1.30
H = 0.20 m
A. METRADO DE CARGAS
Wl : 0.50 Tn/ml
Wu = 4.50 Tn/ml
M (+) = W(L)2 / 8
Ku = Mu Asumimos d = h - 3
fc x b x d^2 d = 20 - 3 = 17 cm
Ku = 4.08 x 165
210 x 100 x 17^2
Ku = 0.067 W = 0.078
P = 0.05 W
P = 0.05 x 0.078
P = 0.004
Ku = Mu
fc x b x d^2
Ku = 6.12 x 165
210 x 100 x 17^2
P = 0.006
Ps = 1.90 Tn/m3
f = 30
Coeficiente de Empuje
Ka = tan^2 ( 45 -O/2 )
Ka = 0.333
E = Ka x Ys X h^2
2
M max = F x d . M max = 1 x ( E x h)
3
; k = n ; r = fs ; n = Es
d = 2x M
n+r fc Ec
K x J x b x Fc
E. DETERMINACION DE ACERO
As = M x IE5
Fs x J x d
A. IDEALIZACION DE LA ESTRUCTURA
Wv
B. METRADOS DE CARGA
Wn = Wd
Te x b
Mr = K x J x b x Fc x d^2
2
Mr = 0.30 x 0.89 x 100 x 84 x 17^2
2
As = M
Fs x J x d
G. DETERMINACION DE ACERO
As = M
Fs x J x d
Ast = 0.0018x b x h
2.20
SE COLOCARAN JUNTAS DE CONSTRUCCION @ 9 MTS; LA CUAL SE
SELLARA CON CON WATER STOP DE E = 6
EN MUROS Y LOSA DE FONDO