Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO

TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADO DE ALCANTARILLAS TIPO MC

601.A 605.A 610.D 610.E 610.H 610.G 612.A ENCOFRADO Y DESENCOFRADO 615.00 640.A 642.A
CARACTERISTICAS GEOMETRICAS ACERO
EXCAVACION CONCRETO CONCRETO CONCRETO CONCRETO CLASE EMBOQUILL. LIMPIEZA
RELLENO PARA Encofrado de Encofrado de Encofrado
TIPO PARA CLASE D CLASE E CLASE H G (f'c=140 DE PIEDRA DE CAUCE
N Ubicacin Seccin Longitud AREA AREA e ESTRUCTURAS Cimentacin Elevacin de Losa fy=4200
SECC. N de ojos Esviajamiento ESTRUCTURAS. (f'c=210 k/cm2) (f'c=175 k/cm2) (f'c=100 k/cm2) k/cm2+30%P.G.) E=0.15m ALCANTARI
m CORTE RELL. m Kg/cm2
BxH m3 m3 m3 m3 m3 m2 m2 m2 m2 kg. m2 LLAS
m3
1 15+824 MC 1.00x1.00 1.00 13.80 1 36.70 2.86 0.20 - 73.40 33.32 18.55 0.79 7.59 55.20 13.80 634.22 108.28
2 15+868 MC 0.70x0.70 0.70 10.70 1 13.36 3.33 0.20 - 22.71 20.64 10.81 0.44 5.35 29.96 7.49 324.01 1.27
3 17+206 MC 0.50x0.50 0.50 12.80 1 59.00 2.86 0.15 - 88.50 17.09 6.76 0.37 5.12 25.60 6.40 357.97 34.00 0.13
4 19+793 MC 1.00x1.00 1.00 12.20 1 19.38 0.62 0.20 - 38.76 25.64 16.75 0.71 6.71 48.80 12.20 576.33 1.04
5 22+133 MC 0.50x0.50 0.50 8.90 1 0.00 2.46 0.15 - 0.00 12.59 6.23 0.27 3.56 17.80 4.45 269.08 0.97
6 22+300 MC 0.50x0.50 0.50 12.00 1 22.54 9.75 0.15 30 33.81 26.63 6.38 0.35 4.80 24.00 6.00 339.33 -
7 27+484 MC 3.00x3.00 3.00 15.60 1 99.40 2.21 0.35 - 397.60 102.44 105.29 2.64 15.60 187.20 46.80 1,847.15 -
8 28+950 MC 0.50x0.50 0.50 11.65 1 31.88 1.27 0.15 - 47.82 13.56 6.21 0.34 4.66 23.30 5.83 331.18 119.56
9 29+031 MC 1.00x1.00 1.00 10.50 1 10.05 2.59 0.20 - 20.09 26.18 14.85 0.63 5.78 42.00 10.50 514.82 9.90 4.28
10 29+459 MC 1.00x1.00 1.00 10.50 1 28.19 4.13 0.20 - 56.38 29.26 14.85 2.31 0.63 5.78 42.00 10.50 514.82 14.10 25.04
11 30+580 MC 3.00x3.00 3.00 20.90 1 3.48 8.12 0.35 - 13.92 157.88 132.29 8.55 3.44 14.13 20.90 250.80 62.70 2,199.15 38.00
12 32+108 MC 0.70x0.70 0.70 12.40 1 27.33 6.43 0.20 - 46.46 28.29 12.31 0.50 6.20 34.72 8.68 363.73 3.18
13 32+210 MC 0.70x0.70 0.70 11.10 1 32.45 0.60 0.20 - 55.17 16.56 11.16 2.05 0.46 5.55 31.08 7.77 333.36 1.23
14 32+641 MC 0.70x0.70 0.70 10.20 1 18.56 12.71 0.20 - 31.55 35.89 10.37 3.70 0.43 5.10 28.56 7.14 312.33 19.44 1.82
15 33+263 MC 2.00x2.00 2.00 11.20 1 33.39 1.55 0.30 - 100.17 49.45 45.95 15.20 1.32 19.80 8.96 89.60 22.40 1,139.57 16.80 53.09
16 33+390 MC 0.50x0.50 0.50 12.10 1 55.06 7.39 0.15 - 82.59 23.19 6.43 0.35 4.84 24.20 6.05 341.66 4.22
17 33+783 MC 2.00x2.00 2.00 12.80 1 88.75 10.83 0.30 62 266.25 83.69 50.95 16.00 1.48 34.25 10.24 102.40 25.60 1,244.55 138.43
18 33+966 MC 0.70x0.70 0.70 10.80 1 20.25 0.72 0.20 - 34.43 16.34 10.90 2.05 0.45 5.40 30.24 7.56 326.35 8.51 0.62
19 34+362 MC 1.00x1.00 1.00 10.90 1 16.80 0.60 0.20 - 33.60 23.00 15.30 0.65 6.00 43.60 10.90 529.29 12.00 0.14
20 34+557 MC 0.50x0.50 0.50 9.60 1 27.28 0.11 0.15 - 40.92 9.77 5.23 0.29 3.84 19.20 4.80 283.43 0.11
21 34+981 MC 0.50x0.50 0.50 13.80 1 22.92 5.51 0.15 - 34.38 22.07 7.24 0.40 5.52 27.60 6.90 381.26 -
22 35+055 MC 0.50x0.50 0.50 12.90 1 12.23 3.49 0.15 - 18.35 18.14 6.81 0.37 5.16 25.80 6.45 360.29 17.13
23 36+720 MC 1.00x1.00 1.00 9.75 1 58.32 3.60 0.20 - 116.64 26.70 14.01 0.59 5.36 39.00 9.75 487.68
TOTAL 1,653.49 818.29 535.62 49.86 17.88 68.18 158.01 1,242.66 310.67 14,011.57 114.75 518.52

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO: ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

ETRADO DE ALCANTARILLAS TIPO MC

645A ANEXO (*)


Eliminacin de
DEMOLICION Alcantarillas
OBSERVAC.
TMC existentes
m3 und.

217.00

196.67

258.90

290.40

962.97 0.00

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO: ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO

645.A DEMOLICION DE ESTRUCTURAS

Area Longitud Nmero de


ALCANTARILLA ELEMENTO Cantidad
m2 m veces

losa 6.00 7.00 1.00 1.00

Estribo Izquierdo
8.75 10.00 1 1

27+483.5
Estribo Derecho
8.75 10.00 1 1

TOTAL

losa 8.31 5.00 1.00 1.00

Estribo Izquierdo
5.60 13.85 1 1

30+580
Estribo Derecho
5.60 13.85 1 1

TOTAL

losa 4.80 8.00 1.00 1.00

Estribo Izquierdo
15.75 7.00 1 1

33+263
Estribo Derecho
15.75 7.00 1 1

TOTAL

losa 4.80 8.00 1.00 1.00

Estribo Izquierdo
15.75 8.00 1 1

33+783.32
Estribo Derecho
15.75 8.00 1 1

TOTAL

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO: ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
645.A DEMOLICION DE ESTRUCTURAS

Parcial

42.00

87.50

87.50

217.00

41.55

77.56

77.56

196.67

38.40

110.25

110.25

258.90

38.40

126.00

126.00

290.40

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO: ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO