ITEM DESCRIPCION UND CANTIDAD

1 PAVIMENTACION
1.01 SUBRASANTE M2
1.02 SUBBASE GRANULAR M3
1.03 BASE GRANULAR M3 26,700.00
1.04 IMPRIMACIN ASFALTICA M2 12,400.00
1.05 CARPETA ASFALTICA M3 11,700.00
11.4
H:V 1.5:1 e=0.10 m
12.05
e=0.10 m

12.7

14

15.4625
Descripcion Und Base Mayor (m) Base Menor (m) Espesor Area (m2)
MACS: m3 12.05 11.40 0.10 1.17
Berma mezcla asfaltica m2 12.7 12.05 0.1 1.24
Base Granular m3 14.00 12.70 0.2 2.67
Sub base Granular m3 15.4625 14 0.225 3.31

11.4
H:V 5:1 e=0.10 m
12.05
e=0.10 m
13.2975

14.1975

15.21
Descripcion Und Base Mayor (m) Base Menor (m) Espesor Area (m2)
MACS: m3 12.05 11.40 0.10 1.17
Berma mezcla asfaltica m2 13.2975 12.8475 0.1 1.31
Base Granular m3 14.20 13.30 0.2 2.75
Sub base Granular m3 15.21 14.1975 0.225 3.31
H: V 5:1 MACS
BASE GRANULAR
SUBBASE GRANULAR

SUBRASANTE

Distancia (m) Total


10,000.00 11,700.00
10,000.00 12,400.00
10,000.00 26,700.00
10,000.00 33,100.00

H: V 1.5:1 MACS

Distancia (m) Total


10,000.00 11,700.00
10,000.00 13,100.00
10,000.00 27,500.00
10,000.00 33,100.00