Simulacion Proyectos Planificacion Obras Construccion-Leonardo Rischmoller
Simulacion Proyectos Planificacion Obras Construccion-Leonardo Rischmoller
Tecnolgico
www.cdt.cl
Corporacin de Desarrollo Tecnolgico 1 de 112 pgs.
Simulacin de proyectos y planificacin
en obras de construccin
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.
Director
Departamento de Ingeniera y Gestin de la Construccin
Facultad de Ingeniera
Universidad de Talca
Construction Virtual Prototyping
yp g
Technology
Li Heng
Construction Virtual Prototyping Laboratory
Department off Building
ildi and
d Reall Estate
The Hong Kong Polytechnic University
1. Introduction
Virtual Prototyping
provides an
environment to
construct in
computer. It can
simulate the entire life
cycle of a construction
project.
Try before you buy!
SIMULACION
http://www.imaginethatinc.com/sols_simoverview.html
Autos de Prueba?
Improved Construction schedule and
Sequence
4 Other projects
4.
OIE Project
This project studies
the feasibility of a
4-days floor cycle
in a 70th stories
grade A office
buildingg duringg the
tender stage. The
simulation of the
final 4-days floor
cycle is presented
to the developer to
depict a clear and
detailed schedule.
Case Studyy on Venetian Macau Hotel
Project
Background:
B k d A 4-day
4d
cycle has been
designed by Gammon
Construction for
typical floor (8/F -37/F)
construction of the
Venetian Macau hotel
t
tower. Th
The aim
i off this
thi
virtual prototyping
project is to visualize,
analyze and improve
the 4-day cycle.
Kwai Chung Public Housing Project
CONTRATISTA:
Vamos a realizar
una perforacin
p
a la placa
GERENCIA DE
PROYECTO:
E una b
Es buena
solucion!
INGENIERIA:
La p
perforacion no
afectaria el
comportamiento de la
estructura
t t
Vinculando el modelo 3D y el programa de Construccin
NO NO
OK?
4D Modelo
CAD 4D: Fundaciones Escondida IV
4D-PS Using 4D Models
Savings at Escondida Phase IV Expansion Project
1.150.000
Hours (Direct H
1.100.000
1.050.000 980.936
1.000.000
Man H
950 000
950.000
900.000
850.000
Earned To-Date
Actual To-Date
To Date
(Budget)
Man Hours 1.151.136 980.936
D t Source:
Data S
Construction Progress & Performance Status by Direct Hire Commodity Summary
Run date: 05 Dic 2001 - Data date: 02 Dic 2001
Week N 47
Reduccin de Costo
15%
Reduccin de Plazo
16%
Aumento de la Productividad
15%
X
Y
-Z
EJECUCION DE
PROYECTOS
O C OS EN
3D, 4D, BIM