PPTO

"MEJORAMIENTO DEL SERVICIO EDUCATIVO D


PRIMARIA N XXXXX- DEL DISTRITO DE XX
PROVINCIA DE HUANCAYO - DEPARTAMENTO D

COMPONENTE: LOSA DEPORTIVA MULTIFUNC

PRESUPUESTO DE OBRA

MONTO APROBADO: S/. 102,771.00

PRESUPUE
PART. DESCRIPCION
UNID

06.00.00 LOSA DEPORTIVA

06.01.00 TRABAJOS PRELIMINARES

06.01.01 LIMPIEZA DE TERRENO MANUAL M2

06.01.02 TRAZO,NIVELES Y REPLANTEO PRELIMINAR M2

06.02.00 MOVIMIENTO DE TIERRAS

06.02.01 CORTE DE TERRENO EN H=50 CM. M3

06.02.02 EXCAVACION DE ZANJAS M3

06.02.03 RELLENO Y COMPACTADO DE SUB RASANTE CON MATERI M3

06.02.04 ELIMINACION DEMATERIAL EXCEDENTE CON EQUIPO D=5 M3

06.03.00 OBRAS DE CONCRETO SIMPLE

06.03.01 CONCRETO f'c= 175 Kg/cm2. M3

06.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA DEPORTIVA M3

06.03.03 SELLADO DE UNTAS DE DILATACION CON ASFALTO M

06.04.00 VARIOS

06.04.01 SOPORTE METALICO PARA NET DE VOLEY UNID

Pgina 1
PPTO

06.04.02 ARCO DE ESTRUCTURA METALICA + MALLA GALVANIZADA UNID

06.04.03 ESTRUCTURA METALICA PARA TABLEROS DE CRISTAL TEM UNID

06.04.04 PINTURA TRANSITO 2 MANOS M2

TOTAL COSTO DIRECTO

GASTOS GENERALES (8%)

TOTAL COSTO DIRECTO

Pgina 2
PPTO

EDUCATIVO DE LA I.E
TRITO DE XXXXX -
RTAMENTO DE JUNIN"

A MULTIFUNCIONAL

OBRA

PRESUPUESTADO

METRADO C.U. PARCIAL RENDIMIENTO

1,200.00 1.54 1,848.00 200 6.00

1,200.00 2.38 2,856.00 400 3.00

550.00 5.15 2,832.50 25 22.00

20.00 26.78 535.60 3.5 5.71

250.00 33.11 8,277.50 12 20.83

200.00 10.59 2,118.00 40 5.00

185.15 285.43 52,847.36 18 10.29

75.00 33.47 2,510.25 12 6.25

450.00 2.66 1,197.00 30 15.00

4.00 226.76 907.04 4 1.00

Pgina 3
PPTO

4.00 1,091.02 4,364.08 2 2.00

4.00 2,957.25 11,829.00 2 2.00

1,200.00 2.53 3,036.00 80 15.00

95,158.33

7,612.67

102,771.00

Pgina 4
PPTO

TIEMPO DE DURACION

6.00 A

3.00 B

22.00 C

6.00 D

21.00 E

5.00 F

11.00 G

7.00 H

15.00 I

1.00 J

Pgina 5
PPTO

2.00 K

2.00 L

15.00 M

Pgina 6
PPTO

PREDESESOR ACTIVIDAD EI EF LI LF RC D

A 0 6 0 6 V 6.00

A B 6 9 6 9 V 3.00

B C 9 31 9 31 V 22.00

C D 31 37 31 37 V 6.00

D E 37 58 37 58 V 21.00

D F 58 63 58 63 V 5.00

F G 63 74 63 74 V 11.00

G H 74 81 74 81 V 7.00

H I 81 96 81 96 V 15.00

I J 96 97 96 97 V 1.00

Pgina 7
PPTO

I K 97 99 97 99 V 2.00

K L 99 101 99 101 V 2.00

L M 101 116 101 116 V 15.00

Pgina 8
PPTO

EI+D LI+D HT HL HI

6.00 6.00 0.00 0.00 0.00

9.00 9.00 0.00 0.00 0.00

31.00 31.00 0.00 0.00 0.00

37.00 37.00 0.00 0.00 0.00

58.00 58.00 0.00 0.00 0.00

63.00 63.00 0.00 0.00 0.00

74.00 74.00 0.00 0.00 0.00

81.00 81.00 0.00 0.00 0.00

96.00 96.00 0.00 0.00 0.00

97.00 97.00 0.00 0.00 0.00

Pgina 9
PPTO

99.00 99.00 0.00 0.00 0.00

101.00 101.00 0.00 0.00 0.00

116.00 116.00 0.00 0.00 0.00

Pgina 10