(Ton-m)
P (Ton) P (Ton) P (Ton)
X y X y X
muerta viva Mm Mv Mm Mv muerta viva Mm Mv Mm Mv muerta viva Mm
G 7 30.93582 3.894 0.134 0.0033 0.716 0.121 14 54.3333 8.19814 0.087 -0.0027 0.009 0.021 19 29.7568 4.23804 0.133
F 6 29.88411 3.7711 -0.073 0.0059 0.514 0.115 13 51.3379 8.187501 -0.139 0.0014 0.091 0.023 18 31.392 4.10734 -0.071
E 5 33.60566 4.9399 0.162 0.0079 0.544 0.155 12 58.807 10.68192 0.136 0.0070 0.216 0.031 17 38.2765 5.38819 0.161
D 4 45.11907 7.6922 -0.151 0.0028 0.848 0.240 11 80.3936 16.6801 -0.228 -0.0035 0.204 0.047 16 48.3311 8.38074 -0.174
C 3 42.1123 6.016 -0.076 0.0011 0.900 0.183 10 66.8809 12.65538 -0.174 -0.0147 -0.208 0.030 15 35.5341 6.51552 -0.029
B 2 32.73057 6.1235 -0.009 0.0018 0.577 0.194 9 33.5867 6.427527 -0.059 -0.0103 -0.528 -0.185 183.291 28.6298
A 1 32.36607 4.9155 -0.032 0.0008 0.643 0.149 8 32.831 4.911442 -0.044 -0.0044 -0.630 -0.151
246.7536 37.352 378.17 67.74202
Vigas de Cimentacion
C-6 C-13
F
E
C-5 C-12
C-4 C-11
D
C-3 C-10
C
C-2 C-9
B
C-1 C-8
A
Mto. (Ton-m)
X y
Mv Mm Mv
0.0046 -0.752 -0.1423
0.0076 -0.603 -0.1342
0.0098 -0.733 -0.1815
0.0043 -1.024 -0.2829
0.0015 -0.715 -0.2171
2 3
C-2 C-9
C-1 C-8
DISEO DE VIGA DE CONEXIN
A B C
EJE 1-1:
CARGAS (Ton)
P (Ton)
Col b t Pcm Pcv P Pu Ru
A 0.35 0.35 42.11 6.02 48.13 60.16 72.5
B 0.35 0.35 66.88 12.66 79.54 100.51 121.8
C 0.30 0.30 35.53 6.52 42.05 53.07 64.3
Predimensionado Predimensiona
h= L/7 = 4.15 / 7 = 0.59 m Asumir : h = 0.60 m
b= h / 2 = 0.60 /2 = 0.30 m
b= Pu1/31L = 60.2 / 129 = 0.47 m Asumir : b = 0.40 m
b= a ,b = = 0.35 m
Peralte : d= 60.0 - 5.00 - - 1.59 - 0.64 rec = 5.00 cm
d= 52.78 cm ESTRIBO = 5/8''
vari .= 1/2''
Diagrama de Momentos : Diagrama de M
Mu = 51.14 Ton-m
Md
Mu = Md
3.48 2.60
Md = 38.26 Ton-m
h/4 = 0.15
f' c
As min = 0.8 bd Mu = 38.26 x10^5 =19.19cm
fy As
= 5.83cm a 0.9 ### x(52.78- 0.04)
fy(d )
14bd 2
fy
Mu
As
a
fy(d )
As min = 14bd 0 2
fy = 7.04cm Asfy = 19.19 x 4200 =0.09cm
a
As min = 7.04cm 0.85fcb 0.85 x 210 x 5278
5/8'' As (cm)
usar para As min 4 Vari. 7.92 ok
se usar :
As = 19.19 cm 1 '' 5/8'' As (cm) sh
2 Vari. 5 Vari. 20.03 2.85 ok usar 2 1 '' + 5 5/8''
Refuerzo Tranversal :
Corte tomado por el concreto :
Vc = 0.53 f ' c Bd
Vc = 16.2 Ton
Vc = 0.85 Vc = 13.8 Ton Vu < Vc Ok CONFORME
Colocar acero Mnimo :
3.5bs
Avmin ; tomando estribos de 3/8'' A = 1.43cm
fy
2 1 '' + 5 5/8''
1.38
4 5/8''
b= h / 2 = 0.70 / 2 = 0.35 m
b= Pu1/31L = 53.1 / 143 = 0.37 m Asumir : b = 0.45 m
b= a ,b = = 0.35 m
Peralte : d = 70.0 - 5.00 - - 1.59 - 0.64 rec = 5.00 cm
d = 62.78 cm ESTRIBO = 5/8''
vari .= 1/2''
Diagrama de Momentos :
Mu = 51.74 Ton-m
Md
Mu = Md
3.80 2.85
Md = 38.80 Ton-m
h/4 = 0.175
f' c
As min = 0.8 bd Mu = 38.80 x10^5 =16.36cm
fy As
= 7.80cm a 0.9 ### x(62.78- 0.03)
fy(d )
14bd 2
fy
Mu
As
a
fy(d )
As min = 14bd 0 2
fy = 9.42cm Asfy = 16.36 x 4200 =0.06cm
a
As min = 9.42cm 0.85fcb 0.85 x 210 x 6278
3/4'' As (cm)
usar para As min 4 Vari. 11.40 ok
se usar :
As = 16.36 cm 3/4'' 1 '' As (cm) sh
4 Vari. 1 Vari. 16.47 ### ok usar 4 3/4'' + 1 1 ''
Refuerzo Tranversal :
Corte tomado por el concreto :
Vc = 0.53 f ' c Bd
Vc = ###
Vc = 0.85 Vc =184.4 Ton Vu < Vc Ok CONFORME
Colocar acero Mnimo :
3.5bs
Avmin ; tomando estribos de 3/8'' A = 1.43cm
fy
Avmin
s fy = 1.43 x 4200 = 38.00 cm
3.5b 3.50 x 45.00
Separacin mnima por sismo :
.-) 1 a 0.05
d/4 = 15.69 cm
.-) 2h = 1.40 m 8db = 20.32 cm
So
24estr = 22.86 cm
Minimo = 30.00 cm
4 ### + 1 1 ''
1.53
4 3/4''
0.70
. 0.60 0.45
0.10 4 3/4''
2.25 1.15 3.35
TRAMO: A B
A B
0.60 0.60
2.50 3.10
EJE 7-7:
CARGAS (t):
Col b t Cm Cv P Pu Ru
A 0.30 0.30 47.21 5.15 52.36 74.85 96.00
B 0.30 0.30 64.58 12.73 77.31 112.05 133.20
PRE-DIMENSIONADO:
h= L/7 = 3.81 / 7 = 0.54 m ASUMIR: h = 0.80 m
b= h / 2 = 0.80 /2 = 0.40 m
b= Pu1/31L = 75 / 118 = 0.63 m ASUMIR: b = 0.45 m
b= a ,b = = 0.35 m
Mu = 80.46 Ton-m
Md
Mu = Md
2.93 1.88
Md = 51.63 Ton-m
h/4 = 0.2
Vu = Ru1 - Pu1 = 96 - 75
Vu = 21.15 Ton
Pu1= 74.8 Ton
DETERMINACIN DEL AREA DE REFUERZO:
REFUERZO LONGITUDINAL:
f'c = 210 Kg/cm
f y = 4200 Kg/cm
0.8(^
As min = )/ = 0.09cm Mu = 51.63 x10^5 =0.00cm
As
a 0.9 x 4200 x(73.25- 0.00)
fy(d )
As min = 14()/ = 10.99cm 2
Asfy = 18.65 x 4200 =0.00cm
a
As min = 10.99cm 0.85fcb 0.85 x 210 x 0.45
5/8'' As (cm)
USAR As min:
6 VAR. 11.88 OK!
se usar :
As = 18.653 cm 5/8'' 1 '' As (cm) sh
6 Vari. 2 Vari. 22.010 2.93 ok usar 6 5/8'' + 2 1 ''
Refuerzo Tranversal :
Corte tomado por el concreto : Vc = 0.53 f ' c Bd
Vc = 25.3 Ton
Vc = 0.85 Vc = 21.5 Ton Vu < Vc Ok CONFORME
Colocar acero Mnimo :
3.5bs
Avmin ; tomando estribos de 3/8'' A = 1.43cm
fy
6 5/8'' + 2 1 ''
hVIGA = 0.80
0.60 0.60
0.10 6 5/8''
2.50 0.31 3.10
=0.00cm
1 ''
5/8''
0.60
DISEO DE VIGA DE CONEXIN:
TRAMO: A B
A B
0.60 0.60
2.50 3.10
EJE 7-7:
CARGAS (t):
Col b t Cm Cv P Pu Ru
A 0.30 0.30 47.21 5.15 52.36 74.85 96.00
B 0.30 0.30 64.58 12.73 77.31 112.05 133.20
PRE-DIMENSIONADO:
h= L/7 = 3.81 / 7 = 0.54 m ASUMIR: h = 0.80 m
b= h / 2 = 0.80 /2 = 0.40 m
b= Pu1/31L = 75 / 118 = 0.63 m ASUMIR: b = 0.45 m
b= a ,b = = 0.35 m
Mu = 80.46 Ton-m
Md
Mu = Md
2.93 1.88
Md = 51.63 Ton-m
h/4 = 0.2
Vu = Ru1 - Pu1 = 96 - 75
Vu = 21.15 Ton
Pu1= 74.8 Ton
DISEO DEL REA DE REFUERZO
1). REFUERZO LONGITUDINAL:
1.1) ACERO MNIMO
=()/
(.^ )
DIMENSIONES NOMINALES
EJE A - A:
EJE B - B:
EJE C - C:
TRAMO: A B
A B
0.60 0.60
2.50 3.10
EJE 7-7:
CARGAS (t):
Col b t Cm Cv P Pu Ru
A 0.30 0.30 47.21 5.15 52.36 74.85 96.00
B 0.30 0.30 64.58 12.73 77.31 ### ###
PRE-DIMENSIONADO:
h= L/7 = 3.81 / 7 = 0.54 m ASUMIR: h = 0.80 m
b= h / 2 = 0.80 / 2 = 0.40 m
b= Pu1/31L = 75 / 118 = 0.63 m ASUMIR: b = 0.45 m
b= a ,b = = 0.35 m
Mu = 80.46 Ton-m
Md
Mu = Md
2.93 1.88
Md = 51.63 Ton-m
h/4 = 0.2
Vu = Ru1 - Pu1 = 96 - 75
Vu = 21.15 Ton
Pu1= 74.8 Ton
DETERMINACIN DEL AREA DE REFUERZO:
REFUERZO LONGITUDINAL:
f'c = 210 Kg/cm
f y = 4200 Kg/cm
0.8(^
As min = )/ = 9.10cm
As
Mu = 51.63 x10^5 =18.65cm
a 0.9 ### x(73.25- 0.03)
fy(d )
As min = 14()/ = 10.99cm 2
Asfy = 18.65 x 4200 =0.00cm
a
As min = 10.99cm 0.85fcb 0.85 x 210 x 73.25
5/8'' As (cm)
USAR As min:
6 VAR. 11.88 OK!
se usar :
As = 18.653 cm 5/8'' 1 '' As (cm) sh
6 Vari. 2 VAR. 22.010 2.93 ok usar 6 5/8'' + 2 1 ''
Refuerzo Tranversal :
Corte tomado por el concreto : Vc = 0.53 f ' c Bd
Vc = 25.3 Ton
Vc = 0.85 Vc = 21.5 Ton Vu < Vc Ok CONFORME
Colocar acero Mnimo :
3.5bs
Avmin ; tomando estribos de 3/8'' A = 1.43cm
fy
6 5/8'' + 2 1 ''
hVIGA = 0.80
0.60 0.60
0.10 6 5/8''
2.50 0.31 3.10
=0.00cm
1 ''
5/8''
0.60
DISEO DE VIGA DE CONEXIN:
TRAMO: A B
A B
0.60 0.60
2.50 3.10
EJE 7-7:
CARGAS (t):
Col b t Cm Cv P Pu Ru
A 0.30 0.30 0.00 0.00 0.00 0.00 0.00
B 0.30 0.30 0.00 0.00 0.00 0.00 0.00
PRE-DIMENSIONADO:
h= L/7 = 3.81 / 7 = 0.54 m ASUMIR: h = 0.80 m
b= h / 2 = 0.80 /2 = 0.40 m
b= Pu1/31L = 0 / 118 = 0.00 m ASUMIR: b = 0.45 m
b= a ,b = = 0.35 m
Mu = 0.00 Ton-m
Md
Mu = Md
2.93 1.88
Md = 0.00 Ton-m
h/4 = 0.2
Vu = Ru1 - Pu1 = 0 -0
Vu = 0.00 Ton
Pu1= 0.0 Ton