Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Did
Didinclement
inclementweather
weatheraffect
affectprogress
progresson
onsite?
Yes
site? No /
.
.
.
WORKERS ON SITE
MASONS 1
CARPENTERS 2
STEEL FIXERS 4
HELPERS 2
TILERS
BREAKERMAN
TOTAL 9
CUREPIPE Date: 23.10.17
Site Conditions
onditions:
/
afficable
icult for traffic
Heavy
Medium
Low /
Subcontractors:
Mason Carp
P ABS T P ABS
TOTAL #REF!
WORK DESCRIPTION
KUROS Bracing to wall panels prior to casting of RCC walls.
jack)) - RCC walls of water
SUBCON
PROGRESS OF WORK
Item Percentage completion
DIRECT LAB
TOTAL COMPAN
Accidents/ Incidents
Signed
Carp SF Tilers BM Helpers
T P ABS T P ABS T P ABS T P ABS T
/
/
/
/
0 4 ### 2 ###
ng of RCC walls. ( 4x4 post retained by scaffolding ledger (base jack or U head
CC walls of water tanks; Prepare reinforcement for lift
DIRECT LAB 5
TOTAL COMPANY 10