTTER SLIDING WINDOW

SOUTHCO: IPDS SCHEME Page 110 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing and fixing of FRP door frame including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P
B.17.(I) articles required for the work complete in all respect as per the latest specification and direction of the Engineer-in-Charge. Mtr

Providing and fixing of FRP door shutter including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P
B.18.(I) articles required for the work complete in all respect as per the latest specification and direction of the Engineer-in-Charge. Sqm

Providing 18mm. thick cement plaster with cement mortar of mix (1:5) with approved quality cement with screened and washed sharp
sand for mortar and finished smooth to the surface over brick work after racking out the joints including watering and curing, rounding
B.19.(I)
of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, and taxes of all materials and cost of all labours,
sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge

B.19.(I).01 Ground Floor Sqm


B.19.(I).02 First Floor Sqm

Providing 12mm. thick cement plaster with cement mortar of mix (1:6) with approved quality cement and screened and washed sharp
sand for mortar and finished smooth to the surface over brick work after racking out the joints including watering and curing, rounding
B.20.(I)
of corners etc. complete with cost, conveyance, loading, unloading, royalties and taxes, cess, of all materials and cost of all labours,
sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charger in charge

SOUTHCO: IPDS SCHEME Page 111 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.20.(I).01 Ground Floor Sqm


B.20.(I).02 First Floor Sqm

Providing 12mm. thick cement plaster with cement mortar of mix (1:4) with approved quality cement with screened and washed sharp
sand for mortar and finished smooth to the surface in ceiling and R.C.C. surface after chipping the surface in all floors including watering
B.21.(I) Sqm
and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, and taxes of all materials and cost
of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge.

Providing and finishing the wall surface with oil bound washable distemper on smooth surface applied with 2 mm thick Plaster of Paris as
B.22.(I) per Technical specification including scaffolding, all labour, cost, conveyance, cess, taxes of all materials, T&P articles, brushes all other Sqm
machineries required for the work complete in all respect confirming to relevant I.S. Specification and direction of the Engineer-in-Charge

Supplying fitting and fixing of M.S shutter made out of M.S Angle 40mmx40mmx6mmm, M.S.Flat 19 mm x 5 mm size, M.S. guide, top
B.23.(I) hood cover etc. as per design provided including cost, conveyance, royalities of all materials, cost of all labour, T&P articles required for Kg
the work etc. complete in all respect confirming to relevant I.S specification and direction of the Engineer-in Charge.

Supplying fitting and fixing of M.S grill made out of M.S M.S.Flat 19 mm x 5 mm size, as per design provided including cost,
B.24.(I) conveyance, royalities of all materials, cost of all labour, T&P articles required for the work etc. complete in all respect confirming to Kg
relevant I.S specification and direction of the Engineer-in Charge.

SOUTHCO: IPDS SCHEME Page 112 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Wall painting 2 coats with acrylic distemper over one coat of wall primer of approved shade on new work to give an even shade in all
B.25.(I) floors at all height including scafolding cost of brushes including cost of paint cost conveyance royality of all materials labour,T&P articles Sqm
required for the work etc complete in all respect as per the latest specification and direction of the Engineer-in-charge.

Painting two coats with weather coat on exterior walls surface of approved quality and approved shade over a coat of primer in all floors
at all height of approved quality and shade including cleaning and sand papering the surface and making the surface smooth with cost,
B.26.(I) Sqm
conveyance, loading, unloading, and taxes of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work
complete in all respect as directed by Engineer-in-charge

Painting two Coats with approved colour synthetic enamel paint on wood / iron work in all floors at all height including scafolding cost
B.27.(I) conveyance royality of all materials labour,T&P articles required for the work etc complete in all respect as per the latest specification Sqm
and direction of the Engineer-in-charge.

Providing cement concrete (1:1.5:3) using 12mm size black hard crusher broken granite stone chips, screened & washed sharp sand for
mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing
etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading,
B.28.(I) Cum
royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machinaries required for the work including
shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per
latest specification & direction of the Engineer in charge.

SOUTHCO: IPDS SCHEME Page 113 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of
size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per
B.29.(I) Mtr
approved design and specification, buffing, polishing etc. with cost, conveyance, taxes of all materilas, labour, T&P etc. required for the
complete in all respect.

Providing and fixing M.S. fan clamp type-I of 16mm dia M.S. bar bent to shape with hooked ends in R.C.C. slab during laying including
B.30.(I) Nos
painting the exposed portion of loop as per standard design complete as directed by the Engineer-in-charge.

Providing 12mm. thick cement plaster in cement mortar of mix (1:4) with neat cement punning with approved quality cement with
screened and washed sharp sand for mortar and finished smooth to the surface in ceiling and R.C.C. surface after chipping the surface in
B.31.(I) septic tank including watering and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, Sqm
and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired
by the Engineer in charge.

Providing neat cement punning with approved quality cement finished smooth to the surface etc. complete with cost, conveyance,
B.32.(I) loading, unloading, royalties, cess, and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the Sqm
work etc. complete in all respect as desired by the Engineer in charge.

SOUTHCO: IPDS SCHEME Page 114 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

40 mm thick grading concrete with cement concrete (1:2:4) using 12mm and down graded b.h.g. chips to the roof surface with water
proofing cement compound finished smooth over RCC slab including hoisting and laying in position watering and curing for required
B.33.(I) Sqm
number of days finished to smooth surface and desired slope including cost conveyance,royalty and taxes of all materials, labour T&P
articles required for the work etc. complete in all respect confirming to relevent I.S specification and direction of the Engineer-in-Charge.

B.8.(II) Switchgear Cum Control Room (SBC more than 10) in NON-FLOOD AREA

Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except
sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the
B.8.(II).01 excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with Cum
cost of labour,cess, hire & running charges of water pumps sundries , T & P & all other machinaries required for the work etc.complete in
all respect as per latest specification & direction of the Engineer in charge.

Earth work in excavation of foundation trenches in laterite rock or any hard rock (other than granite or disintegrated rock ) removed
by chiselling including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away
B.8.(II).02 from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire Cum
& running charges of water pumps sundries , T & P & all other machinaries required for the work etc.complete in all respect as per
latest specification & direction of the Engineer in charge.

SOUTHCO: IPDS SCHEME Page 115 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer
B.8.(II).03 including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest Cum
specification & direction of the Engineer in charge.

Providing and lying plain cement concrete of proportion (1:3:6) in foundation and plinths using approved quality cement , 40 mm. size
black hard crusher broken granite stone metal and screened, washed sharp sand for mortar of approved quality and from approved
quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not
exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all
B.8.(II).04 Cum
labours, cess, sundries, T&P & all other machinaries required for the work including shoring, shuttering and dewatering if required
including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in
charge.

K.B. Brick masonary in cement mortar (1:6) using the bricks of size 10" x 5" x 3" of crushing strength not less than 100 kg / centimetre
square with dimensional tolerance 3% after immersing the bricks for 6 hours in water before use including hoisting to required height
placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and
B.8.(II).05 curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machinaries scaffolding all labour T&P articles
required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the
Engineer-in-charge.
in-

B.8.(II).05(a) In Foundation and Plinth Cum

SOUTHCO: IPDS SCHEME Page 116 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.8.(II).05(b) Ground Floor Cum


B.8.(II).05(c) First Floor Cum

RCC work M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 200 Kg./ Sqcm.in
15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S.456 and I.S 516 using 12 mm. to 20 mm. size black hard
crusher broken granite stone chips, screened and washed sharp sand for mortar of approved quality from approved quarry, to be
mixed in concrete mixture with approved quality cement including hoisting, lowering, laying and compacting concrete by using
B.8.(II).06 vibrators, watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or
beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes and cess of all materials, cost of all
labours, sundries, T&P & all other machinaries required for the work but excluding cost and conveyance of M.S. or Tor steel and
binding wires etc.complete in all respect as per latest specification & direction of the Engineer in charge.

B.8.(II).06(a) Footing and pedestal Cum


B.8.(II).06(b) R.C.C. wall Cum
B.8.(II).06(c) Plinth Beam Cum
B.8.(II).06(d) Column & Beam- Ground Floor Cum
B.8.(II).06(e) Column & Beam- First Floor Cum

SOUTHCO: IPDS SCHEME Page 117 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.8.(II).06(f) Lintel Cum


B.8.(II).06(g) 50 mm thick shelves Sqm
B.8.(II).06(h) 75 mm thick R.C.C.Chajja Sqm
B.8.(II).06(i) Roof slab - Ground Floor Cum
B.8.(II).06(j) Roof slab - First Floor Cum
B.8.(II).06(k) Staircase Cum

Cutting, Straightening coiled or bent up M.S. rods or Tor steel welding or jointing if necessary, bending, binding, tying the grills as
required for R.C.C. works, providing fan hooks where necessary and hoisting, lowering and placing in proper position according to
approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods or Tor steel and binding wires of 18 to
B.9.(II) 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in MT
charge (payment will be made according to the actual weight of M.S. rod / Tor steel consumed in the work and no separate payment will
be made towards weight of binding wires which is to be borne by the contractor at his own cost etc complete in all respect as per direction
of the Engineer-in-charge.

Supplying, fitting and fixing vitrified tile 60x60cm plain Ivory 8 to 10 mm thick in floors of approved make with application of polymer
modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved
B.10.(II) Sqm
quality including cost of all materials, takes labour T&P etc required for the work etc complete in all respect as per the latest specification
and direction of the Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 118 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying, fitting and fixing vitrified tile 60x60cm plain Ivory 8 to 10 mm thick in dado of approved make with application of polymer
modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved
B.11.(II) Sqm
quality including cost of all materials, takes labour T&P etc required for the work etc complete in all respect as per the latest specification
and direction of the Engineer-in-charge.

Supplying, fitting and fixing Floor tile of size 40cmx40 cm / 30cmx30cm in floors on 25mm thick bed of cement mortar 1:1 (1cement :
1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles of required thickness of approved quality
B.12.(II) Sqm
including cost of all materials, takes labour T&P etc required for the work.etc complete in all respect as per the latest specification and
direction of the Engineer-in-charge.
Providing fitting fixing Glazed /Ceramic tiles of size 20cmX30cm & 6.5 to 6.7mm thick of size up to 0.10sqm in wall dados skirting and
on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing
B.13.(II) Sqm
and polishing complete including cost of precast tiles etc complete in all respect as per the latest specification and direction of the
Engineer-in-charge.

Supplying, fitting and fixing 5"x2" size Dressed seasoned Sal wood chaukaths including cost, conveyance royality taxes of all materials.
B.14.(II) Cum
labour, all other machinaries, T & P articles required for the work complete in all respect as per the direction of the Engineer-in-Charge.

Supplying, fitting and fixing 30mm/32mm flush door shutter (Non-Sal hard wood frame fixed with 4mm BWR ply on both sides of
frame.including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P articles required for the work complete
B.15.(II) Sqm
in all respect as per the direction of the Engineer-in-Charge.

SOUTHCO: IPDS SCHEME Page 119 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing and fixing of sliding windows of approved make to be febricated from roll formed sections made of pre-painted steel (base steel
as per IS-513 of 0.6 mm thick "D" quality, galvanized as per IS-277 with zinc of 120 Gm/ Sqm.) including cost conveyance royality taxes of
B.16.(II) Sqm
all materials. labour, all other machinaries, T & P articles required for the work complete in all respect as per the direction of the Engineer-
in-Charge. DOUBLE SHUTTER SLIDING WINDOW

Providing and fixing of FRP door frame including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P
B.17.(II) articles required for the work complete in all respect as per the latest specification and direction of the Engineer-in-Charge. Mtr

Providing and fixing of FRP door shutter including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P
B.18.(II) articles required for the work complete in all respect as per the latest specification and direction of the Engineer-in-Charge. Sqm

Providing 18mm. thick cement plaster with cement mortar of mix (1:5) with approved quality cement with screened and washed sharp
sand for mortar and finished smooth to the surface over brick work after racking out the joints including watering and curing, rounding
B.19.(II)
of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, and taxes of all materials and cost of all labours,
sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge

B.19.(II).01 Ground Floor Sqm


B.19.(II).02 First Floor Sqm

SOUTHCO: IPDS SCHEME Page 120 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing 12mm. thick cement plaster with cement mortar of mix (1:6) with approved quality cement and screened and washed sharp
sand for mortar and finished smooth to the surface over brick work after racking out the joints including watering and curing, rounding
B.20.(II)
of corners etc. complete with cost, conveyance, loading, unloading, royalties and taxes, cess, of all materials and cost of all labours,
sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charger in charge

B.20.(II).01 Ground Floor Sqm


B.20.(II).02 First Floor Sqm

Providing 12mm. thick cement plaster with cement mortar of mix (1:4) with approved quality cement with screened and washed sharp
sand for mortar and finished smooth to the surface in ceiling and R.C.C. surface after chipping the surface in all floors including watering
B.21.(II) Sqm
and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, and taxes of all materials and cost
of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge.

Providing and finishing the wall surface with oil bound washable distemper on smooth surface applied with 2 mm thick Plaster of Paris as
B.22.(II) per Technical specification including scaffolding, all labour, cost, conveyance, cess, taxes of all materials, T&P articles, brushes all other Sqm
machineries required for the work complete in all respect confirming to relevant I.S. Specification and direction of the Engineer-in-Charge

Supplying fitting and fixing of M.S shutter made out of M.S Angle 40mmx40mmx6mmm, M.S.Flat 19 mm x 5 mm size, M.S. guide, top
B.23.(II) hood cover etc. as per design provided including cost, conveyance, royalities of all materials, cost of all labour, T&P articles required for Kg
the work etc. complete in all respect confirming to relevant I.S specification and direction of the Engineer-in Charge.

SOUTHCO: IPDS SCHEME Page 121 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying fitting and fixing of M.S grill made out of M.S M.S.Flat 19 mm x 5 mm size, as per design provided including cost,
B.24.(II) conveyance, royalities of all materials, cost of all labour, T&P articles required for the work etc. complete in all respect confirming to Kg
relevant I.S specification and direction of the Engineer-in Charge.

Wall painting 2 coats with acrylic distemper over one coat of wall primer of approved shade on new work to give an even shade in all
B.25.(II) floors at all height including scafolding cost of brushes including cost of paint cost conveyance royality of all materials labour,T&P articles Sqm
required for the work etc complete in all respect as per the latest specification and direction of the Engineer-in-charge.

Painting two coats with weather coat on exterior walls surface of approved quality and approved shade over a coat of primer in all floors
at all height of approved quality and shade including cleaning and sand papering the surface and making the surface smooth with cost,
B.26.(II) Sqm
conveyance, loading, unloading, and taxes of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work
complete in all respect as directed by Engineer-in-charge

Painting two Coats with approved colour synthetic enamel paint on wood / iron work in all floors at all height including scafolding cost
B.27.(II) conveyance royality of all materials labour,T&P articles required for the work etc complete in all respect as per the latest specification Sqm
and direction of the Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 122 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing cement concrete (1:1.5:3) using 12mm size black hard crusher broken granite stone chips, screened & washed sharp sand for
mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc.
complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties
B.28.(II) Cum
and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machinaries required for the work including shoring,
shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest
specification & direction of the Engineer in charge.

Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of
size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per
B.29.(II) Mtr
approved design and specification, buffing, polishing etc. with cost, conveyance, taxes of all materilas, labour, T&P etc. required for the
complete in all respect.

Providing and fixing M.S. fan clamp type-I of 16mm dia M.S. bar bent to shape with hooked ends in R.C.C. slab during laying including
B.30.(II) Nos
painting the exposed portion of loop as per standard design complete as directed by the Engineer-in-charge.

Providing 12mm. thick cement plaster in cement mortar of mix (1:4) with neat cement punning with approved quality cement with
screened and washed sharp sand for mortar and finished smooth to the surface in ceiling and R.C.C. surface after chipping the surface in
B.31.(II) septic tank including watering and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, Sqm
and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired
by the Engineer in charge.

SOUTHCO: IPDS SCHEME Page 123 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing neat cement punning with approved quality cement finished smooth to the surface etc. complete with cost, conveyance,
B.32.(II) loading, unloading, royalties, cess, and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work Sqm
etc. complete in all respect as desired by the Engineer in charge.

40 mm thick grading concrete with cement concrete (1:2:4) using 12mm and down graded b.h.g. chips to the roof surface with water
proofing cement compound finished smooth over RCC slab including hoisting and laying in position watering and curing for required
B.33.(II) Sqm
number of days finished to smooth surface and desired slope including cost conveyance,royalty and taxes of all materials, labour T&P
articles required for the work etc. complete in all respect confirming to relevent I.S specification and direction of the Engineer-in-Charge.

B.8.(III) Switchgear Cum Control Room For Pile foundation in FLOOD AREA (with SBC upto 10)
Boring and casting 300 mm dia single under reamed pile of 5.00 m. long with R.C.C. M-20 using 20 mm down graded chips with cost of
B.8.(III).01 all materials, labours, T&P etc. & all other machinaries required for the work etc.complete in all respect as per latest specification & Nos
direction of the Engineer in charge.

Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except
sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the
B.8.(III).02 excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with Cum
cost of labour,cess, hire & running charges of water pumps sundries , T & P & all other machinaries required for the work etc.complete in
all respect as per latest specification & direction of the Engineer in charge.

SOUTHCO: IPDS SCHEME Page 124 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer
B.8.(III).03 including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest Cum
specification & direction of the Engineer in charge.

Providing and lying plain cement concrete of proportion (1:3:6) in foundation and plinths using approved quality cement , 40 mm. size
black hard crusher broken granite stone metal and screened, washed sharp sand for mortar of approved quality and from approved
quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not
exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all
B.8.(III).04 Cum
labours, cess, sundries, T&P & all other machinaries required for the work including shoring, shuttering and dewatering if required
including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in
charge.

K.B. Brick masonary in cement mortar (1:6) using the bricks of size 10" x 5" x 3" of crushing strength not less than 100 kg / centimetre
square with dimensional tolerance 3% after immersing the bricks for 6 hours in water before use including hoisting to required height
placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and
B.8.(III).05 curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machinaries scaffolding all labour T&P articles
required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the
Engineer-in-charge.
in-

B.8.(III).05(a) In Foundation and Plinth Cum


B.8.(III).05(b) Ground Floor Cum

SOUTHCO: IPDS SCHEME Page 125 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.8.(III).05(c) First Floor Cum


B.8.(III).05(d) Second Floor Cum

RCC work M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 200 Kg./ Sqcm.in 15
cm. cubes at 28 days after mixing and test conducted in accordance with I.S.456 and I.S 516 using 12 mm. to 20 mm. size black hard
crusher broken granite stone chips, screened and washed sharp sand for mortar of approved quality from approved quarry, to be mixed
in concrete mixture with approved quality cement including hoisting, lowering, laying and compacting concrete by using vibrators,
B.8.(III).06 watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads
wherever necessary including cost, conveyance, loading, unloading, royalties and taxes and cess of all materials, cost of all labours,
sundries, T&P & all other machinaries required for the work but excluding cost and conveyance of M.S. or Tor steel and binding wires
etc.complete in all respect as per latest specification & direction of the Engineer in charge.

B.8.(III).06(a) Pile cap & Grade beam Cum


B.8.(III).06(b) R.C.C. wall Cum
B.8.(III).06(c) Plinth Beam Cum
B.8.(III).06(d) Column & Beam- Ground Floor Cum
B.8.(III).06(e) Column & Beam- First Floor Cum
B.8.(III).06(f) Column & Beam- second Floor Cum

SOUTHCO: IPDS SCHEME Page 126 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.8.(III).06(g) Lintel-Ground Floor Cum


B.8.(III).06(h) Lintel- First Floor Cum
B.8.(III).06(i) Fin- First Floor Sqm
B.8.(III).06(j) 65mm thick R.C.C.Chajja- Ground Floor Sqm
B.8.(III).06(k) 65mm thick R.C.C.Chajja- First Floor Sqm
B.8.(III).06(l) 50mm thick R.C.C.Sleves- First Floor Sqm
B.8.(III).06(m) Roof slab - Ground Floor Cum
B.8.(III).06(n) Roof slab - First Floor Cum
B.8.(III).06(o) Roof slab - Second Floor Cum
B.8.(III).06(p) Staircase- Ground Floor Cum
B.8.(III).06(q) Staircase- First Floor Cum

SOUTHCO: IPDS SCHEME Page 127 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Cutting, Straightening coiled or bent up M.S. rods or Tor steel welding or jointing if necessary, bending, binding, tying the grills as
required for R.C.C. works, providing fan hooks where necessary and hoisting, lowering and placing in proper position according to
approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods or Tor steel and binding wires of 18 to
B.9.(III) 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in
charge (payment will be made according to the actual weight of M.S. rod / Tor steel consumed in the work and no separate payment will
be made towards weight of binding wires which is to be borne by the contractor at his own cost etc complete in all respect as per direction
of the Engineer-in-charge.

B.9.(III).01 Ground Floor MT


B.9.(III).02 First Floor MT
B.9.(III).03 Second Floor MT

Supplying, fitting and fixing vitrified tile 60x60cm plain Ivory 8 to 10 mm thick in floors of approved make with application of polymer
modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved
B.10.(III) Sqm
quality including cost of all materials, takes labour T&P etc required for the work etc complete in all respect as per the latest specification
and direction of the Engineer-in-charge.

Supplying, fitting and fixing vitrified tile 60x60cm plain Ivory 8 to 10 mm thick in dado of approved make with application of polymer
modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved
B.11.(III) Sqm
quality including cost of all materials, takes labour T&P etc required for the work etc complete in all respect as per the latest specification
and direction of the Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 128 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying, fitting and fixing Floor tile of size 40cmx40 cm / 30cmx30cm in floors on 25mm thick bed of cement mortar 1:1 (1cement :
1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles of required thickness of approved quality
B.12.(III) Sqm
including cost of all materials, takes labour T&P etc required for the work.etc complete in all respect as per the latest specification and
direction of the Engineer-in-charge.
Providing fitting fixing Glazed /Ceramic tiles of size 20cmX30cm & 6.5 to 6.7mm thick of size up to 0.10sqm in wall dados skirting and
on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing
B.13.(III) Sqm
and polishing complete including cost of precast tiles etc complete in all respect as per the latest specification and direction of the
Engineer-in-charge.

Supplying, fitting and fixing 5"x2" size Dressed seasoned Sal wood chaukaths including cost, conveyance royality taxes of all materials.
B.14.(III) Cum
labour, all other machinaries, T & P articles required for the work complete in all respect as per the direction of the Engineer-in-Charge.

Supplying, fitting and fixing 30mm/32mm flush door shutter (Non-Sal hard wood frame fixed with 4mm BWR ply on both sides of
frame.including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P articles required for the work complete
B.15.(III) Sqm
in all respect as per the direction of the Engineer-in-Charge.

Providing and fixing of sliding windows of approved make to be febricated from roll formed sections made of pre-painted steel (base steel
as per IS-513 of 0.6 mm thick "D" quality, galvanized as per IS-277 with zinc of 120 Gm/ Sqm.) including cost conveyance royality taxes of
B.16.(III) Sqm
all materials. labour, all other machinaries, T & P articles required for the work complete in all respect as per the direction of the Engineer-
in-Charge. DOUBLE SHUTTER SLIDING WINDOW

SOUTHCO: IPDS SCHEME Page 129 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing and fixing of FRP door frame including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P
B.17.(III) articles required for the work complete in all respect as per the latest specification and direction of the Engineer-in-Charge. Mtr

Providing and fixing of FRP door shutter including cost conveyance royality taxes of all materials. labour, all other machinaries, T & P
B.18.(III) articles required for the work complete in all respect as per the latest specification and direction of the Engineer-in-Charge. Sqm

Providing 18mm. thick cement plaster with cement mortar of mix (1:5) with approved quality cement with screened and washed sharp
sand for mortar and finished smooth to the surface over brick work after racking out the joints including watering and curing, rounding
B.19.(III)
of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, and taxes of all materials and cost of all labours,
sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge

B.19.(III).01 Ground Floor Sqm


B.19.(III).02 First Floor Sqm
B.19.(III).03 Second Floor Sqm

Providing 12mm. thick cement plaster with cement mortar of mix (1:6) with approved quality cement and screened and washed sharp
sand for mortar and finished smooth to the surface over brick work after racking out the joints including watering and curing, rounding
B.20.(III)
of corners etc. complete with cost, conveyance, loading, unloading, royalties and taxes, cess, of all materials and cost of all labours,
sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charger in charge

SOUTHCO: IPDS SCHEME Page 130 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.20.(III).01 Ground Floor Sqm


B.20.(III).02 First Floor Sqm

Providing 18mm. thick cement plaster with cement mortar of mix (1:4) with approved quality cement with screened and washed sharp
sand for mortar and finished smooth to the surface in ceiling and R.C.C. surface after chipping the surface in all floors including watering
B.21.(III)
and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, and taxes of all materials and cost
of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge.

B.21.(III).01 Ground Floor Sqm


B.21.(III).02 First Floor Sqm
B.21.(III).03 Second Floor Sqm

Providing and finishing the wall surface with oil bound washable distemper on smooth surface applied with 2 mm thick Plaster of Paris as
B.22.(III) per Technical specification including scaffolding, all labour, cost, conveyance, cess, taxes of all materials, T&P articles, brushes all other
machineries required for the work complete in all respect confirming to relevant I.S. Specification and direction of the Engineer-in-Charge

B.22.(III).01 Ground Floor Sqm


B.22.(III).02 First Floor Sqm

SOUTHCO: IPDS SCHEME Page 131 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying fitting and fixing of M.S shutter made out of M.S Angle 40mmx40mmx6mmm, M.S.Flat 19 mm x 5 mm size, M.S. guide, top
B.23.(III) hood cover etc. as per design provided including cost, conveyance, royalities of all materials, cost of all labour, T&P articles required for Kg
the work etc. complete in all respect confirming to relevant I.S specification and direction of the Engineer-in Charge.

Supplying fitting and fixing of M.S grill made out of M.S M.S.Flat 19 mm x 5 mm size, as per design provided including cost,
B.24.(III) conveyance, royalities of all materials, cost of all labour, T&P articles required for the work etc. complete in all respect confirming to Kg
relevant I.S specification and direction of the Engineer-in Charge.
Supplying fitting and fixing of M.S grill made out of M.S M.S.Flat 19 mm x 5 mm size, as per design provided including cost,
B.24.(III) conveyance, royalities of all materials, cost of all labour, T&P articles required for the work etc. complete in all respect confirming to Kg
relevant I.S specification and direction of the Engineer-in Charge.

Painting two coats with weather coat on exterior walls surface of approved quality and approved shade over a coat of primer in all floors
at all height of approved quality and shade including cleaning and sand papering the surface and making the surface smooth with cost,
B.26.(III)
conveyance, loading, unloading, and taxes of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work
complete in all respect as directed by Engineer-in-charge

B.26.(III).01 Ground Floor Sqm


B.26.(III).02 First Floor Sqm

SOUTHCO: IPDS SCHEME Page 132 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Painting two Coats with approved colour synthetic enamel paint on wood / iron work in all floors at all height including scafolding cost
B.27.(III) conveyance royality of all materials labour,T&P articles required for the work etc complete in all respect as per the latest specification Sqm
and direction of the Engineer-in-charge.

Providing cement concrete (1:1.5:3) using 12mm size black hard crusher broken granite stone chips, screened & washed sharp sand for
mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc.
complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties
B.28.(III) Cum
and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machinaries required for the work including shoring,
shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest
specification & direction of the Engineer in charge.

Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of
size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per
B.29.(III) Mtr
approved design and specification, buffing, polishing etc. with cost, conveyance, taxes of all materilas, labour, T&P etc. required for the
complete in all respect.

Providing and fixing M.S. fan clamp type-I of 16mm dia M.S. bar bent to shape with hooked ends in R.C.C. slab during laying including
B.30.(III) Nos
painting the exposed portion of loop as per standard design complete as directed by the Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 133 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing 12mm. thick cement plaster in cement mortar of mix (1:4) with neat cement punning with approved quality cement with
screened and washed sharp sand for mortar and finished smooth to the surface in ceiling and R.C.C. surface after chipping the surface in
B.31.(III) septic tank including watering and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties, cess, Sqm
and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired
by the Engineer in charge.

Providing neat cement punning with approved quality cement finished smooth to the surface etc. complete with cost, conveyance,
B.32.(III) loading, unloading, royalties, cess, and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work Sqm
etc. complete in all respect as desired by the Engineer in charge.

40 mm thick grading concrete with cement concrete (1:2:4) using 12mm and down graded b.h.g. chips to the roof surface with water
proofing cement compound finished smooth over RCC slab including hoisting and laying in position watering and curing for required
B.33.(III) Sqm
number of days finished to smooth surface and desired slope including cost conveyance,royalty and taxes of all materials, labour T&P
articles required for the work etc. complete in all respect confirming to relevent I.S specification and direction of the Engineer-in-Charge.

B.9 P.H. Fitting (Internal & External) Common to all Switch-Gear -Cum -Control Room
Supplying all materials , labours , taxes and tools and plants for fitting and fixing of PVC pipes of following nominal bore conforming to
B.9.01 ASTM-D-1785 (Schedule-80) including fittings and laying as per the site requirement etc., all complete including testing as per the
direction and specification of Engineer-in-charge
B.9.02 15 mm dia Mtr
B.9.03 20 mm dia Mtr

SOUTHCO: IPDS SCHEME Page 134 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.9.04 25 mm dia Mtr


B.9.05 40 mm dia Mtr
B.9.06 50 mm dia Mtr

Supplying all material, labour , T&P & fitting ,fixing the following different water supply fittings of approved make with including
B.10
supply of all necessary jointing materials etc. all complete as directed by the Engineer-in-charge.

B.10.01 25 mm dia Ball valve Nos


B.10.02 50 mm dia Ball valve Nos
B.10.03 25 mm dia F.W. valve Nos
B.10.04 50 mm dia F.W. valve Nos
Supplying all labour T&P and cutting holes in brick masonry wall for taking pipes through and mending good the damages with supply
B.11
of all required materials etc. complete as per the direction of the Engineer-incharge
B.11.01 For 15mm to 50mm CPVC pipe to pass in 125mm to 250mm thick wall Nos

Supplying all labour T&P and materials and making grooves in brick walls vertically and horizontally to the required depth and width for
fixing pipes & fittings of sizes 15mm dia to 25mm dia in the grooves, testing the pipe line against leakage,and filling the grooves with
B.12 Mtr
cement mortar(1:4) to bring the surface to original level including cost of mortars, curing and conveyance of materials etc. complete as
per direction of the Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 135 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying all materials , labour T&P and fittings of approved quality required for fixing of NP or CP Brass or GM fixtures of following
B.13 sizes and specification with leak proof threaded joints tightened with spun yarn and white zinc or any tightened with spun yarn and
white zinc or any including testing and rectification of detects,after testing complete as per direction of Engineer-in-charge.

B.13.01 Bibcock Nos


B.13.02 Long Body Bibcock Nos
B.13.03 Pillar cock Nos
B.13.04 Angular stop cock Nos
B.13.05 Soap Holder Nos
B.13.06 Towel ring Nos
B.13.07 Toilet paper holder Nos
B.13.08 Glass self 22" Nos
B.13.09 Towel rail 24" Nos
B.13.10 Shower arm 190mm long light Nos
B.13.11 CP Grating Nos
B.13.12 Concealed stop cock Nos
B.13.13 Connecting Pipe Nos

SOUTHCO: IPDS SCHEME Page 136 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.13.14 Basin with pedestal Nos

Providing and fixing vitreous China water closet (European with seat and lid), of Cerra Cascade CASINO, CP brass buffers, 10 litre
B.14 cascade dual flushing cistern hinges & rubber with fittings and brackets, 40 mm flush bend of CP brass, 20 mm overflow pipe with Nos
specials & mosquito proof coupling complete, painting on brackets and making good the walls and floors wherever required.

Providing and fixing vitreous China water closet Indian type of Orissa pattern size (580mmx440mm) of approved quality with PVC
Slimeline (Parryware make) 12.5 ltr capacity low level cistrn with hinges & rubber with fittings and brackets, 40 mm flush bend of CP
B.15 Nos
brass, 20 mm overflow pipe with specials & mosquito proof coupling complete, painting on brackets and making good the walls and
floors wherever required.
Providing and fixing vitreous China water urinal of Cerra/Parry ware with fittings and brackets, flush bend of CP brass, and making
B.16 Nos
good the walls and floors wherever required.

Supply of all materials, labour, T&P , fitting and fixing in all floors fixed type bevelled plate glass mirror of size 600mm x 450mm x 5.5mm
B.17 thick best Indian make ,supply of 13mm thick asbestos backing and CP Brass screw including cost conveyance, taxes of all materials Nos
complete as per specification and direction of Engineer-in-charge(Make-Modi Guard/Belgium)

Supply of all materials, joining materials ,labour and T&P and laying UPVC SWR PIPES of Standard make with ISI Mark duly approved
by the Engineer-in-charge including jointing, earthwork in excvation of trenches in all kind of soil to the required depth and refilling of
B.18 pipe line trenches in 0.3048 mtrs layers with 300 mm deep sand around cushion duly watered and rammed or fixing to walls, floors with
supply of necessary clamps, nails and cutting the pipe to length with wastage including supply of all Clamps, Clips, Endcaps & jointing
materials etc, complete as per standard specification and direction of Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 137 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.18.01 100mm dia ( ISI Marked ) Mtr


B.18.02 150mm dia ( ISI Marked) Mtr
Supplying all materials, labour T&P for jointing of the UPVC SWR SEWER pipe fittings of standard make duly approved by the Engineer-
B.19 in-charge with joining material etc. suitably required for fixing on 100mm dia soil waste pipe complete with requissite testing as directed
by Engineer-in-charge.
B.19.01 100mm dia "P" Trap Nos
B.19.02 100mm dia Bend Plain Nos
B.19.03 100mm Door Bend Nos
B.19.04 100 mm dia Single Junction with Door Nos
B.19.05 100 mm dia double Junction with Door Nos
B.19.06 100mm dia Terminal Guard Nos
B.19.07 100mm dia. Floor trap Nos
Supplying all materials, labor T&P for jointing of the UPVC SWR SEWER pipes & fittings of standard make duly approved by the
B.20 Engineer-in-charge suitably required for fixing on 100mm dia soil waste pipe complete with requissite testing as directed by Engineer-in-
charge.
B.20.01 100mm Pipe Mtr
B.21 Fixing of UPVC vent pipes Including labour & T&P all complete as directed by the Engineer-in-charge. Nos
B.21.01 100mm Pipe Mtr

SOUTHCO: IPDS SCHEME Page 138 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.21.02 100mm Vent Cowl No

Supplying all materials labour T&P and constructing inspection chamber C.C.(1:4:8) on bed with hard stone metal size 40mm and 250mm
K.B.Bricks work having crushing strength 75 Kg to 99 Kg/cm2 in cement mortar (1:4), R.C.C. roof slab with 500mm dia light pattern
factory made SFRC M.H cover with frame, moulding and shaping the channel and benching with C.C. 1:2:4 with hard granite chips 12mm
B.22
size, 12mm thick C.P 1:3 including cement punning inside, Cement plaster (1:3) outside the chamber, earth work in excavation in all kinds
of soil and refilling the cavity around the chamber as per detail drawing & design and specification including cost, conveyance, taxes
etc.all complete as directed by Engineer-in-charge.

B.22.01 750mmx 750mm x450mm No

Supplying all material, labour, T&P and constructing manhole chamber of size as mentioned below with 250mm nominal size K.B. Brick
having crushing strength 75kg to 99kg /cm2 in CM 1:4 over a bed of 150mm thick C.C(1:4:8) using 40mm size HG metal, plastering with
12mm thick cement mortar (1:3) on internal and external surface, inside finsh with neat cement punning, providing & fixing step iron of
appropriate quality & size with 3 coats anticorrosive paint, RCC (1:1.5:3) cover slab using 20m & down size graded HG chips alongwith
B.23 No
factory made reinforced concrete cover with frame including breaking of pipe line where ever necessary and earth work in excavation in
all kind of soil & rock and refilling the cavity by selective soil, levelling the surface around the chamber with disposal of surplus earth if
any to a distance of 50mt as per specification, design & drawing including cost of curing and all taxes , royality , cost , conveyance etc. all
complete as directed by the Engineer-in-charge.

SOUTHCO: IPDS SCHEME Page 139 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supplying all material, labour, T&P and constructing 1.80m dia x 2.60m deep soak way pit with dry brick walling upto 2.00m height and
1st class K.B. Brickwork in cement mortar (1:6) for the remaining 06.60m height at top, 12mm thick cement plaster (1:4) inside and outside ,
100mm thick gravel backing in the rear of well staining, 125mm thick RCC cover slab fitted with with iron lifting handles including earth
B.24 No
work in excavation in all kind of soil & rock and refilling the cavity by selective soil, levelling the surface around the pit with disposal of
surplus earth if any to a distance of 50mt including cost of curing and all taxes , royality , cost , conveyance etc. all complete as directed by
the Engineer-in-charge.

Drilling of tube well bore and installation of submersible pump, submersible motor, cabling and
B.25 Set.
control panel of suitable capacity as per Technical Specification & Scope of works.

Design, engineering and construction of Cable Trench of require width, required depth, precast RCC Trench Cover (chequred plate
inside control room), Water stops, Brick Work wherever required including supply of T&P, Labour, Cement, Reinforcement Steel, Steel
B.26
Angles, Flats, Form Work, Excavation etc, all complete as per detailed Technical Specification & Scope of works.

B.26.01 Switchyard Cable trench (Internal width 750 mm). ( Ref Drawing No : REC/DDUGJY/GEN/11A) R/Mtr
B.26.02 Switchyard Cable trench (Internal width 500 mm). ( Ref Drawing No : REC/DDUGJY/GEN/11B) R/Mtr

B.26.03 Cable trench inside control room (internal width 1000 mm). ( Ref Drawing No : REC/DDUGJY/33/11 kV PSS/19A) R-Mtr

Design, engineering and construction of Drainage System made of brick work in the Substation to DISCHARGE WATER from
B.27 SWITCHYARD,WASH BASIN AND CONTROL ROOM ROOF (10 mts) as per design, Technical Specification & Scope of works . (Ref R/Mtr
Drawing No :REC/DDUGJY/33/11kV PSS/17)

SOUTHCO: IPDS SCHEME Page 140 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.28 Gravel filling in switchyard area (of 20mm size, 40ftx40ft) excluding road and footpath as per Technical Specification, & Scope of works. Sqm.

Erection, filtration, testing and commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu Wound, Outdoor Conventional type Power
Transformer along with transformer oil, Buchholtz relay, breather, OTI & WTI, Marshalling Box, Conservator tank, oil level indicator,
B.29 valves by providing 2 sets of 50x8 mm GS Neutral Earthing strips with braided conductor on bushing end supported with insulators, OTI
& WTI Indicators, Vent explosion plug, control wiring / cabling, cable supporting tray on the body,transformer wheels, bushing etc as per
Technical Specification & Scope of works.

B.29.01 3.15 MVA with On load tap changer. Nos.


B.29.02 5.00 MVA with on load tap changer. Nos.
B.29.03 8.00 MVA with on load tap changer. Nos.
B.29.04 10.0 MVA with on load tap changer. Nos.
B.29.05 12.5 MVA with on load tap changer. Nos.
B.30 33/0.433 KV Station Transformer
B.30.01 Excavation for 9 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth)

B.30.01(a) Excavation (Including Require Back Filling) of pole pit in normal soil as per scope of work and specifications. Cmt.

B.30.01(b) Excavation (Including Require Back Filling) of pole pit in soft rock where blasting is not required as per scope of work and specifications. Cmt.

SOUTHCO: IPDS SCHEME Page 141 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.30.02 Erection of the Poles and prefabricated steel items by providing pole numbering as per scope of work and specifications.

Erection of 9 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats
B.30.02(a) Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Double Pole structures for 33/0.433 KV
Station Transformer)

B.30.02(b) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole. Cmt.

Erection, testing and commissioning of 100 KVA, 33/0.4 kV, 3 ph, 50 Hz, ONAN, aluminium / copper wound outdoor type Distribution
B.30.03 Nos.
Transformer (Station Transformer) as per Technical Specification & Scope of works.

Erection, testing and Commissioning of 33KV, 200A, 25KA, 3-ph, 3 Pin type, Horizontal Mounting type, AB Switch along
B.30.04 with phase coupling shaft, operating rod,operating handle,4 -bolt type connector,Support Insulators, Base Channel,AB Switch Set
Channel (75X75X6), down Pipe, Arcing Horns etc. complete as per technical specifications, scope of works.

Erection, testing and Commissioning of 30kV, 10kA, 1-ph Station Class Lightening Arresters, jumpering from bus bar,hardware etc as
B.30.05 Nos.
required, as per technical specifications and scope of the work,
Erection, testing and commissioning of 33 kV, 3-ph, HG fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel
B.30.06 Set
etc. complete as per technical specifications, scope of works.

SOUTHCO: IPDS SCHEME Page 142 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection,Testing and Commissioning Outdoor type Distribution Box for station transformer comprising 400 A TPN Switch Fuse Unit as
incommer , 2 Nos 200A TPN Switch Fuse Unit as outgoing, tri-vector electronic energy meter with suitable CT, control/power cabling
B.30.07 Set.
and terminals, 1 No 20 A Industrial socket and switch for local power supply requirements, mounting channel, clamps and hardware as
per scope of work and technical specifications.

B.31 Excavation for 9 Mt. long RS Joist 152x152 mm Gantry structures poles (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth)

B.31.01 Excavation (Including Require Back Filling) of pole pit in normal soil as per scope of work and specifications. Cmt.

B.31.02 Excavation (Including Require Back Filling) of pole pit in soft rock where blasting is not required as per scope of work and specifications. Cmt.

Erection of the Gantry structures Poles and prefabricated steel items by providing pole numbering as per scope of work and
B.32
specifications.

Erection of 9 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
B.32.01 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.

B.32.02 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole. Cmt.

SOUTHCO: IPDS SCHEME Page 143 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and Commissioning of 36KV, 800A, 25KA for 3 seconds, 3-ph double break center rotating type (DBCR), motorised Gang
B.33 Operated Isolator with earth switch along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required Set.
accessories complete as per technical specifications and scope of works

Erection, testing and commissioning of 36KV, 800A, 25KA for 3 seconds, 3-pole, Outdoor type Vacuum Circuit breaker along with 36kV,
1-Phase, 400-200/1-1-1 Amps 3 Nos outdoor type Current Transformers along with junction box (1 no junction box for 3 no of 1-phase
B.34 Nos.
CTs), Jumpers, earthing, supporting structures, bi-metallic clamps, permanent maintenance platform, marshalling box etc required as per
technical specifications and scope of works.

Erection, testing and commissioning of 33KV, Indoor, Feeder Control & Relay panel along with E/F & O/C numeric relays, Mimic
B.35 Diagram, Voltmeter, Ammeter, Static Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc Nos.
as per specifications and scope of works.

Erection, testing and commissioning of 33KV, Indoor, Transformer Control & Relay panel along with E/F & O/C, Differential Numeric
B.36 Relay Mimic Diagram, Voltmeter, Ammeter, Static Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other Nos.
components etc as per specifications and scope of works.

Erection, testing and commissioning of 30 KV Station Class Lightening Arrester with mounting platform, hardware etc as required as per
B.37 Set.
technical specifications and scope of the works.

SOUTHCO: IPDS SCHEME Page 144 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and commissioning of 36 KV, 1-Phase, 33kV/3/110/3 volt, Single core outdoor type Potential Transformer along with
B.38 junction box (1 no junction box for 3 no of 1-phase PTs), bi-metallic clamp and required accessories etc. ( 1 set consists of 3 PTs & 1 junction Set.
box), complete as per technical specifications and scope of the works.

Erection, testing and commissioning of 12 KV, 1250A, 25kA for 3 seconds, 3-ph double break centre rotating type (DBCR), Gang
B.39 Operated Isolator along with Support Insulators, Operating Mechanism, Base Channel, down Pipe and all required accessories Set.
complete as per technical specifications and scope of works for outgoing feeder.

Erection, testing and commissioning of 9 KV Station Class Lightening Arrester with mounting platform, hardware etc as required as
B.40 Set.
per technical specifications and scope of the works.

Erection, testing and commissioning of 48V, 100 AH VRLA Battery, Battery stand made of teak wood duly painted with anti rusting paint,
B.41 battery insulators, inter-battery wiring using 30 sqmm, 1.1 kv, copper single core multi strand cable, terminal connectors, & all other Set.
accessories and connectors as per technical specifications and scope of works.

Erection, testing and commissioning of Float-cum-Boost Battery Charger for 48 V,100 AH Battery with full wave rectification for 230 V,
B.42 Set.
1 phase, 50 Hz AC Input Supply as per technical specifications and scope of works.

SOUTHCO: IPDS SCHEME Page 145 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and commissioning of 415 V, ACDB along with three phase-neutral voltmeter, three phase ammeter and Selector
switches, 250 Amps TPN MCCB as incomer, 63 A TPN MCCB-2 nos , 32A TPN MCCB-5 nos. , 16A Amps SP MCB - 9 nos. as outgoing
B.43 Nos.
feeders suited for number of control panels, nos of VCB kiosk panel, having 20% spare space provision outgoing feeders, mounting
arrangements etc as per chapter 71 of vol-III of technical specifications and scope of works.

Erection, testing and commissioning of 48 Volts (or voltage as per state practices) Direct Curent Distribution Board (DCDB) Indoor floor
mounted comprising of 63A DP MCCB as incommer and 32 A DP MCB -1 no & 16A DP MCB -10 nos for each individual outgoing circuit
B.44 Set.
of indoor control panels, indoor/outdoor VCB panels, control room emergency DC lighting including 20% as sparespace provision as per
technical specifications and scope of works. .

Paying out,tensioning, binding, testing and commissioning of AAA Conductor(19/3.94 mm (232 mm Al. Area) - Panther) for Bus-Bars &
B.45 Jumpers/Droppers/Terminations and by supplying & erecting of jointing sleeves, binding materials, PG clamps, bi-metallic conducors, KM.
hardware etc as required as per scope of work and technical specifications.

Excavation, laying, welding, refilling, earthing & grounding conductor as per Approved Electrical Layout for each sub-station and
B.46
erection of riser up to various equipment/gantry structures as per Technical Specification & Scope of works

B.46.01 75 x 8 mm GI flat MT.


B.46.02 50 x 6 mm GI flat MT.
B.46.03 50 x 8 mm GI flat MT.

SOUTHCO: IPDS SCHEME Page 146 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.46.04 25 x 3 mm GI flat MT.


Excavation, concreting, Erection, Testing and Commissioning of Earthing arrangement as per technical specifications and scope of
B.47
work.

B.47.01 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder,RCC Pit and other accessories complete. Set.

Erection, testing and commissioning of 33 kV polymer/porcelain insulator including their hardware fittings as per technical
B.48
specification and scope of work.

B.48.01 33 KV Porcelain (B&S type) Disc insulator 70 KN along with suitable hardware fittings for Panther. Nos.

B.48.02 33 KV Polymer (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings Set.

B.48.03 33 KV Porcelain Post Insulators 10 KN. Nos.


B.48.04 33 KV Polymer Post Insulator 10 KN along with suitable hardware fittings. Set.
B.48.05 11 KV Porcelain(B&S Type) Disc insulator 45 KN along with suitable hardware fittings. Nos.
B.48.06 11 KV Polymer Disc insulator 45 KN along with suitable hardware fittings. Set.
B.48.07 11 KV Porcelain Post Insulators 5 KN with suitable hardware fittings Nos.
B.48.08 11 KV Polymer Post Insulator 5 KN with suitable hardware fittings. Set.

SOUTHCO: IPDS SCHEME Page 147 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and commissioning of Internal Electrification works of control room comprising of Main Distribution Board, Sub-
distribution Boards, copper flexible multi conductor 2.5 sqmm wiring (for light & fan)/4 sqmm wiring(for power points), power and light
B.49 points, conduits, fan (56" sweep 2 Nos)/LED lamps, exhaust fan (12" - 2 Nos), switches, sockets, 2mm thick, PVC 25mm dia conduits pipes Set.
in recess, plugs, miniature circuit breakers, seperate independent earthing (2 Nos of 40mm GI Pipe/3-m long)etc as required including DC
emergency lighting and auto-change-over switch as per technical specifcations and scope of works .

Erection, testing and commissioning of External Electrification in switch yard area including power receptacles, station yard lighting with
B.50 4 Nos lightening mast (fitted with 1x100 watts LED fittings at four corner) made of 12 meters high Steel Tubular Poles (IS 2713 part I, II) of Set.
designation 410 SP - 60, complete as per technical specifications and scope of the work.

Laying, testing and commissioning of LT Power Cables including their termination materials like glands, lugs, tagging etc. as per
B.51
technical specifications and scope of the work.
B.51.01 3.5 Core 150 Sq. mm unarmoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
B.51.02 3.5 Core 70 Sq. mm unarmoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
B.51.03 2 Core 35 Sq. mm unarmoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
B.51.04 2 Core 16 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
B.51.05 Joints, Glands, Lugs and tagging as per Requirments for the above power Cables LS
Laying, testing and commissioning of LT Control cables including their termination materials like glands, lugs, tagging etc. as per
B.52
technical specifications and scope of the work.

SOUTHCO: IPDS SCHEME Page 148 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.52.01 2 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
B.52.02 4 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
B.52.03 6 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
B.52.04 10 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
B.52.05 Joints, Glands, Lugs and tagging as per Requirments for the above control Cables LS

Erection, testing and commissioning of 12 KV, 1250 A, 25kA for 3 seconds, 3-ph, indoor type Switchgear(VCB) Panel along with 3 Nos.12
kV, 1-Phase, 600-300/1-1-1 or 3 Nos indoor type Current Transformer (One core PS class, One core 5P10 and Third Core 0.5 Class), indoor
B.53 mounting type control panel for Transformer breaker, control cabling between VCB and indoor control panel and required accessories, bi- Nos.
metallic clamps, Tri Vector Meter, A-meter, volt-meter, Relays & accessories complete as per specifications for transformer breaker &
protection.

Erection, testing and commissioning of 12 KV, 1250 A, 25kA for 3 seconds, 3-ph, indoor type Switchgear(VCB) Panel alongwith 3 Nos. 12
kV, 1-Phase, 600-300/1-1-1 or 3 Nos indoor type Current Transformer ( Two core 5P10 and Third Core 0.5 Class), indoor mounting type
B.54 Nos.
control panel for Feeder breaker & Protection , control cabling between VCB and indoor control panel and required accessories, bi-metallic
clamps, Tri Vector Meter, A-meter, volt-meter, Relays & accessories complete as per specifications for Feeder breaker & protection.

B.55 Erection, testing and commissioning of 12 kV Bus cupler Indor AIS Panel consiting of Breaker - 1250A, Bus-bar - 1250A (Copper). Set.

SOUTHCO: IPDS SCHEME Page 149 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Laying, testing and commissioning of 11 KV, XLPE, 3 phase Power cable unarmored, aluminium conductor, stranded, including their
B.56
termination materials like glands, lugs, tagging etc as required as per technical specifications and scope of the works.

B.56.01 1C X 630 sqmm, (for 12.5 MVA incoming cable to 11kV CR Panel). KM.
B.56.02 3C X 400 sqmm, (for 3.15 MVA, 5 MVA & 8 MVA incoming cable to 11kV CR Panel). KM.
B.56.03 3C X 300 sqmm, (from 11kV CR Panel to 11kV Outdoor DP Structure). KM.
Erection, testing and commissioning of Heat Shrink Out Door cable termination kit complete with all accessories and tagging etc. as per
B.57
technical specifications and scope of the works.
B.57.01 For 1C X 630 sqmm, With one spare Set.
B.57.02 For 3C X 400 sqmm, With one spare Set.
B.57.03 For 3C X 300 sqmm, With one spare Set.
Erection, testing and commissioning of Heat Shrink In Door cable termination kit complete with all accessories and tagging etc. as per
B.58
technical specifications and scope of the works.
B.58.01 For 1C X 630 sqmm, With one spare Set.
B.58.02 For 3C X 400 sqmm, With one spare Set.
B.58.03 For 3C X 300 sqmm, With one spare Set.

Erection, testing and commissioning of 12 KV, 3-pole, 1-Phase, 11KV/110 volt, Single core Indoor type Potential Transformer along with
B.59 Set.
required accessories etc., complete as per technical specifications and scope of the works.

SOUTHCO: IPDS SCHEME Page 150 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

B.60 Erection, testing and commissioning of Feeder Metering

33 KV Feeder Metering at 33/11 kV substation using 33 kV/110 V, 3 ph 4 wire CT ratio 400-200/1 A outdoor oil immersed type metering
equipment including supporting steel fabricated structure, earthing coil, 2Cx2.5 sqmm copper control stranded unarmoured cable, 16 mm
B.60.01 Set.
dia nuts & bolts, meter (HT trivector DLMS compliant category A meter suitable for substation/feeder metering, 3 ph 4 w 110 V 1 A
accuracy class 0.5s with danger board, GI earth wire etc as per specification & scope of works.

11 KV Feeder Metering at 33/11 kV substation using 11 kV/110 V, 3 ph 4 wire CT ratio 400-200/1 A outdoor oil immersed type metering
equipment including supporting steel fabricated structure, earthing coil, 2Cx2.5 sqmm copper control stranded unarmoured cable, 16 mm
B.60.02 Set.
dia nuts & bolts, meter (HT trivector DLMS compliant category A meter suitable for substation/feeder metering, 3 ph 4 w 110 V 1 A
accuracy class 0.5s with danger board, GI earth wire etc as per specification & scope of works.

Erection and commissioning of IPDS New 33/11 kV substation board by providing board, mounting angles, excavation, cement
B.62 Set.
concreting foundation, painting etc as requiredsign Board as per scope of work and technical specification.

Erection, testing and commissioning of 1.5 Ton capacity Window Air Conditioning units with Remote control facility: Including supply of
B.63 Nos.
window Air conditioner Min. 3 Star rated, voltage stabiliser, control boxes etc for completing the A.C scheme.

Erection and testing of Power Receptacles 63A MCCB as incomer, 40A 3 phase socket/switch and 1 No, 20A single phase Industrial type
B.64 Nos.
socket/switch of reputed brand and type.
Fire Fighting/ Protection Equipment System(Fire Bucket (10 Lt. each),Fire Bucket Mounting-stand( 50x50x6 MS stand duly
B.65 painted),Carbon dioxide type (4.5 Kg. Each),Carbon dioxide type Trolley Mounted of 22.5 Kg Capacity,Dry Chemical Powder Type (6 Kg Set.
Each)) as per scope of work and technical specification.

SOUTHCO: IPDS SCHEME Page 151 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and commissioning of 3-Ph 4-Wire 1100 V Submersible Pump(30 Stage),1000 litter Syntax overhead tank & PVC pipe with
B.66 fitting,Start panel with IP 52 protection,water taps and all sanitary items for control room, switch yard and toilets or more with required Set.
Locations inside the boundary.

Erection, testing and commissioning of 36KV, 800A, 25KA for 3 seconds, 3-ph double break center rotating type (DBCR), motorised Gang
B.67 Operated Isolator without earth switch along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required Set.
accessories complete as per technical specifications and scope of works

Total Erection Price (B)

C.
New 11 KV Lines Km
( consisting of but not limited to the following major materials)

C.1 Survey, route alignment & pole spotting, preparation of survey report with drawings Km
C.2 Excavation of pole pit for 11 KV overhead line as per scope of work and specifications.
C.2.01 Excavation & back filling of pole pit in normal soil as per scope of work and specifications:
C.2.01(a) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
C.2.01(b) 10 Mt. RS Joist pole 116x100 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
C.2.01(c) 13 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

C.2.01(d) 11 Mt. long Steel Tubular poles of Designation 540 SP 52 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 152 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

C.2.01(e) 13 Mt. long Steel Tubular poles of Designation 540 SP 72 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

C.2.02 Excavation & back filling of pole pit in soft rock where blasting is not required as per scope of work and specifications:

C.2.02(a) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
C.2.02(b) 10 Mt. RS Joist pole 116x100 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
C.2.02(c) 13 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

C.2.02(d) 11 Mt. long Steel Tubular poles of Designation 540 SP 52 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

C.2.02(e) 13 Mt. long Steel Tubular poles of Designation 540 SP 72 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

C.2.03 Excavation & back filling of pole pit in hard rock where blasting is required as per scope of work and specifications:

C.2.03(a) 9 Mt. long, 300 KG PSC Poles. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
C.2.03(b) 10 Mt. RS Joist pole 116x100 mm. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
C.2.03(c) 13 Mt. long RS Joist pole152x152 mm. (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

C.2.03(d) 11 Mt. long Steel Tubular poles of Designation 540 SP 52 (IS 2713, Pt I, III 1980). (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

C.2.03(e) 13 Mt. long Steel Tubular poles of Designation 540 SP 72 (IS 2713, Pt I, III 1980). (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 153 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

C.3 Erection of the Poles for 11 KV overhead line by providing pole numbering as per scope of work and specifications:

Erection of 9 mtr PSC Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc. made of Channels
(100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical specification
C.3.01 No.
and scope of work.
( Single pole structure)

C.3.01(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

Erection of 10 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc. made of Channels
(100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical specification
C.3.02 No.
and scope of work.
( Single pole structure)

C.3.02(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402 cmt/Pole Cmt.

SOUTHCO: IPDS SCHEME Page 154 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of 11 mtr Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
C.3.03 No.
specification and scope of work.
( Single pole structure)

C.3.03(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 9 mtr PSC Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
C.3.04 No.
specification and scope of work.
( Double pole structure)

C.3.04(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

Erection of 10 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
C.3.05 No.
specification and scope of work.
( Double pole structure)

SOUTHCO: IPDS SCHEME Page 155 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

C.3.05(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402 cmt/Pole Cmt.

Erection of 11 mtr Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc.
made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per
C.3.06 No.
technical specification and scope of work.
( Double pole structure)

C.3.06(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 13 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
C.3.07 No.
specification and scope of work.
( Double pole structure)

C.3.07(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

SOUTHCO: IPDS SCHEME Page 156 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of 13 mtr long Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat
etc. made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per
C.3.08 No.
technical specification and scope of work.
( Double pole structure)

C.3.08(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 9 mt PSC Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
C.3.09 No.
specification and scope of work.
( Four pole structure)

C.3.09(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

Erection of 10 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
C.3.10 No.
specification and scope of work.
( Four pole structure)

SOUTHCO: IPDS SCHEME Page 157 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

C.3.10(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402cmt/Pole Cmt.

Erection of 11 mtr long Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat
etc. made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per
C.3.11 No.
technical specification and scope of work.
( Four pole structure)

C.3.11(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527cmt/Pole Cmt.

C.4 Excavation & back filling of stay pit in following type of soils, as per scope of work and specifications:
C.4.01 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
C.4.02 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
C.4.03 Hard rock soil where blasting is required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

Erection of Stay Set (Galvanised) with 50x8 mm stay clamps, guy insulator (2 Nos.) Designation'C', anchor plate (200x200x6mm), Eye
C.5 bolts with 2 nuts, 1 No turn-buckles,G.I Thimble 2 Nos., 1.8 m long, 16 mm diameter solid GI stay rod & 7/3.15 mm dia (5.5Kg/Stay) GI Set
stranded wire complete as per technical specification and scope of work.

C.5.01 concreting 1 part cement, 2 part sand, 4 part 25 mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set Cmt

SOUTHCO: IPDS SCHEME Page 158 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Excavation, concreting, Erection, Testing and Commissioning of Earthing arrangement as per technical specifications and scope of
C.6
work.
40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder,RCC Pit and other accessories complete.(Used at line
C.6.01 Set.
crossing, DP structure and other specific locations).
C.6.02 GI Earthing spike made of 20 mm dia. 2500 mm solid rod with clamp . Set.

C.6.03 6 SWG GI wire for earthing (for connection of all metallic material with,GI Pipe earth Electrode/GI Earth Spike/Rod Earth Electrodes) MT.

Erection, testing and commissioning of 11 kV insulator including their hardware fittings as per technical specification and scope of
C.7
work.

C.7.01 11 KV Porcelain (B&S type) Disc insulator 45 KN along with suitable hardware fittings for heavily poluted area. Nos.

11 KV Porcelain (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings for
C.7.02 Set.
Rabbit Conductor in normal and moderately polluted area.
11 KV Porcelain (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings for
C.7.03 Set.
Raccoon Conductor in normal and moderately polluted area.
11 KV Porcelain (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings for
C.7.04 Set.
Dog Conductor in normal and moderately polluted area.

C.7.05 11 KV Polymer (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings Set.

C.7.06 11 KV Porcelain Pin Insulator 5KN for heavily poluted area. Nos.
C.7.07 11 KV Porcelain Pin Insulator 5KN for normal and moderately poluted area. Nos.

SOUTHCO: IPDS SCHEME Page 159 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

C.7.08 11 KV Polymer Pin insulator 5 KN along with suitable hardware fittings. Set.
11 KV Porcelain Strain insulator (T&C type) along with suitable hardware fittings. (For XLPE insulated ABC) (1 set = 1 disc with, one
C.7.09 Set.
hardware)
11 KV Polymer Strain insulator (T&C type) along with suitable hardware fittings. (For XLPE insulated ABC) (1 set = 1 disc with, one
C.7.10 Set.
hardware)

C.7.11 Suspension Clamp with suspension bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x95 sqmm ABC ) Set.

C.7.12 Suspension Clamp with suspension bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x120 sqmm ABC ) Set.

Suitable Tapping arrangement along with associated accessories complete (1 Set = 3 nos.) suitable for 11 kV Aerial Bunched Conductor (3c
C.7.13 Set.
x 95 sq.mm + Messenger Wire)

C.7.14 Dead End Clamp with eyehook/ pole bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x95 sqmm ABC ) Set.

C.7.15 Dead End Clamp with eyehook/ pole bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x120 sqmm ABC ) Set.

Suitable Tapping arrangement along with associated accessories complete (1 Set = 3 nos.) suitable for 11 kV Aerial Bunched Conductor (3c
C.7.16 Set.
x 120 sq.mm + Messenger Wire)

SOUTHCO: IPDS SCHEME Page 160 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection,paying out, tensioning, binding of conductor and tightening of stays and stringing, testing and commissioning of 11 KV
C.8 AAAC Conductor/ ABC of following sizes including jointing sleeves, helical formed fittings, jumpering and by providing & erecting
PG Clamps etc as required as per scope of work and technical specifications complete.

C.8.01 7/2.5 mm (35 mm Al. Area) - Weasel. (1 CKM.= 3 KM. Conductor Length) CKM.
C.8.02 7/3.15 mm (55 mm Al. Area) - Rabbit. (1 CKM.= 3 KM. Conductor Length) CKM.
C.8.03 7/3.81 mm (80 mm Al. Area) - Raccoon. (1 CKM.= 3 KM. Conductor Length) CKM.
C.8.04 7/4.26 mm (100 mm Al. Area) - Dog. (1 CKM.= 3 KM. Conductor Length) CKM.
C.8.05 11 KV 3C x 95 mm with bare messenger (1CX70 mm2) XLPE insulated Aerial Bunch Cable. CKM.
C.8.06 11 KV 3 x 120 mm with bare messenger XLPE insulated Aerial Bunch Cable. CKM.
Erection, testing and Commissioning of 12KV, 200A, 25kA for 3sec, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB
C.9 Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications and scope Set
of works
C.10 Erection of 11 KV LINE FOR UNDER GROUND RAILWAY CROSSING & NH Crossing

SOUTHCO: IPDS SCHEME Page 161 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

11 KV LINE FOR UNDER GROUND RAILWAY CROSSING & NH Crossing BY 2 Nos (INCLUDING ONE SPARE) 3Cx185 Sqmm XLPE
Armoured Cable (0.120 km each) USING 140MM DIA HDPE PIPES (PE80 PN8 for underground laying and PE80 PN6 for pole support),
C.10.01 OUTDOOR HEAT SHRINKABLE CABLE JOINTING KITS, 11 KV LIGHTENING ARRESTOR STATION CLASS 10KA (6 NOS.), LUGS, 4 Set
Nos GI 3-Meters LONG pipe EARTHING, 6 SWG GI WIRES, CABLE MARKERS, BI METALLIC CLAMPS, JUMPERING etc AS
REQUIRED AS PER TECHNICAL SPECIFICATIONS AND SCOPE OF THE WORK.

11 KV LINE FOR UNDER GROUND RAILWAY CROSSING & NH Crossing BY 2 Nos (INCLUDING ONE SPARE) 3Cx300 Sqmm XLPE
Armoured Cable (0.120 km each) USING 140MM DIA HDPE PIPES (PE80 PN8 for underground laying and PE80 PN6 for pole support),
C.10.02 OUTDOOR HEAT SHRINKABLE CABLE JOINTING KITS, 11 KV LIGHTENING ARRESTOR STATION CLASS 10KA (6 NOS.), LUGS, 4 Set
Nos GI 3-Meters LONG PIPE EARTHING, 6 SWG GI WIRES, CABLE MARKERS, BI METALLICK CLAMPS, JUMPERING etc AS
REQUIRED AS PER TECHNICAL SPECIFICATIONS AND SCOPE OF THE WORK.

Mounting & erection of Anti-Climbing device/Barbed Wire with Danger Board, complete as per technical specifications and scope of
C.11 Set
works .

C.12 Erection and Mounting of Guarding Arrangement for Road/Line Crossing. ( Ref Drawing No : REC/DDUGJY/11kV/25) Set

Total Erection Price (C)

D.
New 11/0.433 kV Distribution Transformer on DP Structure/Plinth No.
( consisting of but not limited to the following major materials)

SOUTHCO: IPDS SCHEME Page 162 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

D.1.01 Excavation of pole pit (of depth 1/6th of pole length) in normal soil as per scope of work and specifications:

D.1.01(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
D.1.01(b) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
D.1.01(c) 9 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
Excavation of pole pit (of depth 1/6th of pole length) in soft rock where blasting is not required as per scope of work and
D.1.02
specifications:
D.1.02(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
D.1.02(b) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
D.1.02(c) 9 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.

Erection of Poles & Pre-fabricated steel items like DC cross arm (100x50x6 mm), back clamps (65x8 mm), pole clamp (65x8 mm),
transformer mounting & pressure channel (100x50x6 mm), transformer clamping set (50x50x6 mm), transformer belting set ( 50x50x6
D.2
mm) as per technical specification and scope of work. ( Ref Drawing No : REC/DDUGJY/DTR-SS/03, REC/DDUGJY/DTR-SS/04,
REC/DDUGJY/DTR-SS/07 ) for 11/0.433 KV DTR as per scope of work and specifications:

D.2.01 8 Mt. long, 200 KG PSC Pole DP structure No.

SOUTHCO: IPDS SCHEME Page 163 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

D.2.02 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

D.2.03 9 Mt. long, 300 KG PSC Poles DP structure No.

D.2.04 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

D.2.05 9 Mt. long RS Joist pole152x152 mm (37.1Kg/Meter) DP structure No.

D.2.06 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402cmt/Pole Cmt.

D.3 Plinth for Transformer Mounting


D.3.01 Excavation of earth in normal soil as per scope of work and specifications.
D.3.01(a) 11/0.433 KV Distribution Transformer 250 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.
D.3.01(b) 11/0.433 KV Distribution Transformer 315 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.
D.3.01(c) 11/0.433 KV Distribution Transformer 500 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.
D.3.02 Excavation of earth in soft rock as per scope of work and specifications.
D.3.02(a) 11/0.433 KV Distribution Transformer 250 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.

D.3.02(b) 11/0.433 KV Distribution Transformer 315 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.

D.3.02(c) 11/0.433 KV Distribution Transformer 500 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 164 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Brick masonary work and cement plastering as per scope of work and specifications. for 11/0.433 KV DTR with numbering as per
D.4
scope of work and specifications:
D.4.1(a) Brick masonary work for 11/0.433 KV Distribution Transformer 250 KVA 3 phase No.

D.4.1(b) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-12.1875cmt/DT Cmt.

D.4.2(a) Brick masonary work for 11/0.433 KV Distribution Transformer 315 KVA 3 phase No.

D.4.2(b) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-12.1875cmt/DT Cmt.

D.4.3(a) Brick masonary work for 11/0.433 KV Distribution Transformer 500 KVA 3 phase No.

D.4.3(b) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-12.1875cmt/DT Cmt.

D.5 Excavation of stay pit in following type of soils, as per scope of work and specifications:
D.5.01 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
D.5.02 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

Erection of Stay Set (Galvanised) with 50x8 mm stay clamp, stay insulator (1Nos.), anchor plate (200x200x6 mm), nut bolts, 1 Nos turn-
D.6.1 buckles,G.I Thimble 2 Nos., 1.8 m long, 16 mm diameter solid GI stay rod & 7/3.15 mm dia (5.5Kg/Stay) GI stranded wire with Set
insulator mounting & jumpering complete as per technical specifications and scope of work.(8.445 KG.).

SOUTHCO: IPDS SCHEME Page 165 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

D.6.2 concreting 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set Cmt

Excavtion for Earthing arrangement 5 Nos. 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder,RCC Pit
D.7 and other accessories complete.(Used at line crossing, DP structure and other specific locations) as per technical specifications and
scope of work.

D.7.1 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 3 Mtr Depth) Cmt.
D.7.2 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 3 Mtr Depth) Cmt.

Erection, testing and commissioning of 5 Nos. 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder and
D.8 other accessories complete. as per IS 1161, making earth grid using 50x6mm GI Flat and 25x3mm riser and RCC pit as per scope of
work of Distribution Transformer Substations and technical specifications.

Erection, testing and commissioning of 5 Nos. 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder and
D.8.1 Set
other accessories complete
D.8.2 50 x 6 mm GI flat. MT.
D.8.3 25 x 3 mm Galvanized GI flat. MT.
D.8.4 6 SWG GI wire for earthing as per technical specifications and scope of works. MT.

Erection, testing and commissioning of 11 kV Polymer/ Porcelain Insulators with hardware fittings, hardware etc as required as per
D.9
technical specification and scope of work.

SOUTHCO: IPDS SCHEME Page 166 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

D.9.1 11 KV Porcelain (B&S Type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings. Set.

D.9.2 11 KV Polymer (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings Set.

D.9.3 11 KV Porcelain Pin Insulators 5 KN with GI PIN. Nos.


D.9.4 11 KV Polymer Pin Insulators 5 KN with suitable hardware fittings. Set.
D.9.5 11 KV Porcelain Post Insulators 5 KN with suitable hardware fittings Nos.

Erection,Testing and Commissioning of Distribution Transformer with all accessories as per scope of work and technical
D.10
specifications.

D.10.1 11/0.433 KV Distribution Transformer 25 KVA 3 phase Aluminium wound DTR No.
D.10.2 11/0.433 KV Distribution Transformer 63 KVA 3 phase Aluminium wound DTR No.
D.10.3 11/0.433 KV Distribution Transformer 100 KVA 3 phase Aluminium wound DTR No.
D.10.4 11/0.433 KV Distribution Transformer 250 KVA 3 phase Copper wound DTR No.
D.10.5 11/0.433 KV Distribution Transformer 315 KVA 3 phase Copper wound DTR No.
D.10.6 11/0.433 KV Distribution Transformer 500 KVA 3 phase Copper wound DTR No.
Erection, testing and commissioning of 11 KV Distribution Class Lightening Arrester (9 KV,5 KA) for DT as per technical specification
D.11
and scope of work.

SOUTHCO: IPDS SCHEME Page 167 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

D.11.1 Polymer Type Nos.


D.11.2 Porcelain Type Nos.

Erection, testing and commissioning of 12KV, 200A, 25kA for 3sec, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated AB
D.12.1 Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. complete as per technical specifications and scope Set.
of works and GTP.

Erection, testing and commissioning of 12KV, 400A, 25kA for 3sec, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated AB
D.12.2 Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. complete as per technical specifications and scope Set.
of works and GTP.

Erection, testing and commissioning of 11KV, 200 A, 3-ph H.G Fuse assembly including insulators and mounting arrangements,
D.13.1 Set.
hardware, etc as required as per technical specifications and scope of the works.

Erection, testing and commissioning of 11KV, 400 A, 3-ph H.G Fuse assembly including insulators and mounting arrangements,
D.13.2 Set.
hardware, etc as required as per technical specifications and scope of the works.

SOUTHCO: IPDS SCHEME Page 168 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and Commissioning of Distribution box made of CRCA (Galvanised) sheet of thickness not less than of 2 mm (14
SWG) , dust and moisture vermin, weather proof with degree of protection IP 33 as per IS 13947 with suitable bus bars, earthing bus,
earthing terminals, box illumination, front door operated with proper locking arrangement, non magnetic 4 mm thick gland plate,
D.14
double compression brass cable glands, lugs, mounting channel frame, internal wiring with non-FRLS cables, danger plate,
numbering, back clamps, hardware,Manufacturing may be by deep drawn process or welding process by MIG (Metal Inert Gas)
welding process as per scope of the work and technical specifications suitable for following transformer in new DTR substation:

D.14.1 3 Ph 25 KVA transformer 40 A TPN MCCB (incomer) and 6 Nos. 25 A SP MCCB (outgoing). Set.

D.14.2 3 Ph 63 KVA Transformer having 200 A TPN isolator, 100 A HRC fuse (incomer) and 6 Nos. 60 A SP MCCB (outgoing). Set.

D.14.3 3 Ph 100 KVA Transformer having 200 A TPN isolator, 160A HRC fuse (incomer) and 6 Nos. 90 A SP MCCB (outgoing). Set.

D.14.4 3 Ph 250 KVA Transformer having 600 A TPN isolator, 400 A HRC fuse (incomer) and 9 Nos. 120 A SP MCCB (outgoing). Set.

D.14.5 3 Ph 315 KVA Transformer having 600 A TPN isolator, 500 A HRC fuse (incomer) and 12 Nos. 120 A SP MCCB (outgoing). Set.

D.14.6 3 Ph 500 KVA Transformer having 900 A TPN isolator, 800 A HRC fuse (incomer) and 12 Nos. 180 A SP MCCB (outgoing). Set.

SOUTHCO: IPDS SCHEME Page 169 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and Commissioning of 1.1 KV XLPE Aluminium Conductor, Stranded, unarmoured cable for connection of
D.15
transformer LV bushing to Distribution Box and Distribution box to overhead line as per Scope of work and technical specification.

D.15.1 1Cx16 sqmm aluminium conductor cable (for neutral of all DTRs) KM
D.15.2 1CX35 sqmm aluminium conductor cable KM
D.15.3 1CX50 sqmm aluminium conductor cable KM
D.15.4 1Cx70 sqmm aluminium conductor cable KM
D.15.5 1Cx150 sqmm aluminium conductor cable KM
D.15.6 1Cx300 sqmm aluminium conductor cable KM
D.15.7 1Cx 630 sqmm aluminium conductor cable KM

Erection, testing and commissioning of Jumpering for all three phases on HT side for DTR by AAA Dog Conductor including PG
D.16 Set.
Clamps, bi-metallic connectors, hardware etc as per technical specifications and scope of works.

D.17 Erection, testing and commissioning of Distribution Transformer Metering


D.17.1 Thread through Meter with inbuilt CT as per scope of the work and technical specifications.
D.17.1(a) 11/0.433 KV Distribution Transformer 63 KVA 3 phase Aluminium wound DTR (Three Star). Nos.
D.17.1(b) 11/0.433 KV Distribution Transformer 100 KVA 3 phase Aluminium wound DTR (Three Star). Nos.

SOUTHCO: IPDS SCHEME Page 170 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and commissioning of Outdoor mounting type LTCT meter with metering box made of polycarbonate of thickness not
less than 3 mm dust and moisture vermin, weather proof with degree of protection, suitable bus bars, earthing bus, earthing terminals,
D.17.2
box illumination, front door operated with proper locking arrangement, lugs, mounting channel frame, internal wiring with FRLS cables,
danger plate, numbering, back clamps, hardware as per scope of the work and technical specifications.

D.17.2(a) LTTV meter with DLMS support & tamperproof (TP) (IP55) with ring type CT 400/5 Amps for 11/0.433 kV, 3 phase, 250 kVA DTR. Nos.

D.17.2(b) LTTV meter with DLMS support & tamperproof (TP) (IP55) with ring type CT 600/5 Amps for 11/0.433 kV, 3 phase, 315 kVA DTR. Nos.

D.17.2(c) LTTV meter with DLMS support & tamperproof (TP) (IP55) with ring type CT 800/5 Amps for 11/0.433 kV, 3 phase, 500 kVA DTR. Nos.

D.18 Mounting of Anti-Climbing device with Danger Board, complete as per technical specifications and scope of works. Set

Providing and installation of IPDS Distribution Transformer Electrification Board with clamp - mounting on substation structureas
D.19 Set
per scope of work, and technical specification.

Total Erection Price (D)

E.
New LT Line with Aerial Bunched Cable Km
( consisting of but not limited to the following major materials)
E.1 Survey, route alignment & pole spotting, preparation of survey report with drawings Km

SOUTHCO: IPDS SCHEME Page 171 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

E.2 Excavation & back filling with bolder & soil of pole pit for LT overhead line as per scope of work and specifications.

E.2.01 Excavation & back filling with bolder & soil of pole pit in normal soil as per scope of work and specifications:

E.2.01(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.01(b) 8 meter RS joist pole 125x70 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.01(c) 8 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.01(d) 11 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.
Excavation & back filling with bolder & soil of pole pit in soft rock where blasting is not required as per scope of work and
E.2.02
specifications:
E.2.02(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.02(b) 8 meter RS joist pole 125x70 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.02(c) 8 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.02(d) 11 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.
Excavation & back filling with bolder & soil of pole pit in hard rock where blasting is required as per scope of work and
E.2.03
specifications:
E.2.03(a) 8 Mt. long, 200 KG PSC Poles. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.03(b) 8 meter RS joist pole 125x70 mm. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.03(c) 8 M long steel Tubular poles. ( 0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
E.2.03(d) 11 M long steel Tubular poles. (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 172 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of following types of poles for LT overhead line by providing pole numbering,cement concrete foundation or refilling
E.3
average size bolders mixed with excavated earth etc as per scope of work and specifications:

E.3.01(a) 8 Mt. long, 200 KG PSC Poles. No.


E.3.02(a) 8 meter RS joist pole 125x70 mm. No.
E.3.03(a) 8 M long steel Tubular poles. No.
E.3.04(a) 11 M long steel Tubular poles. No.
E.4 Excavation & back filling of stay pit in following type of soils, as per scope of work and specifications:
E.4.1 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
E.4.2 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
E.4.3 Hard rock soil where blasting is required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

Erection of Stay Set (Galvanised) with 50x8 mm stay clamp, stay insulator (1Nos.) Designation'A', anchor plate (200x200x6 mm), nut
E.5.01 bolts, 1 Nos turn-buckles,G.I Thimble 2 Nos., 1.8 m long, 16 mm diameter solid GI stay rod & 7/2.5 mm dia (3.75Kg/Stay) GI stranded Set
wire complete as per technical specifications and scope of work(total wt. 6.695 kg) by providing 0.2 cum cement concrete.

E.5.02 concreting 1 part cement, 2 part sand, 4 part 25 mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set Cmt

SOUTHCO: IPDS SCHEME Page 173 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Excavation (Including Required Back Filling), concreting, Erection, Testing and Commissioning of Earthing arrangement with 8 SWG
E.6 GI wire for earthing (for connection of all metallic material with,GI Pipe earth Electrode/GI Earth Spike/Rod Earth Electrodes) as per Set
technical specifications and scope of work.

Erection, testing and Commissioning of LT line with following arrangements using areal bunched XLPE cable including supply and
erection of tension clamps for dead end, suspension clamps, clamps for neutral,piercing connectors type-I & type-II, 16 mm dia MS
E.7
nuts & bolts, pole clamps, spring loaded bus bar suitable for single phase and three phase systems etc as required as per technical
specification and scope of work.

E.7.1 AERIAL BUNCHED XLPE CABLE 1X16 (Ph) + 1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM
E.7.2 AERIAL BUNCHED XLPE CABLE 3X16(Ph)+1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM

E.7.3 AERIAL BUNCHED XLPE CABLE 3 X 16(Ph) +1x25 (bare messenger cum neutral) + 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

E.7.4 AERIAL BUNCHED XLPE CABLE 1X25(Ph)+1x25 (bare messenger cum neutral) SQ. MM. ( ) CKM

E.7.5 AERIAL BUNCHED XLPE CABLE 3 X 25(Ph) +1x25 (bare messenger cum neutral) + 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

E.7.6 AERIAL BUNCHED XLPE CABLE 1X35(Ph)+1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM

E.7.7 AERIAL BUNCHED XLPE CABLE 1x35(Ph) + 1X25 (bare messenger cum neutral) + 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

E.7.8 AERIAL BUNCHED XLPE CABLE 3X35(Ph)+1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM

SOUTHCO: IPDS SCHEME Page 174 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

E.7.9 AERIAL BUNCHED XLPE CABLE 3X35 (Ph) + 1x25 (bare messenger cum neutral)+ 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

E.7.10 AERIAL BUNCHED XLPE CABLE 3X50(Ph)+1X35 (bare messenger cum neutral) SQ. MM. ( ) CKM

E.7.11 AERIAL BUNCHED XLPE CABLE 3X50 (Ph)+1x35 (bare messenger cum neutral) +1x16 (insulated Street lighting) SQ. MM. ( ) CKM

E.7.12 AERIAL BUNCHED XLPE CABLE 3X95(Ph)+1X70 (bare messenger cum neutral) SQ. MM. ( ) CKM

E.7.13 AERIAL BUNCHED XLPE CABLE 3X95(Ph)+1X70 (bare messenger cum neutral) +1x16 (insulated Street lighting) SQ. MM. ( ) CKM

Dead end Anchor clamp along with anchor bracket for (3X50 (Ph) + 1x35 (bare messenger cum neutral)+ 1x16 (insulated
Street lighting) SQ. MM. & 3X95 (Ph)+1x70 (bare messenger cum neutral) +1x16 (insulated Street lighting) SQ. MM.) AB
E.7.14 Set.
Cable ( Ref Drawing No : REC/DDUGJY/LT-ACC-ABC/02, REC/DDUGJY/LT-ACC-ABC/03A, REC/DDUGJY/LT-ACC-
ABC/03B & REC/DDUGJY/LT-ACC-ABC/04)

Suspension clamps along with suspension bracket. ( Ref Drawing No : REC/DDUGJY/LT-ACC-ABC/02, REC/DDUGJY/LT-ACC-
E.7.15 Set.
ABC/07A, REC/DDUGJY/LT-ACC-ABC/07B & REC/DDUGJY/LT-ACC-ABC/07C)

E.7.16 Eye-Hook/Pole Brackets for Suspesion Clamp. Set.

Pole mounted SMC Distribution Box (1 incoming & 8 outgoing, 225 mm X285 mm X120mm) for service Connection.The connection with
E.7.17 Nos.
bus bar shall be of Screw Bolt technique suitable for three phase systems along with nuts & bolts and clamping arrengement.

SOUTHCO: IPDS SCHEME Page 175 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
E.7.18 3.5C X 25 sq.mm XLPE Unarmoured insulated cable Connection to Distribution Box. Km
E.7.19 3.5C X 50 sq.mm XLPE Unarmoured insulated cable Connection to Distribution Box. Km
Multiport Insulating Piercing connectors (Suitable for main phase & neutral Conductor) for junction/Distribution Box. ( Ref Drawing No :
E.7.20 REC/DDUGJY/LT-ACC-ABC/05A, REC/DDUGJY/LT-ACC-ABC/05B, REC/DDUGJY/LT-ACC-ABC/06A & REC/DDUGJY/LT-ACC- Nos.
ABC/06B)
E.7.21 Insulating Piercing connectors (Suitable for street light & neutral Conductor) for junction/Distribution Box. Nos.
E.7.22 Pre-insulated crimping type straight through connector for jointing and termination lugs. Nos.
E.7.23 Jointing sleeves (Straight joint & cross joint) Nos.

Erection, testing and Commissioning of Single phase service connection by providing Thermo-plastic insulated weatherproof cable of
size 2 Core 2.5 sqmm aluminium conductor (up to 35m length of house hold from LT line), 10 SWG GI tension wire, 20 mm GI Pipe
medium class to accept service cable at consumer residence, single phase whole current 30A tamper proof electronic energy meter with
Tamper proof Box (IP55) (Meter to be installed outside of house premises), 2 Nos. piano type ISI marked 250V/5A switch. 1 no. ISI
E.18.1 mark 250V/5A socket, 250V/5A ISI marked holder, 144-288V, upto 9 watts, 710 lumen LED lamp 250V,5A capacity ISI mark lamp No
holder, Internal wiring using 1.5 sqmm copper multistrands PVC insulated ISI marked cable, 250V/16A switch cartridge fuse assembly
of ISI marked and a 10mm dia earth terminal point, internal wiring in ISI marked 12mm dia PVC rigid pipes including its clamps,
fittings and fixtures as required as per REC Specifications. Earth point would be connected with existing earthing potential
maintained by DISCOM through 10 SWG GI wire.

SOUTHCO: IPDS SCHEME Page 176 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Providing and installation of IPDS Board by providing board, mounting angles, excavation, cement concreting foundation, painting
E.19 Set
etc as required as per scope of work and technical specification.

Total Erection Price (E)


F. Augmentation, Renovation and Modernisation of existing lines and substations

F.(I).
Augmentation & Renovation of DTR Substation. Nos.
( consisting of but not limited to the following major materials)

F.(I).1.01 Excavation of pole pit (of depth 1/6th of pole length) in normal soil as per scope of work and specifications:

F.(I).1.01(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(I).1.01(b) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(I).1.01(c) 9 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
Excavation & back filling of pole pit (of depth 1/6th of pole length) in soft rock where blasting is not required as per scope of work
F.(I).1.02
and specifications:
F.(I).1.02(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(I).1.02(b) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(I).1.02(c) 9 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 177 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of Poles & Pre-fabricated steel items like DC cross arm (100x50x6 mm), back clamps (65x8 mm), pole clamp (65x8 mm),
transformer mounting & pressure channel (100x50x6 mm), transformer clamping set (50x50x6 mm), transformer belting set ( 50x50x6
F.(I).2
mm) as per technical specification and scope of work. ( Ref Drawing No : REC/DDUGJY/DTR-SS/03, REC/DDUGJY/DTR-SS/04,
REC/DDUGJY/DTR-SS/07 ) for 11/0.433 KV DTR as per scope of work and specifications:

F.(I).2.01 8 Mt. long, 300 KG PSC Pole DP structure No.

F.(I).2.02 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

F.(I).2.03 9 Mt. long, 300 KG PSC Poles DP structure No.

F.(I).2.04 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

F.(I).2.05 9 Mt. long RS Joist pole152x152 mm (37.1Kg/Meter) DP structure No.

F.(I).2.06 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402cmt/Pole Cmt.

F.(I).3 Plinth for Transformer Mounting


F.(I).3.01 Excavation & back filling earth in normal soil as per scope of work and specifications.
F.(I).3.01(a) 11/0.433 KV Distribution Transformer 250 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.
F.(I).3.01(b) 11/0.433 KV Distribution Transformer 315 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 178 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F.(I).3.01(c) 11/0.433 KV Distribution Transformer 500 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.
F.(I).3.02 Excavation & back filling of earth in soft rock, as per scope of work and specifications.
F.(I).3.02(a) 11/0.433 KV Distribution Transformer 250 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.
F.(I).3.02(b) 11/0.433 KV Distribution Transformer 315 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.
F.(I).3.02(c) 11/0.433 KV Distribution Transformer 500 KVA 3 phase (2.5 Mtr Length, 2.5 Mtr Width & 0.75 Mtr Depth) Cmt.

Brick masonary work and cement plastering as per scope of work and specifications. for 11/0.433 KV DTR with numbering as per
F.(I).4
scope of work and specifications:
F.(I).4.1(a) Brick masonary work for 11/0.433 KV Distribution Transformer 250 KVA 3 phase No.

F.(I).4.1(b) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-12.1875cmt/DT Cmt.

F.(I).4.2(a) Brick masonary work for 11/0.433 KV Distribution Transformer 315 KVA 3 phase No.

F.(I).4.2(b) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-12.1875cmt/DT Cmt.

F.(I).4.3(a) Brick masonary work for 11/0.433 KV Distribution Transformer 500 KVA 3 phase No.

F.(I).4.3(b) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-12.1875cmt/DT Cmt.

F.(I).5 Excavation & back filling of stay pit in following type of soils, as per scope of work and specifications:
F.(I).5.01 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 179 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F.(I).5.02 Soft rock soil where blasting is not required(0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

Erection of Stay Set (Galvanised) with 50x8 mm stay clamp, stay insulator (1Nos.), anchor plate (200x200x6 mm), nut bolts, 1 Nos turn-
F.(I).6.1 buckles,G.I Thimble 2 Nos., 1.8 m long, 16 mm diameter solid GI stay rod & 7/3.15 mm dia (5.5Kg/Stay) GI stranded wire with Set
insulator mounting & jumpering complete as per technical specifications and scope of work.(8.445 KG.).

F.(I).6.2 concreting 1 part cement, 2 part sand, 4 part 25 mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set Cmt

Excavation & back filling for Earthing arrangement 5 Nos. 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite
F.(I).7 powder,RCC Pit and other accessories complete.(Used at line crossing, DP structure and other specific locations) as per technical
specifications and scope of work.

F.(I).7.1 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 3 Mtr Depth) Cmt.
F.(I).7.2 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 3 Mtr Depth) Cmt.

Erection, testing and commissioning of 5 Nos. 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder and
F.(I).8 other accessories complete. as per IS 1161, making earth grid using 50x6mm GI Flat and 25x3mm riser and RCC pit as per scope of
work of Distribution Transformer Substations and technical specifications.

Erection, testing and commissioning of 5 Nos. 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder and
F.(I).8.1 Set
other accessories complete.

SOUTHCO: IPDS SCHEME Page 180 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F.(I).8.2 50 x 6 mm GI flat. MT.
F.(I).8.3 25 x 3 mm Galvanized GI flat. MT.
F.(I).8.4 6 SWG GI wire for earthing as per technical specifications and scope of works. MT.
Erection, testing and commissioning of 11 kV Polymer/ Porcelain Insulators with hardware fittings, hardware etc as required as per
F.(I).9
technical specification and scope of work.

F.(I).9.1 11 KV Porcelain (B&S Type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings. Set.

F.(I).9.2 11 KV Polymer (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings Set.

F.(I).9.3 11 KV Porcelain Pin Insulators 5 KN with GI PIN. Nos.


F.(I).9.4 11 KV Polymer Pin Insulators 5 KN with suitable hardware fittings. Set.
F.(I).9.5 11 KV Porcelain Post Insulators 5 KN with suitable hardware fittings Nos.

Erection, Testing and Commissioning of Distribution Transformer with all accessories as per scope of work and technical
F.(I).10
specifications.

F.(I).10.1 11/0.433 KV Distribution Transformer 25 KVA 3 phase Aluminium wound DTR No.
F.(I).10.2 11/0.433 KV Distribution Transformer 63 KVA 3 phase Aluminium wound DTR No.
F.(I).10.3 11/0.433 KV Distribution Transformer 100 KVA 3 phase Aluminium wound DTR No.
F.(I).10.4 11/0.433 KV Distribution Transformer 250 KVA 3 phase Copper wound DTR No.
F.(I).10.5 11/0.433 KV Distribution Transformer 315 KVA 3 phase Copper wound DTR No.

SOUTHCO: IPDS SCHEME Page 181 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F.(I).10.6 11/0.433 KV Distribution Transformer 500 KVA 3 phase Copper wound DTR No.
Erection, testing and commissioning of 11 KV Distribution Class Lightening Arrester (9 KV,5 KA) for DT as per technical specification
F.(I).11
and scope of work.
F.(I).11.1 Polymer Type Nos.
F.(I).11.2 Porcelain Type Nos.
Erection, testing and commissioning of 12KV, 200A, 25kA for 3sec, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated AB
F.(I).12.1 Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. complete as per technical specifications and scope Set.
of works and GTP.

Erection, testing and commissioning of 12KV, 400A, 25kA for 3sec, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated AB
F.(I).12.2 Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. complete as per technical specifications and scope Set.
of works and GTP.

Erection, testing and commissioning of 11KV, 200 A, 3-ph H.G Fuse assembly including insulators and mounting arrangements,
F.(I).13.1 Set.
hardware, etc as required as per technical specifications and scope of the works.

Erection, testing and commissioning of 11KV, 400 A, 3-ph H.G Fuse assembly including insulators and mounting arrangements,
F.(I).13.2 Set.
hardware, etc as required as per technical specifications and scope of the works.

SOUTHCO: IPDS SCHEME Page 182 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and Commissioning of Distribution box made of CRCA (Galvanised) sheet of thickness not less than of 2 mm (14
SWG) , dust and moisture vermin, weather proof with degree of protection IP 33 as per IS 13947 with suitable bus bars, earthing bus,
earthing terminals, box illumination, front door operated with proper locking arrangement, non magnetic 4 mm thick gland plate,
F.(I).14
double compression brass cable glands, lugs, mounting channel frame, internal wiring with non-FRLS cables, danger plate,
numbering, back clamps, hardware,Manufacturing may be by deep drawn process or welding process by MIG (Metal Inert Gas)
welding process as per scope of the work and technical specifications suitable for following transformer in new DTR substation:

F.(I).14.1 3 Ph 25 KVA transformer 40 A TPN MCCB (incomer) and 6 Nos. 25 A SP MCCB (outgoing). Set.

F.(I).14.2 3 Ph 63 KVA Transformer having 200 A TPN isolator, 100 A HRC fuse (incomer) and 6 Nos. 60 A SP MCCB (outgoing). Set.

F.(I).14.3 3 Ph 100 KVA Transformer having 200 A TPN isolator, 160A HRC fuse (incomer) and 6 Nos. 90 A SP MCCB (outgoing). Set.

F.(I).14.4 3 Ph 250 KVA Transformer having 600 A TPN isolator, 400 A HRC fuse (incomer) and 9 Nos. 120 A SP MCCB (outgoing). Set.

F.(I).14.5 3 Ph 315 KVA Transformer having 600 A TPN isolator, 500 A HRC fuse (incomer) and 12 Nos. 120 A SP MCCB (outgoing). Set.

F.(I).14.6 3 Ph 500 KVA Transformer having 900 A TPN isolator, 800 A HRC fuse (incomer) and 12 Nos. 180 A SP MCCB (outgoing). Set.

SOUTHCO: IPDS SCHEME Page 183 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and Commissioning of 1.1 KV XLPE Aluminium Conductor, Stranded, unarmoured cable for connection of
F.(I).15 transformer LV bushing to Distribution Box and Distribution box to overhead line as per Scope of work and technical
specification.

F.(I).15.1 1Cx16 sqmm aluminium conductor cable (for neutral of all DTRs) KM
F.(I).15.2 1CX35 sqmm aluminium conductor cable KM
F.(I).15.3 1CX50 sqmm aluminium conductor cable KM
F.(I).15.4 1Cx70 sqmm aluminium conductor cable KM
F.(I).15.5 1Cx150 sqmm aluminium conductor cable KM
F.(I).15.6 1Cx300 sqmm aluminium conductor cable KM
F.(I).15.7 1Cx 630 sqmm aluminium conductor cable KM

Erection, testing and commissioning of Jumpering for DTR by AAA Dog Conductor including PG Clamps, bi-metallic connectors,
F.(I).16 Set.
hardware etc as per technical specifications and scope of works.

F.(I).17 Erection, testing and commissioning of Distribution Transformer Metering


F.(I).17.1 Thread through Meter with inbuilt CT as per scope of the work and technical specifications.
For 11/0.433 KV Distribution Transformer upto 100 KVA 3 phase Aluminium wound DTR (Three Star). 40 to 200 Amps with DLMS
F.(I).17.1(a) Nos.
Inbuilt AMR Modem.

SOUTHCO: IPDS SCHEME Page 184 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and commissioning of outdoor mounting type LTCT meter with metering box made of polycarbonate of thickness not
less than 3 mm dust and moisture vermin, weather proof with degree of protection, suitable bus bars, earthing bus, earthing terminals,
F.(I).17.2
box illumination, front door operated with proper locking arrangement, lugs, mounting channel frame, internal wiring with FRLS cables,
danger plate, numbering, back clamps, hardware as per scope of the work and technical specifications.

F.(I).17.2.1 LTTV meter with DLMS support & tamperproof (TP) (IP55) with ring type CT 400/5 Amps for 11/0.433 kV, 3 phase, 250 kVA DTR. Nos.

F.(I).17.2.2 LTTV meter with DLMS support & tamperproof (TP) (IP55) with ring type CT 600/5 Amps for 11/0.433 kV, 3 phase, 315 kVA DTR. Nos.

F.(I).17.2.3 LTTV meter with DLMS support & tamperproof (TP) (IP55) with ring type CT 800/5 Amps for 11/0.433 kV, 3 phase, 500 kVA DTR. Nos.

F.(I).17.2.4 LTTV meter with DLMS support & tamperproof (TP) (IP55) with ring type CT 900/5 Amps for 11/0.433 kV, 3 phase, 630 kVA DTR. Nos.

F.(I).18 Mounting of Anti-Climbing device with Danger Board, complete as per technical specifications and scope of works. Set

Providing and installation of IPDS Distribution Transformer Electrification Board with clamp - mounting on substation structureas
F.(I).19 Set
per scope of work, and technical specification.

SOUTHCO: IPDS SCHEME Page 185 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Dismantling of existing DTR along, damage pole , steel structure other accessories, where ever is required to carry out the Renovation
F.(I).20 & Augmentation work of DTR. loading, transportation, unloading and handing over the same to the OPTCL identified store including Set
stacking .

Total Erection Price (F(I))

F(II)
Augmentation & Renovation of 33 KV Line Km
( consisting of but not limited to the following major materials)
F(II).1 Survey, route alignment & pole spotting, preparation of survey report with drawings Km

F(II).2.01 Excavation & back filling of pole pit (of depth 1/6th of pole length) in normal soil as per scope of work and specifications:

F(II).2.01(a) 11 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
F(II).2.01(b) 13 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
Excavation & back filling of pole pit (of depth 1/6th of pole length) in soft rock where blasting is not required as per scope of work
F(II).2.02
and specifications:
F(II).2.02(a) 11 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
F(II).2.02(b) 13 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
Excavation & back filling of pole pit (of depth 1/6th of pole length) in hard rock where blasting is required as per scope of work and
F(II).2.03
specifications:
F(II).2.03(a) 11 Mt. long RS Joist 152x152 mm (0.5 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 186 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F(II).2.03(b) 13 Mt. long RS Joist 152x152 mm (0.5 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.
Erection of the Poles and prefabricated steel items for 33 KV overhead line by providing pole numbering as per scope of work and
F(II).3
specifications.

Erection of 11 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc.
F(II).3.01 made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per Nos.
technical specification and scope of work.(Over head Single Pole Structures)

F(II).3.02 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 11 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
F(II).3.03 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Over head Double Pole structures)

F(II).3.04 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 13 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
F(II).3.05 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Over head Double Pole structures)

F(II).3.06 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

SOUTHCO: IPDS SCHEME Page 187 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of 11 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
F(II).3.05 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Over head Four Pole structures)

F(II).3.06 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

F(II).4 Excavtion for 33KV 'PC Type Tower' with all accessories and fittings.

F(II).4.01 Excavation and back Filling of tower pit in normal soil as per scope of work and specifications (3 towers) - 220cmt/tower Cmt.

Excavation and back Filling of tower pit in soft rock where blasting is not required as per scope of work and specifications: (1 tower) - 220
F(II).4.02 Cmt.
cmt/tower
F(II).5 Excavtion for 33KV 'PC+6 Type Tower' with all accessories and fittings.

F(II).5.01 Excavation and back Filling of tower pit in normal soil as per scope of work and specifications: (5 towers) - 220cmt/tower Cmt.

Excavation and back Filling of tower pit in soft rock where blasting is not required as per scope of work and specifications: (1 tower) -
F(II).5.02 Cmt.
220cmt/tower
F(II).6 Concreting for 33KV 'PC and PC+6 Type Towers'.
F(II).6.01 For PC type tower super structure - 4 Nos.
Cement concrete foundation using 1 part cement, 3 part sand, 6 part 20 mm size stone aggregate chips (1:3:6)-0.1cmt/tower as blinding
F(II).6.01(a) Cmt.
layer

SOUTHCO: IPDS SCHEME Page 188 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F(II).6.01(b) Cement concrete foundation using 1 part cement, 1.5 part sand, 3 part 20 mm size stone aggregate chips (1:1.5:3)-88cmt/tower Cmt.

F(II).6.02 For PC+6 mtr type tower super structure - 6 Nos.


Cement concrete foundation using 1 part cement, 3 part sand, 6 part 20 mm size stone aggregate chips (1:3:6)-0.1cmt/tower as blinding
F(II).6.02(a) Cmt.
layer

F(II).6.02(b) Cement concrete foundation using 1 part cement, 1.5 part sand, 3 part 20 mm size stone aggregate chips (1:1.5:3)-88cmt/tower Cmt.

F(II).7 Erection and stringing of PC and PC+6 tower.


Erection of PC type tower super structure complete with 4 Nos GI 3-Meters LONG PIPE EARTHING (40mm dia.) as per scope of work
F(II).7.01 Nos.
and specifications
Erection of PC+6 mtr type tower super structure complete with 4 Nos GI 3-Meters LONG PIPE EARTHING (40mm dia.) as per scope of
F(II).7.02 Nos.
work and specifications
Stringing of river crossing span ( ( 3 nos of, 7/4.26 mm (100 mm Al. Area) - Dog conductors, 1 no of 7/3.15 earthwire along with hoisting
F(II).7.03 Km
of insulators fixing of all hardware and accessories)
F(II).8 Excavation & back filling of stay pit in following type of soils, as per scope of work and specifications:
F(II).8.01 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
F(II).8.02 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
F(II).8.03 Hard rock soil where blasting is required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 189 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of Stay Set (Galvanised) with 50x8 mm stay clamps, guy insulator (2 Nos.) Designation'C', anchor plate (300x300x8mm), Eye
F(II).9 bolts with 2 nuts, 1 No turn-buckles,G.I Thimble 2 Nos., 1.8 m long, 20 mm diameter solid GI stay rod & 7/4.00 mm dia (8.5Kg/Stay) GI Set.
stranded wire complete as per technical specification and scope of work.

F(II).9.01 concreting 1 part cement, 2 part sand, 4 part 20mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set (0.5mX0.5mX0.8m) Cmt

Excavation, concreting, Erection, Testing and Commissioning of Earthing arrangement as per technical specifications and scope of
F(II).10
work.
40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder,RCC Pit and other accessories complete.(Used at line
F(II).10.01 Set.
crossing, DP structure and other specific locations).
F(II).10.02 GI Earthing spike made of 20 mm dia. 2500 mm solid rod with clamp . Set.

F(II).10.03 6 SWG GI wire for earthing (for connection of all metallic material with,GI Pipe earth Electrode/GI Earth Spike/Rod Earth Electrodes) MT.

Erection, testing and commissioning of 33 kV polymer/porcelain insulator including their hardware fittings as per technical
F(II).11
specification and scope of work.

33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for Dog
F(II).11.1 Set.
Conductor in normal and moderately polluted area.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for Dog
F(II).11.2 Set.
Conductor in heavily polluted area.

SOUTHCO: IPDS SCHEME Page 190 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for
F(II).11.3 Set.
WOLF Conductor in normal and moderately polluted area.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for
F(II).11.4 Set.
WOLF Conductor in heavily polluted area.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for
F(II).11.5 Set.
PANTHER Conductor in normal and moderately polluted area.
33 KV Porcelain (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for
F(II).11.6 Set.
PANTHER Conductor in heavily polluted area.
33 KV Polymer (B&S type) Disc insulator 70 KN (1 set = 3 disc with, one 4 Bolted hardware) along with suitable hardware fittings for DOG
F(II).11.7 Set.
conductor
F(II).11.8 33 kV Porcelaine Type Pin Insulator 10 KN for normal and moderately poluted area for DOG Conductor Nos.
F(II).11.9 33 KV Polymer Disc insulator 70 KN along with 4 bolted suitable hardware fittings for WOLF Conductor Set.
F(II).11.10 33 kV Porcelaine Type Pin Insulator 10 KN for normal and moderately poluted area for WOLF Conductor Nos.
F(II).11.11 33 KV Polymer Disc insulator 70 KN along with suitable hardware fittings for PANTHER Conductor Set.
F(II).11.12 33 kV Porcelaine Type Pin Insulator 10 KN for PANTHER Conductor in normal and moderately poluted area. Nos.
F(II).11.13 33 kV Porcelaine Type Pin Insulator 10 KN for DOG Conductor in heavily poluted area. Nos.
F(II).11.14 33 KV Polymer Pin insulator 10 KN along with suitable hardware fittings for DOG Conductor Set.
F(II).11.15 33 kV Porcelaine Type Pin Insulator 10 KN for WOLF Conductor in heavily poluted area. Nos.
F(II).11.16 33 KV Polymer Pin insulator 10 KN along with suitable hardware fittings for WOLF Conductor Set.
F(II).11.17 33 kV Porcelaine Type Pin Insulator 10 KN for PANTHER Conductor in heavily poluted area. Nos.
F(II).11.18 33 KV Polymer Pin insulator 10 KN along with suitable hardware fittings for PANTHER Conductor Set.

SOUTHCO: IPDS SCHEME Page 191 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F(II).11.19 33 KV porcelain Post Insulator for DOG Conductor with suitable hardware fittings Set.
F(II).11.20 33 KV Polymer Post Insulator for DOG Conductor with suitable hardware fittings Set.
F(II).11.21 33 KV porcelain Post Insulator for WOLF Conductor with suitable hardware fittings Set.
F(II).11.22 33 KV Polymer Post Insulator for WOLF Conductor with suitable hardware fittings Set.
F(II).11.23 33 KV porcelain Post Insulator for PANTHER Conductor with suitable hardware fittings Set.
F(II).11.24 33 KV Polymer Post Insulator for PANTHER Conductor with suitable hardware fittings Set.

Erection,paying out,tensioning, binding of conductor, tightening of stays, stringing, testing and commissioning of AAAC Conductor
F(II).12 of following sizes and by supplying & erecting of jointing sleeves, binding materials, PG clamps, bi-metallic conducors, C-wedge
connector, hardware etc as required as per scope of work and technical specifications

F(II).12.01 7/3.81 mm (80 mm Al. Area) - Racoon. (1 CKM.= 3 KM. Conductor Length) CKM.
F(II).12.02 7/4.26 mm (100 mm Al. Area) - Dog. (1 CKM.= 3 KM. Conductor Length) CKM.
F(II).12.03 19/3.15 mm (173 mm Al. Area) - Wolf. (1 CKM.= 3 KM. Conductor Length) CKM.
F(II).12.04 19/3.94 mm (232 mm Al. Area) - Panther. (1 CKM.= 3 KM. Conductor Length) CKM.

Erection, testing and Commissioning of 33KV, 200A, 25KA for 3 sec., 3-ph, 3 Pin type, Horizontal Mounting type, AB Switch along
F(II).13 with phase coupling shaft, operating rod,operating handle,4 -bolt type connector,Support Insulators, Base Channel, down Pipe, Arcing Set.
Horns etc. complete as per technical specifications, scope of works.

F(II).14 Erection, testing and Commissioning of UNDER GROUND RAILWAY CROSSING and NH CROSSING for 33 KV LINE

SOUTHCO: IPDS SCHEME Page 192 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

33 KV LINE FOR UNDER GROUND RAILWAY CROSSING and NH crossing BY 2 Nos (INCLUDING ONE SPARE) 3Cx300 Sqmm
XLPE Armoured Cable (0.120 KM each) USING 160 mm DIA GI PIPES (grade A for underground laying and grade B for pole support),
OUTDOOR HEAT SHRINKABLE CABLE JOINTING KITS, 33 KV Polymer Type LIGHTENING ARRESTOR STATION CLASS 10KA (6
F(II).14.01 Set.
NOS.), LUGS, 4 Nos GI 3-Meters LONG PIPE EARTHING (40mm dia.), 6 SWG GI WIRES, CABLE MARKERS, BI METALLICK CLAMPS
where required As REQUIRED AS PER TECHNICAL SPECIFICATIONS AND SCOPE OF THE WORK. ( Ref Drawing No :
REC/DDUGJY/11kV/02A, REC/DDUGJY/11kV/02B, REC/DDUGJY/11kV/2D & REC/DDUGJY/33kV/21 )

F(II).15 Mounting of Anti-Climbing device/Barbed Wire with Danger Board, complete as per technical specifications and scope of works . Set.

F(II).16 Erection and Mounting of Guarding Arrangement for Road/Line Crossing. ( Ref Drawing No : REC/DDUGJY/11kV/25) Set.

Dismantling of existing 33 kv line , damage pole, steel structure along with other accessories wherever is required to carry out the
F(II).17 Renovation & Augmentation work of 33kv line.Loading, transportation, unloading and handing over to the OPTCL identified store Km
including stacking .

Total Erection Price (F(II))

F(III)
Augmentation & Renovation of 11 KV Line Km
( consisting of but not limited to the following major materials)
F(III).1 Survey, route alignment & pole spotting, preparation of survey report with drawings Km

SOUTHCO: IPDS SCHEME Page 193 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F(III).2 Excavation of pole pit for 11 KV overhead line as per scope of work and specifications.
F(III).2.01 Excavation & back filling of pole pit in normal soil as per scope of work and specifications:
F(III).2.01(a) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F(III).2.01(b) 10 Mt. RS Joist pole 116x100 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F(III).2.01(c) 13 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

F(III).2.01(d) 11 Mt. long Steel Tubular poles of Designation 540 SP 52 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

F(III).2.01(e) 13 Mt. long Steel Tubular poles of Designation 540 SP 72 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

F(III).2.02 Excavation & back filling of pole pit in soft rock where blasting is not required as per scope of work and specifications:

F(III).2.02(a) 9 Mt. long, 300 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F(III).2.02(b) 10 Mt. RS Joist pole 116x100 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.

F(III).2.02(c) 13 Mt. long RS Joist pole152x152 mm. (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

F(III).2.02(d) 11 Mt. long Steel Tubular poles of Designation 540 SP 52 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

F(III).2.02(e) 13 Mt. long Steel Tubular poles of Designation 540 SP 72 (IS 2713, Pt I, III 1980). (1 Mtr Length, 0.5 Mtr Width & 2.0 Mtr Depth) Cmt.

F(III).2.03 Excavation & back filling of pole pit in hard rock where blasting is required as per scope of work and specifications:

SOUTHCO: IPDS SCHEME Page 194 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F(III).2.03(a) 9 Mt. long, 300 KG PSC Poles. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F(III).2.03(b) 10 Mt. RS Joist pole 116x100 mm. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F(III).2.03(c) 13 Mt. long RS Joist pole152x152 mm. (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

F(III).2.03(d) 11 Mt. long Steel Tubular poles of Designation 540 SP 52 (IS 2713, Pt I, III 1980). (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

F(III).2.03(e) 13 Mt. long Steel Tubular poles of Designation 540 SP 72 (IS 2713, Pt I, III 1980). (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

F(III).3 Erection of the Poles for 11 KV overhead line by providing pole numbering as per scope of work and specifications:

Erection of 9 mtr PSC Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc. made of Channels
(100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical specification
F(III).3.01 No.
and scope of work.
( Single pole structure)

F(III).3.01(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

SOUTHCO: IPDS SCHEME Page 195 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of 10 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc. made of Channels
(100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical specification
F(III).3.02 No.
and scope of work.
( Single pole structure)

F(III).3.02(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402 cmt/Pole Cmt.

Erection of 11 mtr Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp, Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
F(III).3.03 No.
specification and scope of work.
( Single pole structure)

F(III).3.03(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 9 mtr PSC Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
F(III).3.04 No.
specification and scope of work.
( Double pole structure)

SOUTHCO: IPDS SCHEME Page 196 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F(III).3.04(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

Erection of 10 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
F(III).3.05 No.
specification and scope of work.
( Double pole structure)

F(III).3.05(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402 cmt/Pole Cmt.

Erection of 11 mtr Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc.
made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per
F(III).3.06 No.
technical specification and scope of work.
( Double pole structure)

F(III).3.06(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 13 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
F(III).3.07 No.
specification and scope of work.
( Double pole structure)

SOUTHCO: IPDS SCHEME Page 197 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F(III).3.07(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 13 mtr long Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat
etc. made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per
F(III).3.08 No.
technical specification and scope of work.
( Double pole structure)

F(III).3.08(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

Erection of 9 mt PSC Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
F(III).3.09 No.
specification and scope of work.
( Four pole structure)

F(III).3.09(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.375cmt/Pole Cmt.

SOUTHCO: IPDS SCHEME Page 198 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of 10 mtr RSJ Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat etc. made of
Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per technical
F(III).3.10 No.
specification and scope of work.
( Four pole structure)

F(III).3.10(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.402cmt/Pole Cmt.

Erection of 11 mtr long Steel Tubular Pole and Pre-fabricated steel items like V cross arm, Top Bracket, Back clamp,Fish Plate,Cleat
etc. made of Channels (100x50x6mm), Angle (65x65x6mm) (75x75x6 mm), Flats (65x8mm) of given sizes for over head structures as per
F(III).3.11 No.
technical specification and scope of work.
( Four pole structure)

F(III).3.11(a) Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527cmt/Pole Cmt.

F(III).4 Excavation & back filling of stay pit in following type of soils, as per scope of work and specifications:
F(III).4.01 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
F(III).4.02 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
F(III).4.03 Hard rock soil where blasting is required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 199 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection of Stay Set (Galvanised) with 50x8 mm stay clamps, guy insulator (2 Nos.) Designation'C', anchor plate (200x200x6mm), Eye
F(III).5 bolts with 2 nuts, 1 No turn-buckles,G.I Thimble 2 Nos., 1.8 m long, 16 mm diameter solid GI stay rod & 7/3.15 mm dia (5.5Kg/Stay) GI Set
stranded wire complete as per technical specification and scope of work.

F(III).5.01 concreting 1 part cement, 2 part sand, 4 part 25 mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set Cmt
Excavation, concreting, Erection, Testing and Commissioning of Earthing arrangement as per technical specifications and scope of
F(III).6
work.
40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder,RCC Pit and other accessories complete.(Used at line
F(III).6.01 Set.
crossing, DP structure and other specific locations).
F(III).6.02 GI Earthing spike made of 20 mm dia. 2500 mm solid rod with clamp . Set.

F(III).6.03 6 SWG GI wire for earthing (for connection of all metallic material with,GI Pipe earth Electrode/GI Earth Spike/Rod Earth Electrodes) MT.

Erection, testing and commissioning of 11 kV insulator including their hardware fittings as per technical specification and scope of
F(III).7
work.

F(III).7.01 11 KV Porcelain (B&S type) Disc insulator 45 KN along with suitable hardware fittings for heavily poluted area. Nos.

11 KV Porcelain (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware in normal and
F(III).7.02 Set.
moderately polluted area.

F(III).7.03 11 KV Polymer (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings Set.

F(III).7.04 11 KV Porcelain Pin Insulator 5KN for heavily poluted area. Nos.

SOUTHCO: IPDS SCHEME Page 200 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F(III).7.05 11 KV Porcelain Pin Insulator 5KN for normal and moderately poluted area. Nos.
F(III).7.06 11 KV Polymer Pin insulator 5 KN along with suitable hardware fittings. Set.
11 KV Porcelain Strain insulator (T&C type) along with suitable hardware fittings. (For XLPE insulated ABC) (1 set = 1 disc with, one
F(III).7.07 Set.
hardware)

11 KV Polymer Strain insulator (T&C type) along with suitable hardware fittings. (For XLPE insulated ABC) (1 set = 1 disc with, one
F(III).7.08 Set.
hardware)

F(III).7.09 Suspension Clamp with suspension bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x95 sqmm ABC ) Set.

F(III).7.10 Suspension Clamp with suspension bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x120 sqmm ABC ) Set.

Suitable Tapping arrangement along with associated accessories complete (1 Set = 3 nos.) suitable for 11 kV Aerial Bunched Conductor (3c
F(III).7.11 Set.
x 95 sq.mm + Messenger Wire)

F(III).7.12 Dead End Clamp with eyehook/ pole bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x95 sqmm ABC ) Set.

F(III).7.13 Dead End Clamp with eyehook/ pole bracket for 11KV AB cable with suitable hardware fittings. (For XLPE insulated 3x120 sqmm ABC ) Set.

Suitable Tapping arrangement along with associated accessories complete (1 Set = 3 nos.) suitable for 11 kV Aerial Bunched Conductor (3c
F(III).7.14 Set.
x 120 sq.mm + Messenger Wire)

SOUTHCO: IPDS SCHEME Page 201 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection,paying out, tensioning, binding of conductor and tightening of stays and stringing, testing and commissioning of AAAC
F(III).8 Conductor of following sizes including jointing sleeves, helical formed fittings, jumpering and by providing & erecting PG Clamps
etc as required as per scope of work and technical specifications.

F(III).8.01 7/2.5 mm (35 mm Al. Area) - Weasel. (1 CKM.= 3 KM. Conductor Length) CKM.
F(III).8.02 7/3.15 mm (55 mm Al. Area) - Rabbit. (1 CKM.= 3 KM. Conductor Length) CKM.
F(III).8.03 7/3.81 mm (80 mm Al. Area) - Raccoon. (1 CKM.= 3 KM. Conductor Length) CKM.
F(III).8.04 7/4.26 mm (100 mm Al. Area) - Dog. (1 CKM.= 3 KM. Conductor Length) CKM.
F(III).8.05(a) 11 KV 3C x 95 mm with bare messenger (1CX70 mm2) XLPE insulated Aerial Bunch Cable. CKM.

F(III).8.05(b) 11 KV 3C x 95 mm with bare messenger XLPE (1CX70 mm2) insulated Aerial Bunch Cable (Double Circuit). CKM.

F(III).8.06 11 KV 3 x 120 mm with bare messenger XLPE insulated Aerial Bunch Cable. CKM.
Erection, testing and Commissioning of 12KV, 200A, 25kA for 3sec, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB
F(III).9 Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications and scope Set
of works
F(III).10 Erection of 11 KV LINE FOR UNDER GROUND RAILWAY CROSSING & NH Crossing

SOUTHCO: IPDS SCHEME Page 202 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

11 KV LINE FOR UNDER GROUND RAILWAY CROSSING & NH Crossing BY 2 Nos (INCLUDING ONE SPARE) 3Cx185 Sqmm XLPE
Armoured Cable (0.120 km each) USING 150MM DIA GI PIPES (grade A for underground laying and grade B for pole support),
F(III).10.01 OUTDOOR HEAT SHRINKABLE CABLE JOINTING KITS, 11 KV LIGHTENING ARRESTOR STATION CLASS 10KA (6 NOS.), LUGS, 4 Set
Nos GI 3-Meters LONG pipe EARTHING, 6 SWG GI WIRES, CABLE MARKERS, BI METALLIC CLAMPS, JUMPERING etc AS
REQUIRED AS PER TECHNICAL SPECIFICATIONS AND SCOPE OF THE WORK.

11 KV LINE FOR UNDER GROUND RAILWAY CROSSING & NH Crossing BY 2 Nos (INCLUDING ONE SPARE) 3Cx300 Sqmm XLPE
Armoured Cable (0.120 km each) USING 150MM DIA GI PIPES (grade A for underground laying and grade B for pole support),
F(III).10.02 OUTDOOR HEAT SHRINKABLE CABLE JOINTING KITS, 11 KV LIGHTENING ARRESTOR STATION CLASS 10KA (6 NOS.), LUGS, 4 Set
Nos GI 3-Meters LONG PIPE EARTHING, 6 SWG GI WIRES, CABLE MARKERS, BI METALLICK CLAMPS, JUMPERING etc AS
REQUIRED AS PER TECHNICAL SPECIFICATIONS AND SCOPE OF THE WORK.

Mounting & erection of Anti-Climbing device/Barbed Wire with Danger Board, complete as per technical specifications and scope of
F(III).11 Set
works .

F(III).12 Erection and Mounting of Guarding Arrangement for Road/Line Crossing. ( Ref Drawing No : REC/DDUGJY/11kV/25) Set

Dismantling of existing 11 kV line alongwith damaged pole,steel structure & other accessories wherever required for augmentation &
F(III).16 renovation of existing 11 kV line.Loading, transportation, unloading, handing over the same to OPTCL identified store including Km
stacking .

Sub-Total Erection Price (F(III))

SOUTHCO: IPDS SCHEME Page 203 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F.(IV)
Augmentation & Renovation of LT Line with Aerial Bunched Cable. Km
( consisting of but not limited to the following major materials)
F.(IV).1 Survey, route alignment & pole spotting, preparation of survey report with drawings Km

F.(IV).2 Excavation & back filling with bolder & soil of pole pit for LT overhead line as per scope of work and specifications.

F.(IV).2.01 Excavation & back filling with bolder & soil of pole pit in normal soil as per scope of work and specifications:

F.(IV).2.01(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.01(b) 8 meter RS joist pole 125x70 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.01(c) 8 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.01(d) 11 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.
Excavation & back filling with bolder & soil of pole pit in soft rock where blasting is not required as per scope of work and
F.(IV).2.02
specifications:
F.(IV).2.02(a) 8 Mt. long, 200 KG PSC Poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.02(b) 8 meter RS joist pole 125x70 mm. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.02(c) 8 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.02(d) 11 M long steel Tubular poles. (1 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.
Excavation & back filling with bolder & soil of pole pit in hard rock where blasting is required as per scope of work and
F.(IV).2.03
specifications:

SOUTHCO: IPDS SCHEME Page 204 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F.(IV).2.03(a) 8 Mt. long, 200 KG PSC Poles. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.03(b) 8 meter RS joist pole 125x70 mm. (0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.03(c) 8 M long steel Tubular poles. ( 0.5 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.
F.(IV).2.03(d) 11 M long steel Tubular poles. (0.5 Mtr Length, 0.5 Mtr Width & 2 Mtr Depth) Cmt.

Erection of following types of poles for LT overhead line by providing pole numbering,cement concrete foundation or refilling
F.(IV).3
average size bolders mixed with excavated earth etc as per scope of work and specifications:

F.(IV).3.01(a) 8 Mt. long, 200 KG PSC Poles. No.


F.(IV).3.02(a) 8 meter RS joist pole 125x70 mm. No.
F.(IV).3.03(a) 8 M long steel Tubular poles. No.
F.(IV).3.04(a) 11 M long steel Tubular poles. No.
F.(IV).4 Excavation & back filling of stay pit in following type of soils, as per scope of work and specifications:
F.(IV).4.1 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
F.(IV).4.2 Soft rock soil where blasting is not required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.
F.(IV).4.3 Hard rock soil where blasting is required (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

Erection of Stay Set (Galvanised) with 50x8 mm stay clamp, stay insulator (1Nos.) Designation'A', anchor plate (200x200x6 mm), nut
F.(IV).5.01 bolts, 1 Nos turn-buckles,G.I Thimble 2 Nos., 1.8 m long, 16 mm diameter solid GI stay rod & 7/2.5 mm dia (3.75Kg/Stay) GI stranded Set
wire complete as per technical specifications and scope of work(total wt. 6.695 kg) by providing 0.2 cum cement concrete.

F.(IV).5.02 concreting 1 part cement, 2 part sand, 4 part 25 mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set Cmt

SOUTHCO: IPDS SCHEME Page 205 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F.(IV).6 Excavation, Erection, testing and commissioning of Earthing arrangement as per technical specificatons and scope of work. Set

Erection, testing and Commissioning of LT line with following arrangements using areal bunched XLPE cable including supply and
erection of tension clamps for dead end, suspension clamps, clamps for neutral,piercing connectors type-I & type-II, 16 mm dia MS
F.(IV).7
nuts & bolts, pole clamps, spring loaded bus bar suitable for single phase and three phase systems etc as required as per technical
specification and scope of work.

F.(IV).7.1 AERIAL BUNCHED XLPE CABLE 1X16 (Ph) + 1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM
F.(IV).7.2 AERIAL BUNCHED XLPE CABLE 3X16(Ph)+1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM

F.(IV).7.3 AERIAL BUNCHED XLPE CABLE 3 X 16(Ph) +1x25 (bare messenger cum neutral) + 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

F.(IV).7.4 AERIAL BUNCHED XLPE CABLE 1X25(Ph)+1x25 (bare messenger cum neutral) SQ. MM. ( ) CKM

F.(IV).7.5 AERIAL BUNCHED XLPE CABLE 3 X 25(Ph) +1x25 (bare messenger cum neutral) + 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

F.(IV).7.6 AERIAL BUNCHED XLPE CABLE 1X35(Ph)+1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM

F.(IV).7.7 AERIAL BUNCHED XLPE CABLE 1x35(Ph) + 1X25 (bare messenger cum neutral) + 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

F.(IV).7.8 AERIAL BUNCHED XLPE CABLE 3X35(Ph)+1X25 (bare messenger cum neutral) SQ. MM. ( ) CKM

F.(IV).7.9 AERIAL BUNCHED XLPE CABLE 3X35 (Ph) + 1x25 (bare messenger cum neutral)+ 1x16 (insulated Street lighting) SQ. MM. ( ) CKM

F.(IV).7.10 AERIAL BUNCHED XLPE CABLE 3X50(Ph)+1X35 (bare messenger cum neutral) SQ. MM. ( ) CKM

SOUTHCO: IPDS SCHEME Page 206 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F.(IV).7.11 AERIAL BUNCHED XLPE CABLE 3X50 (Ph)+1x35 (bare messenger cum neutral) +1x16 (insulated Street lighting) SQ. MM. ( ) CKM

F.(IV).7.12 AERIAL BUNCHED XLPE CABLE 3X95(Ph)+1X70 (bare messenger cum neutral) SQ. MM. ( ) CKM

F.(IV).7.13 AERIAL BUNCHED XLPE CABLE 3X95(Ph)+1X70 (bare messenger cum neutral) +1x16 (insulated Street lighting) SQ. MM. ( ) CKM

Dead end Anchor clamp along with anchor bracket for (3X50 (Ph) + 1x35 (bare messenger cum neutral)+ 1x16 (insulated
Street lighting) SQ. MM. & 3X95 (Ph)+1x70 (bare messenger cum neutral) +1x16 (insulated Street lighting) SQ. MM.) AB
F.(IV).7.14 Set.
Cable ( Ref Drawing No : REC/DDUGJY/LT-ACC-ABC/02, REC/DDUGJY/LT-ACC-ABC/03A, REC/DDUGJY/LT-ACC-
ABC/03B & REC/DDUGJY/LT-ACC-ABC/04)

Suspension clamps along with suspension bracket. ( Ref Drawing No : REC/DDUGJY/LT-ACC-ABC/02, REC/DDUGJY/LT-ACC-
F.(IV).7.15 Set.
ABC/07A, REC/DDUGJY/LT-ACC-ABC/07B & REC/DDUGJY/LT-ACC-ABC/07C)

F.(IV).7.16 Eye-Hook/Pole Brackets for Suspesion Clamp. Set.

Pole mounted SMC Distribution Box (1 incoming & 8 outgoing, 225 mm X285 mm X120mm) for service Connection.The connection with
F.(IV).7.17 Nos.
bus bar shall be of Screw Bolt technique suitable for three phase systems along with nuts & bolts and clamping arrengement.

F.(IV).7.18 3.5C X 25 sq.mm XLPE Unarmoured insulated cable Connection to Distribution Box. Km
F.(IV).7.19 3.5C X 50 sq.mm XLPE Unarmoured insulated cable Connection to Distribution Box. Km

SOUTHCO: IPDS SCHEME Page 207 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Multiport Insulating Piercing connectors (Suitable for main phase & neutral Conductor) for junction/Distribution Box. ( Ref Drawing No :
F.(IV).7.20 REC/DDUGJY/LT-ACC-ABC/05A, REC/DDUGJY/LT-ACC-ABC/05B, REC/DDUGJY/LT-ACC-ABC/06A & REC/DDUGJY/LT-ACC- Nos.
ABC/06B)

F.(IV).7.21 Insulating Piercing connectors (Suitable for street light & neutral Conductor) for junction/Distribution Box. Nos.

F.(IV).7.22 Pre-insulated crimping type straight through connector for jointing and termination lugs. Nos.
F.(IV).7.23 Jointing sleeves (Straight joint & crosss joint) Nos.

Dismantling of existing LT line ,damaged pole,steel structure alongwith accessories wherever required for to carryout the renovation
& augmentation work of LT line.Loading, transportation, unloading, handing over the same to OPTCL identified store including
F.(IV).8 Km
stacking.Disconnection of existing service connection & reconnecting the same with SMC distribution box after augmentation &
renovation work of LT line by AB Cable

Total Erection Price (F(IV))

F(V)
33/11 KV Substation Renovation & Augmentation Works - Partly Outdoor Substation (33 KV out door and 11 KV indoor) Nos.
( consisting of but not limited to the following major materials)

F(V).1 Civil works: Design, supply of all material, T&P, labour etc for the following civil works complete
F(V).1.01 Soil Investigation & Contour Survey of Substation area as per Technical Specification, & Scope of works PER S/S
F(V).1.01(a) Earth Filling & Site Levelling

SOUTHCO: IPDS SCHEME Page 208 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Earth work in PSS site provided by employer for pits free from logs, stumps, roots, rubbish or any other ingredients likely to deteriorate
or affect the stability of the (0.5 meter filling considered size 50 mt. x 30 mt.) site surface including breaking the clods maximum to 60 mm.
F(V).1.01(b) CMT
cube, placing the earth in layers not exceeding 225 mm in loose thickness, rough dressing including cost of cutting and removing shrubs,
roots falling in borrow area all complete as per approved design, as per Technical Specification, approved Drawing & Scope of works

Design, engineering and construction of foundation for Power transformer considering original equipment manufacturer
F(V).2 recommendations including excavation of pit, shuttering,reinforcement, cement concreting including providing and erecting guiding
rail, wheel stopper etc as per Technical Specification & Scope of works. ( Ref Drawing No : 10001CIV0027/REV-04)

F(V).2.01 Excavation & back filling of pit for all power transformer as per scope of work and specifications.
F(V).2.01(a) Excavation & back filling of pit in normal soil as per scope of work and specifications perTfr. (3.5X2.4x2.1 mtr) CMT

F(V).2.01(b) Excavation & back filling of pit in soft rock where blasting is not required as per scope of work and specifications. (3X3X1.1 mtr) CMT

F(V).2.02 Cement Concreting for all power transformer as per scope of work and specifications.
F(V).2.02(a) PCC (1:3:6 ) per Tfr.(3.2X2.1X0.1 mtr) CMT
F(V).2.02(b) RCC ( 1:1.5:3 ) per Tfr. ((3*2.1*0.3)+(2*(.4*2.1*3)) m CMT
F(V).2.02(c) RRHG stone grouting with sand per Tfr.(3.2*2.1*.5 mtr.) CMT
F(V).3 Construction of 100kVA 33/0.4 kV station Trf. Plinth. ( Ref Drawing No : ODSSP/CIVIL/5/REV C)
F(V).3.01 Excavation of pit for station Trf. for as per scope of work and specifications.
F(V).3.01(a) Excavation of pit in normal soil as per scope of work and specifications. (2.8*2.8*.75 mtr) CMT

SOUTHCO: IPDS SCHEME Page 209 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F(V).3.01(b) Excavation of pit in soft rock where blasting is not required as per scope of work and specifications. (2.8*2.8*.75 mtr) CMT

F(V).3.02 Cement Concreting for station Trf. as per scope of work and specifications.
F(V).3.02(a) PCC (1:3:6 ) (2.5X2.5X0.075 mtr) CMT
F(V).3.02(b) RCC ( 1:1.5:3 ) (1.5X1.5X0.1 mtr) CMT
F(V).3.02(c) Brick Masonary work (2.5x2.5x1.675)+ (1.5X1.5X 0.5) - (0.5X0.5X0.5) m CMT
F(V).3.02(d) Cement Plastering (1:6) 20 mm thick (1.15x2.5x4)+(1.5x0.5X4) m Sq Mtr
F(V).3.02(e) Sand Filling (0.5 X 0.5 X0.5) m CMT

F(V).4 Construction of oil sump pit for Transformer (2.0x2.0x2.1mtr.). ( Ref Drawing No : REC/DDUGJY/33/11kV PSS/16)

Excavation of Earth for oil sump pit for Transformer.


F(V).4.1 Excavation of pit in normal soil as per scope of work and specifications. (2.0x2.0x2.1mtr.) CMT

F(V).4.2 Excavation & back filling of pit in soft rock where blasting is not required as per scope of work and specifications. (2.0x2.0x2.1mtr.) CMT

F(V).4.3 PCC (1:3:6) 2X2X0.1 CMT


F(V).4.4 RCC(1:1.5:3) 1.6X1.6X0.1 for Top Slab CMT
F(V).4.5 Brick Masonary work(2x2.1+2x1.6)x0.25x2.3 (1:5) CMT
F(V).4.6 Cement Plastering (1:6) 2.3*( 4x2.1+ 4x1.6 )+ 1.6x1.6 Sq.mtr
F(V).4.7 Drainage for Oil sump pit with 250 dia hume pipe Mtr

SOUTHCO: IPDS SCHEME Page 210 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Design, Engineering, construction of Approach Road and foot path including bitumen carpeting, excavation and compacting etc. all
F(V).5
complete as per technical specification, scope of works. ( Ref Drawing No : REC/DDUGJY/33/11kV PSS/17)

F(V).5.1 3.75m wide approach Road Run/Mtr


F(V).5.2 1.5 mtr wide footpath Run/Mtr
F(V).6 Foundation of VCB & CT
VCB & CT. ( Ref Drawing No : REC/DDUGJY/33/11kV PSS/09)
F(V).6.1 Excavation of earth for VCB & CT.
F(V).6.2 Excavation & back filling of pit in normal soil as per scope of work and specifications.(2.15X1.975X0.575) m CMT

F(V).6.3 Excavation & back filling of pit in soft rock where blasting is not required as per scope of work and specifications.(2.15X1.975X0.575) m CMT

F(V).6.4 PCC 1:3:6 (1.95*2.15*.075) CMT


F(V).6.5 RCC :1:1.5:3 ((2*1.8*.2)+(1.725*1.3*.8)+(1.725*1.3*.38)) CMT

Construction of Boundary Wall (50X30 mtr.)made of reinforced cement concrete foundation (Beam, column, footing), angle supports,
brick works, plastering including Barbed Wire Fencing on angle and one Gate per Substation, including Supply, Fabrication, Fixing
F(V).7.1 R/Mtr
including red oxide and aluminium painting all complete as per Technical Specification & Scope of works. ( Ref Drawing No
:REC/DDUGJY/33/11kV PSS/20A).

F(V).7.2 Foundation of 152x152 RS JOIST ( GI) (20 Nos.) ( Ref Drawing No : ODSSP/CIVIL/2/REV B-01)
Excavation of earth for 152*152 RSJ Pole.

SOUTHCO: IPDS SCHEME Page 211 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
F(V).7.2.1 Excavation of pit in normal soil as per scope of work and specifications.(1*1*1.775 mtr.) CMT

F(V).7.2.2 Excavation of pit in soft rock where blasting is not required as per scope of work and specifications.(1*1*1.775 mtr.) CMT

F(V).7.2.3 PCC (1:3:6) (1*1*.075 mtr.) CMT


F(V).7.2.4 RCC (1:1.5:3) (.6*.6*.15)+2*(.45*.45) CMT

Erection, testing and Commissioning of 33/11 KV, 3 ph, 50 Hz, ONAN, Cu Wound, CRGO core, Outdoor Conventional type Power
Transformer along with transformer oil, Buchholtz relay, breather, OTI & WTI, Marshalling Box, Conservator tank, oil level indicator,
F(V).8 valves, 2 sets of 50x8 mm GI Neutral Earthing strips {(with braided conductor on bushing end), isolating link, isolation with
insulators}, Vent explosion plug, control wiring between sensing equipment and marshalling box, cable supporting tray on the body
of transformer, transformer wheels, LV/HV bushing etc as required as per technical specifications, and scope of the work.

F(V).8.1 3.15 MVA with On load tap changer. Nos.


F(V).8.2 5.00 MVA with on load tap changer. Nos.
F(V).8.3 8.00 MVA with on load tap changer. Nos.
F(V).8.4 10.0 MVA with on load tap changer. Nos.
F(V).8.5 12.5 MVA with on load tap changer. Nos.

Erection, Testing and Commissioning of 100 KVA, 33/0.433 KV, 3 ph, 50 Hz, ONAN, Copper wound, CRGO core, outdoor type Station
F(V).9 Nos.
Transformer along with transformer oil and all accessories as required as per technical specifications and scope of works. ( )

SOUTHCO: IPDS SCHEME Page 212 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, Testing and Commissioning of DP Structure for 33/0.433 KV Station Transformer with RS Joist 152x152 mm 37.1 kg/mtr, 9
meter long, 33 KV AB Switch 33 KV Station Type LAs, with hardware etc all complete as per technical specifications and scope of
F(V).10
works.
(GI Steel Structures)

9 Mt. long RS Joist 152x152 mm 37.1 Kg/Mt.(With "IPDS - OPTCL" Embossed & Pole Numbering By Paint).[Holes Provision - In Top (2 for
F(V).10.1 Nos.
Top Channel) At Bottom (1 for Earthing Fiitings)].

Erection, testing and Commissioning of 33KV, 200A, 25KA for 3 sec., 3-ph, 3 Pin type, Horizontal Mounting type, AB Switch along with
F(V).10.2 phase coupling shaft, operating rod,operating handle,4 -bolt type connector,Support Insulators, Base Channel, down Pipe, Arcing Horns Set.
etc. complete as per technical specifications, scope of works.

F(V).10.3 33KV HG Fuse 200 amps with support insulator and channel etc. Set.
F(V).10.4 HG Fuse & AB Switch mounting channel (24.84 Kg each,75x40x6 mm) MT.
F(V).10.5 Back clamps & Pole clamp (2.1 Kg each,65x8 mm). ( Ref Drawing No : REC/DDUGJY/33kV/01) MT.
F(V).10.6 Post Insulator channel (50x50x6mm)(4.5 Kg/Mt.) MT.
F(V).10.7 Cleat for Pole Base (1.2 Kg. each, 65 X 65 X 6 mm, 2 nos.) MT.
F(V).10.8 Appropriate size of Nut-Bolts & washers as per technical specification,GTP and scope of work. MT.

SOUTHCO: IPDS SCHEME Page 213 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Augmentation of Gantry structures for line terminating made of RS Joist 152x152 mm 37.1 kg/mtr, 9 meter long with Cleat for Pole
Base double Channel 100x50x6 mm cross arms of various length for bus bar supports (Beam), 65x65x6mm angle for cross
F(V).11 arms/supporting structures and 65x8 mm flats for clamps along with hardware items duly painted etc. as per technical specifications
and scope of works.
(GI Steel Structures)

9 Mt. long RS Joist 152x152 mm 37.1 Kg/Mt.(With "IPDS - OPTCL" Embossed & Pole Numbering By Paint).[Holes Provision - In Top (2 for
F(V).11.1 Nos.
Top channel) At Bottom (1 for Earthing Fiitings)].
F(V).11.2 Channel supports for Beam (100x50x6 mm, 5 Mtr length, 46kg each x 44 No's) MT.
F(V).11.3 Cross Bracing (12 Kg. each, 50x50x6 mm, 22 nos). MT.
F(V).11.4 Horizontal Bracing ( 13 Kg each, 75x75x6 mm, 14 nos). MT.
F(V).11.5 Flats for clamps (65x8 mm, 2.1 kg each x 20 No's) MT.
F(V).11.6 Cleat for Pole Base (1.2 Kg. each, 65 X 65 X 6 mm, 2x20 nos.) MT.
F(V).11.7 Appropriate size of Nut-Bolts & washers as per technical specification,GTP and scope of work. MT.
Augmentation of 36KV, 800A, 25KA for 3 seconds, 3-ph double break center rotating type (DBCR), Gang Operated, Isolator along with
F(V).12 Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per technical Set.
specifications and scope of works.

Augmentation of 36KV Outdoor type Vacuum Circuit breaker along with outdoor type Current Transformers and junction box (1 no
F(V).13 junction box for 3 no of 1-phase CTs), Jumpers, earthing, supporting structures, bi-metallic clamps, permanent maintenance platform,
marshalling box etc required as per technical specifications and scope of works.

SOUTHCO: IPDS SCHEME Page 214 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

36KV, 800A, 25KA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 400-200/1-1-1 Amps 3 Nos
outdoor type Current Transformers ( One core PS class, One core 5P10 and the third core 0.5 Class.) along with junction box (1 no junction
F(V).13.1 Nos.
box for 3 no of 1-phase CTs), Jumpers, earthing, supporting structures, bi-metallic clamps, permanent maintenance platform, marshalling
box etc required as per technical specifications and scope of works.

36KV, 800A, 25KA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 400-200/5-5-5 Amps 3 Nos
outdoor type Current Transformers (Two core 5P10 and the third core 0.5 Class.) along with junction box (1 no junction box for 3 no of 1-
F(V).13.2 Nos.
phase CTs), Jumpers, earthing, supporting structures, bi-metallic clamps, permanent maintenance platform, marshalling box etc required
as per technical specifications and scope of works.

33KV, Indoor, Feeder Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static Tri-
F(V).14 (a) Nos.
Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and scope of works.

33KV, Outdoor, Feeder Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static Tri-
F(V).14 (b) Nos.
Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and scope of works.

33KV, Indoor, Transformer Control & Relay panel along with E/F & O/C, Differential Numeric Relay Mimic Diagram, Voltmeter,
F(V).15 (a) Ammeter, Static Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications Nos.
and scope of works.
33KV, Outdoor, Transformer Control & Relay panel along with E/F & O/C, Differential Numeric Relay Mimic Diagram, Voltmeter,
F(V).15 (b) Ammeter, Static Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications Nos.
and scope of works.

SOUTHCO: IPDS SCHEME Page 215 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Augmentation of 30 KV Station Class Lightening Arrester with mounting platform, hardware etc as required as per technical
F(V).16
specifications and scope of the works.
30 KV, 10KA, 1-ph Station Class Porcelain Housing Type Lightening Arrester with mounting platform, hardware etc as required as per
F(V).16.1 Nos.
technical specifications and scope of the works.
30 KV, 10KA, 1-ph Station Class Polymer HousingType Lightening Arrester with mounting platform, hardware etc as required as per
F(V).16.2 Nos.
technical specifications and scope of the works.

Erection, testing and commissioning of 36 KV, 1-Phase, 33kV/3/110/3 volt, Single core outdoor type Potential Transformer along with
F(V).17 junction box (1 no junction box for 3 no of 1-phase PTs), bi-metallic clamp and required accessories etc. ( 1 set consists of 3 PTs & 1 junction Set.
box), complete as per technical specifications and scope of the works.

Augmentation of 12 KV, 1250A, 25kA for 3 seconds, 3-ph double break centre rotating type (DBCR), Gang Operated Isolator along
F(V).18 with Support Insulators, Operating Mechanism, Base Channel, down Pipe and all required accessories complete as per technical Set.
specifications and scope of works for outgoing feeder.
Augmentation of 9 KV Station Class Lightening Arrester with mounting platform, hardware etc as required as per technical
F(V).19
specifications and scope of the works.
9 KV, 10KA, 1-ph Station Class Porcelain Housing Type Lightening Arrester with mounting platform, hardware etc as required as per
F(V).19.1 Nos.
technical specifications and scope of the works.
9 KV, 10KA, 1-ph Station Class Polymer HousingType Lightening Arrester with mounting platform, hardware etc as required as per
F(V).19.2 Nos.
technical specifications and scope of the works.

SOUTHCO: IPDS SCHEME Page 216 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Augmentation of VRLA Battery, Battery stand made of teak wood duly painted with anti rusting paint, battery insulators, inter-battery
F(V).20 wiring using 30 sqmm, 1.1 kv, copper single core multi strand cable, terminal connectors, & all other accessories and connectors as per
technical specifications and scope of works.

48V, 100 AH VRLA Battery, Battery stand made of teak wood duly painted with anti rusting paint, battery insulators, inter-battery wiring
F(V).20.1 using 30 sqmm, 1.1 kv, copper single core multi strand cable, terminal connectors, & all other accessories and connectors as per technical Set.
specifications and scope of works.
24V, 100 AH VRLA Battery, Battery stand made of teak wood duly painted with anti rusting paint, battery insulators, inter-battery wiring
F(V).20.2 using 30 sqmm, 1.1 kv, copper single core multi strand cable, terminal connectors, & all other accessories and connectors as per technical Set.
specifications and scope of works.
Augmentation of Float-cum-Boost Battery Charger for Battery with full wave rectification for 230 V, 1 phase, 50 Hz AC Input Supply
F(V).21
as per technical specifications and scope of works.
Float-cum-Boost Battery Charger for 48 V,100 AH Battery with full wave rectification for 230 V, 1 phase, 50 Hz AC Input Supply as per
F(V).21.1 Set.
technical specifications and scope of works.
Float-cum-Boost Battery Charger for 24 V,100 AH Battery with full wave rectification for 230 V, 1 phase, 50 Hz AC Input Supply as per
F(V).21.2 Set.
technical specifications and scope of works.

Augmentation of 415 V, ACDB along with three phase-neutral voltmeter, three phase ammeter and Selector switches, 250 Amps
TPN MCCB as incomer, 63 A TPN MCCB-2 nos , 32A TPN MCCB-5 nos. , 16A Amps SP MCB - 9 nos. as outgoing feeders suited for
F(V).22 Nos.
number of control panels, nos of VCB kiosk panel, having 20% spare space provision outgoing feeders, mounting arrangements etc as
per chapter 71 of vol-III of technical specifications and scope of works.

SOUTHCO: IPDS SCHEME Page 217 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Augmentation of 48 Volts (or voltage as per state practices) Direct Curent Distribution Board (DCDB) Indoor floor mounted
comprising of 63A DP MCCB as incommer and 32 A DP MCB -1 no & 16A DP MCB -10 nos for each individual outgoing circuit of
F(V).23 Set.
indoor control panels, indoor/outdoor VCB panels, control room emergency DC lighting including 20% as sparespace provision as per
technical specifications and scope of works. .

Augmentation of AAA Conductor for Bus-Bars & Jumpers/Droppers/Terminations including hardware fittings, hardware, T-claimp
F(V).24
suitable for conductor etc as per technical specifications and scope of works.

F(V).24.1 19/3.94 mm (232 mm Al. Area) - Panther ( ) KM.


F(V).24.2 T-clamps suitable for 19/3.94 mm (232 mm Al. Area) - Panther Nos.
F(V).24.3 Bi-metallic suitable for 19/3.94 mm (232 mm Al. Area) - Panther Nos.
F(V).24.4 PG clamps suitable for 19/3.94 mm (232 mm Al. Area) - Panther Nos.
Augmentation of GI flat for Earth-grid,earth-pit and earth-riser arrangement as per Electrical Layout,technical specifications and
F(V).25
scope of works
F(V).25.1 75 x 8 mm GI flat MT.
F(V).25.2 50 x 6 mm GI flat MT.
F(V).25.3 50 x 8 mm GI flat MT.
F(V).25.4 25 x 3 mm GI flat MT.
F(V).26 Augmentation of Earthing arrangement as per technical specifications and scope of work.

SOUTHCO: IPDS SCHEME Page 218 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
40 mm dia., 3000 mm long GI pipe earth electrode with test link,bantonide powder and other accessories complete as per technical
F(V).26.1 Set.
specification. ( Ref Drawing No : REC/DDUGJY/GEN/04)
Augmentation of 33 and 11 KV polymer/porcelain Insulator - Pin, Post and Disc insulators along with suitable hardware & accessories
F(V).27
suitable for Panther/Dog conductors as per specifications.
F(V).27.1 33 KV Porcelain (B&S type) Disc insulator 70 KN along with suitable hardware fittings. Nos.
F(V).27.2 33 KV Polymer Disc insulator 70 KN along with suitable hardware fittings. Set.
F(V).27.3 33 KV Porcelain Post Insulators 10 KN with GI Pin. Nos.
F(V).27.4 33 KV Polymer Post Insulator 10 KN along with suitable hardware fittings. Set.
F(V).27.5 11 KV Porcelain(B&S Type) Disc insulator 45 KN along with suitable hardware fittings. Nos.
F(V).27.6 11 KV Polymer Disc insulator 45 KN along with suitable hardware fittings. Set.
F(V).27.7 11 KV Porcelain Post Insulators 5 KN with suitable hardware fittings Nos.
F(V).27.8 11 KV Polymer Post Insulator 5 KN with suitable hardware fittings Set.

Augmentation of Internal Electrification works of control room comprising of Main Distribution Board, Sub-distribution Boards,
copper flexible multi conductor 2.5 sqmm wiring (for light & fan)/4 sqmm wiring(for power points), power and light points, conduits,
F(V).27 fan (56" sweep 2 Nos)/LED lamps, exhaust fan (12" - 2 Nos), switches, sockets, 2mm thick, PVC 25mm dia conduits pipes in recess, Set.
plugs, miniature circuit breakers, seperate independent earthing (2 Nos of 40mm GI Pipe/3-m long)etc as required including DC
emergency lighting and auto-change-over switch as per technical specifcations and scope of works .

SOUTHCO: IPDS SCHEME Page 219 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Augmentation of External Electrification in switch yard area including power receptacles, station yard lighting with 4 Nos lightening
F(V).28 mast (fitted with 1x100 watts LED fittings at four corner) made of 12 meters high Steel Tubular Poles (IS 2713 part I, II) of designation Set.
410 SP - 60, complete as per technical specifications and scope of the work.

Augmentation of LT Power Cables including their termination materials like glands, lugs, tagging etc. as per technical specifications
F(V).29
and scope of the work.
F(V).29.1 3.5 Core 150 Sq. mm unarmoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
F(V).29.2 3.5 Core 70 Sq. mm unarmoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
F(V).29.3 2 Core 35 Sq. mm unarmoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
F(V).29.4 2 Core 16 Sq. mm unarmoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
F(V).29.5 Joints, Glands, Lugs and tagging as per Requirments for the above power Cables LS
Augmentation of LT Control cables including their termination materials like glands, lugs, tagging etc. as per technical specifications
F(V).30
and scope of the work.
F(V).30.1 2 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
F(V).30.2 4 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
F(V).30.3 6 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
F(V).30.4 10 Core 2.5 sqmm unarmoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
F(V).30.5 Joints, Glands, Lugs and tagging as per Requirments for the above control Cables LS

SOUTHCO: IPDS SCHEME Page 220 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Augmentation of Outdoor type Distribution Box for station transformer comprising 200 A switch fuse unit, 6 Nos SP MCCB 90 A, 2
Nos 32 A SP MCCB, 3-ph, 63A, contactor controlled yard lighting timer unit, tri-vector electronic energy meter with suitable CT,
F(V).31 Set.
control/power cabling and terminals, 1 No 20 A Industrial socket and switch for local power supply requirements, mounting channel,
clamps and hardware as per scope of work and technical specifications.

Augmentation of 12 KV, 1250 A, 25kA for 3 seconds, 3-ph, VCB with CR Panel along with Current Transformer, control cabling
F(V).32 between VCB and control panel and required accessories, bi-metallic clamps, Tri Vector Meter, A-meter, volt-meter, Relays &
accessories complete as per specifications for transformer and Feeder protection.

12 KV, 1250 A, 25kA for 3 seconds, 3-ph, indoor type Switchgear Panel along with 12 kV, 1-Phase, 600-300/1-1-1 Amps,3 Nos Current
F(V).32.1 Transformer, control cabling between VCB and indoor control panel and required accessories, bi-metallic clamps, Tri Vector Meter, A- Set
meter, volt-meter, Relays & accessories complete as per specifications both for transformerr & feeder breaker protection.

12KV,1250A, 25KA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 12kV, 1-Phase, 600-300/1-1-1 Amps, 3 Nos
outdoor type Current Transformers along with junction box (1 no junction box for 3 no of 1-phase CTs), Jumpers, earthing, supporting
F(V).32.2 Set
structures, bi-metallic clamps, permanent maintenance platform, marshalling box etc required as per technical specifications and scope of
works.B948

SOUTHCO: IPDS SCHEME Page 221 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

11KV, Indoor, Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static Tri-Vector
F(V).32.3 Nos.
Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and scope of works.

11KV, outdoor, Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static Tri-Vector
F(V).32.4 Nos.
Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and scope of works.

F(V).33 Augmentation of 12 kV Bus Coupler Indor AIS Panel consiting of Breaker - 1250A, Bus-bar - 1250A (Copper). Set.

Augmentation of 11 KV, XLPE, 3 phase Power cable unarmored, aluminium conductor, stranded, including their termination materials
F(V).34
like glands, lugs, tagging etc as required as per technical specifications and scope of the works.

F(V).34.1 1C X 630 sqmm, (for 10 MVA incoming cable to 11kV CR Panel). KM.
F(V).34.2 3C X 400 sqmm, (for 3.15 MVA, 5 MVA & 8 MVA incoming cable to 11kV CR Panel). KM.
F(V).34.3 3C X 300 sqmm, (from 11kV CR Panel to 11kV Outdoor DP Structure). KM.
Augmentation of Heat Shrink Out Door cable termination kit complete with all accessories and tagging etc. as per technical
F(V).35
specifications and scope of the works.
F(V).35.1 For 1C X 630 sqmm, With one spare Set.
F(V).35.2 For 3C X 400 sqmm, With one spare Set.
F(V).35.3 For 3C X 300 sqmm, With one spare Set.

SOUTHCO: IPDS SCHEME Page 222 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Augmentation of Heat Shrink In Door cable termination kit complete with all accessories and tagging etc. as per technical
F(V).36
specifications and scope of the works.
F(V).36.1 For 1C X 630 sqmm, With one spare Set.
F(V).36.2 For 3C X 400 sqmm, With one spare Set.
F(V).36.3 For 3C X 300 sqmm, With one spare Set.

Augmentation of 33 KV, XLPE, 3 phase Power cable armored, aluminium conductor, stranded, including their termination materials
F(V).37
like glands, lugs, tagging etc as required as per technical specifications and scope of the works.

F(V).37.1 3C x 50 sqmm, (From incoming Isolator to 33/0.433KV Station Transformer ) KM.


Heat Shrink Out Door cable termination kit complete with all accessories and tagging etc. as per technical specifications and scope of the
F(V).37.2 Set.
works.

Augmentation of 12 KV, 3-pole, 1-Phase, 11KV/110 volt, Single core type Potential Transformer along with required accessories etc.,
F(V).38
complete as per technical specifications and scope of the works.

12 KV, 3-pole, 1-Phase, 15 VA, 11KV/110 volt, Single core Indoor type Potential Transformer along with required accessories etc.,
FV).38.1 Set.
complete as per technical specifications and scope of the works.
12 KV, 3-pole, 1-Phase, 100 VA, 11KV/110 volt, Single core outdoor type Potential Transformer along with required accessories etc.,
F(V).38.2 Set.
complete as per technical specifications and scope of the works.

SOUTHCO: IPDS SCHEME Page 223 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F(V).39 Erection, testing and Commissioning of Feeder Metering

33 KV Feeder Metering at 33/11 kV substation using 33 kV/110 V PT, 3 ph 4 wire CT ratio 400-200/5 A outdoor oil immersed
type metering equipment including supporting steel fabricated structure, earthing coil, 2Cx2.5 sqmm copper control stranded
F(V).39.1 unarmoured cable, 16 mm dia nuts & bolts, meter (HT trivector DLMS compliant category A meter suitable for Set.
substation/feeder metering, 3 ph 4 w 110 V 1 A accuracy class 0.5s with danger board, GI earth wire etc as per specification &
scope of works.

33 KV Feeder Metering at 33/11 kV substation using combined metering unit with 33 kV/110 V PT, 3 ph 4 wire CT ratio 400-
200/1 A outdoor oil immersed type metering equipment including earthing coil, 2Cx2.5 sqmm copper control stranded
F(V).39.2 unarmoured cable, 16 mm dia nuts & bolts, meter (HT trivector DLMS compliant category A meter suitable for Set.
substation/feeder metering, 3 ph 4 w 110 V 5 A accuracy class 0.5s with danger board, GI earth wire etc as per specification &
scope of works.

SOUTHCO: IPDS SCHEME Page 224 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

11 KV Feeder Metering at 33/11 kV substation using 11 kV/110 V PT, 3 ph 4 wire CT ratio 600-300/5 A outdoor oil immersed
type metering equipment including earthing coil, 2Cx2.5 sqmm copper control stranded unarmoured cable, 16 mm dia nuts
F(V).39.3 Set.
& bolts, meter (HT trivector DLMS compliant category A meter suitable for substation/feeder metering, 3 ph 4 w 110 V 1 A
accuracy class 0.5s with danger board, GI earth wire etc as per specification & scope of works.

11 KV Feeder Metering at 33/11 kV substation using combined metring unit with 11 kV/110 V PT, 3 ph 4 wire CT ratio 600-
300/1 A outdoor oil immersed type metering equipment, earthing coil, 2Cx2.5 sqmm copper control stranded unarmoured
F(V).39.4 Set.
cable, 16 mm dia nuts & bolts, meter (HT trivector DLMS compliant category A meter suitable for substation/feeder
metering, 3 ph 4 w 110 V 5 A accuracy class 0.5s with danger board, GI earth wire etc as per specification & scope of works.

Augmentation of 1.5 Ton capacity Window Air Conditioning units with Remote control facility: Including supply of window Air
F(V).40 Nos.
conditioner Min. 3 Star rated, voltage stabiliser, control boxes etc for completing the A.C scheme.

Power Receptacles 63A MCCB as incomer, 40A 3 phase socket/switch and 1 No, 20A single phase Industrial type socket/switch of
F(V).41 Nos.
reputed brand and type.
F(V).42 Fire Fighting/ Protection Equipment System as per scope of work and technical specification.

SOUTHCO: IPDS SCHEME Page 225 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

F(V).42.1 Fire detection equipment Set.


F(V).42.2 Fire Bucket (10 Lt. each) (In control room and in switchyard near power transformer.) Nos.
F(V).42.3 Fire Bucket Mounting-stand( 50x50x6 MS stand duly painted) Nos.
F(V).42.4 Carbon dioxide type (4.5 Kg. Each) for Control Room Nos.
F(V).42.5 Carbon dioxide type Trolley Mounted of 22.5 Kg Capacity for Switch Yard Nos.
F(V).42.6 Dry Chemical Powder Type (6 Kg Each) Nos.

Dismantling of existing PTR , PTR plinth, VCB, CT,PT , steel structure, CR panel and with all associated accessories / electrics along
with minor civil work where ever is required for installing new equipments, shifting & handing over the dismantled equipment to
F(V).43 Lumpsum
OPTCL to their identified store including stacking for renovation work of existing 33/11 KV PSS where renovation work to be carried
out (1 Lot/pss).

F(V).43 Filtaration & Filling of Power transformer Oil KL

Total Erection Price (F(V))

G.
New 33 KV BAY.
( consisting of but not limited to the following major materials)

SOUTHCO: IPDS SCHEME Page 226 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Excavation & back filling of pole pit, cemennt concreting & Erection of Gantry structures for line terminating made of RS Joist 152x152
mm 37.1 Kg/mtr, 9 meter long, double Channel (100x50x6 mm) cross arms of various length for bus bar supports (Beam), Angle
G.1 (50x50x6 mm)(65x65x6mm) for cross arms/supporting structures and 50x8mm flats for clamps along with hardware items duly painted Set
etc. as per technical specifications and scope of works.
(GI Steel Structures )

Erection, testing & commissioning of 33 KV polymer/porcelain Insulator - Pin, Post and Disc insulators along with suitable hardware
G.2
& accessories suitable for Panther/Dog conductors as per specifications.

G.2.1 11 KV Porcelain (B&S Type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings. Set.

G.2.2 11 KV Polymer (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 3 Bolted hardware) along with suitable hardware fittings Set.

G.2.3 33 KV Porcelain Post Insulators 10 KN along with suitable hardware fittings. Set.
G.2.4 33 KV Polymer Post insulator 10 KN along with suitable hardware fittings. Set.
Erection, testing & commissioning of 36KV, 800A, 25KA for 3 seconds, 3-ph double break center rotating type (DBCR), Gang
G.3 Operated, Isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories Set.
complete as per technical specifications and scope of works.

SOUTHCO: IPDS SCHEME Page 227 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing & commissioning of 36KV, Outdoor type Vacuum Circuit breaker along with Current Transformers along with
G.4 junction box (1 no junction box for 3 no of 1-phase CTs), Jumpers, earthing, supporting structures, bi-metallic clamps, permanent
maintenance platform, marshalling box etc required as per technical specifications and scope of works.

36KV, 800A, 25KA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 400-200/1-1-1 Amps 3 Nos
outdoor type Current Transformers ( One core PS class, One core 5P10 and the third core 0.5 Class.) along with junction box (1 no junction
G.4.1 Nos.
box for 3 no of 1-phase CTs), Jumpers, earthing, supporting structures, bi-metallic clamps, permanent maintenance platform, marshalling
box etc required as per technical specifications and scope of works.

36KV, 800A, 25KA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 400-200/5-5-5 Amps 3 Nos
outdoor type Current Transformers (Two core 5P10 and the third core 0.5 Class.) along with junction box (1 no junction box for 3 no of 1-
G.4.2 Nos.
phase CTs), Jumpers, earthing, supporting structures, bi-metallic clamps, permanent maintenance platform, marshalling box etc required
as per technical specifications and scope of works.

Erection, testing & commissioning of 33KV Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter,
G.5 Ammeter, Static Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per
specifications and scope of works.

33KV, Indoor, Feeder Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static Tri-
G.5.1 Nos.
Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and scope of works.

SOUTHCO: IPDS SCHEME Page 228 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

33KV, outdoor, Feeder Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static Tri-
G.5.2 Nos.
Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and scope of works.

33KV, Indoor, Transformer Control & Relay panel along with E/F & O/C, Differential Numeric Relay Mimic Diagram, Voltmeter,
G.5.3 Ammeter, Static Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications Nos.
and scope of works.
33KV, outdoor, Transformer Control & Relay panel along with E/F & O/C, Differential Numeric Relay Mimic Diagram, Voltmeter,
G.5.4 Ammeter, Static Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications Nos.
and scope of works.
Erection, testing & commissioning of 30 KV Station Class Lightening Arrester with mounting platform, hardware etc as required as
G.6
per technical specifications and scope of the works.
30 KV, 10KA, 1-ph Station Class Porcelain Housing Type Lightening Arrester with mounting platform, hardware etc as required as per
G.6.1 Set.
technical specifications and scope of the works. (1Set = 3 nos.)
30 KV, 10KA, 1-ph Station Class Polymer HousingType Lightening Arrester with mounting platform, hardware etc as required as per
G.6.2 Set.
technical specifications and scope of the works. (1Set = 1 nos.)

Erection, testing & commissioning of AAA Conductor for Bus-Bars & Jumpers/Droppers/Terminations including hardware fittings,
G.7
hardware, T-claimp suitable for conductor etc as per technical specifications and scope of works.

G.7.1 19/3.94 mm (232 mm Al. Area) - Panther ( ) KM.


G.7.2 T-clamps Nos.
G.7.3 Bi-metallic clamps Nos.

SOUTHCO: IPDS SCHEME Page 229 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
G.7.4 PG clamps Nos.
Erection, testing & commissioning of Earthing & Grounding conductor as per Approved Electrical Layout for each sub-station as per
G.8
technical specifications and scope of works
G.8.1 50 x 6 mm GI flat MT.
G.8.2 25x3 mm MT.
Erection, testing & commissioning of 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bantonide powder and other
G.9 Set.
accessories complete as per technical specification.
Erection, testing & commissioning of LT Power Cables including their termination materials like glands, lugs, tagging etc. as per
G.10
technical specifications and scope of the work.
G.10.1 3.5 Core 150 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
G.10.2 3.5 Core 70 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
G.10.3 2 Core 35 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
G.10.4 2 Core 16 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
G.10.5 Joints, Glands, Lugs and tagging as per Requirments for the above power Cables LS
Erection, testing & commissioning of LT Control cables including their termination materials like glands, lugs, tagging etc. as per
G.11
technical specifications and scope of the work.
G.11.1 2 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
G.11.2 4 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
G.11.3 6 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
G.11.4 10 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.

SOUTHCO: IPDS SCHEME Page 230 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
G.11.5 Joints, Glands, Lugs and tagging as per Requirments for the above control Cables LS

Erection, testing and commissioning of 36 KV, 1-Phase, 33kV/3/110/3 volt, Single core outdoor type Potential Transformer along with
G.12 junction box (1 no junction box for 3 no of 1-phase PTs), bi-metallic clamp and required accessories etc. ( 1 set consists of 3 PTs & 1 junction Set.
box), complete as per technical specifications and scope of the works.

Total Erection Price (G)

H.
New 11 KV BAY. Nos.
( consisting of but not limited to the following major materials)

Excavation & back filling of pole pit, cemennt concreting & Erection of Gantry structures for line terminating made of RS Joist 152x152
mm 37.1 Kg/mtr, 9 meter long, double Channel (100x50x6 mm) cross arms of various length for bus bar supports (Beam), Angle
H.1 (50x50x6 mm)(65x65x6mm) for cross arms/supporting structures and 50x8mm flats for clamps along with hardware items duly painted Set
etc. as per technical specifications and scope of works.
(GI Steel Structures )

Erection, testing & commissioning of Polymer/ Porcelain Insulators with hardware fittings, hardware etc as required as per technical
H.2
specification and scope of work.

H.2.1 11 KV Porcelain (B&S Type) Disc insulator 45 KN (1 set = 2 disc with, one 4 Bolted hardware) along with suitable hardware fittings. Set.

SOUTHCO: IPDS SCHEME Page 231 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

H.2.2 11 KV Polymer (B&S type) Disc insulator 45 KN (1 set = 2 disc with, one 4 Bolted hardware) along with suitable hardware fittings Set.

H.2.3 11 KV Porcelain Post Insulators 5 KN with suitable hardware fittings Nos.


H.2.4 11 KV Polymer Post Insulator 5 KN with suitable hardware fittings. Set.

Erection, testing & commissioning of AAA Conductor for Bus-Bars & Jumpers/Droppers/Terminations including hardware fittings,
H.3
hardware, T-claimp suitable for conductor etc as per technical specifications and scope of works.

H.3.1 19/3.94 mm (232 mm Al. Area) - Panther ( ) KM.


H.3.2 T-clamps Nos.
H.3.3 Bi-metallic clamps Nos.
H.3.4 PG clamps Nos.
Erection, testing & commissioning of Earthing & Grounding conductor as per Approved Electrical Layout for each sub-station as per
H.4
technical specifications and scope of works
H.4.1 50 x 6 mm GI flat MT.
H.4.2 25 x 3 mm GI flat MT.
Erection, testing & commissioning of 40 mm dia., 3000 mm long GI pipe earth electrode with test link,bantonide powder and other
H.5 Set.
accessories complete as per technical specification.

SOUTHCO: IPDS SCHEME Page 232 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing & commissioning of 12 KV, 1250 A, 25kA for 3 seconds, 3-ph, VCB with CR Panel along with Current Transformer,
H.6 control cabling between VCB and control panel and required accessories, bi-metallic clamps, Tri Vector Meter, A-meter, volt-meter,
Relays & accessories complete as per specifications for transformer and Feeder protection.

12 KV, 1250 A, 25kA for 3 seconds, 3-ph, indoor type Switchgear Panel along with 12 kV, 1-Phase, 600-300/1-1-1 Amps,3 Nos
Current Transformer, control cabling between VCB and indoor control panel and required accessories, bi-metallic clamps,
H.6.1 Set
Tri Vector Meter, A-meter, volt-meter, Relays & accessories complete as per specifications both for transformerr & feeder
breaker protection.

12KV,1250A, 25KA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 12kV, 1-Phase, 600-300/1-1-1
Amps, 3 Nos outdoor type Current Transformers along with junction box (1 no junction box for 3 no of 1-phase CTs),
H.6.2 Set
Jumpers, earthing, supporting structures, bi-metallic clamps, permanent maintenance platform, marshalling box etc required
as per technical specifications and scope of works.B948

11KV, Indoor, Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static
H.6.3 Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and Nos.
scope of works.

SOUTHCO: IPDS SCHEME Page 233 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

11KV, outdoor, Control & Relay panel along with E/F & O/C numeric relays, Mimic Diagram, Voltmeter, Ammeter, Static
H.6.4 Tri-Vector Energy Meter, Annunciation Windows with annunciator relays and other components etc as per specifications and Nos.
scope of works.
Erection, testing & commissioning of 9 KV Station Class Lightening Arrester with mounting platform, hardware etc as required as per
H.7
technical specifications and scope of the works.
9 KV, 10KA, 1-ph Station Class Porcelain Housing Type Lightening Arrester with mounting platform, hardware etc as required as per
H.7.1 Nos.
technical specifications and scope of the works.
9 KV, 10KA, 1-ph Station Class Polymer HousingType Lightening Arrester with mounting platform, hardware etc as required as per
H.7.2 Nos.
technical specifications and scope of the works.
Erection, testing & commissioning of LT Power Cables including their termination materials like glands, lugs, tagging etc. as per
H.8
technical specifications and scope of the work.
H.8.1 3.5 Core 150 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
H.8.2 3.5 Core 70 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
H.8.3 2 Core 35 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
H.8.4 2 Core 16 Sq. mm armoured, stranded aluminium conductor, PVC insulated and PVC sheathed cable KM.
H.8.5 Glands and Lugs as per Requirments for the above power Cables LS
Erection, testing & commissioning of LT Control cables including their termination materials like glands, lugs, tagging etc. as per
H.9
technical specifications and scope of the work.
H.9.1 2 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
H.9.2 4 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.

SOUTHCO: IPDS SCHEME Page 234 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3
H.9.3 6 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
H.9.4 10 Core 2.5 sqmm armoured, stranded copper conductor, PVC insulated and PVC sheathed cable KM.
H.9.5 Joints, Glands, Lugs and tagging as per Requirments for the above control Cables LS

Erection, testing & commissioning of 11 KV, XLPE, 3 phase Power cable unarmored, aluminium conductor, stranded, including their
H.10
termination materials like glands, lugs, tagging etc as required as per technical specifications and scope of the works.

H.10.1 1C X 630 sqmm, (for 12.5 MVA incoming cable to 11kV CR Panel) KM.
H.10.2 3C X 400 sqmm, (for 3.15 MVA, 5 MVA & 8 MVA incoming cable to 11kV CR Panel) KM.
H.10.3 3C X 300 sqmm, (from 11kV CR Panel to 11kV Outdoor DP Structure) KM.
Erection, testing & commissioning of Heat Shrink Out Door cable termination kit complete with all accessories and tagging etc. as per
H.11
technical specifications and scope of the works.
H.11.1 For 1C X 630 sqmm, With one spare Set.
H.11.2 For 3C X 400 sqmm, With one spare Set.
H.11.3 For 3C X 300 sqmm, With one spare Set.
Erection, testing & commissioning of Heat Shrink In Door cable termination kit complete with all accessories and tagging etc. as per
H.12
technical specifications and scope of the works.
H.12.1 For 1C X 630 sqmm, With one spare Set.
H.12.2 For 3C X 400 sqmm, With one spare Set.
H.12.3 For 3C X 300 sqmm, With one spare Set.

SOUTHCO: IPDS SCHEME Page 235 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing & commissioning of 12 KV, 1-Phase, 11KV/110 volt, Single core type Potential Transformer along with required
H.13
accessories etc., complete as per technical specifications and scope of the works.

12 KV, 1-Phase, 15 VA, 11KV/110 volt, Single core Indoor type Potential Transformer along with required accessories etc., complete as
H.13.1 Set.
per technical specifications and scope of the works. (1 set= 3 Nos.)

12 KV, 1-Phase, 100 VA, 11KV/110 volt, Single core outdoor type Potential Transformer along with required accessories etc., complete as
H.13.2 Set.
per technical specifications and scope of the works. (1 set= 3 Nos.)

Erection, testing & commissioning of 11KV, 200 A, 3-ph H.G Fuse assembly including insulators and mounting arrangements,
H.14 Set.
hardware, etc as required as per technical specifications and scope of the works.

Erection, testing & commissioning of 12KV, 200A, 25kA for 3sec, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated AB
H.15 Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. complete as per technical specifications and scope Set.
of works and GTP.

Erection, testing & commissioning of 112 KV, 1250A, 25kA for 3 seconds, 3-ph double break centre rotating type (DBCR), Gang
H.16 Operated Isolator along with Support Insulators, Operating Mechanism manually, Base Channel, down Pipe and all required Set.
accessories complete as per technical specifications and scope of works for outgoing feeder.

SOUTHCO: IPDS SCHEME Page 236 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Total Erection Price (H)

I
Erection, testing & commissioning of UG Cable works:
( consisting of but not limited to the following major materials)

I.1.01 Survey and preparation of provisional route plan for the underground 33 KV cabling work Km

Heat Shrink Out Door cable straight through jointing kit for 33 kV 1Cx400 sqmm XLPE cable complete with all accessories
I.1.02 Set
and tagging etc. as per technical specifications and scope of the works.(1 set= 3 Nos.)

Heat Shrink Out Door termination kit for 33 kV 1Cx400 sqmm XLPE cable complete with all accessories and tagging etc. as
I.1.03 Set
per technical specifications and scope of the works. (1 set= 3 Nos.)

Heat Shrink Out Door cable straight through jointing kit for 33 kV 1Cx300 sqmm XLPE cable complete with all accessories
I.1.04 Set
and tagging etc. as per technical specifications and scope of the works.(1 set= 3 Nos.)

Heat Shrink Out Door termination kit for 33 kV 1Cx300 sqmm XLPE cable complete with all accessories and tagging etc. as
I.1.05 Set
per technical specifications and scope of the works. (1 set= 3 Nos.)

SOUTHCO: IPDS SCHEME Page 237 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Laying of 33 kV 1C x 400 sq.mm. XLPE Cable (Three Run) in buried trench covered byPrefabricated Semicircular RCC hume
I.1.06 pipes Heavy duty (NP3) (3 Runs) of 300 mm diameter , cable bonding & earthing, providing adequate brick & sand Km.
protection to the laid cable, compaction, etc complete as per approved drawing /TS.

Laying of 33 kV 1C x 300 sq.mm. XLPE Cable (Three Run) in buried trench and laying of prefabricated Semicircular RCC
I.1.07 hume pipes Heavy duty (NP3) (3 Runs) of 300 mm diameter above the cable, cable bonding & earthing, providing adequate Km.
brick & sand protection to the laid cable, compaction, etc complete as per approved drawing /TS.

Laying of 33 kV 1C x 400 sq.mm. XLPE Cable (Three Run) in buried trench covered by RCC slab , cable bonding & earthing,
I.1.08 Km.
providing adequate brick & sand protection to the laid cable, compaction, etc complete as per approved drawing /TS.

Laying of 33 kV 1C x 400 sq.mm. XLPE Cable (Three Run) and laying of HDPE pipe (Three run) with proper clamp, cable
I.1.09 Km.
bonding & earthing, civil work etc complete for drain crossing as per approved drawing /TS.

SOUTHCO: IPDS SCHEME Page 238 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Supply & Laying of heavy duty GI pipe (160 mm dia) three run with spare and laying of 33 kV 1C x 400 sq.mm. XLPE Cable
(Three Run) by HDD/Jack-Push Method (Trench less boring without disturbing the regular railway or vehicular traffic
I.1.10 Km.
above) as per site condition maintaining statutory depth under the Highway carriageway with sealing or plugging and
earthing complete at both ends.

I.1.11 Excavation (Including Required Back Filling) of pole pit for 33 KV line as per scope of work and specifications.

Excavation & back filling of 9 mtr. pole pit (of depth 1/6th of pole length) in normal soil as per scope of work and
I.1.11.01
specifications

I.1.11.01.a 9 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.

Excavation & back filling of 9 mtr. pole pit (of depth 1/6th of pole length) in soft rock where blasting is not required as per scope of
I.1.11.02
work and specifications:

I.1.11.02.a 9 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 239 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Excavation & back filling of 9 mtr. pole pit (of depth 1/6th of pole length) in hard rock where blasting is required as per scope of work
I.1.11.03
and specifications: (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth)

I.1.11.02.a 9 Mt. long RS Joist 152x152 mm (1 Mtr Length, 0.5 Mtr Width & 1.5 Mtr Depth) Cmt.

Erection of the Poles and prefabricated steel items for 33 KV overhead line by providing pole numbering as per scope of work and
specifications.

Erection of 9 Mt. long RS Joist 152x152 mm along with Pre-fabricated steel items like Top Channel,Horizontal Bracing,Clamps, Cross
I.1.12 bracings, Bracings, Back clamp,Fish Plate,Cleat etc. made of Channels (100x50x6mm), Angle (50x50x6) (65x65x6mm) (75x75x6 mm), Flats Nos.
(65x8mm) of given sizes for over head structures as per technical specification and scope of work.(Over head Double Pole structures)

I.1.12.01 Cement concrete foundation using 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1:2:4)-0.527 cmt/Pole Cmt.

I.1.13 Excavation (Including Required Back Filling) of stay pit in following type of soils, as per scope of work and specifications:

I.1.13.01 Normal soil (0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

SOUTHCO: IPDS SCHEME Page 240 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

I.1.13.02 Soft rock soil where blasting is not required(0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

I.1.13.03 Hard rock soil where blasting is not required(0.5 Mtr Length, 0.5 Mtr Width & 1.6 Mtr Depth) Cmt.

Erection of Stay Set (Galvanised) with 50x8 mm stay clamps, guy insulator (2 Nos.) Designation'C', anchor plate (300x300x8mm), Eye
I.1.14 bolts with 2 nuts, 1 No turn-buckles,G.I Thimble 2 Nos., 1.8 m long, 20 mm diameter solid GI stay rod & 7/4.00 mm dia (8.5Kg/Stay) GI Set.
stranded wire complete as per technical specification and scope of work.

I.1.14.01 concreting 1 part cement, 2 part sand, 4 part 20mm size stone aggregate chips (1:2:4)- 0.2 cmt/Stay Set (0.5mX0.5mX0.8m) Cmt

Excavation, concreting, Erection, Testing and Commissioning of Earthing arrangement as per technical specifications and scope of
I.1.15
work.

40 mm dia., 3000 mm long GI pipe earth electrode with test link,bentonite powder,RCC Pit and other accessories complete.(Used at line
I.1.15.01 Set.
crossing, DP structure and other specific locations).

I.1.15.02 6 SWG GI wire for earthing (for connection of all metallic material with,GI Pipe earth Electrode/GI Earth Spike/Rod Earth Electrodes) MT.

I.1.15.03 25 x 3 mm Galvanized GI flat. MT.

SOUTHCO: IPDS SCHEME Page 241 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing and Commissioning of 33KV, 200A, 25KA for 3 sec., 3-ph, 3 Pin type, Horizontal Mounting type, AB Switch along
I.1.16 with phase coupling shaft, operating rod,operating handle,4 -bolt type connector,Support Insulators, Base Channel, down Pipe, Arcing Set.
Horns etc. complete as per technical specifications, scope of works.

Erection, testing and Commissioning of 30 KV, 10KA, 1-ph Station Class Porceline HousingType Lightening Arrester with mounting
I.1.17 Set.
platform, hardware etc as required as per technical specifications and scope of the works.

Erection, testing and Commissioning of 30 KV, 10KA, 1-ph Station Class Polymer HousingType Lightening Arrester with mounting
I.1.18 Set.
platform, hardware etc as required as per technical specifications and scope of the works.

Mounting of Anti-Climbing device/Barbed Wire with Danger Board, complete as per technical specifications and scope of works . (1
I.1.19 Set.
set= 2 nos. of Anti-Climbing device/Barbed Wire & 1 no. Danger Board)

Erection of High Density Polyethylene (HDPE) pipe 110 mm diameter, PE 80 - PN8 for raising of 33kV UG cable ( with necessary Clamp
I.1.20 Km
fixtures & HW fittings for cable hosting in DP structure) (Three Run)

Dismantling of existing 33 kv over head line , pole, steel structure along with other accessories where is applicable to carry out the
I.1.21 Renovation & Augmentation work of 33kv feeder by U/G cable.Loading, transportation, unloading and handing over to the OPTCL Km
identified store including proper stacking .

SOUTHCO: IPDS SCHEME Page 242 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Total Erection Price (I)

J
Erection, testing & commissioning of Solar Panel Works
( consisting of but not limited to the following major materials)

SPV Modules for a total capacity of 5 KWp with suitable GI mounting structure, power conducting unit,DC junction box with connecting
cable,AC Metering & Distribution box with connecting cable, Fuses, transfer switches & printed circuit boards required for panel,Net
J.1 Set
Meter 10-100 Amps, 48 V,150 AH Battery with battery stand suitable for the panel,9 kV,5KA distribution class polymer housing LA and
suitable Earthing system for complete solar panel as per specifications

SPV Modules for a total capacity of 10 KWp with suitable GI mounting structure, power conducting unit,DC junction box with connecting
cable,AC Metering & Distribution box with connecting cable, Fuses, transfer switches & printed circuit boards required for panel,Net
J.2 Set
Meter 10-100 Amps, 48 V,150 AH Battery with battery stand suitable for the panel,9 kV,5KA distribution class polymer housing LA and
suitable Earthing system for complete solar panel as per specifications

Total Erection Price (J)

K 12 kV Indoor switchgear panel in Augmentation of 33/11 kV Sub-station

SOUTHCO: IPDS SCHEME Page 243 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Erection, testing & commissioning of 12 KV, 1250 A, 25kA for 3 seconds, 3-ph, indoor type Switchgear Panel along with 12 kV, 1-Phase,
K.1 600-300/1-1-1 Amps,3 Nos Current Transformer, control cabling between VCB and indoor control panel and required accessories, bi- set
metallic clamps, Tri Vector Meter, A-meter, volt-meter, Relays & accessories complete as per specifications for feeder protection.

Total Erection Price (K)


Civil work for UG Cable
L
( consisting of but not limited to the following major materials)
L.1 Earth work excavation of soil (2mtr w x 1.6mtr d) Cum

L.2 Shifing of excavated soil to a lead distance of 10 Km Cum

L.3 Filling with fine river sand after laying of Cable inside the trench Cum

L.4 Back filling with excavated soils outside of trench Cum

Reparing of Damage of Asphalt/Tar road & other utilities and Reconstructing to bring its origional shape after laying of cable in open
L.5 trench (2mtr width)
Km

Reparing of Damage of Paver Block Tiles/ Footpath Tiles & other utilities and Reconstructing to bring its origional shape after laying of
L.6 cable in open trench (2mtr width)
Km

SOUTHCO: IPDS SCHEME Page 244 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

Reparing of Damage of Concrete road / Concrete Footpath & other utilities and Reconstructing to bring its origional shape after laying of
L.7 cable in open trench (2mtr width)
Km

L.8 Supply and erection of Route Marker along the Cable Routes at an interval of 30 Mtrs as per the drawing with civil works Nos.

Total Erection Price (L)

Annual comprehensive Maintenance of the entire Solar Panel system (5KWp) with all related accessories along
M with replacement of defective parts during comprehensive maintenance period after handing over the system to
the Employer

M.1 For the 1st year after handing over Set

M.2 For the 2nd year after handing over Set

M.3 For the 3rd year after handing over Set

SOUTHCO: IPDS SCHEME Page 245 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

M.4 For the 4th year after handing over Set

M.5 For the 5th year after handing over Set

Total Comprehensive Maintenance Charges (M)

GRAND TOTAL[A+B+C+D+E+(F.I)+(F.II)+(F.III)+(F.IV)+(F.V)+G+H+I+J+K+ L+M]

Notes: The Prices of all such item(s) where the Contractor has not quoted rates/amount (Viz., items left blank or against which '---' is indic
supply the same free of cost.

SOUTHCO: IPDS SCHEME Page 246 of 403 Price Schedule: Erection


Sl. No. Descripton Unit

2
1 3

SOUTHCO: IPDS SCHEME Page 247 of 403 Price Schedule: Erection


NSMISSION CORPORATION LIMITED
Pkg.- 03) in Odisha under IPDS Tender No. NIT/OPTCL/IPDS/01

Date: 25th October, 2016

Contractor's Name & Address: Sterling & Wilson Pvt. Ltd.


Benfish IT Tower, 3rd Floor
31, G.N. Block, Salt Lake City, Sector V, Kolkata 700091

(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

107.000

107.000 1411.760 211.764 15.0 16.235 227.999 24395.92 151058.32 175454.24

1195.800 235.290 35.294 15.0 2.706 37.999 45439.60 281359.78 326799.38


33.600 235.290 35.294 15.0 2.706 37.999 1276.78 7905.74 9182.52

SOUTHCO: IPDS SCHEME Page 248 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

597.900 235.290 35.294 15.0 2.706 37.999 22719.80 140679.89 163399.69


16.800 235.290 35.294 15.0 2.706 37.999 638.39 3952.87 4591.26

99.650 882.350 132.353 15.0 10.147 142.500 14200.08 87926.18 102126.26


2.800 882.350 132.353 15.0 10.147 142.500 399.00 2470.58 2869.58

1,819 1294.120 194.118 15.0 14.882 209.000 380171.69 2354004.28 2734175.97

958.613 5668.680 340.121 6.0 60.088 400.209 383645.37 5434070.34 5817715.71

79 2588.240 388.236 15.0 29.765 418.001 33022.06 204470.96 237493.02

SOUTHCO: IPDS SCHEME Page 249 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

83.266 5668.680 340.121 6.0 60.088 400.209 33323.79 472008.31 505332.10

28 3058.820 458.823 15.0 35.176 493.999 13831.98 85646.96 99478.94

29.512 5668.680 340.121 6.0 60.088 400.209 11810.96 167294.08 179105.04

4 5176.470 776.471 15.0 59.529 836.000 3344.00 20705.88 24049.88

8.432 5668.680 340.121 6.0 60.088 400.209 3374.56 47798.31 51172.87

SOUTHCO: IPDS SCHEME Page 250 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 251 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

205.440 235.290 35.294 15.0 2.706 37.999 7806.58 48337.98 56144.56


102.720 235.290 35.294 15.0 2.706 37.999 3903.29 24168.99 28072.28
34.240 882.350 132.353 15.0 10.147 142.500 4879.18 30211.66 35090.84

856 382.350 57.353 15.0 4.397 61.750 52857.59 327291.60 380149.19

171.200 5668.680 340.121 6.0 60.088 400.209 68515.75 970478.02 1038993.77

174 1411.760 211.764 15.0 16.235 227.999 39671.87 245646.24 285318.11

1,819 352.940 52.941 15.0 4.059 57.000 103682.65 641997.86 745680.51

SOUTHCO: IPDS SCHEME Page 252 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1.067 8235.290 1235.294 15.0 94.706 1329.999 1419.54 8789.73 10209.27

1,020 82.350 12.353 15.0 0.947 13.300 13565.52 83997.00 97562.52

0.0

252 82.350 12.353 15.0 0.947 13.300 3351.48 20752.20 24103.68

0.0

0.0

1,020 35.290 5.294 15.0 0.406 5.699 5813.32 35995.80 41809.12


12 70.590 10.589 15.0 0.812 11.400 136.80 847.08 983.88
252 35.290 5.294 15.0 0.406 5.699 1436.23 8893.08 10329.31
0.0
0.0
0.0

SOUTHCO: IPDS SCHEME Page 253 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

51 58.820 8.823 15.0 0.676 9.499 484.47 2999.82 3484.29


510 58.820 8.823 15.0 0.676 9.499 4844.71 29998.20 34842.91
0.0
126 58.820 8.823 15.0 0.676 9.499 1196.93 7411.32 8608.25
6 58.820 8.823 15.0 0.676 9.499 57.00 352.92 409.92

85.000 10588.240 1588.236 15.0 121.765 1710.001 145350.06 900000.40 1045350.46


22.000 18823.530 2823.530 15.0 216.471 3040.000 66880.00 414117.66 480997.66

4 2941.180 441.177 15.0 33.824 475.001 1900.00 11764.72 13664.72

SOUTHCO: IPDS SCHEME Page 254 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

7 234588.240 35188.236 15.0 2697.765 37886.001 265202.01 1642117.68 1907319.69

2,049 23.530 3.530 15.0 0.271 3.800 7786.39 48212.97 55999.36

14 1176.470 176.471 15.0 13.529 190.000 2660.00 16470.58 19130.58

1774995.35 14982205.99 16757201.34

SOUTHCO: IPDS SCHEME Page 255 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1 117647.060 17647.059 15.0 1352.941 19000.000 19000.00 117647.06 136647.06

750.000 460.470 69.071 15.0 5.295 74.366 55774.43 345352.50 401126.93

17.640 288.350 43.253 15.0 3.316 46.569 821.47 5086.49 5907.96

9.900 502.940 75.441 15.0 5.784 81.225 804.13 4979.11 5783.24

SOUTHCO: IPDS SCHEME Page 256 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.672 6286.370 377.182 6.0 66.636 443.818 298.25 4224.44 4522.69


6.930 12202.960 732.178 6.0 129.351 861.529 5970.40 84566.51 90536.91

5.880 288.350 43.253 15.0 3.316 46.569 273.82 1695.50 1969.32

5.880 502.940 75.441 15.0 5.784 81.225 477.60 2957.29 3434.89

0.469 6286.370 377.182 6.0 66.636 443.818 208.04 2946.74 3154.78


0.225 12202.960 732.178 6.0 129.351 861.529 193.84 2745.67 2939.51
11.469 5916.590 354.995 6.0 62.716 417.711 4790.63 67855.89 72646.52
14.500 197.220 11.833 6.0 2.091 13.924 201.89 2859.69 3061.58
0.125 887.490 53.249 6.0 9.407 62.657 7.83 110.94 118.77

20 5609.630 336.578 6.0 59.462 396.040 7920.80 112192.60 120113.40

SOUTHCO: IPDS SCHEME Page 257 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

15 2358.740 141.524 6.0 25.003 166.527 2497.91 35381.10 37879.01

2.442 288.350 43.253 15.0 3.316 46.569 113.70 704.03 817.73

2.442 502.940 75.441 15.0 5.784 81.225 198.32 1227.98 1426.30

0.314 6286.370 377.182 6.0 66.636 443.818 139.55 1976.67 2116.22


3.366 12202.960 732.178 6.0 129.351 861.529 2900.04 41076.99 43977.03

35.500 288.350 43.253 15.0 3.316 46.569 1653.18 10236.43 11889.61

35.500 502.940 75.441 15.0 5.784 81.225 2883.48 17854.37 20737.85

1.500 6286.370 377.182 6.0 66.636 443.818 665.73 9429.56 10095.29


9.180 12202.960 732.178 6.0 129.351 861.529 7908.84 112023.17 119932.01

SOUTHCO: IPDS SCHEME Page 258 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

160 12565.570 753.934 6.0 133.195 887.129 141940.68 2010491.20 2152431.88

52 4607.370 276.442 6.0 48.838 325.280 16914.58 239583.24 256497.82

SOUTHCO: IPDS SCHEME Page 259 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 260 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 261 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 262 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 263 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 264 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 265 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 266 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 267 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 268 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

218.000 288.350 43.253 15.0 3.316 46.569 10151.94 62860.30 73012.24

SOUTHCO: IPDS SCHEME Page 269 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

284.000 887.970 53.278 6.0 9.412 62.691 17804.15 252183.48 269987.63

57.000 6286.370 377.182 6.0 66.636 443.818 25297.61 358323.09 383620.70

29.000 5525.650 828.848 15.0 63.545 892.392 25879.38 160243.85 186123.23

SOUTHCO: IPDS SCHEME Page 270 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

91.000 5525.650 828.848 15.0 63.545 892.392 81207.72 502834.15 584041.87


33.000 5525.650 828.848 15.0 63.545 892.392 29448.95 182346.45 211795.40

50.000 9509.680 570.581 6.0 100.803 671.383 33569.17 475484.00 509053.17


4.000 10070.520 604.231 6.0 106.748 710.979 2843.91 40282.08 43125.99
12.000 9509.680 570.581 6.0 100.803 671.383 8056.60 114116.16 122172.76
29.000 10070.520 604.231 6.0 106.748 710.979 20618.38 292045.08 312663.46
3.000 10070.520 604.231 6.0 106.748 710.979 2132.94 30211.56 32344.50

SOUTHCO: IPDS SCHEME Page 271 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

4.000 10070.520 604.231 6.0 106.748 710.979 2843.91 40282.08 43125.99


27.000 1010.750 60.645 6.0 10.714 71.359 1926.69 27290.25 29216.94
23.000 659.450 39.567 6.0 6.990 46.557 1070.81 15167.35 16238.16
29.000 10070.520 604.231 6.0 106.748 710.979 20618.38 292045.08 312663.46
3.000 10070.520 604.231 6.0 106.748 710.979 2132.94 30211.56 32344.50
4.000 10070.520 604.231 6.0 106.748 710.979 2843.91 40282.08 43125.99

14.000 74826.470 11223.971 15.0 860.504 12084.475 169182.65 1047570.58 1216753.23

70.000 1355.880 81.353 6.0 14.372 95.725 6700.76 94911.60 101612.36

SOUTHCO: IPDS SCHEME Page 272 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

12.000 1355.880 81.353 6.0 14.372 95.725 1148.70 16270.56 17419.26

6.000 1355.880 81.353 6.0 14.372 95.725 574.35 8135.28 8709.63

31.000 1170.990 70.259 6.0 12.412 82.672 2562.83 36300.69 38863.52

1.000 135588.440 8135.306 6.0 1437.237 9572.544 9572.54 135588.44 145160.98

13.000 3451.340 207.080 6.0 36.584 243.665 3167.64 44867.42 48035.06

SOUTHCO: IPDS SCHEME Page 273 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

25.000 3697.870 221.872 6.0 39.197 261.070 6526.74 92446.75 98973.49

2.000 365.960 21.958 6.0 3.879 25.837 51.67 731.92 783.59

1.000 3660.890 219.653 6.0 38.805 258.459 258.46 3660.89 3919.35

538.000 197.220 11.833 6.0 2.091 13.924 7490.97 106104.36 113595.33


34.000 202.150 12.129 6.0 2.143 14.272 485.24 6873.10 7358.34

SOUTHCO: IPDS SCHEME Page 274 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

335.000 170.100 10.206 6.0 1.803 12.009 4023.04 56983.50 61006.54


156.000 175.030 10.502 6.0 1.855 12.357 1927.71 27304.68 29232.39

439.000 197.220 11.833 6.0 2.091 13.924 6112.52 86579.58 92692.10

1493.000 197.460 11.848 6.0 2.093 13.941 20813.43 294807.78 315621.21

782.000 110.940 6.656 6.0 1.176 7.832 6124.91 86755.08 92879.99

SOUTHCO: IPDS SCHEME Page 275 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1214.000 104.770 6.286 6.0 1.111 7.397 8979.67 127190.78 136170.45

860.000 123.260 7.396 6.0 1.307 8.702 7483.85 106003.60 113487.45

634.000 123.260 7.396 6.0 1.307 8.702 5517.17 78146.84 83664.01

125.000 87.520 5.251 6.0 0.928 6.179 772.36 10940.00 11712.36

SOUTHCO: IPDS SCHEME Page 276 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

26.000 9614.450 576.867 6.0 101.913 678.780 17648.28 249975.70 267623.98

9.000 6779.420 406.765 6.0 71.862 478.627 4307.64 61014.78 65322.42

36 184.890 11.093 6.0 1.960 13.053 469.92 6656.04 7125.96

9.000 175.030 10.502 6.0 1.855 12.357 111.21 1575.27 1686.48

SOUTHCO: IPDS SCHEME Page 277 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

148.000 46.840 2.810 6.0 0.497 3.307 489.42 6932.32 7421.74

243.000 596.590 35.795 6.0 6.324 42.119 10234.98 144971.37 155206.35

SOUTHCO: IPDS SCHEME Page 278 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 279 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 280 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 281 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 282 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 283 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 284 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 285 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 286 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

SOUTHCO: IPDS SCHEME Page 287 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

15 121.630 7.298 6.0 1.289 8.587 128.81 1824.45 1953.26


20 182.460 10.948 6.0 1.934 12.882 257.63 3649.20 3906.83

SOUTHCO: IPDS SCHEME Page 288 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

15 228.070 13.684 6.0 2.418 16.102 241.53 3421.05 3662.58


20 304.100 18.246 6.0 3.223 21.469 429.39 6082.00 6511.39
20 342.110 20.527 6.0 3.626 24.153 483.06 6842.20 7325.26

2 684.210 41.053 6.0 7.253 48.305 96.61 1368.42 1465.03


2 912.300 54.738 6.0 9.670 64.408 128.82 1824.60 1953.42
2 760.240 45.614 6.0 8.059 53.673 107.35 1520.48 1627.83
2 1140.370 68.422 6.0 12.088 80.510 161.02 2280.74 2441.76

10 76.030 4.562 6.0 0.806 5.368 53.68 760.30 813.98

10 380.130 22.808 6.0 4.029 26.837 268.37 3801.30 4069.67

SOUTHCO: IPDS SCHEME Page 289 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

5 684.210 41.053 6.0 7.253 48.305 241.53 3421.05 3662.58


2 684.210 41.053 6.0 7.253 48.305 96.61 1368.42 1465.03
2 760.240 45.614 6.0 8.059 53.673 107.35 1520.48 1627.83
4 608.200 36.492 6.0 6.447 42.939 171.76 2432.80 2604.56
2 456.140 27.368 6.0 4.835 32.203 64.41 912.28 976.69
2 456.140 27.368 6.0 4.835 32.203 64.41 912.28 976.69
2 456.140 27.368 6.0 4.835 32.203 64.41 912.28 976.69
2 988.310 59.299 6.0 10.476 69.775 139.55 1976.62 2116.17
2 684.210 41.053 6.0 7.253 48.305 96.61 1368.42 1465.03
2 836.270 50.176 6.0 8.864 59.041 118.08 1672.54 1790.62
2 182.460 10.948 6.0 1.934 12.882 25.76 364.92 390.68
4 1368.440 82.106 6.0 14.505 96.612 386.45 5473.76 5860.21
2 76.030 4.562 6.0 0.806 5.368 10.74 152.06 162.80

SOUTHCO: IPDS SCHEME Page 290 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2 8362.670 501.760 6.0 88.644 590.405 1180.81 16725.34 17906.15

1 8362.670 501.760 6.0 88.644 590.405 590.40 8362.67 8953.07

1 6386.040 383.162 6.0 67.692 450.854 450.85 6386.04 6836.89

2 4561.460 273.688 6.0 48.351 322.039 644.08 9122.92 9767.00

2 912.300 54.738 6.0 9.670 64.408 128.82 1824.60 1953.42

SOUTHCO: IPDS SCHEME Page 291 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

10 456.140 27.368 6.0 4.835 32.203 322.03 4561.40 4883.43


25 912.300 54.738 6.0 9.670 64.408 1610.21 22807.50 24417.71

2 486.550 29.193 6.0 5.157 34.350 68.70 973.10 1041.80


3 228.550 13.713 6.0 2.423 16.136 48.41 685.65 734.06
3 288.890 17.333 6.0 3.062 20.396 61.19 866.67 927.86
3 304.100 18.246 6.0 3.223 21.469 64.41 912.30 976.71
3 342.110 20.527 6.0 3.626 24.153 72.46 1026.33 1098.79
2 152.040 9.122 6.0 1.612 10.734 21.47 304.08 325.55
3 228.070 13.684 6.0 2.418 16.102 48.31 684.21 732.52

10 1368.440 82.106 6.0 14.505 96.612 966.12 13684.40 14650.52

5 1368.440 82.106 6.0 14.505 96.612 483.06 6842.20 7325.26

SOUTHCO: IPDS SCHEME Page 292 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2 243.280 14.597 6.0 2.579 17.176 34.35 486.56 520.91

1 6386.040 383.162 6.0 67.692 450.854 450.85 6386.04 6836.89

1 228072.900 13684.374 6.0 2417.573 16101.947 16101.95 228072.90 244174.85

SOUTHCO: IPDS SCHEME Page 293 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1 182458.320 10947.499 6.0 1934.058 12881.557 12881.56 182458.32 195339.88

1 243277.760 14596.666 6.0 2578.744 17175.410 17175.41 243277.76 260453.17

35 7419.670 445.180 6.0 78.649 523.829 18334.00 259688.45 278022.45


25 5624.590 337.475 6.0 59.621 397.096 9927.40 140614.75 150542.15

25 12565.570 753.934 6.0 133.195 887.129 22178.23 314139.25 336317.48

10 1487.520 89.251 6.0 15.768 105.019 1050.19 14875.20 15925.39

SOUTHCO: IPDS SCHEME Page 294 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

169 658.200 39.492 6.0 6.977 46.469 7853.25 111235.80 119089.05

0
2 44470.590 6670.589 15.0 511.412 7182.000 14364.00 88941.18 103305.18
0
0
0

0.75 288.350 43.253 15.0 3.316 46.569 34.93 216.26 251.19

0.75 502.940 75.441 15.0 5.784 81.225 60.92 377.21 438.13

SOUTHCO: IPDS SCHEME Page 295 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1.0 2352.940 352.941 15.0 27.059 380.000 380.00 2352.94 2732.94

1.05 5294.120 794.118 15.0 60.882 855.000 901.17 5580.00 6481.17

1.00 5882.350 882.353 15.0 67.647 950.000 950.00 5882.35 6832.35

1 2941.180 441.177 15.0 33.824 475.001 475.00 2941.18 3416.18

1.00 117.650 17.648 15.0 1.353 19.000 19.00 117.65 136.65

1.00 647.060 97.059 15.0 7.441 104.500 104.50 647.06 751.56

SOUTHCO: IPDS SCHEME Page 296 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1.0 411.760 61.764 15.0 4.735 66.499 66.50 411.76 478.26

15.00 288.350 43.253 15.0 3.316 46.569 698.53 4325.25 5023.78

20.00 3823.530 573.530 15.0 43.971 617.500 12350.00 76470.60 88820.60

10.54 5294.120 794.118 15.0 60.882 855.000 9011.70 55800.02 64811.72

SOUTHCO: IPDS SCHEME Page 297 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1 3882.350 582.353 15.0 44.647 627.000 627.00 3882.35 4509.35

3.00 4117.650 617.648 15.0 47.353 665.000 1995.00 12352.95 14347.95

1.00 2941.180 441.177 15.0 33.824 475.001 475.00 2941.18 3416.18

2.00 2941.180 441.177 15.0 33.824 475.001 950.00 5882.36 6832.36

3 117.650 17.648 15.0 1.353 19.000 57.00 352.95 409.95

SOUTHCO: IPDS SCHEME Page 298 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1 1058.820 158.823 15.0 12.176 170.999 171.00 1058.82 1229.82

0.00

18.00 117.650 17.648 15.0 1.353 19.000 342.01 2117.70 2459.71

1.00 1764.710 264.707 15.0 20.294 285.001 285.00 1764.71 2049.71

1.00 1411.760 211.764 15.0 16.235 227.999 228.00 1411.76 1639.76

SOUTHCO: IPDS SCHEME Page 299 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1 1411.760 211.764 15.0 16.235 227.999 228.00 1411.76 1639.76

1.00 1411.760 211.764 15.0 16.235 227.999 228.00 1411.76 1639.76

0.20 9411.760 1411.764 15.0 108.235 1519.999 304.00 1882.35 2186.35

0.564 14117.650 2117.648 15.0 162.353 2280.000 1285.92 7962.35 9248.27


0.341 14117.650 2117.648 15.0 162.353 2280.000 777.48 4814.12 5591.60
0.050 14117.650 2117.648 15.0 162.353 2280.000 113.09 700.24 813.33

SOUTHCO: IPDS SCHEME Page 300 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.088 14117.650 2117.648 15.0 162.353 2280.000 200.64 1242.35 1442.99

30.00 1411.760 211.764 15.0 16.235 227.999 6839.98 42352.80 49192.78

0.00

24.00 70.590 10.589 15.0 0.812 11.400 273.61 1694.16 1967.77

0.00
7.00 58.820 8.823 15.0 0.676 9.499 66.50 411.74 478.24
0.0
12.00 70.590 10.589 15.0 0.812 11.400 136.80 847.08 983.88
0.0
18.00 58.820 8.823 15.0 0.676 9.499 170.99 1058.76 1229.75

SOUTHCO: IPDS SCHEME Page 301 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1.00 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

1.00 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

0.05 176470.590 26470.589 15.0 2029.412 28500.000 1425.00 8823.53 10248.53


0.05 105882.350 15882.353 15.0 1217.647 17100.000 855.00 5294.12 6149.12
0.05 47058.820 7058.823 15.0 541.176 7599.999 380.00 2352.94 2732.94
0.05 23529.410 3529.412 15.0 270.588 3800.000 190.00 1176.47 1366.47
1.00 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

SOUTHCO: IPDS SCHEME Page 302 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.40 17647.060 2647.059 15.0 202.941 2850.000 1140.00 7058.82 8198.82


0.40 29411.760 4411.764 15.0 338.235 4749.999 1900.00 11764.70 13664.70
0.20 41176.470 6176.471 15.0 473.529 6650.000 1330.00 8235.29 9565.29
0.30 58823.530 8823.530 15.0 676.471 9500.000 2850.00 17647.06 20497.06
1.00 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

2.00 5882.350 882.353 15.0 67.647 950.000 1900.00 11764.70 13664.70

4.00 5882.350 882.353 15.0 67.647 950.000 3800.00 23529.40 27329.40

1.00 5882.350 882.353 15.0 67.647 950.000 950.00 5882.35 6832.35

SOUTHCO: IPDS SCHEME Page 303 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0
0.15 352941.180 52941.177 15.0 4058.824 57000.001 8550.00 52941.18 61491.18
0.30 235294.120 35294.118 15.0 2705.882 38000.000 11400.00 70588.24 81988.24

0.0
3.00 2352.940 352.941 15.0 27.059 380.000 1140.00 7058.82 8198.82
5.00 2352.940 352.941 15.0 27.059 380.000 1900.00 11764.70 13664.70

0.0
3 2352.940 352.941 15.0 27.059 380.000 1140.00 7058.82 8198.82
5 2352.940 352.941 15.0 27.059 380.000 1900.00 11764.70 13664.70

2.00 1176.470 176.471 15.0 13.529 190.000 380.00 2352.94 2732.94

SOUTHCO: IPDS SCHEME Page 304 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0

1 1764.710 264.707 15.0 20.294 285.001 285.00 1764.71 2049.71

6.00 3529.410 529.412 15.0 40.588 570.000 3420.00 21176.46 24596.46

2.00 352.940 52.941 15.0 4.059 57.000 114.00 705.88 819.88

1.00 1411.760 211.764 15.0 16.235 227.999 228.00 1411.76 1639.76

SOUTHCO: IPDS SCHEME Page 305 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1.00 17647.060 2647.059 15.0 202.941 2850.000 2850.00 17647.06 20497.06

3.00 1411.760 211.764 15.0 16.235 227.999 684.00 4235.28 4919.28

1126319.92 11634491.53 12760811.45

279.62

280 1411.760 211.764 15.0 16.235 227.999 63753.15 394756.33 458509.48

0.00
2,601.00 235.290 35.294 15.0 2.706 37.999 98836.27 611989.29 710825.56
83.40 235.290 35.294 15.0 2.706 37.999 3169.14 19623.19 22792.33

0.00

SOUTHCO: IPDS SCHEME Page 306 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.00

0.0
1,300.50 235.290 35.294 15.0 2.706 37.999 49418.14 305994.65 355412.79
41.70 235.290 35.294 15.0 2.706 37.999 1584.57 9811.59 11396.16

0.00

0.00

0.0
216.75 882.350 132.353 15.0 10.147 142.500 30886.77 191249.36 222136.13
6.95 882.350 132.353 15.0 10.147 142.500 990.37 6132.33 7122.70

0.00

0.00

SOUTHCO: IPDS SCHEME Page 307 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.00

0.00

5,313 1294.120 194.118 15.0 14.882 209.000 1110419.02 6875659.56 7986078.58

2,135.83 5668.680 340.121 6.0 60.088 400.209 854776.38 12107314.13 12962090.51

SOUTHCO: IPDS SCHEME Page 308 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.00

0.00

0.00

0.00

210 2588.240 388.236 15.0 29.765 418.001 87571.16 542236.28 629807.44

SOUTHCO: IPDS SCHEME Page 309 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

168.44 5668.680 340.121 6.0 60.088 400.209 67410.37 954821.12 1022231.49

0.0

0.0

70 3058.820 458.823 15.0 35.176 493.999 34332.96 212587.99 246920.95

73.25 5668.680 340.121 6.0 60.088 400.209 29316.50 415247.82 444564.32

SOUTHCO: IPDS SCHEME Page 310 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.00

0.00

0.00

0.0

12 4705.880 705.882 15.0 54.118 760.000 9120.00 56470.56 65590.56

SOUTHCO: IPDS SCHEME Page 311 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

19.30 5668.680 340.121 6.0 60.088 400.209 7722.43 109382.85 117105.28

0.00

0.0

536.88 235.290 35.294 15.0 2.706 37.999 20401.08 126322.50 146723.58


268.44 235.290 35.294 15.0 2.706 37.999 10200.54 63161.25 73361.79
89.48 882.350 132.353 15.0 10.147 142.500 12750.86 78952.68 91703.54

2,237 382.350 57.353 15.0 4.397 61.750 138133.69 855316.95 993450.64

447.40 5668.680 340.121 6.0 60.088 400.209 179053.42 2536167.43 2715220.85

SOUTHCO: IPDS SCHEME Page 312 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

467 1411.760 211.764 15.0 16.235 227.999 106475.65 659291.92 765767.57

5,313 352.940 52.941 15.0 4.059 57.000 302839.99 1875170.22 2178010.21

4.046 8235.290 1235.294 15.0 94.706 1329.999 5381.18 33319.98 38701.16

0.0

110 70.590 10.589 15.0 0.812 11.400 1254.03 7764.90 9018.93

1,838 70.590 10.589 15.0 0.812 11.400 20953.72 129744.42 150698.14

360 70.590 10.589 15.0 0.812 11.400 4104.10 25412.40 29516.50

758 70.590 10.589 15.0 0.812 11.400 8641.42 53507.22 62148.64

0.00
10,968 58.820 8.823 15.0 0.676 9.499 104189.75 645137.76 749327.51

SOUTHCO: IPDS SCHEME Page 313 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

3,602 58.820 8.823 15.0 0.676 9.499 34220.75 211893.17 246113.92

31 35.290 5.294 15.0 0.406 5.699 176.68 1093.99 1270.67

42 35.290 5.294 15.0 0.406 5.699 239.37 1482.18 1721.55

73 58.820 8.823 15.0 0.676 9.499 693.46 4293.86 4987.32

0.00

96 58.820 8.823 15.0 0.676 9.499 911.95 5646.72 6558.67

144 58.820 8.823 15.0 0.676 9.499 1367.92 8470.08 9838.00

0.00

0.00

SOUTHCO: IPDS SCHEME Page 314 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

9 7058.820 1058.823 15.0 81.176 1139.999 10330.09 63963.42 74293.51


175 10588.240 1588.236 15.0 121.765 1710.001 298942.33 1851036.12 2149978.45
23 10588.240 1588.236 15.0 121.765 1710.001 39291.28 243289.66 282580.94
24 14117.650 2117.648 15.0 162.353 2280.000 54720.01 338823.60 393543.61

4 2941.180 441.177 15.0 33.824 475.001 1900.00 11764.72 13664.72

SOUTHCO: IPDS SCHEME Page 315 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

4 234588.240 35188.236 15.0 2697.765 37886.001 151544.00 938352.96 1089896.96

0.00

5,871 23.530 3.530 15.0 0.271 3.800 22310.36 138144.63 160454.99

35 1176.470 176.471 15.0 13.529 190.000 6602.50 40882.33 47484.83

3986937.36 33761684.12 37748621.48

501

SOUTHCO: IPDS SCHEME Page 316 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0
187.50 235.290 35.294 15.0 2.706 37.999 7124.88 44116.88 51241.76
188.25 235.290 35.294 15.0 2.706 37.999 7153.37 44293.34 51446.71

0.0
187.50 235.290 35.294 15.0 2.706 37.999 7124.88 44116.88 51241.76
188.25 235.290 35.294 15.0 2.706 37.999 7153.37 44293.34 51446.71

0.0

SOUTHCO: IPDS SCHEME Page 317 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

250 2352.940 352.941 15.0 27.059 380.000 94999.95 588235.00 683234.95

187.50 5668.680 340.121 6.0 60.088 400.209 75039.15 1062877.50 1137916.65

251 2352.940 352.941 15.0 27.059 380.000 95379.95 590587.94 685967.89

201.80 5668.680 340.121 6.0 60.088 400.209 80763.74 1143962.30 1224726.04

110.16 235.290 35.294 15.0 2.706 37.999 4185.86 25918.66 30104.52


135.94 235.290 35.294 15.0 2.706 37.999 5165.53 31984.73 37150.26
63.28 235.290 35.294 15.0 2.706 37.999 2404.65 14889.45 17294.10

110.16 235.290 35.294 15.0 2.706 37.999 4185.86 25918.66 30104.52

135.94 235.290 35.294 15.0 2.706 37.999 5165.53 31984.73 37150.26

63.28 235.290 35.294 15.0 2.706 37.999 2404.65 14889.45 17294.10

SOUTHCO: IPDS SCHEME Page 318 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

47 5920.620 355.237 6.0 62.759 417.996 19645.80 278269.14 297914.94

572.81 5668.680 340.121 6.0 60.088 400.209 229244.61 3247090.76 3476335.37

58 6172.560 370.354 6.0 65.429 435.783 25275.40 358008.48 383283.88

706.88 5668.680 340.121 6.0 60.088 400.209 282897.60 4007048.18 4289945.78

27 6298.530 377.912 6.0 66.764 444.676 12006.26 170060.31 182066.57

329.06 5668.680 340.121 6.0 60.088 400.209 131693.71 1865350.01 1997043.72

400.80 235.290 35.294 15.0 2.706 37.999 15230.13 94304.23 109534.36


400.80 235.290 35.294 15.0 2.706 37.999 15230.13 94304.23 109534.36

2,004 382.350 57.353 15.0 4.397 61.750 123746.05 766229.40 889975.45

SOUTHCO: IPDS SCHEME Page 319 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

400.80 5668.680 340.121 6.0 60.088 400.209 160403.69 2272006.94 2432410.63

187.88 235.290 35.294 15.0 2.706 37.999 7139.13 44205.11 51344.24


187.88 235.290 35.294 15.0 2.706 37.999 7139.13 44205.11 51344.24

501 7058.820 1058.823 15.0 81.176 1139.999 571139.71 3536468.82 4107608.53

23.297 14117.650 2117.648 15.0 162.353 2280.000 53116.03 328891.83 382007.86


4.434 14117.650 2117.648 15.0 162.353 2280.000 10109.18 62595.54 72704.72
4.997 8235.290 1235.294 15.0 94.706 1329.999 6646.64 41155.66 47802.30

SOUTHCO: IPDS SCHEME Page 320 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2,856 70.590 10.589 15.0 0.812 11.400 32559.21 201605.04 234164.25

666 70.590 10.589 15.0 0.812 11.400 7592.59 47012.94 54605.53

1,170 58.820 8.823 15.0 0.676 9.499 11114.33 68819.40 79933.73


333 58.820 8.823 15.0 0.676 9.499 3163.31 19587.06 22750.37
0.0

26 3529.410 529.412 15.0 40.588 570.000 14819.99 91764.66 106584.65


36 5294.120 794.118 15.0 60.882 855.000 30780.01 190588.32 221368.33
307 5882.350 882.353 15.0 67.647 950.000 291649.85 1805881.45 2097531.30
47 8235.290 1235.294 15.0 94.706 1329.999 62509.97 387058.63 449568.60
58 8823.530 1323.530 15.0 101.471 1425.000 82650.01 511764.74 594414.75
27 11764.710 1764.707 15.0 135.294 1900.001 51300.02 317647.17 368947.19

SOUTHCO: IPDS SCHEME Page 321 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

333 117.650 17.648 15.0 1.353 19.000 6327.16 39177.45 45504.61


1,170 117.650 17.648 15.0 1.353 19.000 22230.56 137650.50 159881.06

369 2941.180 441.177 15.0 33.824 475.001 175275.21 1085295.42 1260570.63

132 2941.180 441.177 15.0 33.824 475.001 62700.08 388235.76 450935.84

369 1176.470 176.471 15.0 13.529 190.000 70109.96 434117.43 504227.39

132 1176.470 176.471 15.0 13.529 190.000 25079.99 155294.04 180374.03

SOUTHCO: IPDS SCHEME Page 322 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

26 352.940 52.941 15.0 4.059 57.000 1482.00 9176.44 10658.44

36 411.760 61.764 15.0 4.735 66.499 2393.97 14823.36 17217.33

307 411.760 61.764 15.0 4.735 66.499 20415.27 126410.32 146825.59

47 470.590 70.589 15.0 5.412 76.000 3572.01 22117.73 25689.74

58 470.590 70.589 15.0 5.412 76.000 4408.02 27294.22 31702.24

27 470.590 70.589 15.0 5.412 76.000 2052.01 12705.93 14757.94

SOUTHCO: IPDS SCHEME Page 323 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2.51 23529.410 3529.412 15.0 270.588 3800.000 9519.00 58941.17 68460.17


0.39 41176.470 6176.471 15.0 473.529 6650.000 2593.50 16058.82 18652.32
0.54 58823.530 8823.530 15.0 676.471 9500.000 5130.00 31764.71 36894.71
4.61 82352.940 12352.941 15.0 947.059 13300.000 61246.50 379235.29 440481.79
0.71 117647.060 17647.059 15.0 1352.941 19000.000 13395.00 82941.18 96336.18
0.87 235294.120 35294.118 15.0 2705.882 38000.000 33060.00 204705.88 237765.88
0.41 352941.180 52941.177 15.0 4058.824 57000.001 23085.00 142941.18 166026.18

501 29411.760 4411.764 15.0 338.235 4749.999 2379749.62 14735291.76 17115041.38

0.0
0.0

SOUTHCO: IPDS SCHEME Page 324 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0

0.0

501 23.530 3.530 15.0 0.271 3.800 1903.85 11788.53 13692.38

501 35.290 5.294 15.0 0.406 5.699 2855.37 17680.29 20535.66

5585637.94 42693639.43 48279277.37

190.60

191 1411.760 211.764 15.0 16.235 227.999 43456.66 269081.46 312538.12

SOUTHCO: IPDS SCHEME Page 325 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1,989.90 235.290 35.294 15.0 2.706 37.999 75614.88 468203.57 543818.45


497.70 235.290 35.294 15.0 2.706 37.999 18912.27 117103.83 136016.10
0.0
0.0

994.95 235.290 35.294 15.0 2.706 37.999 37807.44 234101.79 271909.23


248.85 235.290 35.294 15.0 2.706 37.999 9456.13 58551.92 68008.05
0.00
0.00

165.83 882.350 132.353 15.0 10.147 142.500 23629.98 146315.69 169945.67


82.95 882.350 132.353 15.0 10.147 142.500 11820.34 73190.93 85011.27
0.00
0.00

SOUTHCO: IPDS SCHEME Page 326 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

4,422 1058.820 158.823 15.0 12.176 170.999 756159.48 4682102.04 5438261.52


1,106 941.180 141.177 15.0 10.824 152.001 168112.63 1040945.08 1209057.71
0.00
0.00

228.96 235.290 35.294 15.0 2.706 37.999 8700.33 53872.00 62572.33


114.48 235.290 35.294 15.0 2.706 37.999 4350.16 26936.00 31286.16
38.16 882.350 132.353 15.0 10.147 142.500 5437.78 33670.48 39108.26

954 382.350 57.353 15.0 4.397 61.750 58909.05 364761.90 423670.95

190.80 5668.680 340.121 6.0 60.088 400.209 76359.84 1081584.14 1157943.98

SOUTHCO: IPDS SCHEME Page 327 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

954 470.590 70.589 15.0 5.412 76.000 72504.27 448942.86 521447.13

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

SOUTHCO: IPDS SCHEME Page 328 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.00

0.00

76.55 11764.710 1764.707 15.0 135.294 1900.001 145445.05 900588.55 1046033.60

0.0

114.05 10000.000 1500.000 15.0 115.000 1615.000 184190.75 1140500.00 1324690.75

2287 58.820 8.823 15.0 0.676 9.499 21725.20 134521.34 156246.54

4384 58.820 8.823 15.0 0.676 9.499 41643.60 257855.12 299498.72

3812 117.650 17.648 15.0 1.353 19.000 72429.81 448481.80 520911.61

SOUTHCO: IPDS SCHEME Page 329 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


2 29411.760 4411.764 15.0 338.235 4749.999 9053.50 56058.81 65112.31
2 41176.470 6176.471 15.0 473.529 6650.000 12674.90 78482.35 91157.25

3812 17.650 2.648 15.0 0.203 2.850 10866.01 67281.80 78147.81

2860 17.650 2.648 15.0 0.203 2.850 8152.36 50479.00 58631.36


1144 352.940 52.941 15.0 4.059 57.000 65207.78 403763.36 468971.14
1144 352.940 52.941 15.0 4.059 57.000 65207.78 403763.36 468971.14

SOUTHCO: IPDS SCHEME Page 330 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2007827.98 13041139.18 15048967.16

299

0.0
28.03 235.290 35.294 15.0 2.706 37.999 1065.17 6595.47 7660.64
28.03 235.290 35.294 15.0 2.706 37.999 1065.17 6595.47 7660.64

0.0
28.03 235.290 35.294 15.0 2.706 37.999 1065.17 6595.47 7660.64
28.03 235.290 35.294 15.0 2.706 37.999 1065.17 6595.47 7660.64

SOUTHCO: IPDS SCHEME Page 331 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0

37 2352.940 352.941 15.0 27.059 380.000 14202.49 87941.13 102143.62

28.03 5668.680 340.121 6.0 60.088 400.209 11218.35 158900.19 170118.54

37 2352.940 352.941 15.0 27.059 380.000 14202.49 87941.13 102143.62

30.05 5668.680 340.121 6.0 60.088 400.209 12026.07 170341.00 182367.07

110.16 235.290 35.294 15.0 2.706 37.999 4185.86 25918.66 30104.52


243.75 235.290 35.294 15.0 2.706 37.999 9262.34 57351.94 66614.28

SOUTHCO: IPDS SCHEME Page 332 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

154.69 235.290 35.294 15.0 2.706 37.999 5878.02 36396.42 42274.44

110.16 235.290 35.294 15.0 2.706 37.999 4185.86 25918.66 30104.52


243.75 235.290 35.294 15.0 2.706 37.999 9262.34 57351.94 66614.28
154.69 235.290 35.294 15.0 2.706 37.999 5878.02 36396.42 42274.44

47 5920.620 355.237 6.0 62.759 417.996 19645.80 278269.14 297914.94

572.81 5668.680 340.121 6.0 60.088 400.209 229244.61 3247090.76 3476335.37

104 6172.560 370.354 6.0 65.429 435.783 45321.40 641946.24 687267.64

1,267.50 5668.680 340.121 6.0 60.088 400.209 507264.66 7185051.90 7692316.56

66 6298.530 377.912 6.0 66.764 444.676 29348.63 415702.98 445051.61

804.38 5668.680 340.121 6.0 60.088 400.209 321917.96 4559744.48 4881662.44

59.80 235.290 35.294 15.0 2.706 37.999 2272.36 14070.34 16342.70

SOUTHCO: IPDS SCHEME Page 333 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

59.80 235.290 35.294 15.0 2.706 37.999 2272.36 14070.34 16342.70

299 382.350 57.353 15.0 4.397 61.750 18463.11 114322.65 132785.76

59.80 5668.680 340.121 6.0 60.088 400.209 23932.49 338987.06 362919.55

112.13 235.290 35.294 15.0 2.706 37.999 4260.68 26381.89 30642.57


112.13 235.290 35.294 15.0 2.706 37.999 4260.68 26381.89 30642.57

299 7058.820 1058.823 15.0 81.176 1139.999 340859.83 2110587.18 2451447.01

SOUTHCO: IPDS SCHEME Page 334 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


13.904 14117.650 2117.648 15.0 162.353 2280.000 31699.99 196284.75 227984.74
2.646 14117.650 2117.648 15.0 162.353 2280.000 6033.22 37357.42 43390.64
2.983 8235.290 1235.294 15.0 94.706 1329.999 3966.76 24561.96 28528.72

744 70.590 10.589 15.0 0.812 11.400 8481.81 52518.96 61000.77

279 70.590 10.589 15.0 0.812 11.400 3180.68 19694.61 22875.29

618 58.820 8.823 15.0 0.676 9.499 5870.65 36350.76 42221.41


279 58.820 8.823 15.0 0.676 9.499 2650.34 16410.78 19061.12
618 47.060 7.059 15.0 0.541 7.600 4696.92 29083.08 33780.00

0.0
9 5294.120 794.118 15.0 60.882 855.000 7695.00 47647.08 55342.08
73 5882.350 882.353 15.0 67.647 950.000 69349.97 429411.55 498761.52
47 8235.290 1235.294 15.0 94.706 1329.999 62509.97 387058.63 449568.60
104 8823.530 1323.530 15.0 101.471 1425.000 148200.01 917647.12 1065847.13

SOUTHCO: IPDS SCHEME Page 335 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


66 11764.710 1764.707 15.0 135.294 1900.001 125400.04 776470.86 901870.90

279 117.650 17.648 15.0 1.353 19.000 5301.13 32824.35 38125.48


618 117.650 17.648 15.0 1.353 19.000 11742.29 72707.70 84449.99

82 2941.180 441.177 15.0 33.824 475.001 38950.05 241176.76 280126.81

217 2941.180 441.177 15.0 33.824 475.001 103075.12 638236.06 741311.18

82 1176.470 176.471 15.0 13.529 190.000 15579.99 96470.54 112050.53

217 1176.470 176.471 15.0 13.529 190.000 41229.98 255293.99 296523.97

SOUTHCO: IPDS SCHEME Page 336 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

9 411.760 61.764 15.0 4.735 66.499 598.49 3705.84 4304.33

73 411.760 61.764 15.0 4.735 66.499 4854.44 30058.48 34912.92

47 470.590 70.589 15.0 5.412 76.000 3572.01 22117.73 25689.74

104 470.590 70.589 15.0 5.412 76.000 7904.03 48941.36 56845.39

66 470.590 70.589 15.0 5.412 76.000 5016.02 31058.94 36074.96

SOUTHCO: IPDS SCHEME Page 337 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1.495 23529.410 3529.412 15.0 270.588 3800.000 5681.00 35176.47 40857.47


0.00
0.135 58823.530 8823.530 15.0 676.471 9500.000 1282.50 7941.18 9223.68
1.095 82352.940 12352.941 15.0 947.059 13300.000 14563.50 90176.47 104739.97
0.705 117647.060 17647.059 15.0 1352.941 19000.000 13395.00 82941.18 96336.18
1.560 235294.120 35294.118 15.0 2705.882 38000.000 59280.00 367058.83 426338.83
0.990 352941.180 52941.177 15.0 4058.824 57000.001 56430.00 349411.77 405841.77

299 29411.760 4411.764 15.0 338.235 4749.999 1420249.77 8794116.24 10214366.01

SOUTHCO: IPDS SCHEME Page 338 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

299 23.530 3.530 15.0 0.271 3.800 1136.23 7035.47 8171.70

0.0

SOUTHCO: IPDS SCHEME Page 339 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

299 8823.530 1323.530 15.0 101.471 1425.000 426075.03 2638235.47 3064310.50

4359279.03 36558628.61 40917907.64

303.30

303 1411.760 211.764 15.0 16.235 227.999 69152.17 428186.81 497338.98

513.00 235.290 35.294 15.0 2.706 37.999 19493.66 120703.77 140197.43


49.20 235.290 35.294 15.0 2.706 37.999 1869.57 11576.27 13445.84

256.50 235.290 35.294 15.0 2.706 37.999 9746.83 60351.89 70098.72


24.60 235.290 35.294 15.0 2.706 37.999 934.78 5788.13 6722.91

42.75 882.350 132.353 15.0 10.147 142.500 6091.85 37720.46 43812.31

SOUTHCO: IPDS SCHEME Page 340 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


4.10 882.350 132.353 15.0 10.147 142.500 584.25 3617.64 4201.89

607 1294.120 194.118 15.0 14.882 209.000 126863.23 785530.84 912394.07

319.89 5668.680 340.121 6.0 60.088 400.209 128022.40 1813348.38 1941370.78

114 2588.240 388.236 15.0 29.765 418.001 47652.09 295059.36 342711.45

120.16 5668.680 340.121 6.0 60.088 400.209 48087.49 681125.91 729213.40

41 3058.820 458.823 15.0 35.176 493.999 20253.98 125411.62 145665.60

43.21 5668.680 340.121 6.0 60.088 400.209 17294.62 244966.34 262260.96

SOUTHCO: IPDS SCHEME Page 341 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

5 5176.470 776.471 15.0 59.529 836.000 4180.00 25882.35 30062.35

10.54 5668.680 340.121 6.0 60.088 400.209 4218.20 59747.89 63966.09

0.0

0.0

0.0

0.0

0.0

SOUTHCO: IPDS SCHEME Page 342 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0

0.0

0.0

0.0

0.0

145.68 235.290 35.294 15.0 2.706 37.999 5535.74 34277.05 39812.79


72.84 235.290 35.294 15.0 2.706 37.999 2767.87 17138.52 19906.39
24.28 882.350 132.353 15.0 10.147 142.500 3459.89 21423.46 24883.35

SOUTHCO: IPDS SCHEME Page 343 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

607 382.350 57.353 15.0 4.397 61.750 37481.96 232086.45 269568.41

121.40 5668.680 340.121 6.0 60.088 400.209 48585.35 688177.75 736763.10

248 1411.760 211.764 15.0 16.235 227.999 56543.81 350116.48 406660.29

607 352.940 52.941 15.0 4.059 57.000 34598.88 214234.58 248833.46

0.637 8235.290 1235.294 15.0 94.706 1329.999 847.12 5245.30 6092.42

0.0

1986 82.350 12.353 15.0 0.947 13.300 26412.86 163547.10 189959.96

SOUTHCO: IPDS SCHEME Page 344 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

915 82.350 12.353 15.0 0.947 13.300 12169.07 75350.25 87519.32

0.0

0.0

72 70.590 10.589 15.0 0.812 11.400 820.82 5082.48 5903.30

8441 35.290 5.294 15.0 0.406 5.699 48108.09 297882.89 345990.98


0.0
3886 35.290 5.294 15.0 0.406 5.699 22147.62 137136.94 159284.56
667 70.590 10.589 15.0 0.812 11.400 7603.99 47083.53 54687.52
0.0
0.0
306 58.820 8.823 15.0 0.676 9.499 2906.83 17998.92 20905.75
0.00
0.00
0.00
2836 58.820 8.823 15.0 0.676 9.499 26940.38 166813.52 193753.90

SOUTHCO: IPDS SCHEME Page 345 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


993 58.820 8.823 15.0 0.676 9.499 9432.93 58408.26 67841.19
36 58.820 8.823 15.0 0.676 9.499 341.98 2117.52 2459.50
457 58.820 8.823 15.0 0.676 9.499 4343.14 26892.50 31235.64
0.0
0.0
334 58.820 8.823 15.0 0.676 9.499 3172.81 19645.88 22818.69

0.0
171.5 10588.240 1588.236 15.0 121.765 1710.001 293265.13 1815883.16 2109148.29
76.2 18823.530 2823.530 15.0 216.471 3040.000 231648.01 1434352.99 1666001.00
55.6 28235.290 4235.294 15.0 324.706 4559.999 253535.96 1569882.12 1823418.08

11 2941.180 441.177 15.0 33.824 475.001 5225.01 32352.98 37577.99

SOUTHCO: IPDS SCHEME Page 346 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

5783 23.530 3.530 15.0 0.271 3.800 21975.95 136073.99 158049.94

23 1176.470 176.471 15.0 13.529 190.000 4275.00 26470.58 30745.58

303.30 5882.350 882.353 15.0 67.647 950.000 288134.86 1784116.76 2072251.62

1956726.18 14078809.62 16035535.80

374.25

374.25 1411.760 211.764 15.0 16.235 227.999 85328.72 528351.18 613679.90

SOUTHCO: IPDS SCHEME Page 347 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0
396.00 235.290 35.294 15.0 2.706 37.999 15047.74 93174.84 108222.58
28.80 235.290 35.294 15.0 2.706 37.999 1094.38 6776.35 7870.73

0.0

0.0

0.0
198.00 235.290 35.294 15.0 2.706 37.999 7523.87 46587.42 54111.29

14.40 235.290 35.294 15.0 2.706 37.999 547.19 3388.18 3935.37

0.0

0.0

SOUTHCO: IPDS SCHEME Page 348 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


0.0
33.00 882.350 132.353 15.0 10.147 142.500 4702.48 29117.55 33820.03
2.40 882.350 132.353 15.0 10.147 142.500 342.00 2117.64 2459.64

0.0

0.0

0.0

0.0

SOUTHCO: IPDS SCHEME Page 349 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

748 1294.120 194.118 15.0 14.882 209.000 156332.28 968001.76 1124334.04

300.70 5668.680 340.121 6.0 60.088 400.209 120341.19 1704549.40 1824890.59

0.0

0.0

0.0

SOUTHCO: IPDS SCHEME Page 350 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

66 2588.240 388.236 15.0 29.765 418.001 27588.05 170823.84 198411.89

53.06 5668.680 340.121 6.0 60.088 400.209 21236.68 300802.84 322039.52

0.0

0.0

24 3058.820 458.823 15.0 35.176 493.999 11855.99 73411.68 85267.67

SOUTHCO: IPDS SCHEME Page 351 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

25.30 5668.680 340.121 6.0 60.088 400.209 10123.68 143394.93 153518.61

0.0

0.0

0.0

0.0

SOUTHCO: IPDS SCHEME Page 352 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0

0.0

0.0

179.52 235.290 35.294 15.0 2.706 37.999 6821.64 42239.26 49060.90


89.76 235.290 35.294 15.0 2.706 37.999 3410.82 21119.63 24530.45
29.92 882.350 132.353 15.0 10.147 142.500 4263.59 26399.91 30663.50

SOUTHCO: IPDS SCHEME Page 353 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

748 382.350 57.353 15.0 4.397 61.750 46188.64 285997.80 332186.44

149.60 5668.680 340.121 6.0 60.088 400.209 59871.24 848034.53 907905.77

132 1411.760 211.764 15.0 16.235 227.999 30095.90 186352.32 216448.22

748 352.940 52.941 15.0 4.059 57.000 42635.86 263999.12 306634.98

0.786 8235.290 1235.294 15.0 94.706 1329.999 1045.28 6472.32 7517.60

0.0

3,102 70.590 10.589 15.0 0.812 11.400 35363.68 218970.18 254333.86

974 70.590 10.589 15.0 0.812 11.400 11103.88 68754.66 79858.54

0.0

SOUTHCO: IPDS SCHEME Page 354 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


14,735 58.820 8.823 15.0 0.676 9.499 139974.10 866712.70 1006686.80
4,626 58.820 8.823 15.0 0.676 9.499 43940.09 272074.85 316014.94

83 35.290 5.294 15.0 0.406 5.699 473.04 2929.07 3402.11

42 35.290 5.294 15.0 0.406 5.699 239.37 1482.18 1721.55

125 58.820 8.823 15.0 0.676 9.499 1187.43 7352.50 8539.93

0.0

166 58.820 8.823 15.0 0.676 9.499 1576.91 9764.12 11341.03

249 58.820 8.823 15.0 0.676 9.499 2365.36 14646.18 17011.54

0.0

0.0

SOUTHCO: IPDS SCHEME Page 355 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0
0.0
216.10 10588.240 1588.236 15.0 121.765 1710.001 369531.16 2288118.66 2657649.82
123.65 10588.240 1588.236 15.0 121.765 1710.001 211441.59 1309235.88 1520677.47
27.50 14117.650 2117.648 15.0 162.353 2280.000 62700.01 388235.38 450935.39

7.00 17647.060 2647.059 15.0 202.941 2850.000 19950.00 123529.42 143479.42

0.0

11 2941.180 441.177 15.0 33.824 475.001 5225.01 32352.98 37577.99

SOUTHCO: IPDS SCHEME Page 356 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0

7,859 23.530 3.530 15.0 0.271 3.800 29865.90 184928.15 214794.05

12 1176.470 176.471 15.0 13.529 190.000 2280.00 14117.64 16397.64

374 5882.350 882.353 15.0 67.647 950.000 355537.32 2201469.49 2557006.81

1949152.07 13755786.54 15704938.61

SOUTHCO: IPDS SCHEME Page 357 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

649.00

649 1411.760 211.764 15.0 16.235 227.999 147868.91 915596.95 1063465.86

933.75 235.290 35.294 15.0 2.706 37.999 35481.88 219702.04 255183.92


234.00 235.290 35.294 15.0 2.706 37.999 8891.84 55057.86 63949.70
0.0
0.0

466.88 235.290 35.294 15.0 2.706 37.999 17740.94 109851.02 127591.96


117.00 235.290 35.294 15.0 2.706 37.999 4445.92 27528.93 31974.85
0.0
0.0

SOUTHCO: IPDS SCHEME Page 358 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


77.81 882.350 132.353 15.0 10.147 142.500 11088.24 68657.86 79746.10
39.00 882.350 132.353 15.0 10.147 142.500 5557.48 34411.65 39969.13
0.0
0.0

2,075 1058.820 158.823 15.0 12.176 170.999 354823.82 2197051.50 2551875.32


520 941.180 141.177 15.0 10.824 152.001 79040.30 489413.60 568453.90
0.0
0.0

311.28 235.290 35.294 15.0 2.706 37.999 11828.43 73241.07 85069.50


155.64 235.290 35.294 15.0 2.706 37.999 5914.22 36620.54 42534.76
51.88 882.350 132.353 15.0 10.147 142.500 7392.88 45776.32 53169.20

1,297 382.350 57.353 15.0 4.397 61.750 80089.13 495907.95 575997.08

259.40 5668.680 340.121 6.0 60.088 400.209 103814.16 1470455.59 1574269.75

SOUTHCO: IPDS SCHEME Page 359 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

3,244 470.590 70.589 15.0 5.412 76.000 246544.92 1526593.96 1773138.88

0.0
0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

SOUTHCO: IPDS SCHEME Page 360 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

166.50 11764.710 1764.707 15.0 135.294 1900.001 316350.11 1958824.22 2275174.33

0.0

481.55 10000.000 1500.000 15.0 115.000 1615.000 777703.25 4815500.00 5593203.25

7,782 58.820 8.823 15.0 0.676 9.499 73924.56 457737.24 531661.80

14,917 58.820 8.823 15.0 0.676 9.499 141703.00 877417.94 1019120.94

12,971 117.650 17.648 15.0 1.353 19.000 246455.16 1526038.15 1772493.31

6.49 29411.760 4411.764 15.0 338.235 4749.999 30806.12 190749.97 221556.09


6.49 41176.470 6176.471 15.0 473.529 6650.000 43128.57 267050.00 310178.57

SOUTHCO: IPDS SCHEME Page 361 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

12,971 17.650 2.648 15.0 0.203 2.850 36973.51 228938.15 265911.66

9,730 17.650 2.648 15.0 0.203 2.850 27735.12 171734.50 199469.62

3,891 352.940 52.941 15.0 4.059 57.000 221786.26 1373289.54 1595075.80


3,891 352.940 52.941 15.0 4.059 57.000 221786.26 1373289.54 1595075.80

649 5882.350 882.353 15.0 67.647 950.000 616549.69 3817645.15 4434194.84

3875424.68 24824081.24 28699505.92

44

SOUTHCO: IPDS SCHEME Page 362 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

17.640 288.350 43.253 15.0 3.316 46.569 821.47 5086.49 5907.96

9.900 502.940 75.441 15.0 5.784 81.225 804.13 4979.11 5783.24

0.672 6286.370 377.182 6.0 66.636 443.818 298.25 4224.44 4522.69


6.930 12202.960 732.178 6.0 129.351 861.529 5970.40 84566.51 90536.91
3.360 3243.740 194.624 6.0 34.384 229.008 769.47 10898.97 11668.44

5.880 288.350 43.253 15.0 3.316 46.569 273.82 1695.50 1969.32

SOUTHCO: IPDS SCHEME Page 363 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

5.880 502.940 75.441 15.0 5.784 81.225 477.60 2957.29 3434.89

0.469 6286.370 377.182 6.0 66.636 443.818 208.04 2946.74 3154.78


0.225 12202.960 732.178 6.0 129.351 861.529 193.84 2745.67 2939.51
11.469 5916.590 354.995 6.0 62.716 417.711 4790.63 67855.89 72646.52
14.500 197.220 11.833 6.0 2.091 13.924 201.89 2859.69 3061.58
0.125 887.490 53.249 6.0 9.407 62.657 7.83 110.94 118.77

SOUTHCO: IPDS SCHEME Page 364 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2.442 288.350 43.253 15.0 3.316 46.569 113.70 704.03 817.73

2.442 502.940 75.441 15.0 5.784 81.225 198.32 1227.98 1426.30

0.314 6286.370 377.182 6.0 66.636 443.818 139.55 1976.67 2116.22


3.366 12202.960 732.178 6.0 129.351 861.529 2900.04 41076.99 43977.03

480 12565.570 753.934 6.0 133.195 887.129 425822.04 6031473.60 6457295.64

SOUTHCO: IPDS SCHEME Page 365 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

3 41176.470 6176.471 15.0 473.529 6650.000 19950.00 123529.41 143479.41


17 44470.590 6670.589 15.0 511.412 7182.000 122094.00 756000.03 878094.03
19 58588.240 8788.236 15.0 673.765 9462.001 179778.01 1113176.56 1292954.57
4 65411.760 9811.764 15.0 752.235 10563.999 42256.00 261647.04 303903.04
0.0

1.00 5882.350 882.353 15.0 67.647 950.000 950.00 5882.35 6832.35

SOUTHCO: IPDS SCHEME Page 366 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2 2352.940 352.941 15.0 27.059 380.000 760.00 4705.88 5465.88

1 2941.180 441.177 15.0 33.824 475.001 475.00 2941.18 3416.18

1 1176.470 176.471 15.0 13.529 190.000 190.00 1176.47 1366.47


0.099 8235.290 1235.294 15.0 94.706 1329.999 132.15 818.26 950.41
0.008 8235.290 1235.294 15.0 94.706 1329.999 11.17 69.18 80.35
0.027 8235.290 1235.294 15.0 94.706 1329.999 35.91 222.35 258.26
0.005 8235.290 1235.294 15.0 94.706 1329.999 6.38 39.53 45.91
0.085 8235.290 1235.294 15.0 94.706 1329.999 113.05 700.00 813.05

SOUTHCO: IPDS SCHEME Page 367 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0
0.0
0.0
0.0
0.0
0.0

13 3882.350 582.353 15.0 44.647 627.000 8150.99 50470.55 58621.54

SOUTHCO: IPDS SCHEME Page 368 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

75 4117.650 617.648 15.0 47.353 665.000 49875.04 308823.75 358698.79

0.0

7 2941.180 441.177 15.0 33.824 475.001 3325.00 20588.26 23913.26

27 2941.180 441.177 15.0 33.824 475.001 12825.02 79411.86 92236.88

8 2941.180 441.177 15.0 33.824 475.001 3800.00 23529.44 27329.44

33 2941.180 441.177 15.0 33.824 475.001 15675.02 97058.94 112733.96

SOUTHCO: IPDS SCHEME Page 369 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

177 117.650 17.648 15.0 1.353 19.000 3363.08 20824.05 24187.13

60 117.650 17.648 15.0 1.353 19.000 1140.03 7059.00 8199.03

38 1058.820 158.823 15.0 12.176 170.999 6497.98 40235.16 46733.14

9 1411.760 211.764 15.0 16.235 227.999 2051.99 12705.84 14757.83

258 117.650 17.648 15.0 1.353 19.000 4902.12 30353.70 35255.82

108 117.650 17.648 15.0 1.353 19.000 2052.05 12706.20 14758.25

SOUTHCO: IPDS SCHEME Page 370 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

2 1411.760 211.764 15.0 16.235 227.999 456.00 2823.52 3279.52

2 1411.760 211.764 15.0 16.235 227.999 456.00 2823.52 3279.52

SOUTHCO: IPDS SCHEME Page 371 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.020 2941.180 441.177 15.0 33.824 475.001 9.50 58.82 68.32


2 117.650 17.648 15.0 1.353 19.000 38.00 235.30 273.30
2 117.650 17.648 15.0 1.353 19.000 38.00 235.30 273.30
2 117.650 17.648 15.0 1.353 19.000 38.00 235.30 273.30

4.512 14117.650 2117.648 15.0 162.353 2280.000 10287.36 63698.84 73986.20


2.728 14117.650 2117.648 15.0 162.353 2280.000 6219.84 38512.95 44732.79
0.397 14117.650 2117.648 15.0 162.353 2280.000 904.70 5601.88 6506.58
0.264 14117.650 2117.648 15.0 162.353 2280.000 601.92 3727.06 4328.98

SOUTHCO: IPDS SCHEME Page 372 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

120.00 1411.760 211.764 15.0 16.235 227.999 27359.91 169411.20 196771.11

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0

SOUTHCO: IPDS SCHEME Page 373 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.185 176470.590 26470.589 15.0 2029.412 28500.000 5272.50 32647.06 37919.56


0.185 105882.350 15882.353 15.0 1217.647 17100.000 3163.50 19588.23 22751.73
0.185 47058.820 7058.823 15.0 541.176 7599.999 1406.00 8705.88 10111.88
0.185 23529.410 3529.412 15.0 270.588 3800.000 703.00 4352.94 5055.94
1 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

0.46 17647.060 2647.059 15.0 202.941 2850.000 1318.13 8161.77 9479.90


0.46 29411.760 4411.764 15.0 338.235 4749.999 2196.87 13602.94 15799.81
0.46 41176.470 6176.471 15.0 473.529 6650.000 3075.62 19044.12 22119.74
0.46 58823.530 8823.530 15.0 676.471 9500.000 4393.75 27205.88 31599.63
1 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

SOUTHCO: IPDS SCHEME Page 374 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

2 5882.350 882.353 15.0 67.647 950.000 1900.00 11764.70 13664.70

99 4117.650 617.648 15.0 47.353 665.000 65835.05 407647.35 473482.40

SOUTHCO: IPDS SCHEME Page 375 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

40 2941.180 441.177 15.0 33.824 475.001 18810.02 116470.73 135280.75

59 2941.180 441.177 15.0 33.824 475.001 28215.03 174706.09 202921.12

0.30 235294.120 35294.118 15.0 2705.882 38000.000 11400.00 70588.24 81988.24


1.00 352941.180 52941.177 15.0 4058.824 57000.001 57000.00 352941.18 409941.18
4.04 235294.120 35294.118 15.0 2705.882 38000.000 153520.00 950588.24 1104108.24

12 1176.470 176.471 15.0 13.529 190.000 2280.00 14117.64 16397.64


75 2352.940 352.941 15.0 27.059 380.000 28499.99 176470.50 204970.49
202 2352.940 352.941 15.0 27.059 380.000 76759.96 475293.88 552053.84

SOUTHCO: IPDS SCHEME Page 376 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

28 1176.470 176.471 15.0 13.529 190.000 5320.00 32941.16 38261.16


6 2352.940 352.941 15.0 27.059 380.000 2280.00 14117.64 16397.64
515 2352.940 352.941 15.0 27.059 380.000 195699.90 1211764.10 1407464.00

0.0

36 1058.820 158.823 15.0 12.176 170.999 6155.98 38117.52 44273.50

SOUTHCO: IPDS SCHEME Page 377 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

52 2941.180 441.177 15.0 33.824 475.001 24700.03 152941.36 177641.39

SOUTHCO: IPDS SCHEME Page 378 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

123 3529.410 17.824 0.5 35.472 53.296 6555.39 434117.43 440672.82

0.0

0.0

SOUTHCO: IPDS SCHEME Page 379 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0
0.0
0.0
0.0
0.0
0.0

1 294117.650 44117.648 15.0 3382.353 47500.000 47500.00 294117.65 341617.65

10.0 11764.710 1764.707 15.0 135.294 1900.001 19000.01 117647.10 136647.11

1762770.97 14826733.58 16589504.55

12

SOUTHCO: IPDS SCHEME Page 380 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

12 3149.260 188.956 6.0 33.382 222.338 2668.05 37791.12 40459.17

67 82.350 12.353 15.0 0.947 13.300 891.07 5517.45 6408.52

15 70.590 10.589 15.0 0.812 11.400 171.00 1058.85 1229.85

49 58.820 8.823 15.0 0.676 9.499 465.47 2882.18 3347.65


15 58.820 8.823 15.0 0.676 9.499 142.49 882.30 1024.79

24 3882.350 582.353 15.0 44.647 627.000 15047.99 93176.40 108224.39

SOUTHCO: IPDS SCHEME Page 381 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

12 4117.650 617.648 15.0 47.353 665.000 7980.01 49411.80 57391.81

0.00

12 2941.180 441.177 15.0 33.824 475.001 5700.01 35294.16 40994.17

SOUTHCO: IPDS SCHEME Page 382 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

0.0

0.0

14 117.650 17.648 15.0 1.353 19.000 266.01 1647.10 1913.11

3 117.650 17.648 15.0 1.353 19.000 57.00 352.95 409.95

0.60 9411.760 1411.764 15.0 108.235 1519.999 912.00 5647.06 6559.06


48 88.240 13.236 15.0 1.015 14.251 684.04 4235.52 4919.56
48 88.240 13.236 15.0 1.015 14.251 684.04 4235.52 4919.56

SOUTHCO: IPDS SCHEME Page 383 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


72 88.240 13.236 15.0 1.015 14.251 1026.05 6353.28 7379.33

0.307 14117.650 2117.648 15.0 162.353 2280.000 699.73 4332.71 5032.44


0.079 14117.650 2117.648 15.0 162.353 2280.000 180.58 1118.12 1298.70

48 1411.760 211.764 15.0 16.235 227.999 10943.96 67764.48 78708.44

0.300 176470.590 26470.589 15.0 2029.412 28500.000 8550.00 52941.18 61491.18


0.300 105882.350 15882.353 15.0 1217.647 17100.000 5130.00 31764.71 36894.71
0.300 47058.820 7058.823 15.0 541.176 7599.999 2280.00 14117.65 16397.65
0.300 23529.410 3529.412 15.0 270.588 3800.000 1140.00 7058.82 8198.82
1 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

0.300 17647.060 2647.059 15.0 202.941 2850.000 855.00 5294.12 6149.12


0.300 29411.760 4411.764 15.0 338.235 4749.999 1425.00 8823.53 10248.53
0.300 41176.470 6176.471 15.0 473.529 6650.000 1995.00 12352.94 14347.94
0.300 58823.530 8823.530 15.0 676.471 9500.000 2850.00 17647.06 20497.06

SOUTHCO: IPDS SCHEME Page 384 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


1 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

12 1058.820 158.823 15.0 12.176 170.999 2051.99 12705.84 14757.83

93796.49 602053.91 695850.40

20

20 3149.260 188.956 6.0 33.382 222.338 4446.76 62985.20 67431.96

24 70.590 10.589 15.0 0.812 11.400 273.61 1694.16 1967.77

SOUTHCO: IPDS SCHEME Page 385 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

21 70.590 10.589 15.0 0.812 11.400 239.41 1482.39 1721.80

24 47.060 7.059 15.0 0.541 7.600 182.40 1129.44 1311.84


21 58.820 8.823 15.0 0.676 9.499 199.49 1235.22 1434.71

1.00 9411.760 1411.764 15.0 108.235 1519.999 1520.00 9411.76 10931.76


80.00 88.240 13.236 15.0 1.015 14.251 1140.06 7059.20 8199.26
80.00 88.240 13.236 15.0 1.015 14.251 1140.06 7059.20 8199.26
120.00 88.240 13.236 15.0 1.015 14.251 1710.09 10588.80 12298.89

1.02 14117.650 2117.648 15.0 162.353 2280.000 2332.44 14442.36 16774.80


0.26 14117.650 2117.648 15.0 162.353 2280.000 601.92 3727.06 4328.98

80 1411.760 211.764 15.0 16.235 227.999 18239.94 112940.80 131180.74

SOUTHCO: IPDS SCHEME Page 386 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

20 5882.350 882.353 15.0 67.647 950.000 18999.99 117647.00 136646.99

0.0

0.0

SOUTHCO: IPDS SCHEME Page 387 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

48 117.650 17.648 15.0 1.353 19.000 912.02 5647.20 6559.22

42 117.650 17.648 15.0 1.353 19.000 798.02 4941.30 5739.32

0.50 176470.590 26470.589 15.0 2029.412 28500.000 14250.00 88235.30 102485.30


0.50 105882.350 15882.353 15.0 1217.647 17100.000 8550.00 52941.18 61491.18
0.50 47058.820 7058.823 15.0 541.176 7599.999 3800.00 23529.41 27329.41
0.50 23529.410 3529.412 15.0 270.588 3800.000 1900.00 11764.71 13664.71
1 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

0.50 17647.060 2647.059 15.0 202.941 2850.000 1425.00 8823.53 10248.53


0.50 29411.760 4411.764 15.0 338.235 4749.999 2375.00 14705.88 17080.88

SOUTHCO: IPDS SCHEME Page 388 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)


0.50 41176.470 6176.471 15.0 473.529 6650.000 3325.00 20588.24 23913.24
0.50 58823.530 8823.530 15.0 676.471 9500.000 4750.00 29411.77 34161.77
1 58823.530 8823.530 15.0 676.471 9500.000 9500.00 58823.53 68323.53

0.0
1.00 352941.180 52941.177 15.0 4058.824 57000.001 57000.00 352941.18 409941.18
0.0

0.0
40 2352.940 352.941 15.0 27.059 380.000 15199.99 94117.60 109317.59
0.0

0.0
10 2352.940 352.941 15.0 27.059 380.000 3800.00 23529.40 27329.40
0.0

SOUTHCO: IPDS SCHEME Page 389 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.0

20 1058.820 158.823 15.0 12.176 170.999 3419.99 21176.40 24596.39

20 1176.470 176.471 15.0 13.529 190.000 3800.00 23529.40 27329.40

20 2941.180 441.177 15.0 33.824 475.001 9500.01 58823.60 68323.61

20 1411.760 211.764 15.0 16.235 227.999 4559.98 28235.20 32795.18

SOUTHCO: IPDS SCHEME Page 390 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

209391.18 1331990.95 1541382.13

6.10 1411.760 211.764 15.0 16.235 227.999 1390.80 8611.74 10002.54

17 2352.940 352.941 15.0 27.059 380.000 6460.00 39999.98 46459.98

22 2352.940 352.941 15.0 27.059 380.000 8360.00 51764.68 60124.68

3 2352.940 352.941 15.0 27.059 380.000 1140.00 7058.82 8198.82

2 2352.940 352.941 15.0 27.059 380.000 760.00 4705.88 5465.88

SOUTHCO: IPDS SCHEME Page 391 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

3.33 917647.060 137647.059 15.0 10552.941 148200.000 492765.00 3051176.47 3543941.47

1.00 882352.940 132352.941 15.0 10147.059 142500.000 142500.00 882352.94 1024852.94

1.28 2116305.880 126978.353 6.0 22432.842 149411.195 190499.27 2698290.00 2888789.27

0.25 1764705.880 264705.882 15.0 20294.118 285000.000 71250.00 441176.47 512426.47

SOUTHCO: IPDS SCHEME Page 392 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.25 4534941.180 272096.471 6.0 48070.377 320166.847 80041.71 1133735.30 1213777.01

14.400 235.290 35.294 15.0 2.706 37.999 547.19 3388.18 3935.37

1.600 235.290 35.294 15.0 2.706 37.999 60.80 376.46 437.26

SOUTHCO: IPDS SCHEME Page 393 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

8 2352.940 352.941 15.0 27.059 380.000 3040.00 18823.52 21863.52

8.432 5668.680 340.121 6.0 60.088 400.209 3374.56 47798.31 51172.87

5.760 235.290 35.294 15.0 2.706 37.999 218.88 1355.27 1574.15

SOUTHCO: IPDS SCHEME Page 394 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

0.640 235.290 35.294 15.0 2.706 37.999 24.32 150.59 174.91

16 382.350 57.353 15.0 4.397 61.750 987.99 6117.60 7105.59

3.200 5668.680 340.121 6.0 60.088 400.209 1280.67 18139.78 19420.45

24 1411.760 211.764 15.0 16.235 227.999 5471.98 33882.24 39354.22

0.000 8235.290 1235.294 15.0 94.706 1329.999 0.00 0.00 0.00

0.000 14117.650 2117.648 15.0 162.353 2280.000 0.00 0.00 0.00

SOUTHCO: IPDS SCHEME Page 395 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

14 2941.180 441.177 15.0 33.824 475.001 6650.01 41176.52 47826.53

2 117.650 17.648 15.0 1.353 19.000 38.00 235.30 273.30

2 117.650 17.648 15.0 1.353 19.000 38.00 235.30 273.30

8 23.530 3.530 15.0 0.271 3.800 30.40 188.24 218.64

0.24 882352.940 132352.941 15.0 10147.059 142500.000 33725.00 208823.53 242548.53

6.1 11764.710 1764.707 15.0 135.294 1900.001 11590.00 71764.73 83354.73

SOUTHCO: IPDS SCHEME Page 396 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1062244.58 8771327.85 9833572.43

2 76470.590 11470.589 15.0 879.412 12350.000 24700.00 152941.18 177641.18

24700.00 152941.18 177641.18

SOUTHCO: IPDS SCHEME Page 397 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2 5882.350 882.353 15.0 67.647 950.000 1900.00 11764.70 13664.70

1900.00 11764.70 13664.70

19520 325.000 19.500 6.0 3.445 22.945 447886.40 6344000.00 6791886.40

19520 566.870 34.012 6.0 6.009 40.021 781210.35 11065302.40 11846512.75

1220 934.700 56.082 6.0 9.908 65.990 80507.58 1140334.00 1220841.58

17080 151.160 9.070 6.0 1.602 10.672 182275.98 2581812.80 2764088.78

1.0 151.160 9.070 6.0 1.602 10.672 10.67 151.16 161.83

1.0 1574632.350 94477.941 6.0 16691.103 111169.044 111169.04 1574632.35 1685801.39

SOUTHCO: IPDS SCHEME Page 398 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

1.0 2015529.410 120931.765 6.0 21364.612 142296.376 142296.38 2015529.41 2157825.79

203 314.930 18.896 6.0 3.338 22.234 4520.93 64035.77 68556.70

1749877.33 24785797.89 26535675.22

2 12597.060 755.824 6.0 133.529 889.352 1778.70 25194.12 26972.82

2 13856.760 831.406 6.0 146.882 978.287 1956.57 27713.52 29670.09

2 15242.440 914.546 6.0 161.570 1076.116 2152.23 30484.88 32637.11

SOUTHCO: IPDS SCHEME Page 399 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

2 16766.690 1006.001 6.0 177.727 1183.728 2367.46 33533.38 35900.84

2 18443.350 1106.601 6.0 195.500 1302.101 2604.20 36886.70 39490.90

10859.16 153812.60 164671.76

31537840.22 255966888.92 287504729.14

Say Rs. 287,504,729.00


(Rupees in Word: Twenty Eight Crore Seventy Five Lakh Four Thousand and Seven hundred Twenty Nine Only)
which '---' is indicated) in the Price Schedules; the prices of such items are deemed to have been included in other item(s) and the Contractor shall

SOUTHCO: IPDS SCHEME Page 400 of 403 Price Schedule: Erection


(All Prices are in Indian Rupees)

Unit Price Total

Installation Charges Installation Charges


% of
for Erection, Testing Unit Rate of Total of All taxes for Erection, Testing
Service Tax Service Labour Cess
Quantity and Commissioning Taxes & duties and Duties and Commissioning Total Price
Tax
including Local including Local
Transportation Transportation

4 5 6 7 8 9=(6+8) 10=(4x9) 11=(4x5) 12=(10+11)

Project Manager (DDIP)


Odisha Power Transmission Corporation Limited (OPTCL)

SOUTHCO: IPDS SCHEME Page 401 of 403 Price Schedule: Erection


ODISHA POWER TRANSMISSION CORPORATION LIMITED
Electrification Works of SOUTHCO UTILITY (Pkg.- 03) in Odisha under IPDS
(GRAND SUMMARY OF CONTRACT PRICE)

Contractor's Name & Address: Sterling & Wilson Pvt. Ltd.


Benfish IT Tower, 3rd Floor
31, G.N. Block, Salt Lake City, Sector V, Kolkata 700091

(All pr
Sl.
Description
No.

A. TOTAL CONTRACT PRICE FOR SUPPLY

Ex-Works Plant and Equipment to be Supplied (both for Direct & Bought out) along with
Frieght & insurance & applicable Taxes & Duties

B. TOTAL CONTRACT PRICE FOR INSTALLATION & SERVICE

Installation Services for Erection, Testing ,Commissioning and local transportation along
with applicable Taxes & Duties

TOTAL CONTRACT PRICE COMPRISING SUPPLY AND INSTALLATION &


C.
SERVICES (A+B)

SayRs.

Rupees in Word: Two Hundred Fifteen Crore Ninety Four Lakh Four Thousand & Ninety Fou

SOUTHCO: IPDS Scheme Page 402 of 403 Price Schedule: : Grand Summary
SMISSION CORPORATION LIMITED
CO UTILITY (Pkg.- 03) in Odisha under IPDS
MARY OF CONTRACT PRICE)

(All prices are in Indian Rupees)

Amount (Rs.)

1,871,899,365.00

287,504,729.00

2,159,404,094.00

2,159,404,094.00

re Ninety Four Lakh Four Thousand & Ninety Four Only.

SOUTHCO: IPDS Scheme Page 403 of 403 Price Schedule: : Grand Summary