Está en la página 1de 45

ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT

BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15


ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
Material Cost Labour Cost Subcontractor Cost
Item Description Qty Unit
Rate Amount Rate Amount Rate

3.3 - CEILING FINISHES

Specification Section 092113-


Plaster Assembles

Portland cement and sand plaster to


concrete and concrete unit masonry
surfaces as described in Specification
Section 092113 including plaster stop,
plaster metal lath, accessories and the
like, fixing in position, complete

A To ceilings, 10mm thick 17,317 M2 - Excluded - Excluded -

B Ditto, to stairwells 572 M2 - Excluded - Excluded -

C Ditto, to balconies (Externally) 1,804 M2 - Excluded - Excluded -

D To ceilings, 15mm thick 150 M2 - Excluded - Excluded -

E To ceilings on ground floor entrance 129 M2 - Excluded - Excluded -


(Externally)

F To underside of sloping concrete for roof 781 M2 - Excluded - Excluded -


clay tiles (Externally)

Specification Section 095100-


Metal Ceiling Tiling
Page 1 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
Perforated metal tile suspended ceiling, as
described in Specification Section 093029
including finishes, trims, accessories, etc.
suspension depth as required, fixing in
position, complete

G 600 x 1200mm Metal tiling to hallway, ref. 765 M2 124.85 95,510.25 25.00 19,125.00 -
CT-01 (ID drawing)

ELEMENT 3.3 - CEILING FINISHES


To Collection 95,510.25 19,125.00
1461 JA09/3.0/3.3/1

Page 2 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
Material Cost Labour Cost Subcontractor Cost
Item Description Qty Unit
Rate Amount Rate Amount Rate

Specification Section 095100 -


Suspended Ceilings

Suspended ceiling; gypsum board fixing to


MF suspension systems, as described in
Specification Section 095100, including all
finishes, trims, accessories and the like,
suspension depth as required, as on
Drawings, fixing in position, complete
(excluding paint finish).

A 12.5mm thick moisture resistant gypsum 2,089 M2 25.30 52,851.70 35.00 73,115.00 -
board, to ceiling, ref. GB1

B Decorative gypsum board 12.5mm thick, 2,016 M2 22.00 44,352.00 35.00 70,560.00 -
ref. GB2

C Ditto, in bulkheads upto 300mm high 440 M2 13.20 5,808.00 28.00 12,320.00 -

D 600 x 600 moisture resistant gypsum 1,592 M2 46.20 73,550.40 20.00 31,840.00 -
ceiling tiles, ref. GT1

E Decorative gypsum board, 12.5mm thick, 1,227 M2 22.00 26,994.00 35.00 42,945.00 -
ref. PT01 (ID)

Page 3 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
F 12.5mm thick moisture resistant gypsum 1 M2 43.70 Unit Rate 35.00 Unit Rate -
board ceiling with concealed galvanized
steel suspension system including 600 x
600 x 12.5 glass fiber reinforced high
humidity resistant plain white painted
gypsum ceiling tiles with regular edge,
GB1/GT1 (excluding paint finish)

Sundries

G Access panels, 600 x 600 148 No. 95.00 14,060.00 45.00 6,660.00 -

ELEMENT 3.3 - CEILING FINISHES


To Collection 217,616.10 237,440.00
1461 JA09/3.0/3.3/2
Material Cost Labour Cost Subcontractor Cost
Item Description Qty Unit
Rate Amount Rate Amount Rate

Summary

From Page No. JA09/3.0/3.3/1 95,510.25 19,125.00

JA09/3.0/3.3/2 217,616.10 237,440.00

Page 4 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES

ELEMENT 3.3 - CEILING FINISHES


Page 5 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
To Summary 313,126.35 256,565.00

1461 JA09/3.0/3.3/3

Page 6 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
Subcontractor Cost Our Cost Rate Amount
Amount Rate Amount Dhs. Dhs.

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Page 7 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES

- 149.85 114,635.25 223.00 170,595.00

- 114,635.25 DH 170,595.00

Page 8 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
Subcontractor Cost Our Cost Rate Amount
Amount Rate Amount Dhs. Dhs.

- 60.30 125,966.70 90.00 188,010.00

- 57.00 114,912.00 85.00 171,360.00

- 41.20 18,128.00 61.00 26,840.00

- 66.20 105,390.40 98.00 156,016.00

- 57.00 69,939.00 85.00 104,295.00

Page 9 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
Unit Rate 78.70 Unit Rate Only 117.00 Unit Rate Only

- 140.00 20,720.00 208.00 30,784.00

- 455,056.10 DH 677,305.00

Subcontractor Cost Our Cost Rate Amount


Amount Rate Amount Dhs. Dhs.

- 114,635.25 170,595.00

- 455,056.10 677,305.00

Page 10 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES

Page 11 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA09 - RESIDENTIAL BUILDING 1
JA09/3.0 - INTERNAL FINISHES
- 569,691.35 DH 847,900.00

Page 12 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES
Material Cost Labour Cost
Item Description Qty Unit
Rate Amount Rate Amount

3.3 - CEILING FINISHES

Specification Section 092113-


Plaster Assembles

Portland cement and sand plaster to


concrete and concrete unit masonry
surfaces as described in Specification
Section 092113 including plaster stop,
plaster metal lath, accessories and the
like, fixing in position, complete

A To ceilings, 10mm thick 17,317 M2 - Excluded - Excluded

B Ditto, to stairwells 572 M2 - Excluded - Excluded

C Ditto, to balconies (Externally) 1,804 M2 - Excluded - Excluded

D To ceilings, 15mm thick 150 M2 - Excluded - Excluded

To ceilings on ground floor entrance


E (Externally) 191 M2 - Excluded - Excluded

To underside of sloping concrete for roof


F clay tiles (Externally) 887 M2 - Excluded - Excluded

Specification Section 093029-


Metal Ceiling Tiling
Page 13 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES
Perforated metal tile suspended ceiling, as
described in Specification Section 093029
including finishes, trims, accessories, etc.
suspension depth as required, fixing in
position, complete

Metal tiling to hallway, ref. CT-01 (ID


G drawing) 765 M2 124.85 95,510.25 25.00 19,125.00

ELEMENT 3.3 - CEILING FINISHES


To Collection 95,510.25 19,125.00
1461 JA10/3.0/3.3/1
Material Cost Labour Cost
Item Description Qty Unit
Rate Amount Rate Amount

Specification Section 095100 -


Suspended Ceilings

Suspended ceiling; gypsum board fixing to


MF suspension systems, as described in
Specification Section 095100, including all
finishes, trims, accessories and the like,
suspension depth as required, as on
Drawings, fixing in position, complete

Page 14 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES
A 12.5mm thick moisture resistant gypsum
board, to ceiling, ref. GB1 2,089 M2 25.30 52,851.70 35.00 73,115.00

B Decorative gypsum board 12.5mm thick,


ref. GB2 2,016 M2 22.00 44,352.00 35.00 70,560.00

C Ditto, in bulkheads 440 M2 13.20 5,808.00 28.00 12,320.00

D 600 x 600 moisture resistant gypsum


ceiling tiles, ref. GT1 1,592 M2 46.20 73,550.40 20.00 31,840.00

E Decorative gypsum board, 12.5mm thick,


ref. PT01 (ID) 1,227 M2 22.00 26,994.00 35.00 42,945.00

F 12.5mm thick moisture resistant gypsum 1 M2 43.70 Unit Rate 35.00 Unit Rate
board ceiling with concealed galvanized
steel suspension system including 600 x
600 x 12.5 glass fiber reinforced high
humidity resistant plain white painted
gypsum ceiling tiles with regular edge,
GB1/GT1 (excluding paint finish)

Sundries

G Access panels, 600 x 600 148 No. 95.00 14,060.00 45.00 6,660.00

Page 15 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES

ELEMENT 3.3 - CEILING FINISHES


To Collection 217,616.10 237,440.00
1461 JA10/3.0/3.3/2
Material Cost Labour Cost
Item Description Qty Unit
Rate Amount Rate Amount

From Page No. JA10/3.0/3.3/1 95,510.25 19,125.00

JA10/3.0/3.3/2 217,616.10 237,440.00

Page 16 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES

ELEMENT 3.3 - CEILING FINISHES


To Summary 313,126.35 256,565.00

1461 JA10/3.0/3.3/3

Page 17 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES
Subcontractor Cost Our Cost Rate Amount
Rate Amount Rate Amount Dhs. Dhs.

- Excluded - Excluded - Excluded

- Excluded - Excluded - Excluded

- Excluded - Excluded - Excluded

- Excluded - Excluded - Excluded

- Excluded - Excluded - Excluded

- Excluded - Excluded - Excluded

Page 18 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES

- - 149.85 114,635.25 223.00 170,595.00

- 114,635.25 DH 170,595.00

Subcontractor Cost Our Cost Rate Amount


Rate Amount Rate Amount Dhs. Dhs.

Page 19 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES

- - 60.30 125,966.70 90.00 188,010.00

- - 57.00 114,912.00 85.00 171,360.00

- - 41.20 18,128.00 61.00 26,840.00

- - 66.20 105,390.40 98.00 156,016.00

- - 57.00 69,939.00 85.00 104,295.00

- Unit Rate 78.70 Unit Rate 117.00 Unit Rate


Only

- - 140.00 20,720.00 208.00 30,784.00

Page 20 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES

- 455,056.10 DH 677,305.00

Subcontractor Cost Our Cost Rate Amount


Rate Amount Rate Amount Dhs. Dhs.

- 114,635.25 170,595.00

- 455,056.10 677,305.00

Page 21 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA10 - RESIDENTIAL BUILDING 1
JA10/3.0 - INTERNAL FINISHES

- 569,691.35 DH 847,900.00

Page 22 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES
Material Cost Labour Cost Subcontractor Cost
Item Description Qty Unit
Rate Amount Rate Amount Rate

3.3 - CEILING FINISHES

Specification Section 092113-


Plaster Assemblies

Portland cement and sand plaster to


concrete and concrete unit masonry
surfaces as described in Specification
Section 092113 including plaster stop,
plaster metal lath, accessories and the
like, fixing in position, complete

A To ceilings, 10mm thick 14965 M2 - Excluded - Excluded -

B Ditto, to stairwells 412 M2 - Excluded - Excluded -

C To ceilings, 15mm thick 115 M2 - Excluded - Excluded -

D Ditto, to balconies (Externally) 1697 M2 - Excluded - Excluded -

To ceilings on ground floor entrance


103 M2 - Excluded - Excluded -
E (Externally)

To underside of sloping concrete for roof


411 M2 - Excluded - Excluded -
F clay tiles (Externally)

Specification Section 093029-


Metal Ceiling Tiling
Page 23 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES
Perforated metal tile suspended ceiling, as
described in Specification Section 093029
including finishes, trims, accessories, etc.
suspension depth as required, fixing in
position, complete

Metal tiling to hallway, ref. CT-01 (ID


729 M2 124.85 91,015.65 25.00 18,225.00 -
G drawing)

ELEMENT 3.3 - CEILING FINISHES


To Collection 91,015.65 18,225.00
1461 JA11/3.0/3.3/1
Material Cost Labour Cost Subcontractor Cost
Item Description Qty Unit
Rate Amount Rate Amount Rate

3.3 - CEILING FINISHES (CONTINUED)

Specification Section 095100 -


Suspended Ceilings

Page 24 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES
Suspended ceiling; gypsum board fixing to
MF suspension systems, as described in
Specification Section 095100, including all
finishes, trims, accessories and the like,
suspension depth as required, as on
Drawings, fixing in position, complete

A 12.5mm thick moisture resistant gypsum


board, to ceiling, ref. GB1 1,738 M2 25.30 43,971.40 35.00 60,830.00 -

B Decorative gypsum board 12.5mm thick,


1,367 M2 22.00 30,074.00 35.00 47,845.00 -
ref. GB2

C Ditto, in bulkheads 96 M2 13.20 1,267.20 28.00 2,688.00 -

D 600 x 600 moisture resistant gypsum


1,067 M2 46.20 49,295.40 20.00 21,340.00 -
ceiling tiles, ref. GT1

E Decorative gypsum board, 12.5mm thick,


1,329 M2 22.00 29,238.00 35.00 46,515.00 -
ref. PT01 (ID)

12.5mm thick moisture resistant gypsum 1 M2 43.70 Unit Rate 35.00 Unit Rate -
board ceiling with concealed galvanized
steel suspension system including 600 x
600 x 12.5 glass fiber reinforced high
humidity resistant plain white painted
gypsum ceiling tiles with regular edge,
GB1/GT1 (excluding paint finish)

Page 25 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES
Sundries

F Access panels, 600 x 600 115 No. 95.00 10,925.00 45.00 5,175.00 -

ELEMENT 3.3 - CEILING FINISHES


To Collection 164,771.00 184,393.00
1461 JA11/3.0/3.3/2
Material Cost Labour Cost Subcontractor Cost
Item Description Qty Unit
Rate Amount Rate Amount Rate

Summary

From Page No. JA11/3.0/3.3/1 91,015.65 18,225.00

JA11/3.0/3.3/2 164,771.00 184,393.00

Page 26 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES

ELEMENT 3.3 - CEILING FINISHES


To Summary 255,786.65 202,618.00

1461 JA11/3.0/3.3/4

Page 27 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES
Subcontractor Cost Our Cost Rate Amount
Amount Rate Amount Dhs. Dhs.

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Excluded - Excluded - Excluded

Page 28 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES

- 149.85 109,240.65 223.00 162,567.00

- 109,240.65 DH 162,567.00

Subcontractor Cost Our Cost Rate Amount


Amount Rate Amount Dhs. Dhs.

Page 29 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES

- 60.30 104,801.40 90.00 156,420.00

- 57.00 77,919.00 85.00 116,195.00

- 41.20 3,955.20 61.00 5,856.00

- 66.20 70,635.40 98.00 104,566.00

- 57.00 75,753.00 85.00 112,965.00

Unit Rate 78.70 Unit Rate 117.00 Unit Rate Only

Page 30 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES

- 140.00 16,100.00 208.00 23,920.00

- 349,164.00 DH 519,922.00

Subcontractor Cost Our Cost Rate Amount


Amount Rate Amount Dhs. Dhs.

- 109,240.65 162,567.00

- 349,164.00 519,922.00

Page 31 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA11 - RESIDENTIAL BUILDING 1
JA11/3.0 - INTERNAL FINISHES

- 458,404.65 DH 682,489.00

Page 32 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES
Material Cost Labour Cost
Item Description Qty Unit
Rate Amount Rate Amount

3.3 - CEILING FINISHES

Specification Section 092113-


Plaster Assemblies

Portland cement and sand plaster to


concrete and concrete unit masonry
surfaces as described in Specification
Section 092113 including plaster stop,
plaster metal lath, accessories and the
like, fixing in position, complete

A To ceilings, 10mm thick 20,549 M2 - excluded - excluded

B Ditto, to stairwells 630 M2 - excluded - excluded

C To ceilings, 15mm thick 65 M2 - excluded - excluded

D Ditto, to balconies (Externally) 1,649 M2 - excluded - excluded

E Ditto, to terrace (Externally) 112 M2 - excluded - excluded

F To ceilings on ground floor entrance


(Externally) 75 M2 - excluded - excluded

G Ditto, to underside of sloping concrete for


roof clay tiles ref. AFP 263 M2 - excluded - excluded

Page 33 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES
Specification Section 093029-
Metal Ceiling Tiling

Perforated metal tile suspended ceiling, as


described in Specification Section 093029
including finishes, trims, accessories, etc.
suspension depth as required, fixing in
position, complete

H Metal tiling to hallway, ref. CT-01 (ID


drawing) 638 M2 124.85 79,654.30 25.00 15,950.00

ELEMENT 3.3 - CEILING FINISHES


To Collection 79,654.30 15,950.00
1461 JA12/3.0/3.3/1
Material Cost Labour Cost
Item Description Qty Unit
Rate Amount Rate Amount

Specification Section 095100 -


Suspended Ceilings

Suspended ceiling; gypsum board fixing to


MF suspension systems, as described in
Specification Section 095100, including all
finishes, trims, accessories and the like,
suspension depth as required, as on
Drawings, fixing in position, complete

Page 34 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES
A 12.5mm thick moisture resistant gypsum
board, to ceiling, ref. GB1 885 M2 25.30 22,390.50 35.00 30,975.00

B Decorative gypsum board 12.5mm thick,


ref. GB2 1,352 M2 22.00 29,744.00 35.00 47,320.00

C Ditto, in bulkheads 450 M2 13.20 5,940.00 28.00 12,600.00

D 600 x 600 moisture resistant gypsum


ceiling tiles, ref. GT1 1,546 M2 46.20 71,425.20 20.00 30,920.00

E Decorative gypsum board, 12.5mm thick,


ref. PT01 (ID) 910 M2 22.00 20,020.00 35.00 31,850.00

12.5mm thick moisture resistant gypsum 1 M2 43.70 Unit Rate 35.00 Unit Rate
board ceiling with concealed galvanized
steel suspension system including 600 x
600 x 12.5 glass fiber reinforced high
humidity resistant plain white painted
gypsum ceiling tiles with regular edge,
GB1/GT1 (excluding paint finish)

Sundries

F Access panels, 600 x 600 136 No. 95.00 12,920.00 45.00 6,120.00

Page 35 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES

ELEMENT 3.3 - CEILING FINISHES


To Collection 162,439.70 159,785.00
1461 JA12/3.0/3.3/2
Material Cost Labour Cost
Item Description Qty Unit
Rate Amount Rate Amount

From Page No. JA12/3.0/3.3/1 79,654.30 15,950.00

JA12/3.0/3.3/2 162,439.70 159,785.00

Page 36 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES

ELEMENT 3.3 - CEILING FINISHES


To Summary 242,094.00 175,735.00

1461 JA12/3.0/3.3/5

Page 37 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES
Subcontractor Cost Our Cost Rate Amount
Rate Amount Rate Amount Dhs. Dhs.

- excluded - excluded - excluded

- excluded - excluded - excluded

- excluded - excluded - excluded

- excluded - excluded - excluded

- excluded - excluded - excluded

- excluded - excluded - excluded

- excluded - excluded - excluded

Page 38 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES

- - 149.85 95,604.30 223.00 142,274.00

- 95,604.30 DH 142,274.00

Subcontractor Cost Our Cost Rate Amount


Rate Amount Rate Amount Dhs. Dhs.

Page 39 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES

- - 60.30 53,365.50 90.00 79,650.00

- - 57.00 77,064.00 85.00 114,920.00

- - 41.20 18,540.00 61.00 27,450.00

- - 66.20 102,345.20 98.00 151,508.00

- - 57.00 51,870.00 85.00 77,350.00

- Unit Rate 78.70 Unit Rate 117.00 Unit Rate


Only

- - 140.00 19,040.00 208.00 28,288.00

Page 40 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES

- 322,224.70 DH 479,166.00

Subcontractor Cost Our Cost Rate Amount


Rate Amount Rate Amount Dhs. Dhs.

- 95,604.30 142,274.00

- 322,224.70 479,166.00

Page 41 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT
BILLS OF QUANTITIES ETE/FCP-1569a to d/3402 to 05/15
ANNEXURE - III
JA12 - RESIDENTIAL BUILDING 1
JA12/3.0 - INTERNAL FINISHES

- 417,829.00 DH 621,440.00

Page 42 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT ETE/FCP-1569a to d/3402 to 05/15
BILLS OF QUANTITIES ANNEXURE - III

Material Cost Labour Cost Subcontractor Cost


Item Description Qty Unit
Rate Amount Rate Amount Rate

SUMMARY

JA09/3.0 - INTERNAL FINISHES

A 3.3 - CEILING FINISHES 1 item 313,126.35 256,565.00

JA10/3.0 - INTERNAL FINISHES

B 3.3 - CEILING FINISHES 1 item 313,126.35 256,565.00

JA11/3.0 - INTERNAL FINISHES

C 3.3 - CEILING FINISHES 1 item 255,786.65 202,618.00

JA12/3.0 - INTERNAL FINISHES

D 3.3 - CEILING FINISHES 1 item 242,094.00 175,735.00

To Collection 1,124,133.35 891,483.00

Page 43 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT ETE/FCP-1569a to d/3402 to 05/15
BILLS OF QUANTITIES ANNEXURE - III

Subcontractor Cost Our Cost Rate Amount


Amount Rate Amount Dhs. Dhs.

- 569,691.35 847,900.00 847,900.00

- 569,691.35 847,900.00 847,900.00

- 458,404.65 682,489.00 682,489.00

- 417,829.00 621,440.00 621,440.00

- 2,015,616.35 DH 2,999,729.00

Total Cost : = 2,015,616.35


Total Overheads : 10.00% = 201,561.64
Profit : 35.00% = 776,012.29
Nett Selling Price 2,993,190.28
Page 44 of 45
ANSAM PHASE 1 - RESIDENTIAL DEVELOPMENT ETE/FCP-1569a to d/3402 to 05/15
BILLS OF QUANTITIES ANNEXURE - III

Multiplier ratio 1.4850

Page 45 of 45