4 Earth Work

itemActivity Name B.O.Q Description No.s Length Width Height


no.

Section-1 preliminaries & earth work

1.4.1 Excavation in foundation

Grid A-1 to A-20 1 158800 7700 2715

Grid D-1 to D-17 1 134701 7700 2715

Footing-18 1 15700 16800 2715

Grid G-1 to G-20 1 158800 7700 2715

Kettal 1 48200 7660 2715

Furnace F-16 1 18200 7400 2715

Furnace F-15 1 18200 7400 2715

Grid B -1 to C-1 1 19140 5150 2715

Grid E-1 to F-1 1 19140 5150 2715

Grid B-20 to C-20 1 19140 5150 2715

Grid E-20 to F-20 1 19140 5150 2715

Footing-F-15 A 1 6364 6200 2715

Footing-14 3 5150 6700 2715

Recycling Pool 1 9500 7675 2715

Breaker Base 1 3800 3600 2715


Center Area Excavation due to piles mud pound

A1 1 111601 17940 2715

A2 1 12655 5275 2715

A3 1 18390 13463 2715

A4 1 12740 6800 2715

A5 1 19140 7999 2715

A6 1 45800 11640 2715

A7 1 13593 6200 2715

A8 1 13593 11640 2715

A9 1 16600 11700 2715

A10 1 9478 6240 2715

A11 1 10995 9478 2715

A12 1 16600 10950 2715

A13 1 18390 13030 2715

A14 1 16140 9575 2715

TOTAL :Excavation
Total
Qty/Unit Unit Qty

3319.79 M3 3319.79

2815.99 M3 2815.99

716.11 M3 716.11

3319.79 M3 3319.79

1002.41 M3 1002.41

365.66 M3 365.66

365.66 M3 365.66

267.62 M3 267.62

267.62 M3 267.62

267.62 M3 267.62

267.62 M3 267.62

107.13 M3 107.13

93.68 M3 281.04

197.96 M3 197.96

37.14 M3 37.14
5435.76 M3 5435.76

181.24 M3 181.24

672.19 M3 672.19

235.21 M3 235.21

415.67 M3 415.67

1447.40 M3 1447.40

228.81 M3 228.81

429.57 M3 429.57

527.31 M3 527.31

160.57 M3 160.57

282.93 M3 282.93

493.51 M3 493.51

650.57 M3 650.57

419.58 M3 419.58

M3 25179
Section-2 Concrete Works

2.2.1 R.C.C in Foundation Raf

Footing-1 4 3950 2700 600

Footing-2 1 6500 5400 850

Footing-3 1 6500 5400 850

Footing-4 1 5400 5000 800

Footing-5 10 6500 5400 1000

Footing-5A 1 6500 5400 1000

Footing-6 1 6500 5200 1000

Triangle Portion 2 BH/2

Squre Portion 1 2500 1350 1000

Footing-F-6A 1 6550 6500 1000

Trianglar Portion 2 BH/2

Squre Portion 1 2500 1350 1000

Footing-F-7 1 6500 5400 850

Footing-F-8 8 5400 5000 900

Footing-F-8A 3 5400 5000 900

Footing-F-9 6 6500 5400 1050

Footing-F-9A 1 5400 5000 900


Footing-F-10 10 6500 5400 1000

Footing-F-10A 3 6500 5400 1000

Footing-F-11 5 6500 5400 1200

Footing-F-12 1 6500 5400 1000

Footing-F-13 3 3950 2700 600

Footing-F-13A 3 3700 3300 600

Footing-F-14 3 3950 2700 700

Footings back side of the furnices 6 5350 6450 1000

Footing-F-15A 1 5400 5000 1000

Footing-F-15 furnice 1 17800 7400 1000

Footing-F-16 furnice 1 16900 7400 1000

Footing-F-17 kattel 1 47000 7660 1000

Footing-F-18 1

Trianglar Portion 1 BH/2

Squre Portion at Top 1 8000 2400 1050

Squre Portion at left & Right 2 5000 2500 1000

Recycling pool 1 8300 6475 350

Mid Portion 1 14400 8400 1000

Bottom sqaure portion 1 4800 3600 1000


Total R.C.C in Rafs

2.2.1 R.C.C in Columns

C-1 4 925 500 1150

C-2 Section 2-2 1 1320 950 900

C-2 Section 3-3 1 1320 600 900

C-3 1 1250 400 950

C-4 10 1320 750 750

C-4 Section 5c-5c 1 1320 700 750

C-4 Section 6-6 2 1320 700 900

Short columns section 6-6 2 575 350 900

C-2 Section 7-7 3 1320 600 900

C- Section 8-8 7 1400 550 900

C-Section 8x-8x 3 1250 500 900

C- Section 9-9 6 1250 400 1150

C- Section 9x-9x 1 1250 400 1050

C- 4 Section 10-10 9 1320 600 900

C- 4 Section 10x-10x 3 1320 600 1150

C- 4 Section 11-11 5 1320 600 600

C-2 Section12-12 1 1320 600 770


C-1 Section 13-13 3 925 600 1150

C- Section 14-14 3 725 500 1050

columns back side of kattel 6 1320 600 950

columns back side of furnices 6 1420 750 850

R.C.C wall of kattel 1 196000 600 1359

R.C.C wall of furnices 4

R.C.C Walls of Recycling pool 1 42900 225 2700

Recycling pool wall's chamfer 16 31250 2700

Breaker base columns 4 450 400 1950

2.2.1 R.C.C in Columns upto F.F.L Level

C-1 26 500 230 2850

C-2 4 1270 230 2850

Total:R.C.C In Columns

2.4.1 R.C.C for bracing beam


1 362762 500 230

2.4.1(e R.C.C bath slab Grid A20-B20 2 7120 4450 150

2.4.1(e R.C.C bath slab Grid G8-G9 2 7674 4560 150

R.C.C 1:2:4 ramps raf 8 6000 1000 275


R.C.C 1:1:3 ramps 8 5000 200 1800
6.40 M3 25.60

29.84 M3 29.84

29.84 M3 29.84

21.60 M3 21.60

35.10 M3 351.00

35.10 M3 35.10

33.80 M3 33.80

2.70 M3 5.40

3.38 M3 3.38

42.58 M3 42.58

2.70 M3 5.40

3.38 M3 3.38

29.84 M3 29.84

24.30 M3 194.40

24.30 M3 72.90

36.86 M3 221.13

24.30 M3 24.30
35.10 M3 351.00

35.10 M3 105.30

42.12 M3 210.60

35.10 M3 35.10

6.40 M3 19.20

7.33 M3 21.98

7.47 M3 22.40

34.51 M3 207.05

27.00 M3 27.00

131.72 M3 131.72

125.06 M3 125.06

360.02 M3 360.02

4.20 M3 4.20

20.16 M3 20.16

12.50 M3 25.00

18.81 M3 18.81

120.96 M3 120.96

17.28 M3 17.28
M3 2952

0.53 M3 2.13

1.13 M3 1.13

0.71 M3 0.71

0.48 M3 0.48

0.74 M3 7.43

0.69 M3 0.69

0.83 M3 1.66

0.18 M3 0.36

0.71 M3 2.14

0.69 M3 4.85

0.56 M3 1.69

0.58 M3 3.45

0.53 M3 0.53

0.71 M3 6.42

0.91 M3 2.73

0.48 M3 2.38

0.61 M3 0.61
0.64 M3 1.91

0.38 M3 1.14

0.75 M3 4.51

0.91 M3 5.43

159.82 M3 159.82

11.5 M3 45.84

26.1 M3 26.06

0.1 M3 1.35

0.4 M3 1.40

0.33 M3 8.52

0.83 M3 3.33

M3 299

41.72 M3 41.72

4.75 M3 9.51

5.25 M3 10.50

1.65 M3 13.2
1.80 M3 14.4
1.4.5 Gravel filling under floor
Grid A-1 to A-19' & D-1 to D-19' 1 98625 5350
in B/W Columns grid D-1 to D-20 1 50530 5350
Grid D-1 to D-19' & G-1 to G-19' 1 98726 5350
in B/W Columns grid D-20 to G-20 1 50530 5350
Furnices 4
under brick foundation 1 267504 600
Kattel 1 45800 600
Total: Gravel under floor

Backfill
Excavation R.C.C Gravel
25179 3132 2124

Gravel filling under ramps 8 6000 1200


1150 606.8 M3 606.79
1150 310.9 M3 310.89
1150 607.4 M3 607.41
1150 310.9 M3 310.89
44.0 M3 176
500 80.25 M3 80
1150 31.60 M3 31.60
M3 2124

Gravel Backfill M3
2124 19924 M3

300 2.16 M3 17.28


Section-3 Masonry

1.4.1 Brickwork in foundation at Raf Level

Step (i) 1 143964

Step (ii) 1 143964

Step (iii) 1 143964

1.4.1 Brickwork in foundation at F.F.L

Step (iii) 1 326850

Brickwork in foundation C.L

Step (i) 1 123540

Step (ii) 1 123540

Step (iii) 1 123540

1.4.1 Brickwork in foundation at F.F.L

Step (iii) 1 123540

TOTAL:Brickwork in Foundation

1.4.1 Brickwork in Superstructure

Total Length out walls 1 317402

Total Length C.L wall 1 119200

Total Length 3M height wall 1 79710


Electronic control Room-2,3 2 15070

Electronic control Room-1 2 14856

Total

D/D Doors & opnings

SLDI 2 4600

SLD2 3 4000

SLD3 1 4000

SLD4 2 4600

SD1 1 2000

SD2 1 3000

SD3 1 3600

Loading unloading Area 1 31175

Opening 4 2600

Total Deduction

TOTAL:Brickwork in Foundation

1.4.1 Brickwork IN FOUNDATION for bath at Grid G-8 to G9


Step (i) 1 28742
Step (ii) 1 28627
Step (iii) 1 28512
TOTAL: 1

1.4.1 Brickwork in Foundation above F.F.L at Grid G-8 to G-9


Step (iii) 2 28512
D/D Doors
PDI 10 750
PD2 2 900
Total Deduction
TOTAL:Brickwork in superstructur

1.4.1 13-Brickwork IN FOUNDATION for bath at Grid A20 to B20


Step (i) 1 34440
Step (ii) 1 34440
Step (iii) 1 34440
TOTAL: 1

1.4.1 Brickwork in superstructure for bath at Grid A20 TO B20+ G8-G9


2 34440
D/D Doors
PDI 8 750
AV1 6 600
Total Deduction 2
TOTAL:Brickwork in superstructure
460 75 4.97 M3 4.97

345 75 3.73 M3 3.73

230 1250 41.39 M3 41.39

230 1250 93.97 M3 93.97

460 75 4.26 M3 4.26

345 75 3.20 M3 3.20

230 1250 35.52 M3 35.52

230 1250 35.52 M3 35.52

M3 223

230 3100 226.31 M3 226.31

230 4000 109.66 M3 109.66

230 3000 55.00 M3 55.00


230 3000 10.40 M3 20.80

230 3000 10.25 M3 20.50

432.3

4800 230 5.08 M3 10.16

4200 230 3.86 M3 11.59

4600 230 4.23 M3 4.23

4000 230 4.23 M3 8.46

2500 230 1.15 M3 1.15

3600 230 2.48 M3 2.48

3600 230 2.98 M3 2.98

3100 230 22.23 M3 22.23

3100 230 1.85 M3 7.42

70.7

M3 362

460 75 0.99 M3 0.99


345 75 0.74 M3 0.74
230 1250 8.20 M3 8.20
M3 10

230 2800 18.36 M3 37


2100 230 0.36 M3 3.62
2100 230 0.43 M3 0.87
9.0
M3 28

460 75 1.19 M3 1.19


345 75 0.89 M3 0.89
230 1250 9.90 M3 9.90
M3 12

230 2800 22.18 M3 44

2100 230 0.36 M3 2.90


600 230 0.08 M3 0.50
6.8
M3 38
2.3-Non Structural Concrete
2.3.1 P.C.C (1:4:8) 1 267504 600 150
Recycling pool 1 8500 6675 100
Toilets at grid A-20to B-20 1 34440 600 100
Toilets at grid G-8 to G-9 1 28742 600 100
Braker base 1 4000 3475 100
P.C.C Under ramps 8 7400 1250 100
24.08 M3 24.08
5.67 M3 5.67
2.07 M3 2.07
1.72 M3 1.72
1.39 M3 1.39
0.93 M3 7.4
PLASTER WORK
6.1.1 Plaster work INNER SIDE
walls
Total Length out walls 1 317402 3600
Total Length C.L wall 1 119200 3600
Total Length 3M height wall 1 79710 3600
Electronic control Room-2,3 2 15070 3600
Electronic control Room-2,3 2 14856 3600
Total paster inner side
6.1.1 Plaster work OUT SIDE
walls
Total Length out walls 1 413962 3600
D/D Doors & opnings 8 5000 3350
2 2000 3350
2 900 2100
2 750 2100
NET TOTAL PLASTER 1 31250 3350

6.1.1 Ground Floor+1st floor outside g-8 to g-9


walls
Total 2 21100 2800

D/D Doors & windows


PD2 10 750 2100
PD1 2 900 2100
2
outside Walls
6.1.1 Ground Floor+1st floor inner side
walls
Total 2 13815 2100
inner side Walls

SLAB
2 5960 4000

6.1.1 Ground Floor+1st floor outside at a20-b20


walls
Total 2 16810 2800
Out side Walls
D/D Doors & windows
AV1 6 600 600
PD1 8 900 2100
2
outside Walls
6.1.1 Ground Floor+1st floor inner side
walls
Total 2 17630 2100
inner side Walls
SLAB
2 7674 4560
M2 2285.29 2285.29
M2 429.12 429.12
M2 573.91 573.91
M2 54.25 108.50
M2 53.48 106.96
M2 3504

M2 2980.53 2981
134.00
M2 13.40
M2 3.78
` 3.15
M2 104.69 2722

M2 118.16 236.32
M2 TOTAL QTY 236

M2 1.58 15.75
M2 1.89 3.78
TOTAL D/D 39.1
NET QTY 197

M2 58.02 116.05
M2 TOTAL QTY 116

M2 23.84 47.68
M2 TOTAL SLAB 48
M2 94.14 188.27
M2 TOTAL QTY 188

M2 0.36 2.16
M2 1.89 15.12
TOTAL D/D 34.6
NET QTY 154

M2 74.05 148.09
M2 TOTAL QTY 148

M2 34.99 69.99
M2 TOTAL SLAB 70
7.1.1 11-Horizontal D.P.C
1 357362 230 M2 164.39 164
7.1.1 12-Vertical D.P.C
1 411660 250 M2 205.83 206