PRESUPUESTO GENERAL

PROYECTO: CONSTRUCCION PISCIGRANJAS EN LAS CENTRALIAS 10A,10B,11B,11C


Moneda: Bolivianos

PRECIO COSTO
TEM DESCRIPCIN UND. CANTIDAD UNITARIO PARCIAL
1. OBRAS PRELIMINARES
1 INSTALACION DE FAENAS GLB 1.00 7,558.69 7,558.69
2 MOVILIZACION Y DESMOVILIZACION GLB 1.00 1,815.67 1,815.67
3 LETRERO DE OBRA PZA 1.00 1,193.55 1,193.55
SUBTOTAL OBRAS PRELIMINARES
2. PERFORACION DE POZO
4 PERFORACION POZO PILOTO D=8 1/2" ML 120.00 293.42 35,210.40
5 ENSANCHE DE POZO PILOTO A 20" ML 120.00 123.96 14,875.20
6 GRAVA GRADUADA PARA FILTRO M3 15.12 564.02 8,527.98
7 DESARROLLO PISTONEO Y AIR LIFT HRA 24.00 185.82 4,459.68
8 SELLO SANITARIO M3 1.00 1,048.07 1,048.07
9 PROV. INSTALACION FILTRO PVC- 12 1/2" E80/NB15 ML 20.00 234.11 4,682.20
10 DESINFECCION DE POZO DE AGUA ML 120.00 13.82 1,658.40
11 PROV. INST. TUB. PVC 12 1/2" E80/NB15 GEOMEC.ANICA ML 110.00 157.73 17,350.30
12 PROV. INSTALAC. BOMBA SUMERGIBLE 30HP SALIDA 6"+ACCESORIOS PZA 1.00 65,846.98 65,846.98
13 TABLERO DE CONTROL PZA 1.00 4,198.56 4,198.56
14 PROV. INST. TUB.PVC 6" E-40 NB/15 LINEA DE IMPULSION ML 60.00 180.48 10,828.80
SUBTOTAL PERFORACION DE POZO
3. ESTANQUES
15 REPLANTEO DE ESTRUCTURAS HEC 9.50 782.06 7,429.57
16 DESMOMTE, DESBROCE, ESCARIFICACION HA 9.50 2,041.63 19,395.49
17 EXCAVACION C/MAQUINARIA M3 44,110.00 10.05 443,305.50
18 PERFILADO Y COMPACTADO DE SOLERA Y TALUDES M2 46,640.00 2.36 110,070.40
19 CONFORMACION DE TALUD TIPO DIQUE C/MATERIAL EXC. M3 29,450.50 7.63 224,707.32
20 CAMARA DE VALVULAS DE LADRILLO ADOBITO (0.7 X 0.6) PZA 11.00 762.20 8,384.20
21 TENDIDO DE TUB.PVC 4" RED PRINCIPAL ML 580.00 87.16 50,552.80
22 ZAMPEO DE PIEDRAS E=0.15 M M2 121.00 127.84 15,468.64
23 PROVISION Y COLOCADO DE VALVULAS PZA 11.00 953.59 10,489.49
24 PROV./COLOC. TUBERIA PVC-6" REVALSE ML 253.00 141.58 35,819.74
SUBTOTAL ESTANQUES
COSTO TOTAL DEL PROYECTO
COSTO
TOTAL

10,567.91

168,686.57

925,623.15
1,104,877.63
PRESUPUESTO GENERAL
PROYECTO: CONSTRUCCION PISCIGRANJAS EN LAS CENTRALIAS 10A,10B,11B,11C
Moneda: Bolivianos

PRECIO
TEM DESCRIPCIN UND. CANTIDAD UNITARIO
1. OBRAS PRELIMINARES
1 INSTALACION DE FAENAS GLB 1.00 7,558.69
2 MOVILIZACION Y DESMOVILIZACION GLB 1.00 1,815.67
3 LETRERO DE OBRA PZA 1.00 1,193.55
SUBTOTAL OBRAS PRELIMINARES
2. PERFORACION DE POZO
4 PERFORACION POZO PILOTO D=8 1/2" ML 120.00 293.42
5 ENSANCHE DE POZO PILOTO A 20" ML 120.00 123.96
6 GRAVA GRADUADA PARA FILTRO M3 15.12 564.02
7 DESARROLLO PISTONEO Y AIR LIFT HRA 24.00 185.82
8 SELLO SANITARIO M3 1.00 1,048.07
9 PROV. INSTALACION FILTRO PVC- 12 1/2" E80/NB15 ML 20.00 234.11
10 DESINFECCION DE POZO DE AGUA ML 120.00 13.82
11 PROV. INST. TUB. PVC 12 1/2" E80/NB15 GEOMEC.ANICA ML 110.00 157.73
12 PROV. INSTALAC. BOMBA SUMERGIBLE 30HP SALIDA 6"+ACCESORIOS PZA 1.00 65,846.98
13 TABLERO DE CONTROL PZA 1.00 4,198.56
14 PROV. INST. TUB.PVC 6" E-40 NB/15 LINEA DE IMPULSION ML 60.00 180.48
SUBTOTAL PERFORACION DE POZO
3. ESTANQUES
15 REPLANTEO DE ESTRUCTURAS HEC 5.70 782.06
16 DESMOMTE, DESBROCE, ESCARIFICACION HA 5.70 2,041.63
17 EXCAVACION C/MAQUINARIA M3 21,040.00 10.05
18 PERFILADO Y COMPACTADO DE SOLERA Y TALUDES M2 18,560.00 2.36
19 CONFORMACION DE TALUD TIPO DIQUE C/MATERIAL EXC. M3 19,895.20 7.63
20 CAMARA DE VALVULAS DE LADRILLO ADOBITO (0.7 X 0.6) PZA 8.00 762.20
21 TENDIDO DE TUB.PVC 4" RED PRINCIPAL ML 765.00 87.16
22 ZAMPEO DE PIEDRAS E=0.15 M M2 88.00 127.84
23 PROVISION Y COLOCADO DE VALVULAS PZA 8.00 953.59
24 PROV./COLOC. TUBERIA PVC-6" REVALSE ML 195.50 141.58
SUBTOTAL ESTANQUES
COSTO TOTAL DEL PROYECTO
COSTO COSTO
PARCIAL TOTAL

7,558.69
1,815.67
1,193.55
10,567.91

35,210.40
14,875.20
8,527.98
4,459.68
1,048.07
4,682.20
1,658.40
17,350.30
65,846.98
4,198.56
10,828.80
168,686.57

4,457.74
11,637.29
211,452.00
43,801.60
151,800.38
6,097.60
66,677.40
11,249.92
7,628.72
27,678.89
542,481.54
721,736.02
PRESUPUESTO GENERAL
PROYECTO: CONSTRUCCION PISCIGRANJAS EN LAS CENTRALIAS 10A,10B,11B,11C
Moneda: Bolivianos

PRECIO
TEM DESCRIPCIN UND. CANTIDAD UNITARIO
1. OBRAS PRELIMINARES
1 INSTALACION DE FAENAS GLB 1.00 7,558.69
2 MOVILIZACION Y DESMOVILIZACION GLB 1.00 1,815.67
3 LETRERO DE OBRA PZA 1.00 1,193.55
SUBTOTAL OBRAS PRELIMINARES
2. PERFORACION DE POZO
4 PERFORACION POZO PILOTO D=8 1/2" ML 120.00 293.42
5 ENSANCHE DE POZO PILOTO A 20" ML 120.00 123.96
6 GRAVA GRADUADA PARA FILTRO M3 15.12 564.02
7 DESARROLLO PISTONEO Y AIR LIFT HRA 24.00 185.82
8 SELLO SANITARIO M3 1.00 1,048.07
9 PROV. INSTALACION FILTRO PVC- 12 1/2" E80/NB15 ML 20.00 234.11
10 DESINFECCION DE POZO DE AGUA ML 120.00 13.82
11 PROV. INST. TUB. PVC 12 1/2" E80/NB15 GEOMEC.ANICA ML 110.00 157.73
12 PROV. INSTALAC. BOMBA SUMERGIBLE 30HP SALIDA 6"+ACCESORIOS PZA 1.00 65,846.98
13 TABLERO DE CONTROL PZA 1.00 4,198.56
14 PROV. INST. TUB.PVC 6" E-40 NB/15 LINEA DE IMPULSION ML 60.00 180.48
SUBTOTAL PERFORACION DE POZO
3. ESTANQUES
15 REPLANTEO DE ESTRUCTURAS HEC 3.15 782.06
16 DESMOMTE, DESBROCE, ESCARIFICACION HA 3.15 2,041.63
17 EXCAVACION C/MAQUINARIA M3 11,086.40 10.05
18 PERFILADO Y COMPACTADO DE SOLERA Y TALUDES M2 11,080.00 2.36
19 CONFORMACION DE TALUD TIPO DIQUE C/MATERIAL EXC. M3 7,870.00 7.63
20 CAMARA DE VALVULAS DE LADRILLO ADOBITO (0.7 X 0.6) PZA 8.00 762.20
21 TENDIDO DE TUB.PVC 4" RED PRINCIPAL ML 765.00 87.16
22 ZAMPEO DE PIEDRAS E=0.15 M M2 44.00 127.84
23 PROVISION Y COLOCADO DE VALVULAS PZA 8.00 953.59
24 PROV./COLOC. TUBERIA PVC-6" REVALSE ML 92.00 141.58
SUBTOTAL ESTANQUES
COSTO TOTAL DEL PROYECTO
COSTO COSTO
PARCIAL TOTAL

7,558.69
1,815.67
1,193.55
10,567.91

35,210.40
14,875.20
8,527.98
4,459.68
1,048.07
4,682.20
1,658.40
17,350.30
65,846.98
4,198.56
10,828.80
168,686.57

2,463.49
6,431.13
111,418.32
26,148.80
60,048.10
6,097.60
66,677.40
5,624.96
7,628.72
13,025.36
305,563.88
484,818.36
PRESUPUESTO GENERAL
PROYECTO: CONSTRUCCION PISCIGRANJAS EN LAS CENTRALIAS 10A,10B,11B,11C
Moneda: Bolivianos

PRECIO
TEM DESCRIPCIN UND. CANTIDAD UNITARIO
1. OBRAS PRELIMINARES
1 INSTALACION DE FAENAS GLB 1.00 7,558.69
2 MOVILIZACION Y DESMOVILIZACION GLB 1.00 1,815.67
3 LETRERO DE OBRA PZA 1.00 1,193.55
SUBTOTAL OBRAS PRELIMINARES
2. PERFORACION DE POZO
4 PERFORACION POZO PILOTO D=8 1/2" ML 120.00 293.42
5 ENSANCHE DE POZO PILOTO A 20" ML 120.00 123.96
6 GRAVA GRADUADA PARA FILTRO M3 15.12 564.02
7 DESARROLLO PISTONEO Y AIR LIFT HRA 24.00 185.82
8 SELLO SANITARIO M3 1.00 1,048.07
9 PROV. INSTALACION FILTRO PVC- 12 1/2" E80/NB15 ML 20.00 234.11
10 DESINFECCION DE POZO DE AGUA ML 120.00 13.82
11 PROV. INST. TUB. PVC 12 1/2" E80/NB15 GEOMEC.ANICA ML 110.00 157.73
12 PROV. INSTALAC. BOMBA SUMERGIBLE 30HP SALIDA 6"+ACCESORIOS PZA 1.00 65,846.98
13 TABLERO DE CONTROL PZA 1.00 4,198.56
14 PROV. INST. TUB.PVC 6" E-40 NB/15 LINEA DE IMPULSION ML 60.00 180.48
SUBTOTAL PERFORACION DE POZO
3. ESTANQUES
15 REPLANTEO DE ESTRUCTURAS HEC 9.50 782.06
16 DESMOMTE, DESBROCE, ESCARIFICACION HA 9.50 2,041.63
17 EXCAVACION C/MAQUINARIA M3 42,278.40 10.05
18 PERFILADO Y COMPACTADO DE SOLERA Y TALUDES M2 46,976.00 2.36
19 CONFORMACION DE TALUD TIPO DIQUE C/MATERIAL EXC. M3 23,126.80 7.63
20 CAMARA DE VALVULAS DE LADRILLO ADOBITO (0.7 X 0.6) PZA 10.00 762.20
21 TENDIDO DE TUB.PVC 4" RED PRINCIPAL ML 460.00 87.16
22 ZAMPEO DE PIEDRAS E=0.15 M M2 88.00 127.84
23 PROVISION Y COLOCADO DE VALVULAS PZA 16.00 953.59
24 PROV./COLOC. TUBERIA PVC-6" REVALSE ML 115.00 141.58
SUBTOTAL ESTANQUES
COSTO TOTAL DEL PROYECTO
COSTO COSTO
PARCIAL TOTAL

7,558.69
1,815.67
1,193.55
10,567.91

35,210.40
14,875.20
8,527.98
4,459.68
1,048.07
4,682.20
1,658.40
17,350.30
65,846.98
4,198.56
10,828.80
168,686.57

7,429.57
19,395.49
424,897.92
110,863.36
176,457.48
7,622.00
40,093.60
11,249.92
15,257.44
16,281.70
829,548.48
1,008,802.96

También podría gustarte