Earth work

Length Breadth Depth / Height Total Area Total Volume


Sl. No. Description of Item (L) (B) (D/H) Sq. Ft. Cu. Ft.
Ft. Ft. Ft.
1 Footing excavation 5.5 6.5 5 35.75 178.75
2 Sump excavation 8.5 8.5 6 72.25 433.5
Foundation excavation 49 2 2.5 98 245
Foundation excavation 25 2 2.5 50 125
Foundation excavation 13 2 2.5 26 65
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

282 1047.25
Date :
work
Quantity Rate Per Miscellaneous
Amount Toal amount Explanatory Notes
Unit Amount

14 8.5 21271.25 100 21371.25 8.5 rs. / sq. f


1 8 3468 3468
3 8 5880 5880
1 8 1000 1000
3 8 1560 1560
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

33279.25
Civil Construc
Sl. No. Date Description / Perticulars Quantity

1 2-Aug-17 Solid Brick , 6" 500


2 3-Aug-17 Watchmen Shed Door 2
3 3-Aug-17 Watchmen Toilet Door 1
4 3-Aug-17 Watchmen Shed Cement Sheet 10
5 3-Aug-17 Transport Tata ace (door / Cement Sheet) 0
3-Aug-17
Civil Construction Materials
Unit of measurment Rate Per Unit Amount Miscellaneous Toal amount

Nos. 31 15500 100 15600


Nos. 4000 7900 100 8000
Nos. 400 400 0 400
Lumpsum 0 800 0 800
Lumpsum 0 300 0 300
Explanatory Notes Name - Phone no.

Ravi - 9845278817
Imran - 9980562449
Civil Construction Ma
Sl. No. Date Description / Perticulars Quantity / Unit Rate Per Unit
1 2-Aug-17 Solid Brick , 6" 500 31
2
onstruction Materials
Amount Miscellaneous Toal amount Explanatory Notes Name - Phone no.
15500 100 15600 Ravi - 9845278817