Wafa Field Mitigation Plan - Tie-in Schedule DATE 07/03/2016
Rev Tie-In System Description P & ID New Line Existing Line Operating Design (Hold 2)
Plant
Number
Shutdown Tie in Type Remarks
Size New Line Pipe Insulation Size Existing Line Insulation Temperature Flow Temperature Required
Drawing Number Pipe Class Pressure (barg) Pressure (barg)
(inch) Number Class Type (inch) Number Type ( ) (m3/hr) ( )
Tie-in of NG-1 Gas Trunkline at downstream
01 1 130 of Check Valve RC052A to new Common J-52-D-O-1013-01 16 XXX CA731 Z 16 52 CA731 Z 53.0 74.0 100 89.0 No A3 See Notes.
Header
This Drawing is based on
Tie-in to Split SG1 gas production (J-52-D-O- Doument (D-52-1225-123j
01 2 130 16 XXX CA731 Z 16 010 CA731 Z 55.0 74.0 100 89.0 No A3 See Notes.
1013-01 SHT 3OF 4) Revision F1) (J-52-D-O-1013-
01 SHT 3OF 4)
01 3 130 Tie-in to Gas Slug Catcher 20-130-VQ-002 J-52-D-O-1013-02 24 XXX CA731 Z 36 062 CA731 Z 46 to 48 19 - 74 100 89.0 No A1 See Notes.
REV O1 Preliminary Issue '1. Operating and design conditions are all as per existing P&IDs.
F Cold Insulation (Temp. from -273 to +5C) X Acoustic Insulation (-10 dB)
A3 Flanged (or screwed) joint C Line not emptied: