DETERMINACIN DE LA EVAPOTRANSPIRACIN POTENCIAL

MTODO PENMAN - MONTEITH.

PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

Temperatura Temperatura
Velocidad del Horas de sol Altitud de la
MES No de das
mxima mnima HR viento media media parcela
Eto Eto
mensual mensual
(msnm)
(C) (C) (%) (m/seg) (Hr.) (mm/da) (mm/mes)

Agosto 31 23.013 4.386 57.63 1.745 7.689 3200 3.710 115.010


Septiembre 30 23.969 5.170 57.67 1.681 6.499 3200 4.000 120.000
Octubre 31 25.031 5.979 57.38 1.946 6.428 3200 4.490 139.190
Noviembre 30 25.256 6.415 61.22 2.144 6.325 3200 4.640 139.200
Diciembre 31 24.538 5.964 65.00 2.093 4.886 3200 4.230 131.130
Enero 31 23.106 6.203 73.51 1.690 4.635 3200 3.740 115.940
Febrero 28 22.644 6.062 76.46 1.465 4.409 3200 3.510 98.280
Marzo 31 21.844 6.222 73.37 1.375 4.404 3200 3.290 101.990
Abril 30 22.300 5.836 71.82 1.553 6.056 3200 3.360 100.800
Mayo 31 22.769 5.094 61.37 1.653 8.015 3200 3.400 105.400
Junio 30 21.938 3.884 56.82 1.640 7.740 3200 3.120 93.600
Julio 31 21.894 3.658 54.38 1.648 8.087 3200 3.270 101.370

63.886 TOTAL 1361.910


Nota: Estacin Meteorolgica Tambillo (altitud 3250 m.s.n.m., latitud sur 13.215 longitud oeste 74.105)

Profesional A en Riego Presurizado


GOBIERNO REGIONAL DE AYACUCHO
GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO DE PRECIPITACIN TOTAL MENSUAL (mm)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1992 105.10 193.30 144.82 38.90 10.10 35.33 24.72 36.40 15.14 42.90 42.00 55.86
1993 148.40 127.10 100.00 105.00 15.40 12.46 20.44 22.40 66.08 52.84 114.50 192.50
1994 156.40 167.90 150.00 71.90 5.20 6.20 32.70 7.30 22.60 25.20 60.40 126.30
1995 143.20 111.40 148.90 60.80 13.00 1.00 10.30 4.50 19.20 54.70 89.60 83.20
1996 101.20 100.40 186.50 48.80 13.20 2.10 0.30 19.50 31.30 68.60 26.40 82.80
1997 180.30 195.60 108.20 53.50 6.20 0.00 3.10 42.80 50.50 51.40 124.10 135.40
1998 181.90 152.00 98.80 44.30 2.10 18.80 0.00 0.80 19.00 73.80 50.10 75.20
1999 136.60 165.90 130.50 19.80 0.50 3.70 5.00 0.00 57.20 25.70 79.10 96.10
2000 137.93 225.03 110.50 16.38 30.29 17.29 49.01 5.07 9.36 65.65 20.80 94.12
2001 188.37 75.53 123.11 36.40 43.94 5.85 28.34 16.64 15.86 40.17 134.29 80.47
2002 111.15 187.72 162.11 47.84 17.68 1.82 32.63 12.80 35.49 30.23 72.80 115.57
2003 94.15 181.17 120.10 60.75 10.70 0.00 0.00 44.30 9.90 5.80 11.65 118.00
2004 69.80 162.50 65.40 17.00 10.80 9.80 28.80 7.50 29.20 48.80 58.10 168.10
2005 86.50 75.40 178.20 19.40 0.20 0.00 4.40 1.50 22.10 55.30 44.10 151.70
2006 121.30 109.20 111.20 40.70 1.50 1.80 0.00 14.90 9.00 66.65 172.00 68.10
2007 110.24 82.16 141.83 57.46 4.29 0.00 18.98 1.04 25.20 77.74 31.59 109.72
2008 110.20 148.50 72.80 7.90 10.40 2.00 0.00 1.43 8.06 38.35 31.46 74.49
MEDIA 128.40 144.75 126.65 43.93 11.50 6.95 15.22 14.05 26.19 48.46 68.41 107.51
mm/da 4.14 5.17 4.09 1.46 0.37 0.23 0.49 0.45 0.87 1.56 2.28 3.47
S/D = SIN DATO

GOBIERNO REGIONAL DE AYACUCHO


GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO MENSUAL DE TEMPERATURAS MAXIMAS ABSOLUTAS (C)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1993 23.40 23.20 21.80 21.80 23.00 21.20 21.60 22.00 22.00 24.60 24.80 22.20
1994 22.40 21.80 20.40 21.80 22.40 22.20 21.80 22.40 24.00 26.20 25.60 26.30
1995 23.20 27.60 22.20 21.60 22.00 22.90 22.20 24.80 24.20 25.40 25.00 24.60
1996 22.20 22.00 24.40 20.80 23.00 20.80 22.60 22.40 23.80 25.40 25.20 25.20
1997 25.20 21.60 21.80 22.50 21.10 22.20 22.20 22.30 24.20 25.30 26.50 25.30
1998 22.50 23.00 23.20 24.40 24.40 22.10 22.50 23.90 25.60 25.70 25.60 25.80
1999 23.90 22.30 20.40 21.20 22.20 22.50 21.20 22.70 24.00 23.20 25.80 23.50
2000 21.80 20.70 20.50 22.40 22.10 21.00 20.60 23.30 24.00 23.90 26.20 24.90
2001 21.40 21.50 21.50 21.70 22.60 21.20 21.40 22.50 23.80 25.80 24.40 23.70
2002 24.90 23.30 21.30 21.90 21.70 21.80 21.50 21.90 24.90 25.30 24.20 23.70
2003 23.40 22.50 21.00 21.80 23.10 22.60 21.70 21.70 24.70 25.90 26.70 24.80
2004 24.30 21.90 22.50 24.10 23.70 21.50 22.30 22.60 24.10 24.90 25.30 23.10
2005 24.20 23.90 23.50 23.50 24.80 22.60 23.00 24.40 25.20 25.90 26.00 26.10
2006 22.20 22.80 22.20 22.10 22.40 22.60 21.90 22.80 23.10 25.60 23.40 24.00
2007 24.40 23.20 21.40 21.60 22.40 21.80 21.40 24.10 22.10 24.60 25.60 25.80
2008 20.30 21.00 21.40 23.60 23.40 22.00 22.40 24.40 23.80 22.80 23.80 23.60
MEDIA 23.11 22.64 21.84 22.30 22.77 21.94 21.89 23.01 23.97 25.03 25.26 24.54
SIN DATO: S/D
GOBIERNO REGIONAL DE AYACUCHO
GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO MENSUAL DE TEMPERATURAS MINIMAS ABSOLUTAS (C)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1993 5.50 6.00 6.60 6.00 4.00 -0.20 -0.20 -1.00 5.00 5.00 6.00 6.00
1994 5.50 6.50 6.50 5.50 5.00 4.00 3.50 3.50 5.00 5.50 5.50 6.50
1995 6.50 5.90 6.00 5.50 5.00 4.50 5.50 5.50 5.50 6.00 6.50 6.00
1996 7.00 6.50 1.00 2.50 4.50 3.00 3.50 4.50 5.50 6.00 5.50 5.50
1997 6.50 6.50 5.00 6.50 5.00 4.50 3.00 1.30 3.60 5.40 5.70 7.00
1998 6.50 6.70 6.50 6.00 6.00 4.30 2.20 6.00 5.00 5.00 5.30 5.00
1999 0.00 0.00 5.50 4.70 5.70 4.00 3.50 4.30 5.20 5.60 5.80 5.60
2000 6.60 5.00 7.00 6.60 6.00 5.50 4.40 5.40 6.20 5.40 7.20 5.30
2001 7.20 6.90 6.80 6.00 5.60 4.50 5.10 4.00 6.10 5.70 7.30 5.00
2002 6.30 7.70 7.70 6.00 4.90 3.90 3.90 4.10 3.80 6.30 5.90 5.80
2003 7.45 6.79 6.35 5.57 5.30 5.05 6.33 6.68 7.52 8.66 8.94 9.02
2004 7.60 7.00 7.50 6.30 6.00 4.30 4.60 4.50 5.90 7.30 7.20 3.30
2005 6.90 6.90 7.90 6.40 6.40 5.40 4.20 5.80 6.00 6.20 6.10 6.80
2006 7.00 7.10 7.40 7.60 4.40 5.40 3.20 5.40 5.80 5.80 6.20 7.20
2007 5.80 5.80 6.40 6.80 5.00 4.00 4.80 5.20 5.80 5.40 5.80 5.30
2008 6.90 5.70 5.40 5.40 2.70 0.00 1.00 5.00 0.80 6.40 7.70 6.10
MEDIA 6.20 6.06 6.22 5.84 5.09 3.88 3.66 4.39 5.17 5.98 6.42 5.96
SIN DATO: S/D

REGISTRO DE TEMPERATURA MEDIA MENSUAL (C)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
MEDIA 14.65 14.35 14.03 14.07 13.93 12.91 12.78 13.70 14.57 15.50 15.84 15.25

GOBIERNO REGIONAL DE AYACUCHO


GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO DE VELOCIDADES DE VIENTO PROMEDIO MENSUAL (m/s)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1995 0.70 0.50 0.40 0.20 0.50 1.40 1.60 1.70 1.40 1.60 1.20 1.80
1996 1.50 1.20 0.40 0.80 1.00 0.90 0.60 0.80 0.70 1.10 1.00 0.80
1997 0.82 0.60 0.31 0.70 1.11 1.40 1.81 0.84 1.10 1.04 1.40 0.92
1998 0.91 1.20 0.78 1.60 2.27 2.40 2.13 2.40 2.60 2.28 2.60 3.08
1999 2.00 1.10 1.99 1.21 1.70 1.86 0.40 2.02 1.70 2.32 2.50 2.20
2000 1.18 1.50 1.05 1.40 1.53 1.30 1.32 1.88 1.51 2.23 3.26 2.91
2001 1.60 2.00 1.40 2.20 1.90 1.70 1.80 1.90 1.80 2.10 2.40 S/D
2002 2.42 2.00 1.81 2.23 1.77 1.94 2.40 2.40 2.10 2.50 S/D S/D
2003 3.04 1.67 1.95 1.87 2.29 1.88 2.57 2.20 2.41 2.63 3.52 2.86
2004 2.71 1.84 2.04 2.80 2.12 2.36 2.61 2.57 2.40 2.71 2.61 2.90
2005 2.84 2.58 3.28 3.43 2.96 1.63 1.27 1.87 1.21 1.42 1.82 2.48
2006 0.97 1.30 1.16 0.93 1.20 1.38 1.46 1.26 1.33 1.80 1.79 1.38
2007 1.36 1.86 1.07 0.68 1.22 1.26 1.36 1.28 1.60 1.80 1.67 1.85
2008 1.61 1.15 1.61 1.69 1.57 1.55 1.75 1.31 1.67 1.72 2.11 1.93
MEDIA 1.69 1.46 1.38 1.55 1.65 1.64 1.65 1.74 1.68 1.95 2.14 2.09
S/D: SIN DATO
GOBIERNO REGIONAL DE AYACUCHO
GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO DE EVAPORACIONES DE TANQUE MENSUAL (mm)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1992 143.22 197.00 159.70 142.00 147.70 127.13 142.40 139.70 155.24 165.10 174.54 188.70
1993 123.50 122.20 121.60 112.96 111.00 109.36 113.30 138.60 129.48 149.00 127.00 126.50
1994 99.20 94.90 109.90 96.10 113.00 111.50 140.10 170.00 149.60 169.90 171.40 160.10
1995 131.10 110.30 119.50 125.40 109.60 116.00 133.00 154.10 151.50 183.30 174.80 176.70
1996 120.60 105.00 128.60 101.80 118.80 127.00 136.60 138.50 145.30 164.70 181.60 142.10
1997 171.80 151.70 171.10 113.10 101.00 122.70 130.90 126.20 148.60 166.40 144.40 145.90
1998 115.20 124.70 111.40 126.00 141.70 114.60 131.70 139.50 173.30 162.00 170.10 145.50
1999 130.70 75.70 94.10 99.30 120.60 124.30 128.00 160.80 139.10 129.20 165.80 161.10
2000 94.59 89.78 83.33 108.55 112.04 106.32 120.15 119.21 139.29 124.87 184.80 151.37
2001 103.52 84.62 89.53 100.42 94.61 87.52 98.58 120.01 121.89 145.73 137.05 138.78
2002 137.26 81.75 96.84 93.32 105.45 100.22 94.44 126.83 111.45 137.57 128.19 123.28
2003 117.49 92.41 80.07 89.67 97.17 105.62 119.10 117.20 131.46 169.17 178.97 123.56
2004 135.42 107.38 89.42 110.78 124.91 106.34 105.28 114.46 123.06 144.71 157.68 104.89
2005 141.98 115.65 108.12 114.15 123.96 125.93 131.26 153.40 141.86 124.97 145.92 94.17
2006 92.86 76.29 100.87 81.98 116.64 101.89 125.56 117.43 139.57 155.15 113.47 110.30
2007 109.36 100.98 97.31 85.16 95.56 100.18 106.95 133.89 118.40 138.86 143.03 139.23
2008 51.33 85.06 110.52 88.34 91.90 25.56 112.84 105.82 68.34 181.34 144.62 148.28
MEDIA 118.8 106.8 110.1 105.2 113.3 106.6 121.8 133.9 134.6 153.6 155.5 140.0
S/D: SIN DATO

GOBIERNO REGIONAL DE AYACUCHO


GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO DE HUMEDAD RELATIVA MEDIA MENSUAL (%)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

AO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1992 85.70 89.50 91.30 90.80 84.30 85.60 81.80 82.60 77.20 75.80 71.20 69.60
1993 75.40 79.30 77.40 70.30 65.40 52.90 50.90 59.50 64.90 65.80 68.60 72.10
1994 72.40 74.40 71.90 70.40 52.10 47.90 52.20 48.40 51.60 50.50 57.60 64.50
1995 66.90 71.80 71.20 65.80 50.20 41.50 36.90 51.90 47.40 47.60 50.30 62.70
1996 69.90 71.50 58.70 S/D S/D S/D S/D 42.60 50.00 47.80 54.00 54.10
1997 68.50 74.10 66.50 67.60 63.60 53.20 50.60 60.30 57.90 56.80 65.60 67.00
1998 75.80 74.60 76.60 66.00 52.60 59.80 53.90 58.10 54.70 S/D S/D S/D
MEDIA 73.51 76.46 73.37 71.82 61.37 56.82 54.38 57.63 57.67 57.38 61.22 65.00
S/D: SIN DATO
GOBIERNO REGIONAL DE AYACUCHO
GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO DE HORAS DE SOL PROMEDIOS MENSUALES (horas)

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

ANO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1992 6.30 7.40 6.90 6.60 9.50 7.40 9.30 8.20 8.00 7.00 7.60 7.90
1993 4.10 5.50 5.60 5.30 7.80 9.10 8.40 8.00 6.50 6.70 4.20 4.00
1994 S/D 4.30 4.40 5.10 8.00 8.20 8.10 7.50 6.80 6.60 7.00 5.30
1995 6.26 4.23 4.23 6.29 8.17 7.29 8.19 8.30 5.26 7.30 6.25 5.29
1996 3.32 3.33 4.32 5.25 7.30 8.21 9.25 7.28 7.32 6.36 6.25 4.30
1997 3.29 4.19 4.26 6.35 6.32 6.29 7.29 5.29 4.29 5.30 5.26 5.30
1998 4.24 5.26 5.30 7.29 9.25 7.29 8.29 7.26 7.31 6.22 6.31 4.24
1999 4.27 3.25 3.30 4.33 6.24 8.29 6.33 8.27 7.31 6.22 6.31 4.24
2000 4.29 4.31 4.26 7.24 8.36 7.26 8.27 8.24 7.32 6.29 8.26 6.33
2001 3.20 4.25 5.30 7.30 7.28 7.24 8.22 8.32 6.28 7.27 7.33 4.25
2002 5.32 5.30 4.32 7.30 8.30 8.30 8.29 7.36 6.32 8.23 7.30 7.31
2003 5.27 2.28 3.33 5.26 7.26 8.21 7.25 8.31 6.24 6.36 6.32 5.30
2004 5.29 5.27 5.33 7.24 9.21 7.30 8.28 7.26 4.25 6.29 8.27 5.23
2005 7.24 0.29 1.24 6.29 8.35 8.28 8.25 8.25 7.26 5.29 7.27 3.27
2006 4.28 5.27 4.25 4.24 9.27 7.29 8.28 7.26 6.26 6.25 4.25 4.31
2007 4.30 5.26 4.30 5.30 7.30 7.30 7.20 7.30 S/D 5.30 6.20 3.20
2008 3.19 5.26 4.23 6.28 8.34 8.33 8.29 8.32 7.27 6.29 3.14 3.30
MEDIA 4.64 4.41 4.40 6.06 8.01 7.74 8.09 7.69 6.50 6.43 6.32 4.89
S/D: SIN DATO

GOBIERNO REGIONAL DE AYACUCHO


GERENCIA REGIONAL DE INFRAESTRUCTURA
RED HIDROMETEOROLOGICA

REGISTRO DE NUBOSIDAD Y TIPO DE NUBES EN OCTAVOS

ESTACION : TAMBILLO DISTRITO : TAMBILLO ALTITUD : 3250.0 msnm


CODIGO : 002 PROVINCIA : HUAMANGA LATITUD : 1312'54"S
DEPARTAMENTO : AYACUCHO LONGITUD : 7406'19"W

ANO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
1995 S/D 1.23 S/D 2.02 1.28 1.80 2.06 2.90 2.29 2.27 1.81 0.85
1996 1.12 1.31 1.57 1.44 1.29 1.50 1.49 1.41 0.59 0.55 0.51 0.62
1997 0.94 0.29 S/D 0.65 0.44 0.66 0.62 0.57 0.94 0.88 1.18 0.79
1998 5.44 5.02 4.72 3.13 1.33 2.44 1.13 2.81 2.57 4.58 4.52 5.82
1999 1.88 1.20 1.91 2.12 2.12 1.90 2.35 1.72 1.58 2.18 2.20 2.52
2000 0.85 2.69 3.72 2.11 2.38 2.30 S/D S/D S/D S/D S/D S/D
2001 0.85 2.69 3.72 2.11 2.38 2.30 S/D S/D S/D S/D S/D S/D
2002 4.65 6.86 5.77 4.47 3.25 3.20 4.10 3.61 4.67 5.45 5.60 5.81
2003 6.00 6.00 6.00 7.00 3.68 1.97 2.45 3.52 4.20 3.65 4.23 6.32
2004 5.48 6.00 5.35 7.00 2.19 2.19 3.13 3.61 4.63 5.03 4.90 6.23
2005 5.18 5.96 6.31 4.13 2.52 0.73 1.53 1.48 3.34 4.46 3.69 5.53
2006 5.39 5.57 5.71 4.13 1.32 2.50 1.32 2.97 3.37 4.29 5.73 5.52
2007 5.24 4.95 6.13 5.14 3.28 1.10 3.12 2.51 S/D 5.00 4.16 5.55
2008 7.13 5.48 5.16 3.17 1.74 2.07 1.29 2.39 3.17 4.74 4.73 5.45
MEDIA 3.86 3.95 4.67 3.47 2.09 1.91 2.05 2.46 2.85 3.59 3.61 4.25
S/D: SIN DATO
CALENDARIZACIN CEDULA DE CULTIVOS
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

CAMPAA AGRCOLA 2009 CAMPAA AGRCOLA 2010


Tipo de PERIODO ALTURA PROF. EFECT.
No CULTIVO
cultivo VEGETATIVO (m.s.n.m.) (cm.)
A S O N D E F M A M J J
1 Maz grano Estacionario 5.5 meses 3200 10 a 30

2 Arveja verde (Var. Usui) Estacionario 4 meses 3200 10 a 30

3 Papa blanca Estacionario 6 meses 3200 20 a 40


Fuente: Comit de regantes Raymina.

CUADRO COEFICIENTE DE CULTIVO (Kc)


CAMPAA AGRCOLA 2009 CAMPAA AGRCOLA 2010
CULTIVO
A S O N D E F M A M J J

Maz grano 1.15 0.95 0.60 0.45 0.70 0.85 1.05 0.80 0.55 0.50 0.80 0.90

Arveja verde (Var. Usui) 0.50 0.95 1.15 1.05 0.45 0.80 1.05 0.95 0.50 0.95 1.15 1.05

Papa blanca 0.85 0.55 0.45 0.65 0.90 1.05 0.75 0.50 0.45 0.65 1.00 1.15
Fuente: FAO (Fascculo No 2, tablas 2-26, 2-27 Kc(FAO)
Campaa chica.

Profesional A en Riego Presurizado


CLCULO DEMANDA DE AGUA DEL CULTIVO Y NECESIDAD DE RIEGO.

PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

PERODO 2009 PERODO 2010


DESCRIPCIN Total Anual
A S O N D E F M A M J J
Nmero de das del mes 31 30 31 30 31 31 28 31 30 31 30 31 365.00
Area
N Cultivo programado Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has.
(Has)
01 Maz grano 16.00 1.15 16.0 0.95 16.0 0.60 16.0 0.45 16.0 0.70 16.0 0.85 16.0 1.05 16.0 0.80 16.0 0.55 16.0 0.50 16.0 0.80 16.0 0.90 16.0

Total campaa 2009-2010 16.00


Coeficiente de Cultivo (Kc) 1.15 0.95 0.60 0.45 0.70 0.85 1.05 0.80 0.55 0.50 0.80 0.90
Area de siembra mensual (01 cultivo) 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0

(ETo) Penman - Monteith (mm/da) 3.710 4.000 4.490 4.640 4.230 3.740 3.510 3.290 3.360 3.400 3.120 3.270
(ETc) Uso Consuntivo (mm/da) 4.267 3.800 2.694 2.088 2.961 3.179 3.686 2.632 1.848 1.700 2.496 2.943 34.293
(ETc) Uso Consuntivo (mm/mes) 132.262 114.000 83.514 62.640 91.791 98.549 103.194 81.592 55.440 52.700 74.880 91.233
(ETc) Uso Consuntivo por Ha. / mes (m3/mes) 1,322.62 1,140.00 835.14 626.40 917.91 985.49 1,031.94 815.92 554.40 527.00 748.80 912.33 10,417.95
(ETc) Uso Consuntivo del proyecto (m3/mes) 21,161.84 18,240.00 13,362.24 10,022.40 14,686.56 15,767.84 16,511.04 13,054.72 8,870.40 8,432.00 11,980.80 14,597.28 166,687.12
Pp. Total Promedio diario (mm/da) 0.45 0.87 1.56 2.28 3.47 4.14 5.17 4.09 1.46 0.37 0.23 0.49
(PE) Pp. Efectiva (USDA, CropWat) (mm/da) 0.45 0.84 1.44 2.03 2.87 3.29 3.98 3.26 1.36 0.36 0.23 0.48
(Er) Eficiencia de riego (ASPERSIN) 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
(Nn) Necesidad Unitaria Neta de Riego (mm/da) 3.82 2.96 1.25 0.06 0.09 0.00 0.00 0.00 0.49 1.34 2.27 2.47
(Nb) Necesid. Unitaria Bruta de Riego (mm/da) 5.46 4.23 1.79 0.08 0.13 0.00 0.00 0.00 0.70 1.91 3.24 3.52
(Nb) Necesid. Unitaria Bruta de Riego (mm/mes) 169.23 127.00 55.45 2.49 3.99 0.00 0.00 0.00 20.91 59.14 97.26 109.19
(D) Demanda Agua de riego por Ha./ mes (m3/mes) 1,692.31 1,270.00 554.49 24.86 39.87 0.00 0.00 0.00 209.14 591.43 972.57 1,091.90 6,446.56
(D) Demanda Agua de riego del Proyecto (m3/mes) 27,076.91 20,320.00 8,871.77 397.71 637.94 0.00 0.00 0.00 3,346.29 9,462.86 15,561.14 17,470.40 103,145.03
Mdulo de riego (litros/seg/has.) 0.63 0.49 0.21 0.01 0.01 0.00 0.00 0.00 0.08 0.22 0.38 0.41
ETc = ETo x Kc mm/mes Nn = (ETc - PE) mm/da Nb = (Nn / Er) mm/mes D = 10 x Nb x Area m/has.
campaa chica

CONCLUSIONES:
- El cultivar de maz grano requiere 09 meses de riego, sin embargo, para los meses ENE, FEB y MARZ; las lluvias de la temporada cubren las necesidades
de agua para el cultivo de maz.
- El mtodo de riego utilizado en la parcela Raymina, perteneciente al comit de regantes Raymina, es el riego presurizado por aspersin.
- El mdulo de riego para el cultivar de maz considerando la poca de estiaje, tiene un valor de 0.63 litros/seg/has. (caudal terico disponible en cabecera de chacra).
- La demanda total de agua de riego para la campaa agcola 2009-2010 (16 Ha. De cultivar de maz grano) = 103,145.03 m/ao

Profesional A en Riego Presurizado


CLCULO DEMANDA DE AGUA DEL CULTIVO Y NECESIDAD DE RIEGO.
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

PERODO 2009 PERODO 2010


DESCRIPCIN Total Anual
A S O N D E F M A M J J
Nmero de das del mes 31 30 31 30 31 31 28 31 30 31 30 31 365.00
Area
N Cultivo programado Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has.
(Has)
01 Arveja verde (Var. Usui) 16.00 0.50 16.0 0.95 16.0 1.15 16.0 1.05 16.0 0.45 16.0 0.80 16.0 1.05 16.0 0.95 16.0 0.50 16.0 0.95 16.0 1.15 16.0 1.05 16.0

Total campaa 2009-2010 16.00


Coeficiente de Cultivo (Kc) 0.50 0.95 1.15 1.05 0.45 0.80 1.05 0.95 0.50 0.95 1.15 1.05
Area de siembra mensual (01 cultivo) 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0

(ETo) Penman - Monteith (mm/da) 3.710 4.000 4.490 4.640 4.230 3.740 3.510 3.290 3.360 3.400 3.120 3.270
(ETc) Uso Consuntivo (mm/da) 1.855 3.800 5.164 4.872 1.904 2.992 3.686 3.126 1.680 3.230 3.588 3.434 39.329
(ETc) Uso Consuntivo (mm/mes) 57.505 114.000 160.069 146.160 59.009 92.752 103.194 96.891 50.400 100.130 107.640 106.439
(ETc) Uso Consuntivo por Ha. / mes (m3/mes) 575.050 1,140.000 1,600.685 1,461.600 590.085 927.520 1,031.940 968.905 504.000 1,001.300 1,076.400 1,064.385 11,941.87
(ETc) Uso Consuntivo del proyecto (m3/mes) 9,200.80 18,240.00 25,610.96 23,385.60 9,441.36 14,840.32 16,511.04 15,502.48 8,064.00 16,020.80 17,222.40 17,030.16 191,069.92
Pp. Total Promedio diario (mm/da) 0.45 0.87 1.56 2.28 3.47 4.14 5.17 4.09 1.46 0.37 0.23 0.49
(PE) Pp. Efectiva (USDA, CropWat) (mm/da) 0.45 0.84 1.44 2.03 2.87 3.29 3.98 3.26 1.36 0.36 0.23 0.48
(Er) Eficiencia de riego (ASPERSIN) 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
(Nn) Necesidad Unitaria Neta de Riego (mm/da) 1.41 2.96 3.72 2.84 0.00 0.00 0.00 0.00 0.32 2.87 3.36 2.96
(Nb) Necesid. Unitaria Bruta de Riego (mm/da) 2.01 4.23 5.32 4.06 0.00 0.00 0.00 0.00 0.46 4.09 4.80 4.22
(Nb) Necesid. Unitaria Bruta de Riego (mm/mes) 62.44 127.00 164.81 121.80 0.00 0.00 0.00 0.00 13.71 126.90 144.06 130.91
(D) Demanda Agua de riego por Ha./ mes (m3/mes) 624.36 1,270.00 1,648.12 1,218.00 0.00 0.00 0.00 0.00 137.14 1,269.00 1,440.57 1,309.12 8,916.31
(D) Demanda Agua de riego del Proyecto (m3/mes) 9,989.71 20,320.00 26,369.94 19,488.00 0.00 0.00 0.00 0.00 2,194.29 20,304.00 23,049.14 20,945.94 142,661.03
Mdulo de riego (litros/seg/has.) 0.23 0.49 0.62 0.47 0.00 0.00 0.00 0.00 0.05 0.47 0.56 0.49
ETc = ETo x Kc mm/mes Nn = (ETc - PE) mm/da Nb = (Nn / Er) mm/mes D = 10 x Nb x Area m/has.
campaa chica

CONCLUSIONES:
- El cultivar de arveja verde requiere 08 meses de riego, sin embargo, para los meses DIC, ENE, FEB y MARZ; las lluvias de la temporada cubren las necesidades
de agua para el cultivo de arveja verde.
- El mtodo de riego utilizado en la parcela Raymina, perteneciente al comit de regantes Raymina, es el riego presurizado por aspersin.
- El mdulo de riego para el cultivar de arveja verde considerando la poca de estiaje, tiene un valor de 0.62 litros/seg/has. (caudal terico disponible en cabecera de chacra).
- La demanda total de agua de riego para la campaa agcola 2009-2010 (16 Ha. cultivar de arveja verde) = 142,661.03 m/ao

Profesional A en Riego Presurizado


CLCULO DEMANDA DE AGUA DEL CULTIVO Y NECESIDAD DE RIEGO.

PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

PERODO 2009 PERODO 2010


DESCRIPCIN Total Anual
A S O N D E F M A M J J
Nmero de das del mes 31 30 31 30 31 31 28 31 30 31 30 31 365.00
Area
N Cultivo programado Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has. Kc Has.
(Has)
01 Papa blanca 16.00 0.85 16.0 0.55 16.0 0.45 16.0 0.65 16.0 0.90 16.0 1.05 16.0 0.75 16.0 0.50 16.0 0.45 16.0 0.65 16.0 1.00 16.0 1.15 16.0

Total campaa 2009-2010 16.00


Coeficiente de Cultivo (Kc) 0.85 0.55 0.45 0.65 0.90 1.05 0.75 0.50 0.45 0.65 1.00 1.15
Area de siembra mensual (01 cultivo) 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0

(ETo) Penman - Monteith (mm/da) 3.710 4.000 4.490 4.640 4.230 3.740 3.510 3.290 3.360 3.400 3.120 3.270
(ETc) Uso Consuntivo (mm/da) 3.154 2.200 2.021 3.016 3.807 3.927 2.633 1.645 1.512 2.210 3.120 3.761 33.004
(ETc) Uso Consuntivo (mm/mes) 97.759 66.000 62.636 90.480 118.017 121.737 73.710 50.995 45.360 68.510 93.600 116.576
(ETc) Uso Consuntivo por Ha. / mes (m3/mes) 977.585 660.000 626.355 904.800 1,180.170 1,217.370 737.100 509.950 453.600 685.100 936.000 1,165.755 10,053.79
(ETc) Uso Consuntivo del proyecto (m3/mes) 15,641.36 10,560.00 10,021.68 14,476.80 18,882.72 19,477.92 11,793.60 8,159.20 7,257.60 10,961.60 14,976.00 18,652.08 160,860.56
Pp. Total Promedio diario (mm/da) 0.45 0.87 1.56 2.28 3.47 4.14 5.17 4.09 1.46 0.37 0.23 0.49
(PE) Pp. Efectiva (USDA, CropWat) (mm/da) 0.45 0.84 1.44 2.03 2.87 3.29 3.98 3.26 1.36 0.36 0.23 0.48
(Er) Eficiencia de riego (ASPERSIN) 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
(Nn) Necesidad Unitaria Neta de Riego (mm/da) 2.71 1.36 0.58 0.99 0.94 0.64 0.00 0.00 0.15 1.85 2.89 3.28
(Nb) Necesid. Unitaria Bruta de Riego (mm/da) 3.87 1.95 0.83 1.41 1.34 0.91 0.00 0.00 0.22 2.64 4.13 4.69
(Nb) Necesid. Unitaria Bruta de Riego (mm/mes) 119.94 58.43 25.62 42.26 41.45 28.20 0.00 0.00 6.51 81.73 124.00 145.39
(D) Demanda Agua de riego por Ha./ mes (m3/mes) 1,199.41 584.29 256.22 422.57 414.53 281.96 0.00 0.00 65.14 817.29 1,240.00 1,453.94 6,735.34
(D) Demanda Agua de riego del Proyecto (m3/mes) 19,190.51 9,348.57 4,099.54 6,761.14 6,632.46 4,511.31 0.00 0.00 1,042.29 13,076.57 19,840.00 23,262.97 107,765.37
Mdulo de riego (litros/seg/has.) 0.45 0.23 0.10 0.16 0.15 0.11 0.00 0.00 0.03 0.31 0.48 0.54
ETc = ETo x Kc mm/mes Nn = (ETc - PE) mm/da Nb = (Nn / Er) mm/mes D = 10 x Nb x Area m/has.
cultivo permanente

CONCLUSIONES:
- El cultivar de papa blanca requiere 10 meses de riego, sin embargo, para los meses FEB y MARZ; las lluvias de la temporada cubren las necesidades de agua
para el cultivo de papa blanca..
- El mtodo de riego utilizado en la parcela Raymina, perteneciente al comit de regantes Raymina, es el riego presurizado por aspersin.
- El mdulo de riego para el cultivar papa blanca considerando la poca de estiaje, tiene un valor de 0.54 litros/seg/has. (caudal terico disponible en cabecera de chacra).
- La demanda total de agua de riego para la campaa agcola 2009-2010 (16 Ha. cultivar papa blanca) = 107,785.37 m/ao

Profesional A en Riego Presurizado


Profesional A en Riego Presurizado
DISEO AGRONMICO DEL RIEGO
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

1.1. DATOS: Clculo de las Necesidades de Riego


DATOS DEL CLIMA DATOS DEL SISTEMA DE RIEGO
ETo promedio (mm/da) 3.500 Mtodo Aspersin
Humedad relativa media HRm (%) 60.000 Eficiencia Ef (%) 75
Velocidad mxima del viento 2.144 Modelo del emisor SKIPPER (16 x 6 mm.)
Presin de operacin (atm) 2.5
DATOS DE LA PARCELA Caudal del emisor qe (Litros/hr) 1656
rea bruta A (Ha) 2 Dimetro efectivo de riego d (m) 27.0
rea neta bajo riego Sr (Ha) 2.00 ngulo de cobertura & () 360
Espaciamiento plantas dp (m) Espaciamiento emisores de (m) (*) 13
Espaciamiento hileras dh (m) Espaciamiento laterales dl (m) 13
Pendiente de la parcela (%) 20 # emisores por planta Nep
Horas mx. de operacin / da Hm = Hd 8
DATOS FUENTE DE AGUA Das de paro x ciclo (dp) 1.0
Caudal disponible Qs (m/hora) 7.2 Intensidad horaria (mm/hora) 5
Disponibilidad poco frecuente Turnos (*) Recomendado entre 50 - 65% del efectivo de riego.
Catlogo SIME - ITALIA
DATOS DEL CULTIVO
Nombre mixto DATOS DEL SUELO CALCULADO
Fase Intemedia Textura de suelo Franco-arcillo-arenoso
Kc Mx. de la fase del cultivo 1 Humed. Capacidad campo HCc (%) 23
% de rea de: 100 Humed. Punto marchitez HPm (%) 12
bajo riego a: 100 Peso especfico aparente Pea (gr/cm) 1.40
Profundidad radicular efectiva zr (m) 0.35 Velocid Infiltrac Bsica Ib (mm/h) 10.0
Mximo % agua aprovechable por el cultivo (Pa) 75 Profundidad efectiva (m) 0.35
Valores Mapa de suelo Mundial de la FAO

1.2. RESULTADOS: Clculo de las Necesidades de Riego


Sistema: ASPERSIN Cultivo: PASTO ASOCIADO
Orden Descripcin Smbolo Frmula Resultados Unidades
0 Lmina bruta de riego terico Lb (LDzr/Er)*100 71.87 mm
1 Lmina de agua disponible a zr (lmina bruta) LDzr (HCc-HPm)*(Pea/Pew)*zr*10 53.90 mm/zr
2 Volumen de agua disponible a zr VDzr LDzr*10 539.00 m/Ha/zr
3 Lmina de agua aprovechable a zr LAzr (LDzr*Pa)/100 40.43 mm/zr
4 Porcentaje rea bajo riego Par En aspersin se cubre el 100% del rea 100 %
5 Precipitacin horaria del sistema de riego Phr (qe*100) / (de*dl*Par) 9.799 mm/hr
6 Comparac Phr sistema con Infiltrac suelo Phr Ib 1
7 Uso consuntivo promedio ETc Penman Monteith (Etc promedio) 2.390 mm/da
8 Frecuencia de riego terico Fr LDzr/Etc 22.552 das
9 Intervalo de riego Ir (Lazr*Par) / (ETc*100) 16.914 das
10 Intervalo de riego ajustado Ir(aj) INTEGRO ( Ir ) 11.0 das
11 Ciclo de riego CR Ir(aj) - dp 10.00 das/ciclo
12 Lmina de riego ajustado LR(aj) Ir(aj)*ETc*100 / Par 26.29 mm
13 Comparacin LR(aj) con LAzr LR(aj) LAzr 1
14 % agua aprovechable ajustado Pa(aj) (LR(aj)*100) / LDzr 48.776 %
15 Comparacin Pa(aj) con mximo Pa Pa(aj) Pa 1
16 Lmina bruta ajustada LB (LR(aj)*100) / Ef 35.053 mm
17 Dosis de riego bruta por rea DB (LB*Par) / 10 350.53 m/Ha
18 Horas de riego por turno Ht LB / Phr 3.58 hr/turno
19 Mx. No turnos de riego diarios Td Integro (Hm / Ht) 2.24 turnos/da
20 Horas de riego por da Hd Td * Ht 8 horas/da
21 Horas de riego por ciclo Hc CR * Hd 80.00 horas/ciclo
22 Nmero de turnos por ciclo Tc CR * Td 22.36 turno/ciclo
23 Superficie bajo riego por turno St Sr / Tc 0.0894 Ha/turno
24 Dosis de riego bruta por turno DBt St * DB 31.349 m/turno
25 Caudal requerido Qr DBt / Ht 8.763 m/hora
26 Comparacin Qrequerido y Qdisponible Qr Qs 0
27 No de emisores por turno Emt Qr*1000 / qe 5.292 e / turno
28 Volumen bruto por ciclo de riego VBr DBt * Tc 701.067 m/ciclo
29 Caudal especfico Qe Qr / A 4.382 m/hr/Ha
Fuente: Fascculos 01, 02 y 03 Determinacin del Rgimen de Riego de los Cultivos; ESTADO DE ISRAEL.

Profesional A en Riego Presurizado


DISEO AGRONMICO DEL RIEGO
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

1.1. DATOS: Clculo de las Necesidades de Riego


DATOS DEL CLIMA DATOS DEL SISTEMA DE RIEGO
ETP mx. (mm/da) 3.500 Mtodo Aspersin
Humedad relativa media HRm (%) 60.000 Eficiencia Ef (%) 70
Velocidad mxima del viento 2.144 Modelo del emisor SKIPPER (14 x 6 mm.)
Presin de operacin (atm) 5
DATOS DE LA PARCELA Caudal del emisor qe (Litros/hr) 19400
rea bruta A (Ha) 2 Dimetro efectivo de riego d (m) 66.0
rea neta bajo riego Sr (Ha) 2.0 ngulo de cobertura & () 360
Espaciamiento plantas dp (m) Espaciamiento emisores de (m) (*) 46
Espaciamiento hileras dh (m) Espaciamiento laterales dl (m) 46
Pendiente (%) 20 # emisores por planta Nep
Horas mx. de operacin / da Hm = Hd 14
DATOS FUENTE DE AGUA Das de paro x ciclo 5.23
Caudal disponible Qs (m/hora) 7.2 Intensidad horaria (mm/hora) 7.45
Disponibilidad poco frecuente Turnos (*) Recomendado entre 50 - 65% del efectivo de riego.
Catlogo SIME - ITALIA
DATOS DEL CULTIVO
Nombre mixto DATOS DEL SUELO CALCULADO
Fase Intemedia Textura de suelo Franco-arcillo-arenoso
Kc Mx. de la fase del cultivo 1.15 Humed. Capacidad campo HCc (%) 24.2
% de rea de: 100 Humed. Punto marchitez HPm (%) 12.6
bajo riego a: 100 Peso especfico aparente Pea (gr/cm) 1.32
Profundidad radicular efectiva zr (m) 0.35 Velocid Infiltrac Bsica Ib (mm/h) 15.0
Mximo % agua aprovechable por el cultivo (Pa) 75 Profundidad efectiva (m) 0.35
Resultados Laboratorio UNSCH (06/03/2009)

1.2. RESULTADOS: Clculo de las Necesidades de Riego


Sistema: ASPERSIN Cultivo: PASTO ASOCIADO
Orden Descripcin Smbolo Frmula Resultados Unidades
0 Lmina bruta de riego terico Lb (LDzr/Er)*100 76.56 mm
1 Lmina de agua disponible a zr (lmina neta) LDzr (HCc-HPm)*(Pea/Pew)*zr*10 53.59 mm/zr
2 Volumen de agua disponible a zr VDzr LDzr*10 535.92 m/Ha/zr
3 Lmina de agua aprovechable a zr LAzr (LDzr*Pa)/100 40.19 mm/zr
4 Porcentaje rea bajo riego Par En aspersin se cubre el 100% del rea 100 %
5 Precipitacin horaria del sistema de riego Phr (qe*100) / (de*dl*Par) 9.168 mm/hr
6 Comparac Phr sistema con Infiltrac suelo Phr Ib 1
7 Uso consuntivo promedio ETc Penman Monteith (Etc promedio) 3.500 mm/da
8 Frecuencia de riego terico Fr LDzr/Etc 15.312 das
9 Intervalo de riego Ir (Lazr*Par) / (ETc*100) 11.484 das
10 Intervalo de riego ajustado Ir(aj) INTEGRO ( Ir ) 8.0 das
11 Ciclo de riego CR Ir(aj) - dp 2.77 das/ciclo
12 Lmina de riego ajustado LR(aj) Ir(aj)*ETc*100 / Par 28.00 mm
13 Comparacin LR(aj) con LAzr LR(aj) LAzr 1
14 % agua aprovechable ajustado Pa(aj) (LR(aj)*100) / LDzr 52.247 %
15 Comparacin Pa(aj) con mximo Pa Pa(aj) Pa 1
16 Lmina bruta ajustada LB (LR(aj)*100) / Ef 40.000 mm
17 Dosis de riego bruta por rea DB (LB*Par) / 10 400.00 m/Ha
18 Horas de riego por turno Ht LB / Phr 4.36 hr/turno
19 Mx. No turnos de riego diarios Td Integro (Hm / Ht) 3.21 turnos/da
20 Horas de riego por da Hd Td * Ht 14 horas/da
21 Horas de riego por ciclo Hc CR * Hd 38.78 horas/ciclo
22 Nmero de turnos por ciclo Tc CR * Td 8.89 turno/ciclo
23 Superficie bajo riego por turno St Sr / Tc 0.225 Ha/turno
24 Dosis de riego bruta por turno DBt St * DB 90.003 m/turno
25 Caudal requerido Qr DBt / Ht 20.629 m/hora
26 Comparacin Qrequerido y Qdisponible Qr Qs 0
27 No de emisores por turno Emt Qr*1000 / qe 1.1 e / turno
28 Volumen bruto por ciclo de riego VBr DBt * Tc 800.000 m/ciclo
29 Caudal especfico Qe Qr / A 10.315 m/hr/Ha

Profesional A en Riego Presurizado


Fuente: Fascculos 01, 02 y 03 Determinacin del Rgimen de Riego de los Cultivos; ESTADO DE ISRAEL.

Profesional A en Riego Presurizado


DISEO HIDRULICO DEL SISTEMA
PROYECTO: MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA IRC

2.1. INFORMACIN TCNICA: ELECCIN DEL ASPERSOR


DATOS DE ENTRADA:
Tipo de cultivo mixto Presin disponible de agua P (atm) 4.6
Tipo de suelo (textura) Fco-Arc-Arena Presin de diseo elegido (atm) 2.5
Tasa de infiltrac. Bsica Is (mm/hr) 10.0 Seleccin del aspersor SKIPPER
Superficie neta total de riego Snr (Ha) 2.0 Dimetro de las boquillas (mm) 16 x 6
Velocidad mx. de viento Vv (m/seg.) 2.14 efectivo cobertura de riego d (m) 27
Duracin viento diaria mxima hv (hr/da) 2.0 Eficiencia del sistema de riego Ef (%) 75
% de espaciamiento Pe (%) 65 Espaciamiento aspersores das (m) 13
Lmina aprovechable a zr Lan (mm) 40.43 Espaciamiento laterales dl (m) 13
Horas mx. de riego x da Hd (hr/da) 8 Lmina disponible a zr LB (mm) 53.90
Mx. No turnos de riego diario Td (turnos/da) 2.24 Descarga del emisor elegido qe (Lts/hr) 1656
Intervalo de riego ajustado Ir(aj) (das) 11.0 Horas de riego por turno Ht (hr/turno) 3.58
Das de paro x intervalo Ndp (das/intervalo) 1.0 Das de riego x ciclo Ndc (das/ciclo) 10.00
No de turnos por ciclo (Tc) 22.36 Horas de riego por ciclo Hc (hr/ciclo) 80.00

DATOS DE SALIDA:
Orden Descripcin Smbolo Frmula Resultados Unidades

0 Superficie de espaciamiento Se das x dl 169.00 m2

1 Precipitacin horaria mnima requerida Ph(min) LB/Ht 15.07 mm/hr

2 Precipitacin horaria mxima permitida Ph(mx) Ph(mx) Is 0.00

3 Descarga mxima del aspersor qe(mx) Se x Is 1,690.00 Lts/hr

4 Dsis bruta mx. de riego Dbm LBx10 539.00 m3/Ha

5 Caudal de riego requerido Qr (Dbm x Snr) / Hc 13.48 m3/hr


6 Superficie bajo riego por turno Srt Snr / Td 0.09 Ha/turno
7 Nmero total de aspersores Nta Srt / Se 5.29 aspersores

8 Nmero total de aspersores ajustado Nta 8.00 aspersores

9 Q diseo del sistema de riego y cmara de carga Qb Nta x qe 13.25 m3/hr


10 Dimetro nominal del lateral de PVC 110.00 mm
11 Longitud del terreno en paralelo al lateral Ltl 105.00 mts
12 Nmero mximo de aspersores por lateral Nal(mx) 3.00 Asp/Lat.

13 Longitud mxima del lateral Ll(mx) Nal x das 39.00 mts/Lat.


14 Nmero de divisiones longitudinales Ndl Ltl / Ll(mx) 2.69 div.
15 Longitud elegida del lateral Ll (Ltl / Ndl) - (das / 2) 32.50 mts/Lat.
16 Nmero elegido de aspersores por lateral Nal Ltl / das 3.00 Asp/Lat.

Fuente: Planificacin del Riego por Aspersin; Ing. Daniel Savaldi, ESTADO DE ISRAEL.

Profesional A en Riego Presurizado


DISEO HIDRULICO DEL SISTEMA
PROYECTO: MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA IRC

2.1. INFORMACIN TCNICA: ELECCIN DEL ASPERSOR


DATOS DE ENTRADA:
Tipo de cultivo mixto Presin disponible de agua P (atm) 4.6
Tipo de suelo (textura) Fco-Arc-Arena Presin de diseo elegido (atm) 5
Tasa de infiltrac. Bsica Is (mm/hr) 15.0 Seleccin del aspersor SKIPPER
Superficie neta total de riego Snr (Ha) 2.0 Dimetro de las boquillas (mm) 14 x 6
Velocidad mx. de viento Vv (m/seg.) 2.14 efectivo cobertura de riego d (m) 66
Duracin viento diaria mxima hv (hr/da) 2.0 Eficiencia del sistema de riego Ef (%) 70
% de espaciamiento Pe (%) 65 Espaciamiento aspersores das (m) 46
Lmina aprovechable a zr Lan (mm) 40.19 Espaciamiento laterales dl (m) 46
Horas mx. de riego x da Hd (hr/da) 14 Lmina disponible a zr LB (mm) 53.59
Mx. No turnos de riego diario Td (turnos/da) 3.21 Descarga del emisor elegido qe (Lts/hr) 19400
Intervalo de riego ajustado Ir(aj) (das) 8.0 Horas de riego por turno Ht (hr/turno) 4.36
Das de paro x intervalo Ndp (das/intervalo) 5.2 Das de riego x ciclo Ndc (das/ciclo) 2.77
No de turnos por ciclo (Tc) 8.89 Horas de riego por ciclo Hc (hr/ciclo) 38.78

DATOS DE SALIDA:
Orden Descripcin Smbolo Frmula Resultados Unidades

0 Superficie de espaciamiento Se das x dl 2,116.00 m2

1 Precipitacin horaria mnima requerida Ph(min) LB/Ht 12.28 mm/hr

2 Precipitacin horaria mxima permitida Ph(mx) Ph(mx) Is 1.00

3 Descarga mxima del aspersor qe(mx) Se x Is 31,740.00 Lts/hr

4 Dsis bruta mx. de riego Dbm LBx10 535.92 m3/Ha

5 Caudal de riego requerido Qr (Dbm x Snr) / Hc 27.64 m3/hr


6 Superficie bajo riego por turno Srt Snr / Td 0.23 Ha/turno
7 Nmero total de aspersores Nta Srt / Se 1.06 aspersores

8 Nmero total de aspersores ajustado Nta 8.00 aspersores

9 Q diseo del sistema de riego y cmara de carga Qb Nta x qe 155.20 m3/hr


10 Dimetro nominal del lateral de PVC 110.00 mm
11 Longitud del terreno en paralelo al lateral Ltl 74.00 mts
12 Nmero mximo de aspersores por lateral Nal(mx) 2.00 Asp/Lat.

13 Longitud mxima del lateral Ll(mx) Nal x das 92.00 mts/Lat.


14 Nmero de divisiones longitudinales Ndl Ltl / Ll(mx) 0.80 div.
15 Longitud elegida del lateral Ll (Ltl / Ndl) - (das / 2) 69.00 mts/Lat.
16 Nmero elegido de aspersores por lateral Nal Ltl / das 2.00 Asp/Lat.

Fuente: Planificacin del Riego por Aspersin; Ing. Daniel Savaldi, ESTADO DE ISRAEL.

Profesional A en Riego Presurizado


CLCULO DE PRESIONES LNEA DE CONDUCCIN SUB-SECTOR I.
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

DIM. DIAM. DIM. DIAM. Presin


PROG.
COTA
TERRENO
LONG.
(km)
Q PEND.
(m/km)*
Calc. Comerc. Interno. Interno
VELOC.
(m/s)***
hf calc.
(m/km)
Hf del
tramo (m)
COTA
PIEZOM. (m)
Operacin DESCRIPCIN
(l/s) (pulg) (pulg.) (mm) (pulg.)** (m)

0+000 3255.000 3255.000 0.00 Cmara Carga


0+300 3209.250 0.300 48.5 152.50 4.427 8.00 203.20 8.00 1.50 8.60 2.58 3252.419 43.17 FINAL TUBO 8"
0+585 3193.400 0.285 48.5 55.61 5.446 6.00 155.80 6.13 2.54 31.37 8.94 3243.480 50.08 YEE 6"
0+305 3209.000 0.005 18.2 50.00 3.835 6.00 155.80 6.13 0.95 5.11 0.03 3252.394 43.39 SK 1
0+352 3206.200 0.047 12.2 59.57 3.178 4.00 105.80 4.17 1.39 16.04 0.75 3251.640 45.44 SK 2
0+399 3205.500 0.047 6.1 14.89 3.246 4.00 105.80 4.17 0.69 4.44 0.21 3251.431 45.93 SK 3

0+495 3199.000 0.195 48.5 52.56 5.509 6.00 155.80 6.13 2.54 31.37 6.12 3246.303 47.30 TEE 6"
0+520 3198.500 0.025 6.1 20.00 3.055 3.00 82.10 3.23 1.15 15.28 0.38 3245.921 47.42 SK 13
0+525 3197.000 0.225 48.5 54.44 5.469 6.00 155.80 6.13 2.54 31.37 7.06 3245.362 48.36 YEE 6" a 3"
0+530 3196.600 0.005 12.2 80.00 2.991 3.00 82.10 3.23 2.30 55.15 0.28 3245.086 48.49 SK 14
0+580 3194.500 0.050 6.1 42.00 2.624 3.00 82.10 3.23 1.15 15.28 0.76 3244.322 49.82 SK 15

* Prdida de carga unitaria ** Tener presente "Dimetro Interno" del fabricante *** Rango aceptable de: 0.6 - 3 m/s

C = Coef. Hazen y Williams Prd. de cargas por tramo deben ser < = a la carga disp.(dif. Cotas)
MATERIAL C Ecuacin Hazen Williams Q= 0.0004264xCx (D^2.63)x(hf^0.54)
Fierro fundido 100 Donde:
Concreto 110 D = Dim. Tub. (pulg) TUBO PVC SAP 8" CLASE 5 300 mts.
Acero 120 Q = Caudal (l/s) TUBO PVC SAP 6" CLASE 7,5 1090 mts. 0.710
Asb cem 140 hf = Prdida de carga unitaria (m/km) TUBO PVC SAP 4" CLASE 7,5 920 mts. 0
PVC 150 C = Coef. Hazen-Williams TUBO PVC SAP 3" CLASE 7,5 1300 mts.

Profesional A en Riego Presurizado


CLCULO DE PRESIONES LNEA DE CONDUCCIN SUB-SECTOR II.
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

DIM. DIAM. DIM. DIAM. Presin


PROG.
COTA
TERRENO
LONG.
(km)
Q PEND.
(m/km)*
Calc. Comerc. Interno. Interno
VELOC.
(m/s)***
hf calc.
(m/km)
Hf del
tramo (m)
COTA
PIEZOM. (m)
Operacin DESCRIPCIN
(l/s) (pulg) (pulg.) (mm) (pulg.)** (m)

0+000 3255.000 3255.000 0.00 Cmara Carga


0+300 3209.250 0.300 43.5 152.50 4.248 8.00 203.20 8.00 1.34 7.03 2.11 3252.890 43.64 FINAL TUBO 8"
0+585 3193.400 0.285 43.5 55.61 5.225 6.00 155.80 6.13 2.28 25.64 7.31 3245.582 52.18 YEE 6"
0+590 3193.100 0.290 43.5 55.69 5.224 6.00 155.80 6.13 2.28 25.64 7.44 3245.454 52.35 1 CRUZ 6"
0+614 3192.800 0.024 11 12.50 4.210 4.00 105.80 4.17 1.25 13.24 0.32 3245.136 52.34 SK 16
0+661 3192.300 0.047 5.5 10.64 3.344 3.00 82.10 3.23 1.04 12.61 0.59 3244.543 52.24 SK 17
0+614 3192.800 0.024 11 12.50 4.210 4.00 105.80 4.17 1.25 13.24 0.32 3245.136 52.34 SK 18
0+661 3190.900 0.047 5.5 40.43 2.542 3.00 82.10 3.23 1.04 12.61 0.59 3244.543 53.64 SK 19
0+690 3186.700 0.105 43.5 63.81 5.080 6.00 155.80 6.13 2.28 25.64 2.69 3242.889 56.19 3 CRUZ 6"
0+715 3186.400 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3242.558 56.16 SK 24
0+764 3185.900 0.049 5.5 10.20 3.373 3.00 82.10 3.23 1.04 12.61 0.62 3241.940 56.04 SK 25
0+715 3186.400 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3242.558 56.16 SK 26
0+764 3185.900 0.049 5.5 10.20 3.373 3.00 82.10 3.23 1.04 12.61 0.62 3241.940 56.04 SK 27
0+790 3179.000 0.205 43.5 70.24 4.980 6.00 155.80 6.13 2.28 25.64 5.26 3240.325 61.33 5 CRUZ 6"
0+815 3178.700 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3239.994 61.29 SK 32
0+864 3178.200 0.049 5.5 10.20 3.373 3.00 82.10 3.23 1.04 12.61 0.62 3239.376 61.18 SK 33
0+815 3178.700 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3239.994 61.29 SK 34
0+864 3178.200 0.049 5.5 10.20 3.373 3.00 82.10 3.23 1.04 12.61 0.62 3239.376 61.18 SK 35
0+895 3168.800 0.310 43.5 79.35 4.857 6.00 155.80 6.13 2.28 25.64 7.95 3237.633 68.83 7 CRUZ 6"
0+920 3168.500 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3237.302 68.80 SK 40
0+969 3168.000 0.049 5.5 10.20 3.373 3.00 82.10 3.23 1.04 12.61 0.62 3236.684 68.68 SK 41
0+920 3168.500 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3237.302 68.80 SK 42
0+969 3167.000 0.049 5.5 30.61 2.692 3.00 82.10 3.23 1.04 12.61 0.62 3236.684 69.68 SK 43
* Prdida de carga unitaria ** Tener presente "Dimetro Interno" del fabricante *** Rango aceptable de: 0.6 - 3 m/s

C = Coef. Hazen y Williams Prd. de cargas por tramo deben ser < = a la carga disp.(dif. Cotas)

MATERIAL C Ecuacin Hazen Williams Q= 0.0004264xCx (D^2.63)x(hf^0.54)


Fierro fundido 100 Donde:
Concreto 110 D = Dim. Tub. (pulg) TUBO PVC SAP 8" CLASE 5 300 mts.
Acero 120 Q = Caudal (l/s) TUBO PVC SAP 6" CLASE 7,5 1090 mts.
Asb cem 140 hf = Prdida de carga unitaria (m/km) TUBO PVC SAP 4" CLASE 7,5 920 mts.
PVC 150 C = Coef. Hazen-Williams TUBO PVC SAP 3" CLASE 7,5 1300 mts.

Profesional A en Riego Presurizado


CLCULO DE PRESIONES LNEA DE CONDUCCIN SUB-SECTOR III.
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

DIM. DIAM. DIM. DIAM. Presin


PROG.
COTA
TERRENO
LONG.
(km)
Q PEND.
(m/km)*
Calc. Comerc. Interno. Interno
VELOC.
(m/s)***
hf calc.
(m/km)
Hf del
tramo (m)
COTA
PIEZOM. (m)
Operacin DESCRIPCIN
(l/s) (pulg) (pulg.) (mm) (pulg.)** (m)

0+000 3255.000 3255.000 0.00 Cmara Carga


0+300 3209.250 0.300 43.5 152.50 4.248 8.00 203.20 8.00 1.34 7.03 2.11 3252.890 43.64 FINAL TUBO 8"
0+585 3193.400 0.285 43.5 55.61 5.225 6.00 155.80 6.13 2.28 25.64 7.31 3245.582 52.18 YEE 6"
0+730 3189.500 0.145 43.5 26.90 6.065 6.00 155.80 6.13 2.28 25.64 3.72 3241.864 52.36 CURVA 90 DE 6"
0+787 3186.800 0.057 43.5 47.37 5.400 6.00 155.80 6.13 2.28 25.64 1.46 3240.402 53.60 9 CRUZ 6"
0+811 3186.400 0.024 5.5 16.67 3.050 3.00 82.10 3.23 1.04 12.61 0.30 3240.099 53.70 SK 49
0+811 3186.400 0.024 5.5 16.67 3.050 3.00 82.10 3.23 1.04 12.61 0.30 3240.099 53.70 SK 50
0+895 3177.000 0.165 43.5 75.76 4.904 6.00 155.80 6.13 2.28 25.64 4.23 3237.633 60.63 11 CRUZ 6"
0+919 3176.700 0.024 11 12.50 4.210 4.00 105.80 4.17 1.25 13.24 0.32 3237.315 60.61 SK 54
0+942 3176.200 0.023 5.5 21.74 2.888 3.00 82.10 3.23 1.04 12.61 0.29 3237.025 60.82 SK 55
0+919 3176.700 0.024 11 12.50 4.210 4.00 105.80 4.17 1.25 13.24 0.32 3237.315 60.61 SK 56
0+942 3176.200 0.023 5.5 21.74 2.888 3.00 82.10 3.23 1.04 12.61 0.29 3237.025 60.82 SK 57
1+010 3166.300 0.280 43.5 82.86 4.814 6.00 155.80 6.13 2.28 25.64 7.18 3234.684 68.38 13 CRUZ 6"
1+035 3166.000 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3234.353 68.35 SK 62
1+060 3165.500 0.025 5.5 20.00 2.938 3.00 82.10 3.23 1.04 12.61 0.32 3234.037 68.54 SK 63
1+035 3166.000 0.025 11 12.00 4.245 4.00 105.80 4.17 1.25 13.24 0.33 3234.353 68.35 SK 64
1+060 3165.500 0.025 5.5 20.00 2.938 3.00 82.10 3.23 1.04 12.61 0.32 3234.037 68.54 SK 65

* Prdida de carga unitaria ** Tener presente "Dimetro Interno" del fabricante *** Rango aceptable de: 0.6 - 3 m/s

C = Coef. Hazen y Williams Prd. de cargas por tramo deben ser < = a la carga disp.(dif. Cotas)
MATERIAL C Ecuacin Hazen Williams Q= 0.0004264xCx (D^2.63)x(hf^0.54)
Fierro fundido 100 Donde:
Concreto 110 D = Dim. Tub. (pulg) TUBO PVC SAP 8" CLASE 5 300 mts.
Acero 120 Q = Caudal (l/s) TUBO PVC SAP 6" CLASE 7,5 1090 mts.
Asb cem 140 hf = Prdida de carga unitaria (m/km) TUBO PVC SAP 4" CLASE 7,5 920 mts.
PVC 150 C = Coef. Hazen-Williams TUBO PVC SAP 3" CLASE 7,5 1300 mts.

Profesional A en Riego Presurizado


E1 8537702 591616 3259.112
E1 8537702 591616 3259.112
1 8537684.062 591619.282 3259
2 8537669.445 591615.421 3260.014
3 8537694.653 591615.344 3259.416
4 8537694.38 591625.523 3257.45
5 8537677.419 591628.067 3257.012
6 8537710.145 591617.021 3258.178
7 8537711.689 591628.314 3255.307
8 8537704.754 591642.504 3252.259
9 8537730.486 591636.775 3250.095
10 8537739.547 591622.871 3253.056
11 8537708.578 591643.624 3251.048
12 8537752.273 591646.958 3245.326
13 8537763.106 591637.969 3246.636
14 8537739.393 591653.917 3244.892
15 8537776.37 591663.728 3238.932
16 8537762.897 591666.071 3239.169
17 8537784.979 591661.252 3238.693
18 8537789.123 591681.017 3234.116
19 8537807.469 591675.376 3233.992
20 8537770.015 591690.521 3233.099
21 8537808.51 591692.853 3229
22 8537788.914 591709.144 3228.331
23 8537827.882 591682.586 3230.925
24 8537823.462 591710.884 3224.979
25 8537836.037 591701.177 3225.794
26 8537809.535 591730.514 3222.025
27 8537841.791 591728.809 3220.771
28 8537829.631 591750.885 3218.305
29 8537852.039 591718.096 3221.237
30 8537874.808 591739.311 3216.654
31 8537842.536 591764.573 3215.563
E2 8537868.681 591737.303 3217.562
32 8537858.055 591747.905 3217.466
33 8537868.609 591767.353 3213.927
34 8537844.972 591781.905 3213.429
35 8537888.756 591761.231 3212.711
36 8537876.776 591787.507 3211.581
37 8537856.893 591799.77 3211.77
38 8537889.401 591781.919 3211.845
39 8537889.287 591814.333 3210.099
40 8537866.311 591820.448 3210.045
41 8537894.294 591814.071 3210.735
42 8537896.856 591836.907 3210.174
43 8537882.066 591848.361 3210.182
44 8537909.007 591840.191 3209.4
45 8537935.637 591854.234 3209.404
46 8537963.993 591864.956 3208.462
47 8537898.653 591820.241 3209.641
48 8537922.544 591802.707 3209.069
49 8537940.242 591790.621 3208.174
E3 8537958.68 591716.93 3211.292
51 8537951.214 591734.12 3210.018
52 8537978.413 591716.563 3209.019
53 8537924.651 591754.251 3210.482
54 8537963.863 591724.355 3209.353
55 8537961.935 591744.874 3208.125
56 8537976.442 591733.62 3207.656
57 8537941.962 591776.952 3208.285
58 8537944.536 591789.653 3207.465
59 8537983.091 591757.396 3205.256
60 8538002.28 591722.531 3206.049
61 8537994.612 591783.474 3203.678
62 8537957.626 591812.909 3206.424
63 8538024.071 591731.677 3202.888
64 8538013.459 591755.089 3202.702
65 8537975.417 591817.539 3204.615
66 8538005.932 591792.128 3202.445
67 8538021.111 591804.767 3201.247
68 8537997.724 591821.394 3202.849
69 8538047.055 591773.953 3199.502
70 8538041.673 591738.437 3200.972
71 8538000.708 591802.525 3202.515
72 8538058.649 591756.031 3198.805
73 8538030.883 591821.6 3200.715
74 8538002.122 591837.774 3203.294
75 8538035.121 591840.847 3201.121
76 8538085.525 591779.158 3196.386
77 8538047.883 591855.462 3200.792
78 8538074.501 591802.724 3197.595
79 8538002.005 591872.458 3205.188
80 8538057.725 591860.669 3200.247
81 8538100.858 591801.29 3195.709
82 8538027.813 591900.01 3203.801
83 8538061.018 591862.532 3200.115
84 8538116.871 591815.922 3194.755
85 8538000.475 591908.889 3206.099
86 8538076.266 591873.544 3199.515
87 8538093.564 591833.719 3196.932
88 8538038.014 591914.698 3203.512
89 8538094.455 591886.852 3198.643
90 8538106.798 591868.768 3197.627
91 8538055.038 591923.887 3201.728
92 8538109.865 591900.948 3198.039
93 8538133.645 591827.499 3194.314
94 8538028.398 591933.787 3203.845
95 8538124.852 591911.833 3197.024
96 8538069.617 591944.381 3200.548
97 8538190.34 591825.897 3192.145
98 8538145.214 591919.15 3195.6
99 8538175.211 591863.584 3194.139
100 8538110.953 591954.555 3197.015
E4 8538214.279 591919.368 3190.792
101 8538179.455 591994.119 3190.611
102 8538158.529 591978.175 3192.152
103 8538125.444 591960.017 3195.506
104 8538170.738 591964.658 3191.737
105 8538133.73 591942.97 3195.213
106 8538191.037 591974.318 3190.502
107 8538201.035 591952.867 3190.391
108 8538183.145 591947.878 3191.391
109 8538143.357 591925.106 3195.032
110 8538210.924 591930.344 3190.351
111 8538199.439 591925.616 3191.074
112 8538155.131 591907.399 3194.585
113 8538200.66 591907.548 3191.553
114 8538161.505 591895.768 3194.141
115 8538217.697 591914.759 3190.394
116 8538169.736 591875.563 3194.269
117 8538208.07 591898.076 3191.401
118 8538226.844 591889.967 3190.633
119 8538240.666 591858.316 3189.834
120 8538263.471 591804.241 3189.384
121 8538292.29 591801.905 3189.4
122 8538319.053 591792.763 3188.332
123 8538348.996 591778.908 3186.48
124 8538282.467 591826.305 3189.044
125 8538323.157 591818.431 3187.64
126 8538353.416 591821.494 3185.55
127 8538332.141 591838.995 3186.144
128 8538364.138 591829.528 3184.299
129 8538267.176 591861.329 3188.608
130 8538311.863 591858.162 3186.23
131 8538365.837 591838.852 3183.739
132 8538293.151 591873.775 3186.58
133 8538261.677 591874.52 3188.778
134 8538326.144 591863.306 3185.105
135 8538256.375 591887.196 3188.989
136 8538281.429 591891.633 3187.177
137 8538305.199 591894.556 3185.127
E5 8538301.827 591908.84 3185.336
158 8538252.878 591896.602 3188.993
159 8538298.881 591913.692 3185.561
160 8538273.35 591901.191 3187.168
161 8538245.19 591916.03 3189.204
162 8538266.441 591921.83 3187.366
163 8538291.748 591930.342 3185.654
164 8538234.09 591941.516 3188.823
165 8538255.032 591947.5 3187.189
166 8538281.452 591957.114 3185.776
167 8538222.657 591969.941 3188.718
168 8538243.615 591974.214 3187.077
169 8538270.623 591983.602 3185.917
170 8538214.417 591990.527 3188.51
171 8538232.298 592000.903 3186.942
172 8538261.827 592006.571 3185.672
173 8538203.827 592012.874 3188.361
174 8538219.507 592025.113 3186.95
175 8538267.464 592059.032 3182.433
176 8538282.98 592082.547 3180.931
177 8538312.075 592092.471 3178.194
178 8538278.828 592037.094 3183.076
179 8538298.557 592049.988 3181.176
180 8538323.755 592062.853 3178.749
181 8538289.731 592011.916 3183.315
182 8538310.267 592021.431 3181.657
183 8538340.687 592039.581 3178.52
184 8538296.542 591989.092 3183.785
185 8538320.361 591997.957 3181.747
186 8538359.956 592013.009 3178.05
187 8538303.918 591966.646 3183.795
188 8538332.538 591969.532 3181.466
189 8538369.455 591973.933 3178.514
190 8538314.251 591939.323 3183.629
191 8538340.912 591946.357 3181.483
192 8538376.157 591947.644 3179.117
193 8538325.587 591914.319 3183.268
194 8538351.326 591921.643 3181.572
195 8538385.851 591931.984 3178.761
E6 8538399.172 591928.653 3177.865
196 8538401.32 591922.188 3177.627
197 8538357.046 591906.387 3181.875
198 8538370.154 591927.06 3180.14
199 8538375.771 591919.424 3180.009
200 8538406.871 591907.439 3177.517
201 8538363.357 591890.935 3181.977
202 8538382.171 591901.428 3180.217
203 8538415.379 591885.917 3177.248
204 8538390.452 591883.638 3179.603
205 8538425.61 591860.366 3177.322
206 8538398.656 591854.899 3180.058
207 8538381.252 591847.69 3181.992
208 8538435.988 591833.856 3177.54
209 8538405.694 591826.216 3180.532
210 8538391.954 591821.711 3182.539
211 8538448.54 591803.027 3178.056
212 8538422.84 591794.932 3180.499
213 8538404.738 591789.211 3182.415
214 8538458.295 591779.887 3178.122
215 8538432.038 591775.625 3180.284
216 8538409.343 591772.113 3182.124
217 8538409.623 591766.446 3181.825
218 8538436.941 591759.537 3179.531
219 8538468.898 591753.121 3177.034
220 8538454.628 591842.087 3175.212
221 8538437.737 591858.787 3175.934
222 8538433.56 591884.797 3175.279
223 8538462.666 591908.327 3172.658
224 8538481.362 591913.609 3170.46
225 8538421.209 591900.784 3176.124
226 8538456.454 591926.212 3172.091
227 8538476.604 591930.876 3170.124
228 8538416.172 591917.78 3176.07
229 8538412.47 591926.002 3176.358
230 8538450.448 591941.797 3172.036
231 8538467.664 591949.865 3169.356
232 8538413.701 591953.697 3175.248
233 8538441.239 591963.493 3172.096
234 8538456.87 591970.075 3170.399
235 8538405.951 591977.1 3175.069
236 8538431.698 591986.774 3172.52
237 8538447.595 591992.72 3170.48
238 8538421.859 592010.765 3172.457
239 8538397.879 592002.157 3175.061
240 8538438.275 592017.214 3170.431
241 8538411.666 592040.503 3172.517
242 8538387.958 592030.178 3174.863
243 8538426.575 592047.593 3170.759
244 8538397.261 592079.633 3172.816
245 8538370.982 592070.495 3174.87
246 8538411.54 592084.055 3171.152
247 8538383.957 592112.633 3172.113
248 8538357.201 592104.919 3174.111
249 8538407.944 592125.845 3169.693
250 8538419.791 592123.318 3168.92
251 8538452.477 592097.105 3166.86
252 8538473.027 592115.381 3164.149
253 8538432.136 592099.567 3168.786
254 8538459.414 592082.657 3166.953
255 8538489.257 592105.089 3163.205
256 8538442.64 592074.08 3168.496
257 8538467.621 592065.487 3166.539
258 8538505.64 592090.555 3162.219
259 8538453.243 592052.715 3168.294
260 8538476.892 592046.714 3166.292
261 8538517.547 592065.015 3162.196
262 8538465.785 592026.957 3167.719
263 8538488.547 592021.431 3165.266
264 8538532.631 592035.358 3160.816
265 8538477.729 592002.33 3167.256
266 8538497.531 592002.696 3165.181
267 8538544.242 592015.069 3160.031
268 8538486.813 591984.174 3167.107
269 8538506.048 591984.279 3164.839
270 8538553.793 591995.076 3158.843
271 8538519.641 591982.578 3162.88
272 8538490.919 591975.559 3166.045
273 8538498.535 591957.433 3166.246
274 8538522.334 591965.086 3164.053
275 8538505.332 591938.26 3167.22
276 8538532.88 591944.413 3164.415
277 8538505.326 591938.177 3167.226
278 8538532.793 591944.486 3164.447
279 8538511.034 591919.894 3167.459
280 8538542.85 591925.965 3164.37
E7 8538504.498 591866.758 3169.718
281 8538497.512 591893.867 3169.493
282 8538471.883 591886.56 3172.197
283 8538512.561 591900.438 3168.023
284 8538500.086 591874.813 3169.827
285 8538478.157 591870.481 3171.902
286 8538519.294 591881.229 3168.122
287 8538503.326 591859.921 3170.062
288 8538486.011 591850.548 3171.97
289 8538524.158 591862.895 3168.477
290 8538495.762 591825.382 3172.333
291 8538517.533 591830.825 3170.264
292 8538533.001 591834.921 3168.685
293 8538504.351 591802.456 3172.651
294 8538521.533 591809.281 3170.636
295 8538541.575 591812.383 3168.58
296 8538509.72 591787.638 3172.909
297 8538524.888 591791.153 3171.109
298 8538546.235 591794.194 3168.906
299 8538517.088 591766.773 3172.972
300 8538553.031 591776.611 3168.716
301 8538531.093 591770.223 3171.27
302 8538522.281 591747.371 3172.05
303 8538532.81 591754.064 3170.858
304 8538563.574 591761.979 3167.635
305 8538590.969 591768.954 3164.393
306 8538607.238 591759.845 3162.759
307 8538629.167 591761.495 3160.079
308 8538587.492 591780.966 3164.774
309 8538605.168 591781.271 3163.044
310 8538631.214 591781.629 3159.843
311 8538577.384 591796.426 3165.559
312 8538600.029 591803.197 3163.046
313 8538631.683 591806.658 3159.235
314 8538573.846 591821.456 3164.884
315 8538593.978 591828.558 3162.684
316 8538630.717 591827.184 3158.853
317 8538566.764 591843.507 3165.211
318 8538593.035 591850.081 3162.082
319 8538628.489 591853.638 3158.414
320 8538560.593 591863.1 3165.177
321 8538584.42 591867.799 3162.164
322 8538623.417 591876.457 3158.195
323 8538556.142 591882.701 3164.841
324 8538579.799 591884.724 3161.698
325 8538621.236 591896.184 3157.53
326 8538575.567 591890.112 3161.197
327 8538558.047 591887.862 3163.74
328 8538616.409 591908.512 3157.098
PROYECTO PROMOCIN Y DESARROLLO AGROPECUARIO
GESTIN DE SISTEMAS DE RIEGO

HOJA DE METRADOS
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

N DIMENSIONES
PART. DESCRIPCION PARCIAL TOTAL UND.
VECES LARGO ANCHO ALTO

MODULO DE RIEGO POR ASPERSION


01.01.00 CAMARA DE CARGA Y CAJA DE VLVULA

01.01.01 EXCAVACION DE POZA 1.00 4.30 2.30 1.00 9.89 9.89 M3


01.01.02 MURO DE SOGA CON LADRILLO ARCILLA 1.00 12.60 1.50 18.90 18.90 M2
01.01.03 ENCOFRADO Y DESENCOFRADO LOSA TECHO 1.00 4.30 2.30 9.89 9.89 M2
01.01.04 CONCRETO SIMPLE FC=175 Kg/cm2 2.82 M3
Piso 1.00 4.30 2.30 0.15 1.48
Losa de techo 1.00 4.30 2.30 0.10 0.99
Caja de vlvula 1.00 3.00 0.15 0.50 0.23
Dado salida de tubo 8" 1.00 0.50 0.50 0.50 0.13

N Long. Peso N de
(pulg) Total (kg)
Elemt. (m) (Kg x m) Varillas
01.01.05 ACERO GRADO 60 LOSA TECHO 50.73 10
Losa de techo 3/8 20.00 2.30 0.57 26.22 5.1
3/8 10.00 4.30 0.57 24.51 4.8

01.01.06 REVEST. IMPERMEABILIZADO MORTERO 1:2 44.80 M2


Piso 1.00 4.00 2.00 8.00
Muro interior 1.00 12.00 1.50 18.00
Muro exterior 1.00 13.20 0.60 7.92
Techo 1.00 4.00 2.00 8.00
Caja de vlvulas 2.00 2.40 0.60 2.88
01.01.07 INSTALACION ACCESOR Y VALVULA 8" 1.00 1.00 GLB
01.01.08 COLOCACION TAPA DE INSPECCION 1.00 2.00 UND

01.02.00 INSTALACION DE RED MATRZ (1370 ml.)

01.02.01 TRAZO, REPLANTEO DE ZANJA 1.00 1,370.00 1,370.00 1,370.00 M


01.02.02 EXCAVACION ZANJA PARA TUBERA (M. SUELTO) 1.00 1,370.00 0.50 0.80 548.00 548.00 M3
01.02.03 REFINE ZANJA INCLUYE.CAMA 1.00 1,370.00 1,370.00 1,370.00 M
01.02.04 INSTALACION TUBERIA MATRIZ 1.00 1,370.00 1,370.00 1,370.00 M
01.02.05 PRUEBA HIDRAULICA A TUBO LLENO 1.00 1,370.00 0.20 0.15 41.10 41.10 M3
01.02.06 RELLENO ZANJA APISONADO CON MATERIAL PROPIO 1.00 1,370.00 0.50 0.70 479.50 479.50 M3
01.02.07 INSTALACION VALV. Y ACCES. RED MATRIZ 1.00 1.00 GLB

Profesional A en Riego Presurizado


PROYECTO PROMOCIN Y DESARROLLO AGROPECUARIO
GESTIN DE SISTEMAS DE RIEGO

HOJA DE METRADOS
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

N DIMENSIONES
PART. DESCRIPCION PARCIAL TOTAL UND.
VECES LARGO ANCHO ALTO

01.03.00 INSTALACION DE RED SECUNDARIA (2240 ml.)

01.03.01 TRAZO Y REPLANTEO DE ZANJA 1.00 2,240.00 2,240.00 2,240.00 M


01.03.02 EXCAVACION ZANJA PARA TUBERA (M. SUELTO) 1.00 2,240.00 0.50 0.70 784.00 784.00 M3
01.03.03 REFINE ZANJA INCLUYE.CAMA 1.00 2,240.00 2,240.00 2,240.00 M
01.03.04 INSTALACION TUBERIA SECUNDARIA 1.00 2,240.00 2,240.00 2,240.00 M
01.03.05 PRUEBA HIDRAULICA A TUBO LLENO 1.00 2,240.00 0.10 0.10 22.40 22.40 M3
01.03.06 RELLENO ZANJA APISONADO CON MATERIAL PROPIO 1.00 2,240.00 0.50 0.60 672.00 672.00 M3
01.03.07 INSTALACION ACCES. EN RED SECUNDARIA 1.00 1.00 GLB

01.04.00 HIDRANTES FIJOS (65 PEDESTALES)

01.04.01 INSTALACION ACCESORIOS Y VALVULAS 65.00 65.00 PED


01.04.02 CONCRETO ARMADO FC=175 Kg/cm2 10.04 M3
Zapata 65.00 0.50 0.50 0.40 6.50
Pedestal 65.00 AREA 0.03 1.70 3.54

01.05.00 EMISORES (01 TIPO)

01.05.01 INSTALACION ASPERSORES SKIPPER 8.00 8.00 UND

01.06.00 VALVULA DE PURGA (02 UND)

01.06.01 CONCRETO SIMPLE FC=175 Kg/cm2 2.00 2.20 0.15 0.50 0.33 0.33 M3
01.06.02 INSTALACION VALVULA DE PURGA 2.00 2.00 GLB
01.06.03 COLOCACION TAPA DE INSPECCION 2.00 2.00 UND

01.07.00 VALVULA DE AIRE (09 UND)

01.07.01 CONCRETO SIMPLE FC=175 Kg/cm2 9.00 1.40 0.10 0.40 0.50 0.50 M3
01.07.02 INSTALACION VALVULA DE AIRE 9.00 9.00 UND

01.08.00 DATOS DE SUELO

01.08.01 ANALISIS ESPECIAL DE SUELO 1.00 1.00 GLB

Profesional A en Riego Presurizado


PROYECTO PROMOCIN Y DESARROLLO AGROPECUARIO
GESTIN DE SISTEMAS DE RIEGO

Presupuesto Estimado
Obra MODULO DE RIEGO RAYMINA
Frmula RIEGO PRESURIZADO Dpto AYACUCHO
Cliente GOBIERNO REGIONAL DE AYACUCHO Prov. HUAMANG Dist. TAMBILLO

Item Descripcin Unidad Metrado Precio Parcial Subtotal


MODULO DE RIEGO POR ASPERSI{ON
01.01.00 CAMARA DE CARGA Y CAJA DE VALVULA 5,854.30
01.01.01 EXCAVACION DE POZA M3 9.89 11.75 116.21
01.01.02 MURO DE SOGA LADRILLO ARCILLA M2 18.90 31.40 593.46
01.01.03 ENCOFRADO Y DESENCOFRADO LOSA TECHO M2 9.89 76.77 759.26
01.01.04 CONCRETO SIMPLE FC=175 KG/CM2 M3 2.82 280.45 790.87
01.01.05 ACERO GRADO 60 EN LOSA TECHO KG 50.73 3.93 199.37
01.01.06 REVESTIMTO. IMPERMEABILIZADO MORTERO 1:2 M2 44.80 21.42 959.62
01.01.07 INSTALACION ACCESORIOS Y VALVULA 8" GLB 1.00 2,105.50 2,105.50
01.01.08 COLOCACION TAPA DE INSPECCION UND 2.00 165.01 330.02

01.02.00 INSTALACION DE RED MATRIZ (1370 ml.) 74,242.84


01.02.01 TRAZO Y REPLANTEO DE ZANJA M 1,370.00 0.16 219.20
01.02.02 EXCAVACION ZANJA PARA TUBERIA (M. SUELTO) M3 548.00 9.40 5,151.20
01.02.03 REFINE ZANJA INCLUYE.CAMA M 1,370.00 0.39 534.30
01.02.04 INSTALACION TUBERIA MATRIZ M 1,370.00 45.81 62,759.70
01.02.05 PRUEBA HIDRAULICA A TUBO LLENO M3 41.10 0.55 22.61
01.02.06 RELLENO ZANJA APISONADO CON MATERIAL PROPIO M3 479.50 4.13 1,980.34
01.02.07 INSTALACION VALV. ACCES. RED MATRIZ GLB 1.00 3,575.50 3,575.50

01.03.00 INSTALACION DE RED SECUNDARIA (2240 ml.) 49,213.95


01.03.01 TRAZO Y REPLANTEO DE ZANJA M 2,240.00 0.16 358.40
01.03.02 EXCAVACION ZANJA PARA TUBERIA (M. SUELTO) M3 784.00 9.40 7,369.60
01.03.03 REFINE ZANJA INCLUYE.CAMA M 2,240.00 0.39 873.60
01.03.04 INSTALACION TUBERIA SECUNDARIA M 2,240.00 15.00 33,600.00
01.03.05 PRUEBA HIDRAULICA A TUBO LLENO M3 22.40 0.55 12.32
01.03.06 RELLENO ZANJA APISONADO CON MATERIAL PROPIO M3 672.00 4.13 2,775.36
01.03.07 INSTALACION ACCES. EN RED SECUNDARIA GLB 1.00 4,224.67 4,224.67

01.04.00 HIDRANTES FIJOS (65 PEDESTALES) 16,960.08


01.04.01 INSTALACION ACCESORIOS Y VALVULAS UND 65.00 192.45 12,509.25
01.04.02 CONCRETO ARMADO FC=175 KG/CM2 M3 10.04 443.31 4,450.83

01.05.00 EMISORES (01 TIPO) 15,310.08


01.05.01 INSTALACION ASPERSORES SKIPPER UND 8.00 1,913.76 15,310.08

01.06.00 VALVULA DE PURGA (02 UNIDADES) 1,677.09


01.06.01 CONCRETO SIMPLE FC=175 KG/CM2 M3 0.33 280.45 92.55
01.06.02 INSTALACION VALVULA DE PURGA UND 2.00 664.76 1,329.52
01.06.03 COLOCACION TAPA DE INSPECCION PZA 2.00 127.51 255.02

01.07.00 VALVULA DE AIRE (09 UNIDADES) 2,703.07


01.07.01 CONCRETO SIMPLE FC=175 KG/CM2 M3 0.50 280.45 140.23
01.07.02 INSTALACION VALVULA DE AIRE UND 9.00 284.76 2,562.84

01.08.00 INFORMACION DE SUELO 80.00


01.08.01 ANALISIS ESPECIAL DE SUELO GLB 1.00 80.00 80.00

COSTO DIRECTO MODULO POR ASPERSION UNIN POTRERO S/. 166,041.40

Profesional A en Riego Presurizado


PROYECTO PROMOCIN Y DESARROLLO AGROPECUARIO
GESTIN DE SISTEMAS DE RIEGO

Precios y cantidades de insumos requeridos


Obra MODULO DE RIEGO RAYMINA
Frmula RIEGO PRESURIZADO Fecha 24/07/2009

Cant.
Cdigo Descripcin insumo Unidad Precio Parcial
Requerida

MANO DE OBRA 21,904.53


470102 OPERARIO HH 4.38 1,276.45 5,590.85
470104 PEON HH 2.50 6,525.47 16,313.68

MATERIALES 144,136.88
723115 ADAPTADOR PVC SAP 2" (s/p) UND 10.00 65.00 650.00
723110 ADAPTADOR PVC SAP 6" (s/p) UND 55.00 8.00 440.00
723114 ADAPTADOR PVC SAP 8" (s/p) UND 80.00 2.00 160.00
390500 AGUA M3 1.00 1,154.52 1,154.52
20409 ALAMBRE NEGRO N16 KG 5.00 15.00 75.00
40000 ARENA FINA M3 85.00 0.72 61.20
50133 ARENA PARA ASENTAR LADRILLO M3 65.00 0.57 37.05
309261 ASPERSOR SECTORIAL DE ALUMINIO (SKIPPER) UND 1,800.00 8.00 14,400.00
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 21.50 111.40 2,395.10
291310 CINTA TEFLON UND 1.00 132.00 132.00
20161 CLAVOS PARA MADERA C/C DE 2" a 3" KG 5.00 10.00 50.00
725368 CODO PVC SAP 3" X 90 (s/p) PZA 21.00 30.00 630.00
725367 CODO PVC SAP 4" X 90 (s/p) PZA 28.00 6.00 168.00
725370 CODO PVC SAP 8" X 45 (s/p) PZA 120.00 2.00 240.00
725369 CODO PVC SAP DE 6" X 45 (s/p) PZA 75.00 2.00 150.00
304267 COLLARIN HDPE 160 mm x 2" UND 61.00 9.00 549.00
731508 CRUZ PVC SAP 6" X 6" (s/p) PZA 95.00 13.00 1,235.00
26107 DETERMINACION HUMEDAD CAPACIDAD DE CAMPO UND 20.00 1.00 20.00
26108 DETERMINACION HUMEDAD PUNTO DE MARCHITEZ UND 20.00 1.00 20.00
26110 DETERMINACION PESO ESPECIFICO APARENTE UND 20.00 1.00 20.00
26109 DETERMINACION TEXTURA DEL SUELO UND 20.00 1.00 20.00
30033 FIERRO CORRUGADO DE 1/4" VAR 6.50 65.00 422.50
30393 FIERRO CORRUGADO DE 3/8" VAR 15.00 75.00 1,125.00
390235 HOJA DE SIERRA UND 5.00 7.00 35.00
380198 HORMIGON MENUDO PUESTO EN OBRA M3 70.00 17.80 1,246.00
290105 IMPERMEABILIZANTE SIKA-1 KG 25.00 4.00 100.00
170025 LADRILLO ARCILLA 22.5 x 12.5 x 9 CM UND 0.40 907.20 362.88
390237 LIJA #40 (PLIEGO) UND 2.50 9.41 23.53
435803 LISTONES MADERA TORNILLO (2" x 3" 10 pies) PZA 20.00 8.00 160.00
101251 LLAVE PREFABRICADA CON DADO UND 15.00 1.00 15.00

Profesional A en Riego Presurizado


PROYECTO PROMOCIN Y DESARROLLO AGROPECUARIO
GESTIN DE SISTEMAS DE RIEGO

Precios y cantidades de insumos requeridos


Obra MODULO DE RIEGO RAYMINA
Frmula RIEGO PRESURIZADO Fecha 24/07/2009

Cant.
Cdigo Descripcin insumo Unidad Precio Parcial
Requerida

723068 NIPLE PVC SAP 2" DE 15 cM. ROSCA MACHO PZA 20.00 9.00 180.00
304637 PEGAMENTO PARA PVC 1/4 GLN POT 25.00 5.40 135.00
261903 PIN A - 200 UND 30.00 65.00 1,950.00
261902 PIN B - 200 CON GANCHO UND 60.00 8.00 480.00
541190 PINTURA ESMALTE GLN 50.00 3.61 180.50
721580 REDUCCION PVC SAP 12" a 8" (s/p) PZA 220.00 1.00 220.00
721574 REDUCCION PVC SAP 3" A 2" (s/p) PZA 18.00 65.00 1,170.00
721576 REDUCCION PVC SAP 4" a 3" (s/p) PZA 29.00 62.00 1,798.00
721578 REDUCCION PVC SAP 6" a 3" (s/p) PZA 35.00 7.00 245.00
721577 REDUCCION PVC SAP 6" a 4" (s/p) PZA 45.00 30.00 1,350.00
721579 REDUCCION PVC SAP 8" a 6" (s/p) PZA 125.00 1.00 125.00
436702 TABLA MADERA TORNILLO (1" x 8" x 10 pies) TAB 25.00 15.00 375.00
399911 TAPA METALICA DE 40 X 40 cm. UND 120.00 4.00 480.00
399904 TAPA METALICA DE 60 x 60 cm. UND 150.00 2.00 300.00
721368 TEE PVC SAP 4" (s/p) UND 40.00 29.00 1,160.00
720781 TEE PVC SAP DE 6" (s/p) UND 55.00 6.00 330.00
440327 TRIPLAY DE 4 MM M2 25.00 1.00 25.00
720298 TUBO PVC SAP 3" CLASE 7.5 (UNION CAMPANA) UND 55.00 290.99 16,004.45
720297 TUBO PVC SAP 4" CLASE 7.5 (UNION CAMPANA) UND 95.00 188.94 17,949.30
740195 TUBO PVC SAP 6" CLASE 7.5 (UNION CAMPANA) UND 210.00 225.09 47,268.90
740194 TUBO PVC SAP 8" CLASE 5 (UNION CAMPANA) UND 235.00 64.02 15,044.70
520107 UNION CAMPANA GALV. 2" a 1 1/2" HEMBRA PZA 25.00 8.00 200.00
520108 UNION MACHO GALV. DE 1 1/2" CON ROSCA PZA 20.00 8.00 160.00
520109 UNION MACHO GALV. DE 2" CON ROSCA PZA 25.00 65.00 1,625.00
723069 UNION PVC SAP 2" HEMBRA ROSCADA UND 25.00 9.00 225.00
784001 VALVULA COMPUERTA FF MAZZA 6" UND 540.00 4.00 2,160.00
784002 VALVULA COMPUERTA FF MAZZA 8" UND 997.00 1.00 997.00
300014 VALVULA DE AIRE 2" DE DOBLE EFECTO UND 165.00 9.00 1,485.00
770152 VALVULA HDPE TIPO BOLA DE 2" UND 63.00 65.00 4,095.00
723206 YEE PVC SAP 12" (s/p) UND 125.00 1.00 125.00
723205 YEE PVC SAP 6" (s/p) UND 95.00 2.00 190.00
290302 YESO EN BOLSAS DE 25 KG. BOL 5.00 1.45 7.25

TOTAL INSUMOS DE RIEGO S/. 166,041.40


Nota: Los precios unitarios cotizados en tiendas de Ayacucho, no incluye flete terrestre.

Profesional A en Riego Presurizado


S10 Pgina :
CCCEIC Fecha :

Anlisis de precios unitarios

Obra 0901001 MODULO DE RIEGO RAYMINA

Frmula 01 RIEGO PRESURIZADO Fecha


Partida 01.01.01 EXCAVACION DE POZA
Rendimiento 2.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 0.10 0.40
470104 PEON HH 1.00 4.00

Partida 01.01.02 MURO DE SOGA LADRILLO ARCILLA


Rendimiento 7.00 M2/DIA Costo unitario directo por : M2

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 1.14
470104 PEON HH 1.00 1.14

Materiales
050133 ARENA PARA ASENTAR LADRILLO M3 0.03
170025 LADRILLO ARCILLA 22.5 x 12.5 x 9 CM UND 48.00
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.11
390500 AGUA M3 0.01

Partida 01.01.03 ENCOFRADO Y DESENCOFRADO LOSA TECHO


Rendimiento 10.00 M2/DIA Costo unitario directo por : M2

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.80
470104 PEON HH 2.00 1.60

Materiales
020161 CLAVOS PARA MADERA C/C DE 2" a 3" KG 1.01
020409 ALAMBRE NEGRO N16 KG 1.52
435803 LISTONES MADERA TORNILLO (2" x 3" 10 pies) PZA 0.81
436702 TABLA MADERA TORNILLO (1" x 8" x 10 pies) TAB 1.52
440327 TRIPLAY DE 4 MM M2 0.10
Partida 01.01.04 CONCRETO SIMPLE FC=175 KG/CM2
Rendimiento 8.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 2.00 2.00
470104 PEON HH 12.00 12.00

Materiales
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 7.00
380198 HORMIGON MENUDO PUESTO EN OBRA M3 1.30
390500 AGUA M3 0.19

Partida 01.01.05 ACERO GRADO 60 EN LOSA TECHO


Rendimiento 200.00 KG/DIA Costo unitario directo por : KG

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.04
470104 PEON HH 1.00 0.04

Materiales
030393 FIERRO CORRUGADO DE 3/8" VAR 0.20
390235 HOJA DE SIERRA UND 0.14

Partida 01.01.06 REVESTIMTO. IMPERMEABILIZADO MORTERO 1:2


Rendimiento 4.00 M2/DIA Costo unitario directo por : M2

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 2.00
470104 PEON HH 1.00 2.00

Materiales
040000 ARENA FINA M3 0.02
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.19
290105 IMPERMEABILIZANTE SIKA-1 KG 0.09
390500 AGUA M3 0.01

Partida 01.01.07 INSTALACION ACCESORIOS Y VALVULA 8"


Rendimiento 10.00 GLB/DIA Costo unitario directo por : GLB

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.80
470104 PEON HH 1.00 0.80

Materiales
720297 TUBO PVC SAP 4" CLASE 7.5 (UNION CAMPANA) UND 1.00
721580 REDUCCION PVC SAP 12" a 8" (s/p) PZA 1.00
723114 ADAPTADOR PVC SAP 8" (s/p) UND 2.00
723206 YEE PVC SAP 12" (s/p) UND 1.00
725367 CODO PVC SAP 4" X 90 (s/p) PZA 1.00
725370 CODO PVC SAP 8" X 45 (s/p) PZA 2.00
740194 TUBO PVC SAP 8" CLASE 5 (UNION CAMPANA) UND 1.00
784002 VALVULA COMPUERTA FF MAZZA 8" UND 1.00

Partida 01.01.08 COLOCACION TAPA DE INSPECCION


Rendimiento 6.00 UND/DIA Costo unitario directo por : UND

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 1.33
470104 PEON HH 0.50 0.67

Materiales
101251 LLAVE PREFABRICADA CON DADO UND 0.50
399904 TAPA METALICA DE 60 x 60 cm. UND 1.00

Partida 01.02.01 TRAZO Y REPLANTEO DE ZANJA


Rendimiento 700.00 M/DIA Costo unitario directo por : M

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.01
470104 PEON HH 2.00 0.02

Materiales
541190 PINTURA ESMALTE GLN 0.00

Partida 01.02.02 EXCAVACION ZANJA PARA TUBERIA (M. SUELTO)


Rendimiento 2.50 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 0.10 0.32
470104 PEON HH 1.00 3.20
Partida 01.02.03 REFINE ZANJA INCLUYE.CAMA
Rendimiento 60.00 M/DIA Costo unitario directo por : M

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 0.10 0.01
470104 PEON HH 1.00 0.13

Partida 01.02.04 INSTALACION TUBERIA MATRIZ


Rendimiento 250.00 M/DIA Costo unitario directo por : M

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.03
470104 PEON HH 4.00 0.13

Materiales
304637 PEGAMENTO PARA PVC 1/4 GLN POT 0.00
390237 LIJA #40 (PLIEGO) UND 0.00
740194 TUBO PVC SAP 8" CLASE 5 (UNION CAMPANA) UND 0.05
740195 TUBO PVC SAP 6" CLASE 7.5 (UNION CAMPANA) UND 0.16

Partida 01.02.05 PRUEBA HIDRAULICA A TUBO LLENO


Rendimiento 100.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.08
470104 PEON HH 1.00 0.08

Partida 01.02.06 RELLENO ZANJA APISONADO CON MATERIAL PROPIO


Rendimiento 12.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 0.50 0.33
470104 PEON HH 1.00 0.67

Materiales
390500 AGUA M3 1.00
Partida 01.02.07 INSTALACION VALV. ACCES. RED MATRIZ
Rendimiento 10.00 GLB/DIA Costo unitario directo por : GLB

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.80
470104 PEON HH 1.00 0.80

Materiales
399911 TAPA METALICA DE 40 X 40 cm. UND 2.00
720781 TEE PVC SAP DE 6" (s/p) UND 6.00
721579 REDUCCION PVC SAP 8" a 6" (s/p) PZA 1.00
723110 ADAPTADOR PVC SAP 6" (s/p) UND 4.00
723205 YEE PVC SAP 6" (s/p) UND 2.00
725369 CODO PVC SAP DE 6" X 45 (s/p) PZA 2.00
731508 CRUZ PVC SAP 6" X 6" (s/p) PZA 13.00
784001 VALVULA COMPUERTA FF MAZZA 6" UND 2.00

Partida 01.03.01 TRAZO Y REPLANTEO DE ZANJA


Rendimiento 700.00 M/DIA Costo unitario directo por : M

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.01
470104 PEON HH 2.00 0.02

Materiales
541190 PINTURA ESMALTE GLN 0.00

Partida 01.03.02 EXCAVACION ZANJA PARA TUBERIA (M. SUELTO)


Rendimiento 2.50 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 0.10 0.32
470104 PEON HH 1.00 3.20

Partida 01.03.03 REFINE ZANJA INCLUYE.CAMA


Rendimiento 60.00 M/DIA Costo unitario directo por : M

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 0.10 0.01
470104 PEON HH 1.00 0.13

Partida 01.03.04 INSTALACION TUBERIA SECUNDARIA


Rendimiento 250.00 M/DIA Costo unitario directo por : M

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.03
470104 PEON HH 4.00 0.13

Materiales
304637 PEGAMENTO PARA PVC 1/4 GLN POT 0.00
390237 LIJA #40 (PLIEGO) UND 0.00
720297 TUBO PVC SAP 4" CLASE 7.5 (UNION CAMPANA) UND 0.08
720298 TUBO PVC SAP 3" CLASE 7.5 (UNION CAMPANA) UND 0.12

Partida 01.03.05 PRUEBA HIDRAULICA A TUBO LLENO


Rendimiento 100.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.08
470104 PEON HH 1.00 0.08

Partida 01.03.06 RELLENO ZANJA APISONADO CON MATERIAL PROPIO


Rendimiento 12.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 0.50 0.33
470104 PEON HH 1.00 0.67

Materiales
390500 AGUA M3 1.00

Partida 01.03.07 INSTALACION ACCES. EN RED SECUNDARIA


Rendimiento 15.00 GLB/DIA Costo unitario directo por : GLB

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.53
470104 PEON HH 1.00 0.53

Materiales
721368 TEE PVC SAP 4" (s/p) UND 29.00
721576 REDUCCION PVC SAP 4" a 3" (s/p) PZA 24.00
721577 REDUCCION PVC SAP 6" a 4" (s/p) PZA 30.00
721578 REDUCCION PVC SAP 6" a 3" (s/p) PZA 7.00
725367 CODO PVC SAP 4" X 90 (s/p) PZA 5.00
725368 CODO PVC SAP 3" X 90 (s/p) PZA 30.00

Partida 01.04.01 INSTALACION ACCESORIOS Y VALVULAS


Rendimiento 10.00 UND/DIA Costo unitario directo por : UND

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 0.80
470104 PEON HH 1.00 0.80

Materiales
261903 PIN A - 200 UND 1.00
291310 CINTA TEFLON UND 2.00
520109 UNION MACHO GALV. DE 2" CON ROSCA PZA 1.00
720298 TUBO PVC SAP 3" CLASE 7.5 (UNION CAMPANA) UND 0.40
721574 REDUCCION PVC SAP 3" A 2" (s/p) PZA 1.00
721576 REDUCCION PVC SAP 4" a 3" (s/p) PZA 0.58
723115 ADAPTADOR PVC SAP 2" (s/p) UND 1.00
770152 VALVULA HDPE TIPO BOLA DE 2" UND 1.00

Partida 01.04.02 CONCRETO ARMADO FC=175 KG/CM2


Rendimiento 6.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 2.00 2.67
470104 PEON HH 12.00 16.00

Materiales
030033 FIERRO CORRUGADO DE 1/4" VAR 6.47
030393 FIERRO CORRUGADO DE 3/8" VAR 6.47
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 7.50
380198 HORMIGON MENUDO PUESTO EN OBRA M3 1.30
390500 AGUA M3 0.19

Partida 01.05.01 INSTALACION ASPERSORES SKIPPER


Rendimiento 4.00 UND/DIA Costo unitario directo por : UND

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 2.00

Materiales
261902 PIN B - 200 CON GANCHO UND 1.00
309261 ASPERSOR SECTORIAL DE ALUMINIO (SKIPPER) UND 1.00
520107 UNION CAMPANA GALV. 2" a 1 1/2" HEMBRA PZA 1.00
520108 UNION MACHO GALV. DE 1 1/2" CON ROSCA PZA 1.00

Partida 01.06.01 CONCRETO SIMPLE FC=175 KG/CM2


Rendimiento 8.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 2.00 2.00
470104 PEON HH 12.00 12.00

Materiales
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 7.00
380198 HORMIGON MENUDO PUESTO EN OBRA M3 1.30
390500 AGUA M3 0.19

Partida 01.06.02 INSTALACION VALVULA DE PURGA


Rendimiento 4.00 UND/DIA Costo unitario directo por : UND

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 2.00
470104 PEON HH 1.00 2.00

Materiales
291310 CINTA TEFLON UND 1.00
723110 ADAPTADOR PVC SAP 6" (s/p) UND 2.00
784001 VALVULA COMPUERTA FF MAZZA 6" UND 1.00

Partida 01.06.03 COLOCACION TAPA DE INSPECCION


Rendimiento 6.00 PZA/DIA Costo unitario directo por : PZA

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 1.33
470104 PEON HH 0.50 0.67

Materiales
399911 TAPA METALICA DE 40 X 40 cm. UND 1.00

Partida 01.07.01 CONCRETO SIMPLE FC=175 KG/CM2


Rendimiento 8.00 M3/DIA Costo unitario directo por : M3

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 2.00 2.00
470104 PEON HH 12.00 12.00

Materiales
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 7.00
380198 HORMIGON MENUDO PUESTO EN OBRA M3 1.30
390500 AGUA M3 0.19

Partida 01.07.02 INSTALACION VALVULA DE AIRE


Rendimiento 4.00 UND/DIA Costo unitario directo por : UND

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Mano de Obra
470102 OPERARIO HH 1.00 2.00
470104 PEON HH 1.00 2.00

Materiales
300014 VALVULA DE AIRE 2" DE DOBLE EFECTO UND 1.00
304267 COLLARIN HDPE 160 mm x 2" UND 1.00
723068 NIPLE PVC SAP 2" DE 15 cM. ROSCA MACHO PZA 1.00
723069 UNION PVC SAP 2" HEMBRA ROSCADA UND 1.00

Partida 01.08.01 ANALISIS ESPECIAL DE SUELO


Rendimiento 50.00 GLB/DIA Costo unitario directo por : GLB

Cdigo Descripcin Insumo Unidad Cuadrilla Cantidad


Materiales
026107 DETERMINACION HUMEDAD CAPACIDAD DE CAMPO UND 1.00
026108 DETERMINACION HUMEDAD PUNTO DE MARCHITEZ UND 1.00
026109 DETERMINACION TEXTURA DEL SUELO UND 1.00
026110 DETERMINACION PESO ESPECIFICO APARENTE UND 1.00
1

24/07/2009

Costo unitario directo por : M3 11.75

Precio Parcial

4.38 1.75
2.50 10.00
11.75

A LADRILLO ARCILLA
31.40

Precio Parcial

4.38 5.01
2.50 2.86
7.87

65.00 1.95
0.40 19.20
21.50 2.37
1.00 0.01
23.53

DO LOSA TECHO
76.77

Precio Parcial

4.38 3.50
2.50 4.00
7.50

5.00 5.06
5.00 7.58
20.00 16.18
25.00 37.92
25.00 2.53
69.27
280.45

Precio Parcial

4.38 8.76
2.50 30.00
38.76

21.50 150.50
70.00 91.00
1.00 0.19
241.69

3.93

Precio Parcial

4.38 0.18
2.50 0.10
0.28

15.00 2.96
5.00 0.69
3.65

ADO MORTERO 1:2


21.42

Precio Parcial

4.38 8.76
2.50 5.00
13.76

85.00 1.36
21.50 4.06
25.00 2.23
1.00 0.01
7.66

2,105.50

Precio Parcial
4.38 3.50
2.50 2.00
5.50

95.00 95.00
220.00 220.00
80.00 160.00
125.00 125.00
28.00 28.00
120.00 240.00
235.00 235.00
997.00 997.00
2,100.00

165.01

Precio Parcial

4.38 5.84
2.50 1.67
7.51

15.00 7.50
150.00 150.00
157.50

0.16

Precio Parcial

4.38 0.05
2.50 0.06
0.11

50.00 0.05
0.05

ERIA (M. SUELTO)


9.40

Precio Parcial

4.38 1.40
2.50 8.00
9.40

0.39

Precio Parcial

4.38 0.06
2.50 0.33
0.39

45.81

Precio Parcial

4.38 0.14
2.50 0.32
0.46

25.00 0.03
2.50 0.01
235.00 10.81
210.00 34.50
45.35

0.55

Precio Parcial

4.38 0.35
2.50 0.20
0.55

CON MATERIAL PROPIO


4.13

Precio Parcial

4.38 1.46
2.50 1.67
3.13

1.00 1.00
1.00
3,575.50

Precio Parcial

4.38 3.50
2.50 2.00
5.50

120.00 240.00
55.00 330.00
125.00 125.00
55.00 220.00
95.00 190.00
75.00 150.00
95.00 1,235.00
540.00 1,080.00
3,570.00

0.16

Precio Parcial

4.38 0.05
2.50 0.06
0.11

50.00 0.05
0.05

ERIA (M. SUELTO)


9.40

Precio Parcial

4.38 1.40
2.50 8.00
9.40

0.39

Precio Parcial
4.38 0.06
2.50 0.33
0.39

15.00

Precio Parcial

4.38 0.14
2.50 0.32
0.46

25.00 0.05
2.50 0.01
95.00 7.97
55.00 6.51
14.54

0.55

Precio Parcial

4.38 0.35
2.50 0.20
0.55

CON MATERIAL PROPIO


4.13

Precio Parcial

4.38 1.46
2.50 1.67
3.13

1.00 1.00
1.00

SECUNDARIA
4,224.67

Precio Parcial

4.38 2.34
2.50 1.33
3.67

40.00 1,160.00
29.00 696.00
45.00 1,350.00
35.00 245.00
28.00 140.00
21.00 630.00
4,221.00

192.45

Precio Parcial

4.38 3.50
2.50 2.00
5.50

30.00 30.00
1.00 2.00
25.00 25.00
55.00 22.00
18.00 18.00
29.00 16.95
10.00 10.00
63.00 63.00
186.95

443.31

Precio Parcial

4.38 11.68
2.50 40.00
51.68

6.50 42.08
15.00 97.11
21.50 161.25
70.00 91.00
1.00 0.19
391.63
1,913.76

Precio Parcial

4.38 8.76
8.76

60.00 60.00
1,800.00 1,800.00
25.00 25.00
20.00 20.00
1,905.00

280.45

Precio Parcial

4.38 8.76
2.50 30.00
38.76

21.50 150.50
70.00 91.00
1.00 0.19
241.69

664.76

Precio Parcial

4.38 8.76
2.50 5.00
13.76

1.00 1.00
55.00 110.00
540.00 540.00
651.00

127.51

Precio Parcial

4.38 5.84
2.50 1.67
7.51

120.00 120.00
120.00

280.45

Precio Parcial

4.38 8.76
2.50 30.00
38.76

21.50 150.50
70.00 91.00
1.00 0.19
241.69

284.76

Precio Parcial

4.38 8.76
2.50 5.00
13.76

165.00 165.00
61.00 61.00
20.00 20.00
25.00 25.00
271.00

80.00

Precio Parcial

20.00 20.00
20.00 20.00
20.00 20.00
20.00 20.00
80.00
REQUERIMIENTO DE INSUMOS RAYMINA - TAMBILLO
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

Prec.
N DESCRIPCIN CANTIDAD UNIDAD
Unit.

CAMARA DE CARGA (10 m3 LAMBRASCCATA)


1 Tubo PVC SAP 8" clase 5 unin campana 01 unidad
2 Codo PVC SAP de 8" x 45 (s/p) 02 unidades
3 Yee PVC SAP 12" (s/p) 01 unidad
4 Vlvula compuerta F F 8" 01 unidad
5 Adaptador PVC SAP 8" (s/p) 02 unidades
6 Tapa metlica 0.60 x 0.60 m. 02 unidades
7 Reduccin PVC SAP de 12" a 8" (s/p) 01 unidad
8 Llave prefabricada tipo dado 01 unidad
9 Tubo PVC SAP 4" clase 5 unin campana 01 unidad
10 Codo PVC SAP de 4" x 90 (s/p) 01 unidad
11 Cemento portland tipo I (42,5 Kg.) 27 bolsas
12 Fierro corrugado de 3/8" 10 varillas
13 Alambre negro No 16 10 kilos
14 Ladrillo rojo de arcilla (22,5 x 12,5 x 9 cm.) 900 unidades
15 Arena para asentar ladrillo 01 m3
16 Hormign menudo 04 m3
17 Arena fina 01 m3
18 Listones madera tornillo (2" x 3" x 10 pies) 08 listones
19 Tabla (1"x8"x10 pies) madera tornillo 15 tablas
20 Triplay de 4 mm 01 plancha
21 Clavos 2" a 3" 10 kilos
22 Hoja de sierra 07 unidades
23 Impermeabilizante Sika 1 04 kilos

INSTALACION DE RED MATRZ (1370 ml.)


22 Tubo PVC SAP = 8" clase 5 unin campana 63 tubos
23 Tubo PVC SAP = 6" clase 7,5 unin campana 225 tubos
24 Reduccin PVC SAP de 8" a 6" (s/p) 01 unidad
25 Codo PVC SAP de 6" x 45 (s/p) 02 unidades
26 Yee PVC SAP 6" (s/p) 02 unidades
27 Cruz PVC SAP 6" x 6" (s/p) 13 unidades
28 Tee PVC SAP 6" (s/p) 06 unidades
29 Pegamento para PVC 02 galones
30 Lija para tubo PVC 10 pliegos
31 Vlvula compuerta F F 6" 02 unidad
32 Adaptador PVC SAP 6" (s/p) 04 unidades
33 Tapa metlica 0.40 x 0.40 m. 02 unidades
34 Cemento portland tipo I (42,5 Kg.) 03 bolsas
35 Hormign menudo 01 m3

INSTALACION DE RED SECUNDARIA (2240 ml.)


34 Tubo PVC SAP = 4" clase 7.5 unin campana 188 tubos
35 Tubo PVC SAP = 3" clase 7.5 unin campana 265 tubos
36 Tee PVC SAP 4" (s/p) 29 unidades
37 Codo PVC SAP 4" x 90 (s/p) 05 unidades
REQUERIMIENTO DE INSUMOS RAYMINA - TAMBILLO
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

Prec.
N DESCRIPCIN CANTIDAD UNIDAD
Unit.
38 Codo PVC SAP 3" x 90 (s/p) 30 unidades
39 Reduccin PVC SAP 4" a 3" (s/p) 24 unidades
40 Reduccin PVC SAP 6" a 4" (s/p) 30 unidades
41 Reduccin PVC SAP 6" a 3" (s/p) 07 unidades
REQUERIMIENTO DE INSUMOS RAYMINA - TAMBILLO
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

Prec.
N DESCRIPCIN CANTIDAD UNIDAD
Unit.

HIDRANTES FIJOS (65 PEDESTALES)


42 Tubo PVC SAP = 3" clase 7.5 unin campana 26 tubos
43 Reduccin PVC SAP 4" a 3" (s/p) 38 unidades
44 Reduccin PVC SAP 3" a 2" (s/p) 65 unidades
45 Vlvula HDPE tipo bola de 2" 65 unidades
46 Adaptadores PVC SAP de 2" (s/p) 65 unidades
47 Unin macho galvanizado de 2" c/rosca 65 unidades
48 Pin A - 200 65 unidades
49 Cinta teflon 130 unidades
50 Cemento portland tipo I (42,5 Kg.) 75 bolsas
51 Fierro corrugado de 3/8" 65 varillas
52 Fierro corrugado de 1/4" 65 varillas
53 Hormign menudo 14 m3
54 Arena fina 03 m3

EMISORES (01 TIPO)


55 Aspersor sectorial de aluminio (SKIPPER boca 1 1/2") 08 unidades
56 Pines B-200 con gancho 08 unidades
57 Unin campana galvanizada 2" a 1 1/2" hembra 08 unidades
58 Unin macho galvanizado de 1 1/2" c/rosca 08 unidades

VALVULA DE PURGA (02 UND)


59 Vlvula compuerta F F 6" 02 unidad
60 Adaptador PVC SAP 6" (s/p) 04 unidades
61 Tapa metlica 0.40 x 0.40 m. 02 unidades
62 Cemento portland tipo I (42,5 Kg.) 02 bolsas
63 Hormign menudo 0.5 m3

VALVULA DE AIRE (09 UND)


64 Vlvula de aire 2" de doble efecto 09 unidades
65 Collarin HDPE 160 mm x 2" 09 unidades
66 NIPLE PVC SAP 15 cm. x 2" roscado 09 pieza
67 Unin PVC SAP 2" hembra roscada 09 unidades
68 Cemento portland tipo I (42,5 Kg.) 04 bolsas
69 Hormign menudo 01 m3

MANO DE OBRA
68 Operario (especialista en instalacin riego presurizado) 01 operario

Nota: La adquisicin de los insumos debe incluir asistencia tcnica e instalacin del mdulo de riego.

Ayacucho, 21 de julio del 2009

GOBIERNO REGIONAL DE AYACUCHO


PROMOCIN Y DESARROLLO AGROPECUARIO

ING. JAIME VILLAR RODRGUEZ


REQUERIMIENTO DE INSUMOS RAYMINA - TAMBILLO
PROYECTO: INSTALACIN MDULO DE RIEGO POR ASPERSIN RAYMINA, CUENCA BAJA DE LA IRC

Prec.
N DESCRIPCIN CANTIDAD UNIDAD
Unit.
Profesional A en Riego Presurizado