Documentos de Académico
Documentos de Profesional
Documentos de Cultura
0.3
PLANTA
4 5 4
13
P Q R
CONTRATRABE
ELEVACION
DATOS:
COLUMNA = 0.3 * 0.4
FC= 200 KG/
^2 min= 0.002357023
FY= 4200 KG/
^2 max= 0.017927171
y= 1400 KG/^3 qadm= 13 TON/^2
F*C= 160 q= 0.553633218
FC= 136
PROCEDIMIENTO:
1) PASO DE LA RESULTANTE
RESULTANTE= 185 TON
=
1385
=
X= RESULTANTE = 7.48648649 M
CL
R = 0.98648649
6.5
7.48648649
P Q R
0.98648649 4 5 4
QUEDANDO L= 14.972973
2) DIMENSIONAMIENTO PRELIMINAR
REVISANDON LA PRESION CONSIDERANDO PESO DEL RELLENO Y PESO PROPIO DE LA ZAPATA (10% DE LAS CARGA
SI B= 1.2 M
0.3
qu=
W=
0.45
1.2
MU= 1.25306622
V W
^2 = 25.5694874 d= 5.056628071 CM
= 0.00150846 2.78388497
4) REVISAR EL PERALTE POR CORTANTE
0.45
5) ANALISIS DE CONTRATABE
LO VOLTEAMOS
RESULTANDO UNA VIGA CONTINUA
V V
0.98648649 4 5
ME
FD
MD
MT
V V
0.98648649 4 5
6) CALCULAR EL PERALTE
Mu=
DESPEJAR
d= 40 CMS
h= 45 CMS
qu qadm
P= 50 TON
Q= 55 TON
R= 60 TON
S= 20 TON
4 0.98648649
12.3759627 TON/M
Usar 3 Var. # 4
ORTANTE DEBIDO AL EMPUJE DEL TERRENO EN 1M DE LARGO
3.71278881 TON
W= 14.8511552 TON/M
4 0.98648649
V
4 0.98648649
CORTANTES EN TONS
MOMENTOS EN TOM-M