Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Dr Mostafa Ghasemi
Email: mostafa.baboli@utp.edu.my
Ext:7375
Room: No.8, 2nd floor, Block J3
Principle of Superposition
Superposition in Space
Superposition is summation of all individual parts (responses) that contribute
to the total system.
= + +
Where, = ()
Superposition in Space
70.6 948 2
OR (, ) = +
70.6 948 2
+
70.6 948 2
+
Superposition in Space
If we have a well producing at a constant production rate, the
pressure in that well is a function of its own production as well
as the production from the surrounding wells.
= + +
Superposition in Space
70.6 948 2
, = + 2
2
70.6 948
+
70.6 2
948
+
Example 1: Multiwell test
For the conditions shown in the figure below, estimate the pressure at Well 1 after 7 hours of
production. Well 1 is producing with a rate of 100 STB/D and Well 2 production rate is 25 STB/D.
12 = 100
Well Well
1 2
+
= h=20 ft
= 1 = 0.2
=76 md = 10 106 1
=1 cp B=1.08 RB/STB
S (@well 1)=5
2 2 2
70.6 948 70.6 948 70.6 948
, = + 2 + +
12 = 100
Well Well
1 2
Solution:
70.61 2
948 70.62 2
948 12
,1 = + 2 +
,1
70.6 100 1 1.08 948 0.2 1 10 106 12
= 2200 + 25
76 20 76 7
70.6 25 1 1.08 948 0.2 1 10 106 1002
+
76 20 76 7
Example 1 Solution contd
The most important application of superposition is in modeling variable rate test (including
buildup test). Assuming the three
Consider the case in the figure below: wells are located at the
same place, but
t produce at different
2
time as shown below:
1
q 1
3 = Well 1
0 1 2 t
(2 1 )
+ Well 2
+0
2
Well 3
(3 2 )
Superposition in Time Contd
Using the concept of superposition in space, the pressure at the well with the rate change
shown before becomes:
70.61 948 2
= + 2
70.6(2 1 ) 2
948
+
(1 )
2
70.6(3 2 ) 2
948
+
(2 )
2
Superposition in Time
For a general rate change case as shown in the figure below:
70.6( 1 ) 948 2
= + 2
=1
( 1 )
Or
70.6 948 2
= + ( 1 ) 2
=1
( 1 )
Example 2: Variable rate test
A flowing well is completed in a reservoir that has the following properties.
= h=43 ft
= 0.35 = 0.16
= 25 md = 18 106 1
= 0.44 cp B=1.32 RB/STB
S =2
Calculate the pressure in the well after 11 days for the following rate history.
2 = 350
2 = 350
=
3
70.6 948 2 70.6 948 2
+ ( 1 ) 2 = + (1 0) 2 + (2
( 1 ) 0
=1
Example 2 solution
1 = 250
t=11*24=264 hrs
t1=120 hrs 2 = 350
t2=168 hrs
3 = 100
= 11
= 2500 + 0.038 250 17.042 4 + 100 16.436 4 + (250) 16.03 4
= 2500 + 0.038 5260.5 2043.6 + 5007.53 = 2500 232.856 = 2412.73
Build up and Superposition
Buildup Test
Horner Plot Relationship Buildup Semilog Plots Infinite Reservoir