Rebar Ratio kg/m3

Element Tender Design Optimised Solution Dif.


Piles 127 120 6%
Pile Cap 329 260 21%
Precast Formwork Shells 294 200 32%

D40

layer area comp peso ao


3D40/15 long inf 3 0.0083775804 23 7850
3D40/15 transv inf 3 0.0083775804 23 7850
3D40/15 long sup 2 0.0083775804 23 7850
3D40/15 transv sup 2 0.0083775804 23 7850
ref estacas D40 long 2 0.0041887902 16 7850
ref estacas D40 transv 2 0.0041887902 16 7850
D20/60 long 7 0.0005235988 23 7850
D20/60 transv 7 0.0005235988 23 7850
Face D25/15 2 0.0032724923 6.3 7850
Face D25/15 2 0.0032724923 3.4 7850
Estribos D20/15 32 0.0020943951 7 7850
Estribos D20/30 28 0.0010471976 7 7850
D25/15 pile 176 0.0004908739 1 7850
D25/15 topo pile 1 0.0016362462 23 7850
7850
7850
7850
Total
Contingencia
total kg/m3
4537.716 42
4537.716 42
3025.144 28
3025.144 28
1052.224 10
1052.224 10
794.1004 7
794.1004 7
323.6822 3
174.6856 2
3682.784 34
1611.218 15
678.1913 6
295.4242 3
0 0
0 0
0 0
237
261