MEJORAMIENTO DE SUELOS A NIVEL DESUBRASANTE CON MATERIAL DE CANTERA m3 341.62 7.99 2,729.54 EXCAVADORA SOBRE ORUGAS 300 0.

7.99 2,729.54 EXCAVADORA SOBRE ORUGAS 300 0.75 52.70 4.86 379.00 1,841.94
MOTONIVELADORA 145-150 HP 0.22 52.70 1.43 320.00 457.60
RODILLO VIB LISO AUTOPROPULSADO 101-135 HP 10-12 Ton 0.22 52.70 1.43 220.00 314.60
TANQUETA DE AGUA CISTERNA 2500 GLN 0.10 52.70 0.65 179.00 116.35 2,730.49
MATERIAL DE CANTERA PARA RELLENOS TERRAPLEN Y SUBRASANTE m3 20,189.86 9.70 195,841.64 EXCAVADORA SOBRE ORUGAS 300 0.90 61.95 293.32 379.00 111,168.28
TRACTOR SOBRE ORUGAS CAT D7R 0.10 61.95 32.59 450.00 14,665.50
ZARANDA FIJA 0.75 61.95 244.43 50.00 12,221.50
CARGADOR FRONTAL 0.78 61.95 254.21 250.00 63,552.50 201,607.78
EXCAVACION NO CLASIFICADA PARAESTRUCTURAS m3 19,037.30 7.50 142,779.75 RETROEXCAVADORA 1.00 22.00 865.33 157.50 136,289.48 136,289.48
RELLENO PARA ESTRUCTURAS m3 18,839.68 13.75 259,045.60 RETROEXCAVADORA 0.22 8.47 489.34 165.00 80,741.10
RODILLO MANUAL 1.00 8.47 2,224.28 32.00 71,176.96
TANQUETA DE AGUA CISTERNA 2500 GLN 0.10 8.47 224.76 179.00 40,232.04
COMPACTADORA PLANCHA 1.00 8.47 2,224.28 30.00 66,728.40 258,878.50
TRANSPORTE DE MATERIALES GRANULARES TERRAPLEN Y SUBRASANTEPARA DISTANCIAS ENTRE 120M Y 1000M m3k 11,960.08 5.50 65,780.44 CAMION VOLQUETE 17 m3 1.00 50.00 239.20 150.00 35,880.00
CARGADOR FRONTAL 0.50 50.00 119.60 250.00 29,900.00 65,780.00
TRANSPORTE DE MATERIALES GRANULARES: TERRAPLEN Y SUBRASANTE PARA DISTANCIAS MAYORES A 1000M m3k 23,155.34 0.90 20,839.81 CAMION VOLQUETE 17 m3 1.00 166.70 138.90 150.00 20,835.00 20,835.00
TRANSPORTE DE MATERIALES GRANULARES PARA RELLENO EN ODS Y ESTRUCTURAS PARA DISTANCIAS ENTRE 120M Y 1000M m3k 3,383.31 5.50 18,608.21 CAMION VOLQUETE 17 m3 1.00 50.00 67.67 150.00 10,150.50
CARGADOR FRONTAL 0.50 50.00 33.83 250.00 8,457.50 18,608.00
TRANSPORTE DE MATERIALES GRANULARES: RELLENOS EN ODS Y ESTRUCTURAS PARA DISTANCIAS MAYORES A 1000M m3k 12,242.58 0.90 11,018.32 CAMION VOLQUETE 17 m3 1.00 166.67 73.45 150.00 11,017.50 11,017.50
TRANSPORTE DE MATERIALES EXCEDENTESPARA DISTANCIAS ENTRE 120M Y 1000M m3k 163,927.46 5.50 901,601.03 CAMION VOLQUETE 17 m3 1.00 50.00 3,278.55 150.00 491,782.50
CARGADOR FRONTAL 0.50 50.00 1,639.27 250.00 409,817.50 901,600.00
TRANSPORTE DE MATERIALES EXCEDENTESPARA DISTANCIAS MAYORES A 1000M m3k 399,972.59 0.90 359,975.33 CAMION VOLQUETE 17 m3 1.00 166.67 2,399.79 150.00 359,968.50 359,968.50
Acondicionamiento de Depsitos de Material Excedente m3 192,434.28 0.74 142,401.37 TRACTOR SOBRE ORUGAS CAT D7R 1.00 656.70 293.03 450.00 131,863.50
TANQUETA DE AGUA CISTERNA 2500 GLN 0.20 656.70 58.61 179.00 10,491.19 142,354.69
Retiro y almacenamiento de top-soil en DME m2 96,217.14 0.65 62,541.14 TRACTOR SOBRE ORUGAS CAT D7R 1.00 692.30 138.98 450.00 62,541.00 62,541.00
Reposicion de top-soil m2 96,217.00 0.50 48,108.50 CAMION VOLQUETE 17 m3 1.00 550.00 174.94 150.00 26,241.00
CARGADOR FRONTAL 0.50 550.00 87.47 250.00 21,867.50 48,108.50

3,628,419.97 3,628,344.11