GENERAL 3.0 BULK EARTHWORKS 5.07 WHERE FOOTINGS ARE OVER-EXCAVATED, FILL OVER-EXCAVATED
AREAS WITH BLINDING CONCRETE GRADE SAME AS FOOTING TO A
1.01 TECHNICAL SPECIFICATIONS OR SPECIFIC INSTRUCTIONS ON 3.01 ALL EXCAVATION WORK TO BE CARRIED OUT TO THE SATISFACTION OF MINIMUM THICKNESS OF 50mm.
DRAWINGS TAKE PRECEDENCE OVER THESE NOTES. THE GEOTECHNICAL CONSULTANT INCLUDING INSPECTION OF
STRIPPING, APPROVAL OF FILL MATERIAL AND APPROVAL OF 5.08 KEEP FOOTINGS CLEAN AND FREE OF LOOSE MATERIAL BEFORE
1.02 THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL COMPACTION. INSPECTION, IMMEDIATELY PRIOR TO POURING OF CONCRETE, AND
ARCHITECTURAL AND OTHER CONSULTANTS' DRAWINGS AND DURING POURING.
SPECIFICATIONS AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS 3.02 REFER TO THE GEOTECHNICAL REPORT FOR EXCAVATION CONDITIONS,
MAY BE ISSUED DURING THE COURSE OF THE CONTRACT. ANY INCLUDING NATURAL WATER LEVELS AND GROUND CONDITIONS. 5.09 DO NOT EXCEED A RISE OF 1000mm IN A RUN OF 3000mm FOR THE LINE
DISCREPANCY SHALL BE REFERRED TO THE ENGINEER BEFORE OF SLOPE BETWEEN ADJACENT FOOTINGS OR EXCAVATIONS.
PROCEEDING WITH THE WORK. CONSTRUCTION FROM THESE 3.03 REFER TO SURVEY DRAWINGS FOR EXISTING SERVICES AND LEVELS.
1.05 DURING CONSTRUCTION THE STRUCTURE, AND ANY ASSOCIATED 3.07 SITE SURFACE CONTOURS SHOWN ARE INDICATIVE ONLY. FOR TRUE 6.0 CONCRETE
EXCAVATIONS, SHALL BE MAINTAINED IN A STABLE CONDITION AND NO SURFACE LEVELS REFER SURVEY DRAWINGS. 6.01 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH
PART SHALL BE OVERSTRESSED. TEMPORARY BRACING SHALL BE
AS 3600 CURRENT EDITION WITH AMENDMENTS, EXCEPT WHERE
PROVIDED BY THE BUILDER TO KEEP THE WORKS AND EXCAVATIONS 4.0 SLAB ON GRADE VARIED BY THE CONTRACT DOCUMENTS.
STABLE AT ALL TIMES.
4.01 REMOVE ALL TOP SOIL INCLUDING ROOTS AND ANY OTHER ORGANIC
1.06 UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE IN MILLIMETRES MATTER. STORE TOP SOIL AS REQUIRED. 6.02 PRE-MIXED CONCRETE SUPPLY SHALL COMPLY WITH AS 1379.
(mm) AND ALL LEVELS ARE IN METRES (m) TO AUSTRALIAN HEIGHT
DATUM (AHD). 4.02 WHERE SHOWN ON THE DRAWINGS, BASE AND SAND BLINDING ARE TO 6.03 NO ADMIXTURES SHALL BE USED IN CONCRETE UNLESS APPROVED IN
BE PLACED AND COMPACTED AS SPECIFIED. WRITING.
1.07 ALL ABBREVIATIONS ARE IN ACCORDANCE WITH AS 1100. ADDITIONAL 6.04 CONCRETE MIX DESIGNS TO BE SUBMITTED FOR REVIEW PRIOR TO USE
ABBREVIATIONS USED ARE AS FOLLOWS: 4.03 EXCAVATE TO THE REQUIRED FORMATION LEVEL AND PROOF ROLL OF CONCRETE.
NSOP NOT SHOWN ON PLAN FORMATION WITH 6 PASSES OF A 10 TONNE SMOOTH WHEELED
NSOE NOT SHOWN ON ELEVATION ROLLER. SOFT AREAS ARE TO BE REMOVED AND REPLACED WITH 6.05 ENSURE CLEAR COVER TO REINFORCEMENT IS AS FOLLOWS UNLESS
UNO UNLESS NOTED OTHERWISE SUITABLE FILL COMPACTED TO THE DENSITY NOMINATED BELOW. DETAILED OTHERWISE.
U/S UNDERSIDE
GL GROUND LINE 4.04 CONTROLLED FILL MATERIAL SHALL MEET THE REQUIREMENTS OF THE COVER (mm)
FFL FINISHED FLOOR LEVEL GEOTECHNICAL REPORT. PLACE IN MAXIMUM 150mm THICK LAYERS TO FORMED - FORMED - NOT NOT FORMED -
98% STANDARD COMPACTION IN ACCORDANCE WITH AS 1289-E1.1 ELEMENT
EXPOSED TO EXPOSED TO CAST AGAINST
2.0 DESIGN DATA MAXIMUM DEPTH OF FILL IS TO BE 400mm FOR COHESIVE FILL AND WEATHER (B1) WEATHER (A1) GROUND
800mm FOR GRANULAR FILL.
FOOTINGS & PILES - - 50
2.01 THE STRUCTURAL COMPONENTS DETAILED ON THESE DRAWINGS HAVE
BEEN DESIGNED IN ACCORDANCE WITH THE RELEVANT STANDARDS 4.05 CLAY SUBGRADE FORMATION IS TO BE MAINTAINED AT OPTIMUM SLABS ON GROUND
40 20 -
AUSTRALIA CODES AND LOCAL GOVERNMENT ORDINANCES FOR THE MOISTURE CONTENT -0,+3% PRIOR TO COVERING. (TOP COVER)
FOLLOWING LOADINGS. REFER TO ARCHITECTURAL DRAWINGS FOR
PROPOSED FLOOR USAGE. 5.0 FOUNDATIONS 6.06 CONCRETE SIZES SHOWN DO NOT INCLUDE THICKNESSES OF APPLIED
FINISHES.
2.02 LIVE LOADS ARE IN ACCORDANCE WITH AS 1170.1. 5.01 FOUNDATIONS HAVE BEEN DESIGNED FOR THE FOLLOWING
ALLOWABLE PRESSURES: 6.07 DEPTHS OF BEAMS ARE GIVEN FIRST AND INCLUDE SLAB THICKNESS.
SUPERIMPOSED DEAD
FLOOR USAGE LIVE LOAD (kPa) 6.08 FOR CHAMFERS, DRIP GROOVES, REGLETS, ETC., REFER TO
LOADS (kPa)
BEARING PRESSURE SHAFT ADHESION ARCHITECTURAL DETAILS. MAINTAIN COVER TO REINFORCEMENT AT
ELEMENT
RESIDENTIAL (kPa) (kPa) THESE DETAILS.
- INTERNAL 0.50 1.5 WAFFLE SLAB, PAD &
150 - 6.09 NO HOLES, CHASES OR EMBEDMENT OF PIPES OTHER THAN THOSE
- WET AREAS 1.00 1.5 STRIP FOOTINGS
SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE MADE IN
PILES 300 25 CONCRETE MEMBERS WITHOUT THE PRIOR WRITTEN APPROVAL OF
- BALCONIES 0.50 2.0
THE ENGINEER.
5.02 THE FOUNDATION MATERIAL SHALL BE APPROVED BY THE
2.03 WIND LOADS ARE IN ACCORDANCE WITH AS 1170.2-2002 AS FOLLOWS: 6.10 CONSTRUCTION JOINTS WHERE NOT SHOWN SHALL BE LOCATED TO
GEOTECHNICAL ENGINEER FOR THIS BEARING CAPACITY BEFORE
REGIONAL WIND SPEED: V = 46 m/s PLACING ANY MEMBRANE, REINFORCEMENT OR CONCRETE. WHERE THE APPROVAL OF THE ENGINEER.
R
NECESSARY, THE FOOTING DESIGN MAY BE ALTERED.
ANNUAL PROBABILITY OF EXCEEDANCE = 1:1000 6.11 THE FINISHED CONCRETE SHALL BE A DENSE HOMOGENEOUS MASS,
5.03 SITE CLASSIFICATION IS ASSUMED CLASS 'M' IN ACCORDANCE WITH COMPLETELY FILLING THE FORMWORK THOROUGHLY EMBEDDING THE
REGION: A2
AS2870. THIS IS TO BE CONFIRMED ON SITE AFTER EXCAVATION HAS REINFORCEMENT AND FREE OF STONE POCKETS. ALL CONCRETE
TERRAIN CATEGORY: 3 TAKEN PLACE. INCLUDING SLABS ON GROUND AND FOOTINGS SHALL BE COMPACTED
WITH MECHANICAL VIBRATORS.
5.04 THE BUILDER SHALL BE RESPONSIBLE FOR MAINTAINING ANY
2.04 THE CONCRETE ELEMENTS HAVE BEEN DESIGNED FOR THE 6.12 CURING OF ALL CONCRETE IS TO BE ACHIEVED BY KEEPING SURFACES
EXCAVATIONS IN A STABLE CONDITION WITHOUT ADVERSELY
FOLLOWING EXPOSURE CLASSIFICATIONS IN ACCORDANCE WITH AS CONTINUOUSLY WET FOR A PERIOD OF 3 DAYS, AND PREVENTION OF
AFFECTING SURROUNDING PROPERTIES INCLUDING SERVICES. THIS
3600. LOSS OF MOISTURE FOR A TOTAL OF 7 DAYS FOLLOWED BY A
INCLUDES OBTAINING ALL NECESSARY APPROVALS FOR SHORING AND
ANCHORING SYSTEMS. GRADUAL DRYING OUT. APPROVED SPRAYED ON CURING COMPOUNDS
ELEMENT CLASSIFICATION THAT COMPLY WITH AS 3799 MAY BE USED WHERE FLOOR FINISHES
5.05 FOOTINGS SHALL BE LOCATED CENTRALLY UNDER WALLS AND WILL NOT BE AFFECTED (REFER MANUFACTURER'S SPECIFICATION).
EXTERIOR CONCRETE B1 COLUMNS UNLESS NOTED OTHERWISE. POLYTHENE SHEETING OR WET HESSIAN MAY BE USED TO RETAIN
INTERNAL CONCRETE A1
CONCRETE MOISTURE WHERE PROTECTED FROM WIND AND TRAFFIC.
5.06 FOOTINGS NEAR BOUNDARIES MUST NOT BE LOCATED HIGHER OR
LOWER THAN FOOTINGS OF ADJACENT PROPERTIES UNLESS
APPROVED.
7.0 REINFORCEMENT 8.07 UNLESS NOTED OTHERWISE, PROVIDE VERTICAL CONTROL JOINTS AT
9.14 FREE ALL MEMBERS FROM TWISTS AND DISTORTIONS BEFORE AND
AFTER WELDING.
7.01 REINFORCEMENTS SYMBOLS: 12.0m MAXIMUM CENTRES, AND 6.0m MAXIMUM FROM CORNERS IN ALL
S DENOTES GRADE 250 S HOT ROLLED DEFORMED BARS TO MASONRY WALLS U.N.O. 9.15 ALL MEMBERS TO BE IN ONE LENGTH, UNLESS OTHERWISE APPROVED.
AS 4671
N DENOTES GRADE D 500 N BARS TO AS 4671 GRADE N 8.08
SL & RL DENOTES GRADE 250 HOT ROLLED PLAIN BARS TO AS 4671
BACKFILL TO RETAINING WALLS TO BE FREE DRAINING GRANULAR
MATERIAL U.N.O. PROVIDE SUBSOIL DRAIN OR WEEP HOLES.
10.0 STRUCTURAL TIMBER
SQUARE & RECTANGULAR MESH RESPECTIVELY 10.01 ALL TIMBER DESIGN, CONSTRUCTION AND MATERIAL TO BE AS 1720.1
R DENOTES GRADE 250 HOT ROLLED PLAIN BARS TO AS 4671 8.09 ALL CAVITY CONSTRUCTION TO HAVE GALVANISED WALL TIES AND AS 1720.2 U.N.O.
W DENOTES HARD-DRAWN PLAIN WIRE TO AS 4671 INSTALLED AS PER CLAUSE 3.4 AND 4.10, AS 3700.
DW DENOTES COLD ROLLED RIBBED WIRE TO A.S 4671 10.02 AS 1684 SHALL BE APPLIED TO DOMESTIC CONSTRUCTION IN
SLABS ON GROUND A1 32 40
INTERNAL
A1 32 20
SUSPENDED SLABS
EXTERNAL
B1 32 40
SUSPENDED SLABS
PILES A1 32 75
P1 P1 P1
SF4
P1 P1 P1 P1 P1 P1 P1 P1
P1
SF4
P1 P1
SF2
SF1
P1 P1
SF2
SF2
P1
SF2
SF4
P1
SF1
EXISTING SWIMMING
POOL SHOWN P1
HATCHED P1 P1 P1
SF2
P1 P1 P1 P1 P1 P1 SF2 SF1
SF1
P1
SF2
SF2
SF2
P1
SF2
SF1
P1 SF1 SF1
SF1
P1 P1 P1 P1 P1 P1 P1 P1
SF2
SF4 SF2 SF2 SF2
NEW SLAB TO BE AT P1 P1
THE SAME LEVEL OF P1 P1
SF2
SF4
SF2
SF2
SF2
SF1
P1
SF1
SF2
P1
P1 SF1
SF1
SF1
SF1
P1 P1 P1 P1 P1 P1 P1 P1 P1
P1
120 W 120
EXISTING SWIMMING
POOL SHOWN 120
TR TR
HATCHED
TBC
TBC
TR 120
TR TR
EXISTING SLAB
TBC
TR
TBC
120
120
120
W
TR
TR
120
WEEPHOLES
SL92 MESH TOP
120
50mm MORTAR OR MIN. COVER 30 mm. COMPACT FILL
CONCRETE COMPACT FILL WATER PROOFING MEMBRANE
120
ON 50mm SAND BED
WATER PROOFING MEMBRANE
ON 50mm SAND BED
750 MAX.
NGL
600
WATER PROOFING MEMBRANE
ON 50mm SAND BED
600
600
300
3-L12 TRENCH MESH
450 TOP & BOT. WITH R10
4-L12 TRENCH MESH P1
TIES @ 900 C/C 50mm
P1 TOP & BOT. WITH R10
COVER MIN.
450 TIES @ 900 C/C 50mm
4-L12 TRENCH MESH COVER MIN.
P1 TOP & BOT. WITH R10 TYPICAL INTERNAL SF3
TIES @ 900 C/C 50mm SCALE 1:20
COVER MIN. TYPICAL INTERNAL SF2
SCALE 1:20 110
SL92 MESH TOP
TYPICAL EXTERNAL SF1 MIN. COVER 30 mm.
SCALE 1:20 270
1N16
120
SL92 MESH TOP SL82 MESH TOP
N12-400 Z-BARS MIN. COVER 30 mm.
800 MAX
MIN. COVER 30 mm. 85/50
500 LEGS
COMPACT FILL
120
COMPRESSIBLE FILLER
120
WATER PROOFING MEMBRANE
ON 50mm SAND BED
600 MAX.
120
230 COMPACT FILL
COMPACT FILL
100 MIN.
600
450 450
4-L12 TRENCH MESH 4-L12 TRENCH MESH
TOP & BOT. WITH R10 P1
P1 P1 TOP & BOT. WITH R10
TIES @ 900 C/C 50mm TIES @ 900 C/C 50mm
COVER MIN. COVER MIN.
TYPICAL EXTERNAL STEP DOWN
TYPICAL EXTERNAL SF4 SCALE 1:20 TYPICAL STEPDOWN SF5
SCALE 1:20 SCALE 1:20
D
CUT CORNER
FOOTINGS 25 20 80 A
SQUARE & 25 LAP SQUARE & 25 LAP
SLAB ON 1N12 Z-BAR E.F.
GROUND 25 20 80 A
ALL LAPS TO COMPLY WITH CONSTRUCTION NOTES FOR EACH LONGITUDINAL
BAR IN STRIP FOOTING 400 LEGS
SUSPENDED
SLABS 32 20 80 A
COLUMNS &
BEAMS MESH LAPPING DETAIL
NTS STEP IN STRIP FOOTING DETAIL
C3 Provide the following clear cover to all SCALE 1:20
reinforcement unless noted otherwise on the
drawings (clear cover to ties)
500
ELEMENT MIN. COVER (mm)
STRIP FOOTINGS 50
LESS THAN 200 TO
SLABS (INTERNAL) 20
SUIT COURSING
500
SLABS (EXTERNAL) 40
SLABS (ON GROUND) 40
1N12 CORNER BAR
TOP & BOTTOM
G5 At the connection line of internal and external slabs AS REQUIRED
on ground DJ must be used.
G6 SCJ for external slabs on ground Max. 6.0m apart.
1
D
10 MAX.
PILES A1 25 75
200
200
200
200
1
S11
W
N12-200
N16-200
N12-200
N16-200
N12-200 N12-200
N12-200
N16-200
N12-200
W BOT. REINF.
TOP REINF.
FIRST FLOOR SLAB BOTTOM REINFORCEMENT PLAN BRICK WALL OVER ONLY
SCALE 1:100
BRICK WALL UNDER ONLY
N12-200
N12-200
3N16-200 L=3m
EXTRA
2N16-200 L=3m
N12-200
N12-200 N12-200 N12-200 TYPICAL COG DETAILS
EXTRA
N12-200
W
TOP REINF.
2N16-200 L=3m
EXTRA
FIRST FLOOR SLAB TOP REINFORCEMENT PLAN BRICK WALL OVER & UNDER
SCALE 1:100
600 LAP
200
N12-200
N12-200
N12-200 STARTER
BARS 800 LAP
SCABBLE N12-200
SURFACE 17
5
GROUND FLOOR
60
0
P1
N12-200
N12-200 E/W
5
17
CONCRETE STAIR - LANDING TO FIRST FLOOR
SCALE 1:20
20
2N16 TOP & BOT. AT
SLAB PERIMETER
20
20
SLIP
JOINT
20
SLIP
JOINT
FOR EVERY TWO BARS STOPPED BY
PENETRATION ADD ONE BAR EACH SIDE OF
SAME SIZE AND GRADE. WHERE NO TOP AND
BOTTOM BARS ARE SHOWN, ADD 2N16 TOP AND
110 BOTTOM EACH SIDE OF PENETRATION.
TYPICAL
TYPICAL SLAB EXTERNAL SUPPORT
SCALE 1:20
600
SCALE 1:20
STANDARD COG
TYPICAL
PENETRATION
270 SLAB EDGE
MAXIMUM
1000
REFER TO PLAN FOR
REINFORCEMENT
2N16 TOP & BOT. AT
20
SLAB PERIMETER 85 STEP
40
40
20
20
top
bot
top
bot
Top Reo Top Reo
Top Reo Top Reo
top
bot
top
bot
TENSION LAP
20
TENSION LAP
3N20 TOP & BOT.
375 1.5T
PROVIDE N16-250 TENSION LAP TENSION LAP WET AREA SETDOWN (option 1)
T
TENSION LAP
S
T
STANDARD COG
BARS CRANKED AT
TYPICAL
SLOPE OF 1:6 MAXIMUM
20
'Z' BARS TO MATCH
SLAB REINFORCEMENT TENSION LAP TENSION LAP
NSOP
TENSION LAP
TENSION LAP
WET AREA SETDOWN (option 2)
B10
B7 240x45 hySPAN LVL - B6
B3
B1
B2
DS DOUBLE STUD -
B3
B10
B3
B2
B1
NOTES:
1. ALL EXTERNAL STEELWORK TO BE HOT DIPPED GALVANISED B10
2. WALL STUDS TO BE 100x50 F7 @ 450 C/C
3. ALL TIMBER TO BE SEASONED
4. ALL BEAMS TO HAVE MINIMUM 150mm BEARING
5. hySPAN LVL TO BE INSTALLED AS PER MANUFACTURERS INSTRUCTIONS
6. EXTERNAL hySPAN LVL TO BE H2-S TREATED FOR TERMITE PROTECTION
7. WALL BRACING AND TIMBER FRAMING TO AS1684 FIRST FLOOR FRAMING PLAN
SCALE 1:100
8. TIMBER BEAM TO TIMBER BEAM CONNECTIONS TO BE WITH PRYDA BEAM HANGERS UNO
9. STEELWORK CUT ON SITE TO BE PAINTED WITH COLD-GAL OR EQUIVALENT NOTES:
10. ALL WELDS 6mm SP CFW UNO DOUBLE STUD TO BE PLACED UNDER BEAM ENDS U.N.O
11. DOUBLE JOIST TO BE PLACED UNDER WALLS PARALLEL TO JOISTS
12. ALL EXTERNAL TIMBER TO BE TREATED SEE TYPICAL SECTIONS FOR DETAILS
13. BEAMS DOUBLED UP TO BE BOLTED WITH M10-600 STAGGERED BOLTS
14. ALL BEAMS/JOISTS SPANNING MORE THAN 3m TO HAVE CENTRAL AND END BLOCKING
B7
B5
B5
C1 50x50x5 SHS -
RJ1
B3
DS DOUBLE STUD -
B3
B6
B6
RJ1 RJ1
RJ1
B9
B5
B5
B4
RJ1
B5 B5
B3
B5 B5
B3 B3
NOTES: RJ1 RJ2
50mm BATTENS
3M16 4.6/S
RJ1/RJ2
3M16 4.6/S
TIMBER BEAM TO JOIST CONNECTION
SCALE 1:10
40mm REBATE IN
TIMBER BEAM TO ROOF JOIST
TIMBER BEAM CONNECTION JOIST HANGER M16 RAMSET
M10@900C/C ANKASCREW AT
SCALE 1:10 BEAM TO MATCH RJ1
STAGGERED 900 C/C
STAGGERED
SECTION 4
3
- 1:10 S14
SECTION A
1:10 -
BLOCK