DISEO PUENTE CANAL

Qd= 0.12 [m^3/s]


Z= 0.03 [m]
DATOS: b= 0.40 [m]
nHA= 0.018 [adim]
ntierra= 0.027 [adim]
L= 20.00 [m]

1.- Caracteristicas del canal:

Canal de ingreso: Yn= 0.2148 [m] Canal de ingreso: Yn=


A= 0.0859 [m^2] A=
Siendo: P= 0.8296 [m] Siendo: P=
S= 0.0130 R= 0.1036 [m] S= 0.0130 R=
b= 0.40 [m] T= 0.4 [m] b= 0.40 [m] T=
Z= 0 D= 0.2148 [m] Z= 0 D=
F= 0.9621 [adim] F=
E= 0.3142 [m] E=
V= 1.3966 [m/s] V=

Lte L Lts

1 2 3

2.- Calculo del ancho del conducto elevado:


V 42 V2
E min Y 4 Yn n
27 * Q 2 2g 2g
b Donde:
8 * g * E min 3 Yn=Y4= 0.2148 [m]
Vn= 1.3966
Qd= 0.1200

Entonces: Emin= 0.3142 [m]

Por lo tanto: b= 0.3996 [m] Se asumira: b= 0.40

3.- Calculo de la longitud de transicion:


T4= 0.4000
T4 T3
Lts Donde: T3= 0.40
2 * Tan ( 22.5)

Entonces: Lts= 0.0 Se asumira: Lts= 0.00

4.- Calculo de Y3

Aplicando la ecuacion de energia entre laseccion 3 y 4


V32 V 42 V32 V 42
Z 3 4 Y3 Y4 Ks *

(1) Donde:
2g 2g 2g
Siendo: Z3-4= 0 [m]

Ademas; Ks= Coeficiente que depende del tipo de transicion, para nuestro caso la transicion
es curvada para lo cual.
Ks= 0.3

Para la seccion 3 A= b*Y3 = 0.50*Y3 V3=Qd/(0.4*Y3) Donde:

Entonces: V3=0,3/Y3

Sustituyendo a la ecuacion (1) e iterando se tiene:

Y3= 0.1312 [m]

5.- Calculo de Y2

Aplicando la ecuacion de energia entre laseccion 2 y 3


Z2-3=
V 2
V 2 (2) Donde: Lts=
Z 2 3 Y 2 2
Y3 hf 2 3
3
S=
2g 2g Y3=
Siendo: Z2-3= 0.072 [m] b=

2 V 2 V 3
V * n Ademas; V
hf 2 3 S E * L Donde: S
E 2 /3
2
R R 2 R 3
R
Y3= 0.1312 [m] 2
A3 = b*Y3 = 0.0525 [m^2]
P3 = b + 2*Y3 = 0.6624 [m]
V3=Qd/A3= 2.2866 [m/s]

Para la seccion 2: A2= b*Y2 = 0.50*Y2 V2=Qd/(0.40*Y2) Donde: Qd=


b=
Entonces: V2=0,3/Y2

V 22 V2
Z 2 3 Y 2 Y 3 3 hf 2 3
Sustituyendo a la ecuacion (2) e iterando se tiene: 2g 2g
V 22 V32
Z 2 3 Y2 Y3 hf 2 3
2g 2g

Y2= [m]

6.- Calculo de Y1: Siendo Y2= 0.0000 [m]

Aplicando la ecuacion de energia entre laseccion 1 y 2:


Z1-2=
V2 V2 V 2 V22
Z 1 2 Y 1 1 Y 2 2 Ke * 1

.(3) Donde: Lte=
2g 2g 2g S=
Y2=
Siendo: Z1-2= 0.002 [m] b=

T1 T 2
Longitud de transicion de entrada: Lte Donde: T1=
2 * Tan ( 22.5) T2=

Entonces: Lte= 0.0000 [m] Se adoptara; Lte= 1.000

Ademas; Ke= Coeficiente que depende del tipo de transicion, para nuestro caso la transicion
es curvada para lo cual.
Ke= 0.1

Para la seccion 1 Donde:

Siendo: V1=Qd/A1 --> V1=0.205/(0.5*Y1+1*Y1^2)

A1: Area de la seccion trapezoidal de entrada.

Sustituyendo a la ecuacion (3) e iterando se tiene:

Y1= 0.4024 [m]

7.- Calculo de la altura de curva de remanso.

hrem = Y1 - Yne Y1: 0.4024 Tirante de agua en la seccion 1


Yne: 0.2148 Tirante normal del canal de entrada

Entonces: hrem= 0.1876 [m]

8.- Determinacion de la curva de remanso.

Qd= 0.12 [m^3/s] n= 0.027


b= 0.40 S= 0.0036
Z= 0
Y A P R V V2 E SE SEm So - SE E
2g
0.388 0.1552 1.4974 0.10364 0.7732 0.03047 0.418 0.008951852 --- --- ---
0.389 0.1556 1.5003 0.10372 0.77121 0.03031 0.419 0.008897733 0.0089248 -0.00532 0.0008
0.390 0.1560 1.5031 0.10379 0.76923 0.03016 0.420 0.008844094 0.0088709 -0.00527 0.0008
0.392 0.1568 1.5087 0.10393 0.76531 0.02985 0.422 0.008738234 0.0087912 -0.00519 0.0017
0.394 0.1576 1.5144 0.10407 0.76142 0.02955 0.424 0.008634229 0.0086862 -0.00509 0.0017
0.396 0.1584 1.5201 0.10421 0.75758 0.02925 0.425 0.008532035 0.0085831 -0.00498 0.0017
0.398 0.1592 1.5257 0.10434 0.75377 0.02896 0.427 0.008431613 0.0084818 -0.00488 0.0017
0.400 0.1600 1.5314 0.10448 0.75 0.02867 0.429 0.008332921 0.0083823 -0.00478 0.0017
0.402 0.1608 1.5370 0.10462 0.74627 0.02839 0.430 0.00823592 0.0082844 -0.00468 0.0017

Por lo tanto la curva de remanso sera:


TIRANTES

CURVA DE REMANSO
0.405

0.400

0.395

0.390

0.385

0.380
-3 -2.5 -2 -1.5 -1 -0.5 0
LONGITUD

Canal de ingreso: Ync=


Y1= 0.4024 A=
Y2= 0.0000 Siendo: P=
Y3= 0.1312 S= 0.0010 R=
Y4= 0.2148 b= 0.40 [m] T=
Z= 0 Yc=
Qd= 0.12 F=
E=
V=

Yne
Y1
Y2
Ync Y3 Y4
Yc
NAL

0.2148 [m]
0.0859 [m^2]
0.8296 [m]
0.1036 [m]
0.4000 [m]
0.2148 [m]
0.9621 [adim]
0.3142 [m]
1.3966 [m/s]

Lts

2
V n2
Yn
g 2g

[m]
[m]

Z3-4= S*Lts
Lts= 0.00
S= 0.013
Y4= 0.2148

o caso la transicion

Qd= 0.12
b= 0.40

Z2-Z3=S*Lts
20.00
0.0036
0.1312 [m]
0.40 [m]

V 2 V 3
V
2
R 2 R 3
R
2

0.12 [m^3/s]
0.40 [m]

V 22 V2
Y 3 3 hf 2 3
2g 2g
V 22 V32
Y3 hf 2 3
2g 2g

Z1-Z2=S*Lte
1.000
0.002
0.0000
0.40

0.4000 [m]
0.400 [m]

[m]

o caso la transicion

Qd= 0.12
b= 0.40

gua en la seccion 1
mal del canal de entrada

X x=X
--- 0.000
-0.158418 -0.158
-0.160265 -0.319
-0.326139 -0.645
-0.333784 -0.979
-0.341607 -1.320
-0.349613 -1.670
-0.357809 -2.028
-0.366201 -2.394

0.405

0.400

0.395

0.390

0.385

0.380
-0.5 0
LONGITUD

0.3656 [m]
0.1462 [m^2]
1.1312 [m]
0.1293 [m]
0.4000 [m]
0.2992 [m]
0.4333 [adim]
0.3999 [m]
0.8206 [m/s]

Y4
x=X
0.000
-0.158
-0.319
-0.645
-0.979
-1.320
-1.670
-2.028
-2.394
DISE O DEL DESAREADOR
PROGRESIVA 0+330 - 0+435
DATOS :
Qd = 0.12 m^3/s
B= 0.40 mts.
b= 0.45 mts. ancho de la camara de sedimentacion

1.-DIAMETRO DE LA PARTICULA, VELOCIDAD DE SEDIMENTACION :

D= 2 mm Vs = 15.29 cm/s
tabla15,3 -pag200 -pronar
2.-CALCULO DE LA VELOCIDA DE ESCURRIMIENTO :

D= 2 mm [Diametro de la Particula Asumida]


a= 36 [Coef. de Decantacion] tabla-15,2 -pag199 -pronar

Vd a D Vd = 0.51 m/s

3.-CALCULO DE LA ALTURA DE LA CAMARA DE SEDIMENTACION :


0.85913474
Qd
H H= 0.52 mts.
Vd b

4.-CALCULO DEL TIEMPO DE RETENCION :

H
ts ts = 3.43 seg.
Vs

5.-CALCULO DE LA LONGITUD MINIMA DE LA CAMARA :

K= 2 [Coef. de Seguridad] tabla-15,4-pag201-pronar

L K Vd ts L= 3 mts.

6.-CALCULO DE LA LONGITUD DE TRANSICION :

= 12.5 [Angulo de Transicion]


B=T2 0.40 mts.
b=T1 0.45 mts.

b B
LT LT = 0.11 mts.
2 tan g
LT = 0.15 mts. [Asumo por fines Constructivos]
DISE O DEL DISIPADOR DE EERGIA
CAIDA VERTICAL

DATOS :
PROGRESIVA 0+330 - 0+435
Qd = 120 l/s [Caudal de Diseo]
So = 0.013 m/m [Pendiente del canal]
H= 0.694 mts. [Desnivel de la Rapida]
n= 0.018 [Desnivel de la Rapida]

1.-CALCULO DEL CANAL DE INGRESO :

2 1 2
1 B 2 Y2 3 1
Q A R 3 So 2
n Y
2 1

Q 2 Y2 So 2
n 4Y

Y= 0.21 mts.

B= 0.4 mts.

2.-CALCULO DE LA ENERGIA EN EL CANAL DE INGRESO :

V2
V= 1.40 m/s E1 Y E1 = 0.307
2g

3.-CALCULO DE LA SECCION DE CONTROL :

Caso de seccion Rectangular


1
Qd 2 3 Qd 2
Vc 2
1
Qd E 1 2
E 1 Yc q2 3
q B1 g 1 2

2g Yc Qd
2
B1 3
g B1 2 2 g
B1 g

B1 = 0.41 mts. Asumo 0.4

Yc = 0.20 mts. Vc = 1.42

0.20

4.-CALCULO DE LA LONGITUD DE TRANSICION :

= 22.5 [Angulo de Transicion]


B = 0.4 mts. [Ancho del Canal]
B1 = 0.4 mts. [Ancho de la Rapida]

B B1
LT LT = 0.00 mts. LT = 0.00 mts.
2 tan g

5.-CALCULO DE LA LONGITUD Y LA PROFUNDIDAD DEL COLCHON DISIPADOR :

Qd= 120.00 l/s [Caudal de Diseo]


h= 0.93 mts. [Altura de Caida del Agua]
B = 0.41436 mts. [Base del Canal]
^
=^/
(^^ ) D= 0.01079

=(,^(,),^(, L= 3.068 mts.


)) Asumo Constructivamente
L= 4.000 mts.

OTRO CRITERIO

Tiemo de Caida del Chorro de Agua


=(((+))/)
t= 0.43 s

Distancia Horizontal Recorrida por el Chorro

=
= Xn= 0.62 mts.

Longitud del Colchon

=
L= 1.23 mts.
Constructivamente Asumo
L= 2.00 mts.
Para la construccion de la longitud del colchon adopataremos el resultado que obtuvimos aplicando el primer metodo

L= 4.000 mts.
mts.

Qd 2
2
1

d 2
3
2g
g

ulo de Transicion]

ho de la Rapida]
DISE O DEL SIFO IVERTIDO
UBICACIN (1+455 : 1+530 )

DATOS :
Qd = 0.12 m^3/s
B = 0.4 mts.
Y = 0.21 mts.
Cota A = 1279.489 m.s.n.m.
Cota B = 1278.22 m.s.n.m.
L= 88.492 mts. [Longitud de la Tuberia ]
Z = 1.3 mts. [Desnivel entre los Puntos de Entrada y salida]
1.-CALCULO DEL AREA DE LA SECCION TRANSVERSAL DEL DUCTO :

Vd = 2 m/s Velocidad en el Ducto [1,5 - 3 m/s] por norma - pagina 111- pronar

Qd
Ad Ad = 0.060 m^2
Vd

2.-CALCULO DEL DIAMETRO DE LA TUBERIA :

d2
Ad d= 0.2764 mts.
4 d= 10.9 plg [Asumo]
d= 304.800 mm

Q Vd = 1.64 m/s
Vd
Ad

3.-PERDIDA DE CARGA POR LA REJILLA DE ENTRADA :

eb = 0.0095 mts. [Espesor de las Barras] 3/8"


Sb = 0.05 mts. [Espaciamiento de las Barras] Asumimos Constructivamente
= 75 [Angulo de inclinacion de la Regilla]
F = 1.79 [Factor de forma]
4
e 3 Vc 2
hr e F b sen hre = 0.01878 mts.
sb 2g

3.-CALCULO DE LA LONGITUD DE TRANSICION :

T D
LT LT = 0.1149 mts.
2 Tan
LT = 0.15 mts.

5.-PERDIDA POR TRANSICION EN LA ENTRADA :

Vd = 1.64 m/s [Velocidad en la Tuberia]


Vc = 1.40 m/s [Velocidad en el Canal de Ingreso]

0,4 Vd 2 Vc 2
h te hte = 0.01537 mts.
2g

6.-NIVEL DE AGUA SOBRE EL PUNTO B :

Cota : 1279.70 m.s.n.m.

NA B Cota h r e h te NA B = 1279.670 m.s.n.m.

7.-PROYECCION VERTICAL DEL DIAMETRO :

d= 304.800 mm [Diametro del Conducto]


1 = 53.28 [Angulo de Inclinacion de la Tuberia de Ingreso]

D
D PE
cos 1 D PE = 0.510 mts.

8.-CALCULO DEL PORCENTAJE DE AHOGAMIENTO :

a% = 45 % [Porcentaje de Ahogamiento (10% - 50%)]


NA B = 1279.670 m.s.n.m.
D PE = 0.510 mts.

a%
CotaB NA B DPE 1 Cota B = 1279.389 m.s.n.m.
100

a NA B Cota B D PE a= 0.229 mts.


9.-PERDIDA POR ENTRADA EN EL DUCTO :

Vd = 1.64 m/s [Velocidad en la Tuberia]


Ke = 0.5 [Coef. de Perdida por Entrada] tabla 8,2-pag113-pronar
aristas con angulos rectos
Vd 2
he Ke he = 0.069 mts.
2g

10.-PERDIDAS LOCALIZADAS :

Vd = 1.64 m/s
Coeficientes de Perdidas de Carga por Accesorios
K1 = 2.5 [Valvula de Retencion] n= 1
K2 = 0.6 [Codos de Radio Largo] n= 3

Km = 4.3

Vd 2
hm k m 2g
hm = 0.593 mts.

11.-PERDIDAS POR FRICCION :

Vd = 1.64 m/s
= 1.50E-06 m [Rugosidad Absluta PVC] tabla 8,5 pvc
d= 304.800 mm [Diametro]
T= 15 C [Temperatura del Agua]
= 1.15E-06 m^2/s [Viscosidad Cinematica]
Ld = 88.492 mts. [Longitud del la Tuberia]

d Vd
Re Re = 435890.64270942


1 2,51
2 Log d f= 1.36E-02
f 3,71 Re f

Ld Vd 2
hf f hf = 0.543 mts.
d 2g

12.-PERDIDA POR SALIDA :


Vd = 1.64 m/s [Velocidad en el Conducto]
Ve = Vsalida = 1.40 m/s [Velocidad de Salida al Canal]
_=(__ )^/
() hs = 0.003134 mts.

13.-PERDIDA DE CARGA POR REJILLA :

eb = 0.0094 mts. [Espesor de las Barras] 3/8"


Sb = 0.1 mts. [Espaciamiento de las Barras]
= 75 [Angulo de inclinacion de la Regilla]
F = 1.79 [Factor de forma]
Vs = 1.40 m/s [Velocidad de Salida al Canal]

4
e 3 VS 2
h re F b sen hre = 0.007
sb 2g

14.-PERDIDA DE CARGA TOTAL :

hT h re h te h e h f h m h s h r e hT =

hT = 1.2489 mts. < Z = 1.3

15.-CALCULO DE LA COTA DE SOLERA :


hT = 1.25 mts. [Perdida total de Carga]
Cota A = 1279.489 m.s.n.m.

Cota F Cota A 1,1 hT Cota F = 1278.12 mts.

16.CALCULO DE LA COTA DE SALIDA :


YF = 0.21 mts.

Cota NA F Cota F YF hrs Cota NA F = 1278.34 m.s.n.m.

17.-CALCULO DEL NIVEL DE AGUA EN EL PUNTO E :

Cota NA E Cota NA F h S Cota NA E = 1278.34 m.s.n.m.

18.-CALCULO DEL AHOGAMIENTO DE SALIDA :

d= 304.800 mm

d
as as = 0.05 mts.
6
d
as
6

19.-CALCULO DE LA COTA DEL PUNTO E :


d= 304.8 mm
= 11.53 [Angulo de Deflexion de Salida del Sifon]

d
Dps Dps = 0.31 mts.
cos

< /
-0.10 < 0.0508

Cota E Cota NA E Dps as Cota E = 1277.98 m.s.n.m.


r norma - pagina 111- pronar

12.0 pulg

umimos Constructivamente
bla 8,2-pag113-pronar
stas con angulos rectos
mts.

1.25 mts.

mts. Ok !!! Cumple


Ok !!! Cumple
DISEO DEL VERTEDERO LATERAL

DATOS :
Qd = 0.12 m^3/s [Caudal de Diseo]
Qmax = 0.240 m^3/s [caudal de de ingreso 2x Qd]
Qs = 0.144 m^3/s [Caudal de salida 1,2x Qd]
Y= 0.21 mts. [Altura del Canal]
B= 0.40 mts. [Base del Canal]
n= 0.018 [Coef. de Rugosidad de Mannig]
L= ? mts. [Longitud de la Cresta del Vertedero]
So = 0.013 m/m [Pendiente del Canal]

1.-CALCULO DEL CAUDAL CON TIRANTE NORMAL :

2 1
1 Q= 0.12 m^3/s
Q A R 3 So 2
n

2.-VERIFICACION DEL TIPO DE REGIMEN:


Q
q q= 0.300 m^3/s/m
B
1
q 2 3
Yc = 0.209 mts.
Yc
g
Y1 = 0.21 mts. > Yc = 0.209 mts. OK !!!!

3.-DETERMINACION DEL TIRANTE AGUAS ABAJO :

Qs = 0.144 m^3/s
2 1
1
Q A R 3 So 2 Y4 = 0.247 mts.
n
2 1
1
Q A R 3 So 2
n
4.-VERIFICACION DEL TIPO DE REGIMEN AGUAS ABAJO DEL VERTEDERO:

Q
q q2 = 0.360 m^3/s/m
B
1
q
2 3
Yc 4 Yc 4 = 0.236 mts.
g
Y4 = 0.247 mts. > Yc4 = 0.236 mts. OK !!!!

5.-CALCULO DEL TIRANTE AL COMIENZO DEL VERTEDERO :

E2 E4 V22 V42
Y2 Y4 Y2 = 0.33 mts.
2g 2g
6.-CALCULO DE LA CRESTA DEL VERTEDERO :

Qv = 0.096 m^3/s/m [Caudal que se Vierte]


Cd = 2 [Coef. de Descarga 2-1,84 Borde Rectangular]
s = 0.21


y S
1 1
5 Qv Y 4 S
L
2 3 5
L 2.108 mts.
Cd*(y1 S)2 y1 S 2
1
Y S 2.1 constructivamente
4

7.-VERIFICACION CAUDAL VERTIDO :


=0,4(1( (2 )/(4)) ^(5/2))/(1(2 )/(4))
=(2+42" " )/2
= ^(3/2
)
hm= 0.0885
C= 3.19947505
Qv= 0.17756344 0.096 m3/seg OK !!!!

8.-DIMENSIONAMIENTO FINAL :

0.12

0.247
0.33 2.1
2))/(1(2 )/(4))
DISE O DEL VERTEDERO LATERAL
UBICACIN (0+0814 )

DATOS :
Qd = 0.12 m^3/s [Caudal de Diseo]
Qmax = 0.240 m^3/s [caudal de de ingreso 2x Qd]
Qs = 0.144 m^3/s [Caudal de salida 1,2x Qd]
Y= 0.21 mts. [Altura del Canal]
B= 0.40 mts. [Base del Canal]
n= 0.018 [Coef. de Rugosidad de Mannig]
L= ? mts. [Longitud de la Cresta del Vertedero]
So = 0.013 m/m [Pendiente del Canal]

1.-CALCULO DEL CAUDAL CON TIRANTE NORMAL :

2 1
1 Q= 0.12 m^3/s
Q A R 3 So 2
n

2.-VERIFICACION DEL TIPO DE REGIMEN:


Q
q q= 0.300 m^3/s/m
B
1
q 2 3
Yc = 0.209 mts.
Yc
g
Y1 = 0.21 mts. > Yc = 0.209 mts. OK !!!!

3.-DETERMINACION DEL TIRANTE AGUAS ABAJO :

Qs = 0.144 m^3/s
2 1
1
Q A R 3 So 2 Y4 = 0.247 mts.
n
2 1
1
Q A R 3 So 2
n
4.-VERIFICACION DEL TIPO DE REGIMEN AGUAS ABAJO DEL VERTEDERO:

Q
q q2 = 0.360 m^3/s/m
B
1
q
2 3
Yc 4 Yc 4 = 0.236 mts.
g
Y4 = 0.247 mts. > Yc4 = 0.236 mts. OK !!!!

5.-CALCULO DEL TIRANTE AL COMIENZO DEL VERTEDERO :

E2 E4 V22 V42
Y2 Y4 Y2 = 0.33 mts.
2g 2g
6.-CALCULO DE LA CRESTA DEL VERTEDERO :

Qv = 0.096 m^3/s/m [Caudal que se Vierte]


Cd = 2 [Coef. de Descarga 2-1,84 Borde Rectangular]
s = 0.21


y S
1 1
5 Qv Y 4 S
L
2 3 5
L 2.108 mts.
Cd*(y1 S)2 y1 S 2
1
Y S 2.1 constructivamente
4

7.-VERIFICACION CAUDAL VERTIDO :


=0,4(1( (2 )/(4)) ^(5/2))/(1(2 )/(4))
=(2+42" " )/2
= ^(3/2
)
hm= 0.0885
C= 3.19947505
Qv= 0.17756344 0.096 m3/seg OK !!!!

8.-DIMENSIONAMIENTO FINAL :

0.12

0.247
0.33 2.1
2))/(1(2 )/(4))
DISE O DEL SIFO IVERTIDO
UBICACIN (1+455 : 1+530 )

DATOS :
Qd = 0.12 m^3/s
B = 0.4 mts.
Y = 0.21 mts.
Cota A = 1279.489 m.s.n.m.
Cota B = 1278.22 m.s.n.m.
L= 88.492 mts. [Longitud de la Tuberia ]
Z = 1.3 mts. [Desnivel entre los Puntos de Entrada y salida]
1.-CALCULO DEL AREA DE LA SECCION TRANSVERSAL DEL DUCTO :

Vd = 2 m/s Velocidad en el Ducto [1,5 - 3 m/s] por norma - pagina 111- pronar

Qd
Ad Ad = 0.060 m^2
Vd

2.-CALCULO DEL DIAMETRO DE LA TUBERIA :

d2
Ad d= 0.2764 mts.
4 d= 10.9 plg [Asumo]
d= 304.800 mm

Q Vd = 1.64 m/s
Vd
Ad

3.-PERDIDA DE CARGA POR LA REJILLA DE ENTRADA :

eb = 0.0095 mts. [Espesor de las Barras] 3/8"


Sb = 0.05 mts. [Espaciamiento de las Barras] Asumimos Constructivamente
= 75 [Angulo de inclinacion de la Regilla]
F = 1.79 [Factor de forma]
4
e 3 Vc 2
hr e F b sen hre = 0.01878 mts.
sb 2g

3.-CALCULO DE LA LONGITUD DE TRANSICION :

T D
LT LT = 0.1149 mts.
2 Tan
LT = 0.15 mts.

5.-PERDIDA POR TRANSICION EN LA ENTRADA :

Vd = 1.64 m/s [Velocidad en la Tuberia]


Vc = 1.40 m/s [Velocidad en el Canal de Ingreso]

0,4 Vd 2 Vc 2
h te hte = 0.01537 mts.
2g

6.-NIVEL DE AGUA SOBRE EL PUNTO B :

Cota : 1279.70 m.s.n.m.

NA B Cota h r e h te NA B = 1279.670 m.s.n.m.

7.-PROYECCION VERTICAL DEL DIAMETRO :

d= 304.800 mm [Diametro del Conducto]


1 = 53.28 [Angulo de Inclinacion de la Tuberia de Ingreso]

D
D PE
cos 1 D PE = 0.510 mts.

8.-CALCULO DEL PORCENTAJE DE AHOGAMIENTO :

a% = 45 % [Porcentaje de Ahogamiento (10% - 50%)]


NA B = 1279.670 m.s.n.m.
D PE = 0.510 mts.

a%
CotaB NA B DPE 1 Cota B = 1279.389 m.s.n.m.
100

a NA B Cota B D PE a= 0.229 mts.


9.-PERDIDA POR ENTRADA EN EL DUCTO :

Vd = 1.64 m/s [Velocidad en la Tuberia]


Ke = 0.5 [Coef. de Perdida por Entrada] tabla 8,2-pag113-pronar
aristas con angulos rectos
Vd 2
he Ke he = 0.069 mts.
2g

10.-PERDIDAS LOCALIZADAS :

Vd = 1.64 m/s
Coeficientes de Perdidas de Carga por Accesorios
K1 = 2.5 [Valvula de Retencion] n= 1
K2 = 0.6 [Codos de Radio Largo] n= 3

Km = 4.3

Vd 2
hm k m 2g
hm = 0.593 mts.

11.-PERDIDAS POR FRICCION :

Vd = 1.64 m/s
= 1.50E-06 m [Rugosidad Absluta PVC] tabla 8,5 pvc
d= 304.800 mm [Diametro]
T= 15 C [Temperatura del Agua]
= 1.15E-06 m^2/s [Viscosidad Cinematica]
Ld = 88.492 mts. [Longitud del la Tuberia]

d Vd
Re Re = 435890.64270942


1 2,51
2 Log d f= 1.36E-02
f 3,71 Re f

Ld Vd 2
hf f hf = 0.543 mts.
d 2g

12.-PERDIDA POR SALIDA :


Vd = 1.64 m/s [Velocidad en el Conducto]
Ve = Vsalida = 1.40 m/s [Velocidad de Salida al Canal]
_=(__ )^/
() hs = 0.003134 mts.

13.-PERDIDA DE CARGA POR REJILLA :

eb = 0.0094 mts. [Espesor de las Barras] 3/8"


Sb = 0.1 mts. [Espaciamiento de las Barras]
= 75 [Angulo de inclinacion de la Regilla]
F = 1.79 [Factor de forma]
Vs = 1.40 m/s [Velocidad de Salida al Canal]

4
e 3 VS 2
h re F b sen hre = 0.007
sb 2g

14.-PERDIDA DE CARGA TOTAL :

hT h re h te h e h f h m h s h r e hT =

hT = 1.2489 mts. < Z = 1.3

15.-CALCULO DE LA COTA DE SOLERA :


hT = 1.25 mts. [Perdida total de Carga]
Cota A = 1279.489 m.s.n.m.

Cota F Cota A 1,1 hT Cota F = 1278.12 mts.

16.CALCULO DE LA COTA DE SALIDA :


YF = 0.21 mts.

Cota NA F Cota F YF hrs Cota NA F = 1278.34 m.s.n.m.

17.-CALCULO DEL NIVEL DE AGUA EN EL PUNTO E :

Cota NA E Cota NA F h S Cota NA E = 1278.34 m.s.n.m.

18.-CALCULO DEL AHOGAMIENTO DE SALIDA :

d= 304.800 mm

d
as as = 0.05 mts.
6
d
as
6

19.-CALCULO DE LA COTA DEL PUNTO E :


d= 304.8 mm
= 11.53 [Angulo de Deflexion de Salida del Sifon]

d
Dps Dps = 0.31 mts.
cos

< /
-0.10 < 0.0508

Cota E Cota NA E Dps as Cota E = 1277.98 m.s.n.m.


r norma - pagina 111- pronar

12.0 pulg

umimos Constructivamente
bla 8,2-pag113-pronar
stas con angulos rectos
mts.

1.25 mts.

mts. Ok !!! Cumple


Ok !!! Cumple
DISE O DEL DISIPADOR DE EERGIA
CAIDA VERTICAL

DATOS :
PROGRESIVA 0+330 - 0+435
Qd = 120 l/s [Caudal de Diseo]
So = 0.013 m/m [Pendiente del canal]
H= 0.694 mts. [Desnivel de la Rapida]
n= 0.018 [Desnivel de la Rapida]

1.-CALCULO DEL CANAL DE INGRESO :

2 1 2
1 B 2 Y2 3 1
Q A R 3 So 2
n Y
2 1

Q 2 Y2 So 2
n 4Y

Y= 0.21 mts.

B= 0.4 mts.

2.-CALCULO DE LA ENERGIA EN EL CANAL DE INGRESO :

V2
V= 1.40 m/s E1 Y E1 = 0.307
2g

3.-CALCULO DE LA SECCION DE CONTROL :

Caso de seccion Rectangular


1
Qd 2 3 Qd 2
Vc 2
1
Qd E 1 2
E 1 Yc q2 3
q B1 g 1 2

2g Yc Qd
2
B1 3
g B1 2 2 g
B1 g

B1 = 0.41 mts. Asumo 0.4

Yc = 0.20 mts. Vc = 1.42

0.20

4.-CALCULO DE LA LONGITUD DE TRANSICION :

= 22.5 [Angulo de Transicion]


B = 0.4 mts. [Ancho del Canal]
B1 = 0.4 mts. [Ancho de la Rapida]

B B1
LT LT = 0.00 mts. LT = 0.00 mts.
2 tan g

5.-CALCULO DE LA LONGITUD Y LA PROFUNDIDAD DEL COLCHON DISIPADOR :

Qd= 120.00 l/s [Caudal de Diseo]


h= 0.93 mts. [Altura de Caida del Agua]
B = 0.41436 mts. [Base del Canal]
^
=^/
(^^ ) D= 0.01079

=(,^(,),^(, L= 3.068 mts.


)) Asumo Constructivamente
L= 4.000 mts.

OTRO CRITERIO

Tiemo de Caida del Chorro de Agua


=(((+))/)
t= 0.43 s

Distancia Horizontal Recorrida por el Chorro

=
= Xn= 0.62 mts.

Longitud del Colchon

=
L= 1.23 mts.
Constructivamente Asumo
L= 2.00 mts.
Para la construccion de la longitud del colchon adopataremos el resultado que obtuvimos aplicando el primer metodo

L= 4.000 mts.
mts.

Qd 2
2
1

d 2
3
2g
g

ulo de Transicion]

ho de la Rapida]
DISE O DEL DESAREADOR
PROGRESIVA 0+080
DATOS :
Qd = 0.12 m^3/s
B= 0.40 mts.
b= 0.45 mts. ancho de la camara de sedimentacion

1.-DIAMETRO DE LA PARTICULA, VELOCIDAD DE SEDIMENTACION :

D= 2 mm Vs = 15.29 cm/s
tabla15,3 -pag200 -pronar
2.-CALCULO DE LA VELOCIDA DE ESCURRIMIENTO :

D= 2 mm [Diametro de la Particula Asumida]


a= 36 [Coef. de Decantacion] tabla-15,2 -pag199 -pronar

Vd a D Vd = 0.51 m/s

3.-CALCULO DE LA ALTURA DE LA CAMARA DE SEDIMENTACION :


0.85913474
Qd
H H= 0.52 mts.
Vd b

4.-CALCULO DEL TIEMPO DE RETENCION :

H
ts ts = 3.43 seg.
Vs

5.-CALCULO DE LA LONGITUD MINIMA DE LA CAMARA :

K= 2 [Coef. de Seguridad] tabla-15,4-pag201-pronar

L K Vd ts L= 3 mts.

6.-CALCULO DE LA LONGITUD DE TRANSICION :

= 12.5 [Angulo de Transicion]


B=T2 0.40 mts.
b=T1 0.45 mts.

b B
LT LT = 0.11 mts.
2 tan g
LT = 0.15 mts. [Asumo por fines Constructivos]
m

También podría gustarte

  • Concreto Cuevas Ultimo
    Concreto Cuevas Ultimo
    Documento802 páginas
    Concreto Cuevas Ultimo
    Norvin Martinez Rodriguez
    88% (8)
  • Proyecto Obras Oscarin
    Proyecto Obras Oscarin
    Documento158 páginas
    Proyecto Obras Oscarin
    salin
    Aún no hay calificaciones
  • Segunda Parte
    Segunda Parte
    Documento17 páginas
    Segunda Parte
    salin
    Aún no hay calificaciones
  • Tema Dos
    Tema Dos
    Documento3 páginas
    Tema Dos
    salin
    Aún no hay calificaciones
  • NDICE
    NDICE
    Documento1 página
    NDICE
    salin
    Aún no hay calificaciones
  • Parte 3
    Parte 3
    Documento22 páginas
    Parte 3
    salin
    Aún no hay calificaciones
  • Libro 2
    Libro 2
    Documento4 páginas
    Libro 2
    salin
    Aún no hay calificaciones
  • Sifon Obras mirandaEEEEEEEEEEEEE
    Sifon Obras mirandaEEEEEEEEEEEEE
    Documento13 páginas
    Sifon Obras mirandaEEEEEEEEEEEEE
    salin
    Aún no hay calificaciones
  • Modifivcado BBBBB
    Modifivcado BBBBB
    Documento25 páginas
    Modifivcado BBBBB
    salin
    Aún no hay calificaciones
  • Parte 3
    Parte 3
    Documento22 páginas
    Parte 3
    salin
    Aún no hay calificaciones
  • Modifivcado
    Modifivcado
    Documento22 páginas
    Modifivcado
    salin
    Aún no hay calificaciones
  • ALAMBRADO
    ALAMBRADO
    Documento60 páginas
    ALAMBRADO
    salin
    Aún no hay calificaciones
  • Parte 3
    Parte 3
    Documento22 páginas
    Parte 3
    salin
    Aún no hay calificaciones
  • Tema Dos
    Tema Dos
    Documento3 páginas
    Tema Dos
    salin
    Aún no hay calificaciones
  • Segunda Parte
    Segunda Parte
    Documento17 páginas
    Segunda Parte
    salin
    Aún no hay calificaciones
  • Imprimir Puente CaNAL
    Imprimir Puente CaNAL
    Documento12 páginas
    Imprimir Puente CaNAL
    salin
    Aún no hay calificaciones
  • Sifon Obras Miranda
    Sifon Obras Miranda
    Documento8 páginas
    Sifon Obras Miranda
    salin
    Aún no hay calificaciones
  • Clasificacion de Los Suelos
    Clasificacion de Los Suelos
    Documento22 páginas
    Clasificacion de Los Suelos
    salin
    Aún no hay calificaciones
  • Libro 2
    Libro 2
    Documento4 páginas
    Libro 2
    salin
    Aún no hay calificaciones
  • Maestro
    Maestro
    Documento87 páginas
    Maestro
    salin
    Aún no hay calificaciones
  • Contenid 1
    Contenid 1
    Documento4 páginas
    Contenid 1
    salin
    Aún no hay calificaciones
  • Maestro
    Maestro
    Documento87 páginas
    Maestro
    salin
    Aún no hay calificaciones
  • PVPie 21 P
    PVPie 21 P
    Documento2 páginas
    PVPie 21 P
    salin
    Aún no hay calificaciones
  • Planillas de Campo (Topografia)
    Planillas de Campo (Topografia)
    Documento32 páginas
    Planillas de Campo (Topografia)
    salin
    Aún no hay calificaciones
  • Obras Baldii
    Obras Baldii
    Documento58 páginas
    Obras Baldii
    rodrigo
    Aún no hay calificaciones
  • Practica N 3
    Practica N 3
    Documento1 página
    Practica N 3
    salin
    Aún no hay calificaciones
  • Parte 3
    Parte 3
    Documento22 páginas
    Parte 3
    salin
    Aún no hay calificaciones
  • Segunda Parte
    Segunda Parte
    Documento17 páginas
    Segunda Parte
    salin
    Aún no hay calificaciones
  • Proyecto Obras Hidraulicas I
    Proyecto Obras Hidraulicas I
    Documento1 página
    Proyecto Obras Hidraulicas I
    salin
    Aún no hay calificaciones