RESIDENTIAL CARE HOME - CUREPIPE


Project No.

Date: 27.10.1 Av. Temperature: General Site Conditions


Weather Conditions: Am Pm
Fine %/ / Ground Conditions:
Light Rain % Dry & Firm
Heavy Rain % Wet but Trafficable
Wet & Difficult for traffic
Wind High % Untrafficable
Wind Moderat %
Wind low %/ / Dust Levels:

Did
Didinclement
inclementweather
weatheraffect
affectprogress
progresson
onsite?
Yes
site? No /

Plant on Site: KUROS Hire Personnel on Site:


Concrete Mixe250 lts
500 lts STAFF 5
Crane
Excavator on Tracks Total Staff 5
JCB
Lorry 10T
Roller
Mobile Toilet Others
Bobcat Expatriates 4
Urinals Mauritian 1
Blower
Water pumps
Generator 5 kva Total Direct 5
Truck ( NEETIA)
Grinder
Circular Saw
Demolition Hammer
Drilling Machine
..........................................
.

.
.
.

WORKERS ON SITE

MASONS 1

CARPENTERS 2

STEEL FIXERS 4

HELPERS 2

TILERS

BREAKERMAN
TOTAL 9
CUREPIPE Date: 23.10.17

Site Conditions

onditions:
/
afficable
icult for traffic

Heavy
Medium
Low /

Subcontractors:

Mason Carp
P ABS T P ABS

TOTAL #REF!

WORK DESCRIPTION
KUROS Bracing to wall panels prior to casting of RCC walls.
jack)) - RCC walls of water
SUBCON
PROGRESS OF WORK
Item Percentage completion

Steel fixing (basement -


water tanks) 100%
Formwork (water tanks) 100%
Casting of walls of
water tanks 100%

DIRECT LAB

TOTAL COMPAN

Delays and Potential Delays (including Action to Mitigate):

Accidents/ Incidents

Signed
Carp SF Tilers BM Helpers
T P ABS T P ABS T P ABS T P ABS T
/
/
/
/
0 4 ### 2 ###

ng of RCC walls. ( 4x4 post retained by scaffolding ledger (base jack or U head
CC walls of water tanks; Prepare reinforcement for lift
DIRECT LAB 5

TOTAL COMPANY 10