2.00 ESTRUCTURA
2.1 ENCOFRADO Y DESENCOFRADO DE ZAPATAS 2.20 4.90
3.00 TANQUE
3.1 TUBO GALVANIZADO D=2" 24.00 2.00
4.00 ACABADOS
4.1 PINTURA CAUCHO TANQUE 2.32 3.00
TOTAL 41,165.13
21.17 21.17
174.65 174.65
10.78
365.77
231.12 231.12 231.12
852.82 852.82 852.82
1.31
8.67
3.28
60.59
12 13 14 15 16 17 18 19
14.11
322.78
7.76
63.86
15.05 15.05
921.36 921.36
59.28 59.28
227.04 227.04
17.67 17.67 17.67 17.67
945.03 945.03 945.03 945.03
161.89 161.89 161.89 161.89
631.37 631.37 631.37 631.37
945.03 945.03 1,576.41 1,963.05 1,552.73 1,552.73 227.04 227.04
2.30% 2.30% 3.83% 4.77% 3.77% 3.77% 0.55% 0.55%
4,452.75 5,397.78 6,974.19 8,937.23 10,489.96 12,042.70 12,269.74 12,496.78
10.82% 13.11% 16.94% 21.71% 25.48% 29.25% 29.81% 30.36%
20 21 22 23 24 25 26 27
59.28 59.28
227.04 227.04
9.00 9.00
285.03 285.03
19.20 19.20
246.72 246.72
5.06 5.06
2,025.27 2,025.27
35.34 35.34
419.07 419.07
19.20 19.20
63.74 63.74
3.55 3.55
1,156.28 1,156.28
12.24
317.90
27.84
580.19
7.34
32.66
4.54
1.35
6.32
21.35
9.11
32.64
3.73
51.32
3.95
58.87
3.88
9.64
53.97
479.84
9.64
35.42
9.64
6.60
18.45
400.18
330.00
28.41
16.53
4.34
17.01
81.98
12.00
19.65
8.27
25.00 3.40
153.50
153.50
0.37%
41,165.13
100.00%
CONTRATO NRO:
TOTAL=
A OBRA CONTRACTUAL: PLANILLA DE AVANCE DE OBRA No. 01 ANTICIPO:
CANTIDADES IMPORTANTE
TOTAL CONTRATO TOTAL A LA %
TOTAL ANTERIOR ESTE PERIODO TOTAL ANTERIOR
FECHA
836.16 - - 0% -
114.38 - - 0% -
69.68 - - 0% -
62.43 - - 0% -
24.94 - - 0% -
580.19 - - 0% -
32.66 - - 0% -
153.50 - - 0% -
41,163.99 BAC
4,452.75 PV
ANTICIPO: 0.00
1% I. RENTA: 0.00
TOTAL DESCUENTOS: 0.00
VALOR LIQUIDO DE LA PALANILLA: 0.00
30.00% 12,349.20
2,166.38 2,166.38
61.90 61.90
2,228.28 2,228.28
3,961.37 3,961.37
4.2
BAC $41,163.99
PV $4,452.74
EV $6,189.65
AC $6,107.71
SV $1,736.90
CV $81.94
SPI $1.39
CPI $1.01
EAC $40,619.03
VAC $544.97
por debajodel
presupuesto y
adelantado
CONTRATO NRO:
RUBRO DESCRIPCION
NRO.
1 MOVIMIENTO DE TIERRAS
1.1 LIMPIEZA DEL TERRENO
1.2 DESALOJO DE ESCOMBROS
1.3 REPLANTEO Y NIVELACIN
1.4 EXCAVACIN PARA CIMENTACIN
1.5 RELLENO COMPACTADO MATERIAL PTREO GRUESO
1.6 RELLENO COMPACTADO CON SUELO NATURAL
2 ESTRUCTURA
2.1 ENCOFRADO Y DESENCOFRADO DE ZAPATAS
2.2 ARMADO DE ZAPATAS
2.3 ENCOFRADO Y DESENCOFRADO DE VIGAS
2.4 ARMADO DE VIGAS
2.5 ENCOFRADO COLUMNAS
2.6 ARMADO DE COLUMNAS
2.7 DESENCOFRADO COLUMNAS
2.8 ENCOFRADO DE LOSA TANQUE
2.9 ARMADO Y FUNDICION DE TANQUE (Incluye paredes y losa)
2.10 DESENCOFRADO DE LOSA TANQUE
2.11 ENCOFRADO PAREDES TANQUE
2.12 DESENCOFRADO PAREDES TANQUE
2.13 HORMIGN SIMPLE f'c 180 kg/cm2 - REPLANTILLO
2.14 HORMIGN SIMPLE f'c= 180 kg/cm2 - CONTRAPISO
2.15 HORMIGN SIMPLE f'c= 210 kg/cm2 - COLUMNAS y VIGAS
2.16 HORMIGN SIMPLE f'c= 210 kg/cm2 - LOSA
2.17 ESCALERAS METALICAS
3 TANQUE
3.1 TUBO GALVANIZADO D=2"
3.2 TUBERIA PVC D = 2"
3.3 PELDAOS TUBO GALVANIZADO D=2"
3.4 TAPA METLICA
3.5 LLAVES DE PASO D = 3/4"
4 ACABADOS
4.1 PINTURA CAUCHO TANQUE
4.2 PINTURA ESCALERA METLICA
4.3 LIMPIEZA FINAL
PLANILLA OBRA CONTRACTUAL: PLANILLA DE AVANCE DE OBRA No. 02
ANTICIPO:
1% I. RENTA:
TOTAL DESCUENTOS:
VALOR LIQUIDO DE LA PALANILLA:
2 ANTICIPO: 30.00% 12,349.20
RECIBO:
DESCONTADO A LA FECHA: 5,048.50
POR DESCONTAR: 7,300.70
- 0% - - - -
- 0% - - - -
- 0% - - - -
- 0% - - - -
- 0% - - - -
-
- 0% - - - -
- 0% - - - -
- 0% - - - -
BAC $ 41,163.99
PV $ 35,793.15
AC $ 14,342.29
SV -$ 21,368.89
CV $ 81.97
SPI 0.40
CPI 1.01
EAC $ 40,930.07
VAC $ 81.97
por ENCIMA del
ariacion del cronograma presupuesto y
ariacion del costo adelantado
ndice de desempeo del cronograma
ndice de desempeo del costo
stimacion optimista
stimacion realista
stimacion pesimista
ariacion optimista
ariarion Realista
ariavion Pesimista