Está en la página 1de 9

Prdidas por flecha

Q m^3 Prdidas (m) Re f Abatimiento (m)


100 m Real
0.00001 50.972 6.20E+01 3.46E-01 0 0 50.972
0.01 58.427 6.20E+04 2.44E-02 0 0 58.393
0.015 61.973 9.31E+04 2.34E-02 0.287 0.177 61.721
0.02 65.238 1.24E+05 2.29E-02 0.481 0.311 64.794
0.025 68.31 1.55E+05 2.26E-02 0.729 0.493 67.612
0.03 71.181 1.86E+05 2.23E-02 1.014 0.712 70.175 7.09E+01
0.035 73.839 2.17E+05 2.21E-02 1.319 0.956 72.483
0.04 76.333 2.48E+05 2.20E-02 1.713 1.277 74.536
0.045 78.584 2.79E+05 2.19E-02 2.087 1.593 76.334
0.05 80.682 3.10E+05 2.18E-02 2.563 1.996 77.877
0.055 82.551 3.41E+05 2.17E-02 3.041 2.407 79.165
0.0536 82.046 3.33E+05 2.18E-02 2.9 2.286 78.83
0.056775 84.341 3.52E+05 2.17E-02 3.21 2.591 80.708
0.06308 83.955 3.91E+05 2.16E-02 3.908 3.109 79.561
N 1
Y =0.0066 Q - 0.8611 Q - 50.689 + 2N
2 Y
Q Y -50
0 10 20 30 40 50 60 70
10 -56.64
20 -63.271 -55
30 -68.582 f(x) = 0.0066x^2 - 0.8611x - 48.689
40 -72.573 -60 R = 1

50 -75.244
-65
60 -76.595
65 -76.7755
-70

Caudal Maximo:
-75
65 lps
Caudal de Operacin -80
52 lps
Abatamiento de Gasto de Operacin
75.6198 m

"El pozo tendr una vida til de 10 aos y el abatimiento medio anual del acufero es de 1.5 m"

Profundidad de la bomba Sumergencia


107.38178 m 7

El pozo Cuauhtmoc XII es de 200 m de profundidad y ademe liso de 60m y ranurado de 140 m de longitud y de 12
dimetro por de espesor con cedazo tipo canastilla de 2mm. Adems se tienen 2 codos de 90, una vlvula de
compuerta de fierro fundido, para una descarga a 5 metros de distancia del pozo (Ltc), con un desnivel entre el bro
de pozo y la descarga de 1.5 metros (DT).

Curva del Sistema

Diametro de Tuberia de extraccion


8"
Perdidas en flecha
2.3 m/100 m
2.5 m

Perdidas Localizadas (Longitud Equivalente)

Codo 90
6.4 m
Compuerta 8"
1.3 m

Hazem-Williams
h = 10,674 * [Q1,852/(C1,852* D4,871)] * L
Hierro fundido Nuevo
C= 130

Desnivel Topografico
1.5 m

Curva del Sistema Y =0.0066 Q2- 0.8611 Q - 50.689 + 2N


Q (lps) Y (m) hf (m) hx (m) hg (m) CDT (m) Q (gmp)
10 -56.64 0.03717666 0.00850407 1.5 60.7 158.503725
20 -63.271 0.14864543 0.03069972 1.5 67.4 317.00745
30 -68.582 0.33947508 0.06505122 1.5 73.0 475.511175
40 -72.573 0.60972421 0.11082608 1.5 77.3 634.014899
50 -75.244 0.95348259 0.16754031 1.5 80.3 792.518624
60 -76.595 1.35896231 0.23483508 1.5 82.2 951.022349
65 -76.7755 1.57959771 0.27235942 1.5 82.6 1030.27421

Curva del Sistema lps vs m


85.0

80.0 f(x) = - 0.0061833567x^2 + 0.862906047x + 52.6399872961


R = 0.9999994922
75.0

70.0

65.0

60.0

55.0

50.0
0 10 20 30 40 50 60 70
Curva del Sistema gpm vs f
280
270
f(x) = - 8.07477451766651E-05x^2 + 0.1786113656x + 172.7033759206
260 R = 0.9999994922

250
240
230
220
210
200
190
100 200 300 400 500 600 700 800 900 1000 1100

Cudal de Operacin Columna


824.219369 gpm 248.096465 f

Seleccin del equipo de Bombeo

Tazn seleccionado: Ser el de 6 5/8 pulgadas.


As que finalmente el tazn requiere de 10 HP y proporciona una carga de 39 ft y requerir un NPSH de 11

Numero de Tazones
7 Tazones

Potencia Requerida
70 hp

Curva de la Bomba con tazones en Serie


Q GPM H (pies) Curva de la Bomba
0 385 430
100 381.5
200 375.9 380
f(x) = 1.51570978314939E-14x^6 - 4.65572533138254E-11x^5 + 5.23008889779199E-08x^4 - 2.5871818244712E-05x^3 + 0.0051709222x^2 - 0.3755086735x + 385.5892449819
300 360.5 R = 0.9950594077

400 339.5 330


500 300.3
600 297.5 280
700 302.4
800 287 230
900 254.1
1000 210 180
0 200 400 600 800 1000 1200
850 273

Interseccion del Sistema y la Curva de la Bomba

380

330

280

230

180
0 200 400 600 800 1000 1200

La explotacion del pozo tendra un caudal de 860 gpm a una carga de 265 ft
lo anterio debido a que el numero de pasos o tazones se redondeo hacia arriba
50 60 70

o de 140 m de longitud y de 12de


2 codos de 90, una vlvula de
c), con un desnivel entre el brocal
CDT (f)
199.000865
221.194646
239.357971
253.488628
263.565638
269.54915
270.988323
y requerir un NPSH de 11 pies

712E-05x^3 + 0.0051709222x^2 - 0.3755086735x + 385.5892449819