The turbine has eight (8) stages of non-regulating extraction steam. The
No.1,2&3 extraction steam supply steam to three (3) HP heaters
respectively. The No.4 extraction steam stage supply steam to auxiliary
steam header and deaerator. The No. 5, 6,7&8 extraction steam supply
steam to four (4) LP heaters respectively. The system functions are:
1.2.1 The No.1 Stage extraction steam includes the extraction steam piping
from No.1 stage extraction steam outlet of HP turbine to No.1 HP heater,
and the fittings on the piping and the drain system of various points.
1.2.2 The No.2 stage extraction steam includes the extraction steam piping
from CR piping to No.2 HP heater, and the fittings on the piping and the
drain system of various points..
1.2.3 The No.3 stage extraction steam includes the extraction steam piping
from the No.3 stage extraction steam outlet of IP turbine to No.3 HP
heater and the fittings on the piping and the drain system of the various
points.
1.2.4 The No.4 stage extraction steam includes the main extraction steam from
No.4 stage extraction steam outlet of IP turbine and the three (3)
branches, connecting to the deaerator, the boiler feed pump turbines and
the auxiliary steam header respectively; also includes the fittings of the
system and the drain systems of the various points.
File No. BTG Supplier Sheet No.
Originator
60-F5691C- J3401-11 Dongfang Electric Corporation NWEPDI 1
Project : LANCO ANPARA C 2600MW THERMAL POWER PROJECT
ANPARA, SONEBHDRA, UTTAR PRADESH - INDIA
Document Title : EXTRACTION STEAM SYSTEM DESIGN DESCRIPTION
Document Number : 60-F5691C-J3401-11 Rev : A
1.2.5 The No.5 stage extraction steam includes the extraction steam piping
from the No.5 stage extraction steam outlet of LP turbine passing
through the condenser to the No.5 LP heater, and the fittings on the
piping and the drain systems of the various points.
1.2.6 The No.6 stage extraction steam includes the extraction steam piping
from the No.6 stage extraction steam outlet of LP turbine passing
through the condenser to the No.6 LP heater, and the fittings on the
piping and the drain systems of the various points.
1.2.7 The No.7 & No.8 stage extraction steam includes the extraction steam
piping from the extraction steam outlets of LP turbine to the LP heaters
No.7A(B)& No.8A(B) inside the condenser which are the responsibility
of the manufacturer.
1.2.8 The No.4 stage extraction steam to the boiler feed water steam driven
turbine during normal operation. During low load operation, the turbines
shall be fed through CR steam line. The auxiliary steam provides steam
for the boiler feed pump turbine drives testing. The exhaust of the boiler
feed water steam driven turbines shall be connected to the main
condense.
The design pressure shall be 1.1 times the extraction steam pressure from
the heat balance diagram under VWO condition.
The design temp of No.1 stage a No.3 stage extraction steam piping is
415.4 & 484.9 respectively, they shall adopt the low alloy steel
12Cr1MoVG.
For extraction steam piping with design temperature lower than 400,
#20 and Q235A carbon steel will be selected
All the three (3) horizontal HP heaters are arranged on the 13.7m
operation floor of the deaerator bay.
The deaerator is located on the 24m floor of the deaerator bay. The No.5
LP heater is located on the 12.6m operation floor. No.6 LP heater is
arranged on the 6.3m mezzanine floor in the deaerator bay.
The No.7 A(B) &No.8 A(B) LP heaters are of compound heater sharing
one shell and arranged horizontally in the neck of the condensers.
In the No.1 & No.3 extraction steam piping a pneumatic check valve & a
motor operated isolating valve are installed nearby the turbine.
The pneumatic check valve are located upstream the isolating valve. The
pneumatic check valve are acting as the over speed protection of the
turbine and also as the first step to protect the turbine against water
induction., The isolating valves are acting as the second step to protect
the turbine against water induction.
The No.4 extraction steam piping supply steam to the deaerator the
boiler feed pump turbines ,and the auxiliary steam header respectively, In
the No.4 extraction steam manifold nearby the turbine extraction steam
outlet two (2) series connected pneumatic check valves and a
motor-operated isolating valve are provided. The reason for installing
two (2) pneumatic check valves is that there are several equipments
connecting to the No.4 extraction steam piping, and these equipment are
connected with auxiliary steam supply also, during unit startup, low load
operation, load tripping or unit shut-down, the other steam supply may
rush into the No.4 extraction steam piping and inducing the risk of
turbine overspeed.
The two series connected pneumatic check valve will provide double
protection.
The No.5, 6 extraction steam outlets are located inside the condenser
shell, so the No.5, 6 extraction steam piping pass out through the
condenser shell, and pneumatic check valve,and the motor operated
isolating valve, are arranged closed to condenser.
File No. BTG Supplier Sheet No.
Originator
60-F5691C- J3401-11 Dongfang Electric Corporation NWEPDI 4
Project : LANCO ANPARA C 2600MW THERMAL POWER PROJECT
ANPARA, SONEBHDRA, UTTAR PRADESH - INDIA
Document Title : EXTRACTION STEAM SYSTEM DESIGN DESCRIPTION
Document Number : 60-F5691C-J3401-11 Rev : A
The No.7A(B), 8 A(B) LP heater are arranged in the condenser neck. All
the No .7 & 8 extraction steam piping are designed & supplied by the
Turbine Manufacturer.
Due to the fact that the No.4 extraction steam piping is connected with
the deaerator with large amount of water and arranged on high elevation,
and the various steam supply branches are connected with aux. steam
supplies, its dangerous to the turbine is the greatest. Therefore, two series
connected pneumatic check valves are installed nearby the No.4
extraction steam outlet to provide the double protection. Besides, before
the aux. steam connection of various steam supply branches, check valve
and a motor operated isolating valve are installed. The check valve and
the isolating valve will be closed automatically during the steam supply
switching over to prevent the aux. steam from coming back to the turbine
through the No.4 extraction steam piping during changing of operation
condition.
One pneumatic check valve and one motor operated isolating valve are
equipped in various extraction steam piping respectively, close to the
extraction steam outlet (for No.2 extraction steam close to the CR steam
pipe connection) except in the No. 7&8 extraction steam piping located
in the condenser neck where no isolating valve can be installed. In the
No.4 extraction steam piping manifold, two (2) series connected
pneumatic check valves are provided upstream the isolating valve for
double protection because of the too much equipment connected and the
other steam supply connected which may intrude into the No.4 extraction
steam piping. In addition, another set of motor operated isolating valve
and pneumatic check valve are provided in each branch supplying steam
to various equipment (or system) to enhance once more the protection
against water induction and overspeed.
The check valves, on the protection against turbine water induction point
of view, although it can afford a certain degree of protective action, its
closing are not tight enough due to the strain of the valve seat and valve
disc surface. Therefore the check valve cannot act as isolating valve
independently, it can only act as the protection against turbine overspeed
by its quick action to prevent the reverse flow of steam from extraction
piping into the turbine, and act as a primary protection against turbine
water induction as well. The motor operated isolating valve act as the
secondary primary protection against turbine water induction.
File No. BTG Supplier Sheet No.
Originator
60-F5691C- J3401-11 Dongfang Electric Corporation NWEPDI 6
Project : LANCO ANPARA C 2600MW THERMAL POWER PROJECT
ANPARA, SONEBHDRA, UTTAR PRADESH - INDIA
Document Title : EXTRACTION STEAM SYSTEM DESIGN DESCRIPTION
Document Number : 60-F5691C-J3401-11 Rev : A
In the extraction steam piping, drain points are provided before the
pneumatic check valve, after the motor operated isolating valve and they
are connected to the condenser separately.
The drain valve will be pneumatic operated. The drain valve at a point in
between the check valve and isolating valve will be manual operated for
discharge water when unit shut down.
The diameter of all the drain line after the motor operated drain valve
shall be larger than that before the drain valve to prevent flow choking
due to evaporation of drain in the drain line after the valve.
All these pneumatic operated drain valves are designed to keep position
when power failure. For the emergency situation need to open drain
valves when power failure, these valves have to be manual operated.
Each drain line shall be led to the heater mounted on the drain flash tank
separately, two or several drain lines of different elevation in the same
piping should not be combined together before connecting to the heater
mounted on the drain flash tank, otherwise the drain of higher elevation
will plug the drain of lower elevation. Drain lines of different piping and
pipes with different pressures should not be combined before leading the
heater mounted on the drain flash tank.
File No. BTG Supplier Sheet No.
Originator
60-F5691C- J3401-11 Dongfang Electric Corporation NWEPDI 7
Project : LANCO ANPARA C 2600MW THERMAL POWER PROJECT
ANPARA, SONEBHDRA, UTTAR PRADESH - INDIA
Document Title : EXTRACTION STEAM SYSTEM DESIGN DESCRIPTION
Document Number : 60-F5691C-J3401-11 Rev : A
If the heaters are start-up along with the unit start-up, the motor operated
isolating valves and pneumatic check valves and drain valves in the
various extraction steam piping should be in the opened position before
the unit is start-up.
File No. BTG Supplier Sheet No.
Originator
60-F5691C- J3401-11 Dongfang Electric Corporation NWEPDI 8
Project : LANCO ANPARA C 2600MW THERMAL POWER PROJECT
ANPARA, SONEBHDRA, UTTAR PRADESH - INDIA
Document Title : EXTRACTION STEAM SYSTEM DESIGN DESCRIPTION
Document Number : 60-F5691C-J3401-11 Rev : A
If the heaters are not start-up along with the unit start-up but is putting
into operation one by one after the unit carrying certain load, the motor
operated isolating valve shall be closed and the drain valve before the
isolating valve be opened before the unit start-up.
When the unit load reaches ~15% (detail see turbine manufacturer
description), the drain valves in the HP heater extraction steam lines will
be closed automatically. When the unit load reaches 20-30%, the drain
valves in the MP & LP heater extraction steam lines will be closed
automatically.
b. Deaerator Start-up
Before the unit start-up, the motor operated isolating valve in the
extraction steam supply line from No. 4 extraction steam manifold to
deaerator shall be closed and the auto-drain valve after the check valve
shall be opened, and the deaerator is steam supplied by aux steam system.
The feedwater in the deaerator feedwater storage tank is heated to the
saturated temp. under 1.47 bar (a). The deaerator pressure is kept stable
under 1.47bar(a) to feed water to the boiler by the pressure control valve
in the aux. steam supply pipe line. Along with the increase of unit load,
when the pressure of No.4 extraction steam reaches 1.47 bar(a)
(meanwhile the corresponding unit load is about 15-18%), the motor
operated isolating valve in the steam supply line from No.4 extraction
steam to deaerator opens automatically and the aux. steam pressure
control valve closed automatically. The steam supply to deaerator is
switched from aux steam system to the No.4 extraction steam
automatically. Along with the increasing of unit load the deaerator steam
pressure increases gradually, and the deaerator begin to operate under
sliding pressure.
c. Heater Start-up
Fill water in the heater water side and pay attention to control the temp
increasing rate. If the heater start-up individually, the drain valve before
and after the pneumatic check valve shall be opened, and the extraction
steam piping fully drained. The steam supply amount to the heater shall
be controlled and the temp. raise rate of the level protection switched in.
The motor operated isolating valves and pneumatic check valves in all
the extraction steam Lines are in the opening status, the drain valves in
all the extraction steam Lines are in closing status, but the automatic
drain valve are in connected status with its relevant interlocking signal
system.
When the pressure of the No.4 extraction steam is lower than 0.8MPa,
the motor operated isolating valve in the No. 4 extraction steam line
supplying steam to aux. steam is closed and the corresponding motor
operated valve in the aux. steam supply piping is opened , steam is
supplied by the aux. steam system. When the pressure of No.4 extraction
steam resumes 0.8MPa, switch to the reverse operating process by
remote manual operation.
When a heater is under hi-hi water level, and automatically close the
motor operated isolating valve and valve in the corresponding extraction
steam line and open the motor operated drain valve in the extraction
steam line by interlocking. Open the manual operated drain valve
in-between the isolating valve and check valve manually to discharge the
accumulated water in the extraction steam line, and after confirming that
the accumulated water is totally discharged and no more accumulation
will be made, then close the above mentioned manual drain valve, but
the motor operated drain valve downstream the motor operated isolating
valve of extraction steam piping and nearby the extraction steam outlet
shall still remain in the opening position.
b. Turbine Tripping
File No. BTG Supplier Sheet No.
Originator
60-F5691C- J3401-11 Dongfang Electric Corporation NWEPDI 10
Project : LANCO ANPARA C 2600MW THERMAL POWER PROJECT
ANPARA, SONEBHDRA, UTTAR PRADESH - INDIA
Document Title : EXTRACTION STEAM SYSTEM DESIGN DESCRIPTION
Document Number : 60-F5691C-J3401-11 Rev : A
When the turbine is tripped, the motor operated isolating valves and
pneumatic check valves in all the extraction steam lines shall be closed
by interlocking (including the motor operated isolating valves in the
No.4 extraction steam branches). And the motor operated drain valves in
all the extraction steam line are opened automatically, and the manual
operated globe valve are opened manually at the same time.
During unit normal shut-down, if the heating steam supply from the No.4
extraction steam manifold will still be used for the various system, then
the auxiliary steam supply will be automatically switch in when the
pressure of No.4 extraction steam drops below 0.8MPa. The procedure of
switching is the same as described in Normal Operation and Variable
Load Operation.
When turbine load reduces to lower than 20-30%, the motor operated
drain valves in the extraction steam line for various LP heaters are
opened automatically. When turbine load reduces to less than ~15 %, the
motor operated drain valves in the extraction steam lines for various HP
heaters are opened automatically till the unit stop operation, and when it
is confirmed that all the accumulated water in the various extraction
steam lines are totally cleared out, the various drain valves shall be
closed.