Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units

ii) Number of standby mills a) At 100% of TMCR, : One


worst coal firing

b) At 100% BMCR, : Nil


worst coal firing

c) At 100% BMCR, : One


design coal firing
iii) Sizing of coal pulverizers confirming to clause (i) and (ii) above shall be
under following conditions all occurring simultaneously:

a) Maximum permissible mill 90% or the mill loading achievable


loading for deciding mill corresponding to the near worn out
capacity conditions of mill grinding
rolls/balls/tyres etc. whichever is
less. This condition shall be
complied for the range of specified
coals including the adequacy range
of coals.

b) Rated pulverized coal Not less than 70% thru 200 mesh
fineness at rated capacity of (75 microns) and 98% thru 50
the pulverizer mesh (300 microns).

c) Input coal size Upto 50 mm.

8.5.3 Classifier design

i) Static/ dynamic classifier capable of maintaining rated conditions of


fineness as specified under all conditions of operation, load changes and
specified fuels shall be provided. Further, the classifier vanes shall be
adjustable externally.

ii) Fineness adjustment shall be possible while the mills are in service.

iii) Outlet shall be of aerodynamic shape to prevent eddies. The classifier


vanes and cones shall be lined with wear resistant material to ensure the
guaranteed wear life.

iv) In case of static classifier, provision for accommodating rotary classifier


in place of stationary classifier in future shall be made in the mill/ boiler
design. For this purpose, necessary structure, pulverized coal piping, spare
piece etc. shall be provided.

8.5.4 Adequate vibration isolation of mills shall be ensured so that no adverse


affects are transmitted to the nearby structure/installations.