obra
propietario
contratista
fecha a febrero 2011
formula N 02- Semaforizaci
1 Semaforizacion
1.01 Semaforo Vehicular 1C-3L Suspendido (Suministro e instalacion) UND
1.02 Semaforo Vehicular 1C-4L Suspendido (Suministro e instalacion) UND
1.03 Semaforo Vehicular 1C-3L Adosado (Suministro e instalacion) UND
1.04 Semaforo Peatonal 2C-2L Adosado UND
1.05 Poste pastoral para semaforo (Demolicion, Excav., Suminist., Instalac., Pintado) UND
1.06 Poste para controlador (Demolicion, Excav., Suminist., Instalac., Pintado) UND
1.07 Controlador local 3 Fases (Suministro e Instalacion) UND
1.08 Suministro e Instalacion murete portamedidor prefabricado UND
1.09 Cajas de paso tipo CE-2 UND
1.1 Canalizacion en Pavimento mixto (incluye demolicion/ reposicion de pavimento) M
1.11 Canalizacion en vereda Ducto 1 Via (Inc. Demo., Corte a maq., Repos. Vedera) M
1.12 Canalizacion en jardin 1 Via M
1.13 Cable Electrico 1 - (4x14 TW) M
1.14 Cable Electrico 2 - (4x14 TW) M
1.15 Cable Electrico 4 - (4x14 TW) M
1.16 Lampara para semaforos de 75W. Suministro e Instalacion UND
1.17 Lampara para semaforos de 100W. Suministro e Instalacion UND
TOTAL COSTO DIRECTO
GASTOS GENERALES FIJOS 10%
GASTOS GENERALES VARIABLES 5%
UTILIDAD 10%
TOTAL PRESUPUESTO
FACTOR DE RELACION 1.08015
TOTAL VALORIZADO
valorizacion de obra n 02
N 02- Semaforizacin
AVANCE
METRAD P. UNIT. S/. TOTAL S/. TOTAL S/. ANTERIOR ACTUAL
O
METRADO VALORIZ. S/. METRADO VALORIZ. S/.
102729.44 102306.91
9.00 1740.71 15666.39 15666.39 0.00 0.00 0
1.00 2140.71 2140.71 2140.71 0.00 0.00 0
9.00 1592.09 14328.81 14328.81 0.00 0.00 0
4.00 2275.02 9100.08 9100.08 0.00 0.00 0
10.00 2503.84 25038.4 25038.40 0.00 0.00 0
3.00 1038.27 3114.81 3114.81 0.00 0.00 0
3.00 5538.33 16614.99 16608.99 0.00 0.00 0
3.00 157.30 471.9 471.90 0.00 0.00 0
11.00 494.48 5439.28 5439.28 0.00 0.00 9 4450.32
40.03 74.71 2990.6413 2990.64 0.00 0.00 0
20.41 83.62 1706.6842 1298.48 0.00 0.00 0
115.78 33.89 3923.7842 3923.78 0.00 0.00 112.4 3809.236
143.68 1.69 242.8192 242.82 0.00 0.00 0
199.31 2.98 593.9438 593.94 0.00 0.00 0
46.59 5.80 270.222 260.90 0.00 0.00 0
47.00 15.77 741.19 741.19 0.00 0.00 0
27.00 12.77 344.79 344.79 0.01 0.13 0
102729.445 102305.91 8259.56
10272.944 10230.59 825.9556
5136.472 5115.30 412.9778
10272.944 10230.59 825.9556
128411.806 127882.39 10324.45
11152.1217 127551.89
ITEM DESCRIPCION PARTIDA
04.00.00 ALBAILERIA
04.01.00 MUROS DE LADRILLO KK ARCILLA
MOVIMIENTOS DE TIERRAS
EXCAVACION DE ZANJA UND 118.00 10.00
ALBAILERIA
MUROS DE LADRILLO KK ARCILLA UND 708.00 40.00
10%
5%
10%
0.95135
AVANCE
TOTAL S/. ANTERIOR ACTUAL ACUMULADO
METRADO VALORIZ. S/. METRADO VALORIZ. S/. METRADO VALORIZ. S/.
63324.234375 0 13378.3594
SALDO
%
METRADO VALORIZ.
21.13% 42000
4200
2100
4200
52500
49945.875