COMPUTO METRICO MAMPOSTERIA

SUPERFICIE EN M2 Rendimiento mano de obra LH=


LH-8 LH-12 LH-18 LC Rendimiento mano de obra LC=
Planta Baja 24.86 133.83 85.71 56.7
1 96.6 163.84 98.32 111.19
2 37.13 188.33 64.12 111
3 37.13 157.85 64.12 86.27
4 37.13 157.85 64.12 86.27
5 37.13 157.85 64.12 86.27
6 37.13 157.85 64.12 86.27
7 37.13 157.85 64.12 86.27
8 37.13 157.85 64.12 86.27
9
10 43 134.4 60.34 86.27
Rendimiento mano de obra LH= 2.5 m2/h Por yunta
Rendimiento mano de obra LC= 1.2 m2/h Por yunta
CONSUMO MATERIALES MORTERO CEMENTO Y CAL
SUPERFICIE EN M2
LH-8 LH-12 LH-18 LC [15cm]
Arena [m3] Arena [m3] Arena [m3] Arena [m3]
Cemento [KG] Cemento [KG] Cemento [KG] Cemento [KG]
Cal [KG] Cal [KG] Cal [KG] Cal [KG]
0.01 0.03 0.03 0.05
2.89 5.4 5.89 6.74
3 5.6 6.2 10.52

CONSUMO MATERIALES MORTERO PLASTICOR


SUPERFICIE EN M2
LH-8 LH-12 LH-18 LC [15cm]
Arena [m3] Arena [m3] Arena [m3] Arena [m3]
Plasticor [KG] Plasticor [KG] Plasticor [KG] Plasticor [KG]
0.02 0.04 0.04 0.07
3.82 7.13 7.89 13.01
COMPUTO METRICO MAMPOSTERIA
MATERIALES MORTERO CEMENTO Y CAL
LH-8 LH-12 LH-18 LC
Arena [m3] Arena [m3] Arena [m3] Arena [m3]
Cemento [KG] Cemento [KG] Cemento [KG] Cemento [KG]
Cal [KG] Cal [KG] Cal [KG] Cal [KG]
0.25 4.01 2.57 2.84
Planta Baja 71.85 722.68 504.83 382.16
74.58 749.45 531.40 596.48
0.97 4.92 2.95 5.56
1 279.17 884.74 579.10 749.42
289.80 917.50 609.58 1169.72
0.37 5.65 1.92 5.55
2 107.31 1016.98 377.67 748.14
111.39 1054.65 397.54 1167.72
0.37 4.74 1.92 4.31
3 107.31 852.39 377.67 581.46
111.39 883.96 397.54 907.56
0.37 4.74 1.92 4.31
4 107.31 852.39 377.67 581.46
111.39 883.96 397.54 907.56
0.37 4.74 1.92 4.31
5 107.31 852.39 377.67 581.46
111.39 883.96 397.54 907.56
0.37 4.74 1.92 4.31
6 107.31 852.39 377.67 581.46
111.39 883.96 397.54 907.56
0.37 4.74 1.92 4.31
7 107.31 852.39 377.67 581.46
111.39 883.96 397.54 907.56
0.37 4.74 1.92 4.31
8 107.31 852.39 377.67 581.46
111.39 883.96 397.54 907.56
0.43 4.03 1.81 4.31
9 124.27 725.76 355.40 581.46
129.00 752.64 374.11 907.56
10
COMPUTO METRICO MAMPOSTERIA
MATERIALES MORTERO CEMENTO Y CAL
LH-8 LH-12 LH-18 LC Resumen materiales para
morteros mamposteria
Arena [m3] Arena [m3] Arena [m3] Arena [m3] segn plantas
Cemento [KG] Cemento [KG] Cemento [KG] Cemento [KG]
Cal [KG] Cal [KG] Cal [KG] Cal [KG]
0.25 4.01 2.57 2.84 10 m3
Planta Baja 1.44 14.45 10.10 7.64 34 Bolsas
2.98 29.98 21.26 23.86 78 Bolsas
0.97 4.92 2.95 5.56 14 m3
1 5.58 17.69 11.58 14.99 50 Bolsas
11.59 36.70 24.38 46.79 119 Bolsas
0.37 5.65 1.92 5.55 13 m3
2 2.15 20.34 7.55 14.96 45 Bolsas
4.46 42.19 15.90 46.71 109 Bolsas
0.37 4.74 1.92 4.31 11 m3
3 2.15 17.05 7.55 11.63 38 Bolsas
4.46 35.36 15.90 36.30 92 Bolsas
0.37 4.74 1.92 4.31 11 m3
4 2.15 17.05 7.55 11.63 38 Bolsas
4.46 35.36 15.90 36.30 92 Bolsas
0.37 4.74 1.92 4.31 11 m3
5 2.15 17.05 7.55 11.63 38 Bolsas
4.46 35.36 15.90 36.30 92 Bolsas
0.37 4.74 1.92 4.31 11 m3
6 2.15 17.05 7.55 11.63 38 Bolsas
4.46 35.36 15.90 36.30 92 Bolsas
0.37 4.74 1.92 4.31 11 m3
7 2.15 17.05 7.55 11.63 38 Bolsas
4.46 35.36 15.90 36.30 92 Bolsas
0.37 4.74 1.92 4.31 11 m3
8 2.15 17.05 7.55 11.63 38 Bolsas
4.46 35.36 15.90 36.30 92 Bolsas
0.43 4.03 1.81 4.31 11 m3
9 2.49 14.52 7.11 11.63 36 Bolsas
5.16 30.11 14.96 36.30 87 Bolsas
10
COMPUTO METRICO MAMPOSTERIA
MATERIALES MORTERO PLASTICOR
LH-8 LH-12 LH-18 LC
Arena [m3] Arena [m3] Arena [m3] Arena [m3]
Plasticor [KG] Plasticor [KG] Plasticor [KG] Plasticor [KG]
0.50 5.35 3.43 3.97
Planta Baja
94.97 954.21 676.25 737.67
1.93 6.55 3.93 7.78
1
369.01 1168.18 775.74 1446.58
0.74 7.53 2.56 7.77
2
141.84 1342.79 505.91 1444.11
0.74 6.31 2.56 6.04
3
141.84 1125.47 505.91 1122.37
0.74 6.31 2.56 6.04
4
141.84 1125.47 505.91 1122.37
0.74 6.31 2.56 6.04
5
141.84 1125.47 505.91 1122.37
0.74 6.31 2.56 6.04
6
141.84 1125.47 505.91 1122.37
0.74 6.31 2.56 6.04
7
141.84 1125.47 505.91 1122.37
0.74 6.31 2.56 6.04
8
141.84 1125.47 505.91 1122.37
0.86 5.38 2.41 6.04
9
164.26 958.27 476.08 1122.37
10
COMPUTO METRICO MAMPOSTERIA 40
MATERIALES MORTERO PLASTICOR Resumen materiales para
LH-8 LH-12 LH-18 LC morteros mamposteria
segn plantas
Arena [m3] Arena [m3] Arena [m3] Arena [m3]
Plasticor [KG] Plasticor [KG] Plasticor [KG] Plasticor [KG]
0.50 5.35 3.43 3.97 13.2 m3
Planta Baja
2.37 23.86 16.91 18.44 61.6 Bolsas
1.93 6.55 3.93 7.78 20.2 m3
1
9.23 29.20 19.39 36.16 94.0 Bolsas
0.74 7.53 2.56 7.77 18.6 m3
2
3.55 33.57 12.65 36.10 85.9 Bolsas
0.74 6.31 2.56 6.04 15.7 m3
3
3.55 28.14 12.65 28.06 72.4 Bolsas
0.74 6.31 2.56 6.04 15.7 m3
4
3.55 28.14 12.65 28.06 72.4 Bolsas
0.74 6.31 2.56 6.04 15.7 m3
5
3.55 28.14 12.65 28.06 72.4 Bolsas
0.74 6.31 2.56 6.04 15.7 m3
6
3.55 28.14 12.65 28.06 72.4 Bolsas
0.74 6.31 2.56 6.04 15.7 m3
7
3.55 28.14 12.65 28.06 72.4 Bolsas
0.74 6.31 2.56 6.04 15.7 m3
8
3.55 28.14 12.65 28.06 72.4 Bolsas
0.86 5.38 2.41 6.04 14.7 m3
9
4.11 23.96 11.90 28.06 68.0 Bolsas
10
COMPUTO METRICO MAMPOSTERIA
CANTIDAD DE LADRILLOS
LH-8 LH-12 LH-18 LC
Planta Baja 373 2007 1286 3402
1 1449 2458 1475 6671
2 557 2825 962 6660
3 557 2368 962 5176
4 557 2368 962 5176
5 557 2368 962 5176
6 557 2368 962 5176
7 557 2368 962 5176
8 557 2368 962 5176
9
10 645 2016 905 5176
COMPUTO METRICO MAMPOSTERIA
CANTIDAD DE PALLETS Rendimiento mano de obra LH= 2.5 m2/h Por yunta
LH-8 LH-12 LH-18 LC Rendimiento mano de obra LC= 1.2 m2/h Por yunta
Planta Baja 1.88 13.94 14.29 4.25
1 7.32 17.07 16.39 8.34 LH-8 x pallet 198
2 2.81 19.62 10.69 8.33 LH-12 x pallet 144
3 2.81 16.44 10.69 6.47 LH-18 x pallet 90
4 2.81 16.44 10.69 6.47 LC x pallet 800
5 2.81 16.44 10.69 6.47
6 2.81 16.44 10.69 6.47
7 2.81 16.44 10.69 6.47
8 2.81 16.44 10.69 6.47
9
10 3.26 14.00 10.06 6.47
COMPUTO METRICO MAMPOSTERIA
TIEMPO EN HORAS Rendimiento mano de obra
LH-8 LH-12 LH-18 LC Rendimiento mano de obra
Planta Baja 62.15 334.58 214.28 68.04
1 241.50 409.60 245.80 133.43
2 92.83 470.83 160.30 133.20
3 92.83 394.63 160.30 103.52
4 92.83 470.83 160.30 133.20
5 92.83 470.83 160.30 133.20
6 92.83 470.83 160.30 133.20
7 92.83 470.83 160.30 133.20
8 92.83 470.83 160.30 133.20
9
10 107.50 336.00 150.85 103.52
Rendimiento mano de obra LH= 2.5 m2/h Por yunta
Rendimiento mano de obra LC= 1.2 m2/h Por yunta
COMPUTO METRICO MAMPOSTERIA
Sumatoria de jornales
JORNALES contratista para rubro
LH-8 LH-12 LH-18 LC completo por planta
Planta Baja 7.77 41.82 26.78 8.51 84.88 Jornales
1 30.19 51.20 30.73 16.68 128.79 Jornales
2 11.60 58.85 20.04 16.65 107.14 Jornales
3 11.60 49.33 20.04 12.94 93.91 Jornales
4 11.60 49.33 20.04 12.94 93.91 Jornales
5 11.60 49.33 20.04 12.94 93.91 Jornales
6 11.60 49.33 20.04 12.94 93.91 Jornales
7 11.60 49.33 20.04 12.94 93.91 Jornales
8 11.60 49.33 20.04 12.94 93.91 Jornales
9
10 13.44 42.00 18.86 12.94 87.23 Jornales