CONCRETO ARMADO f'c=2010kg/cm2

ZAPATAS
Z1 1.25 2.00 0.50 10.00
Z2 1.00 1.30 0.50 2.60
Z3 1.00 1.50 0.50 0.75
Z4 0.70 1.50 0.50 0.53
13.88
VIGA DE CIMENTACION
EJE A-A Y B-B 12.80 0.25 0.60 3.84
EJE 2-2 Y 7-7 6.40 0.25 0.60 1.92
EJE 3-3 AL 6-6 6.20 0.25 0.60 3.72
9.48
COLUMNAS Y PLACA
C-1 0.40 0.40 9.15 11.71
C-2 0.30 0.30 9.15 3.29
C-3 0.25 0.15 3.95 2.52
PL-1 1.00 0.15 6.38 1.91
19.44
VIGAS MESANINE
V-100 (0.30X0.20) 19.50 0.30 0.20 1.17
VCH-100 (0.15X0.20) 33.65 0.15 0.20 1.01
VAP (0.15X0.30) 2.00 0.15 0.30 0.09
2.27
TECHO MESANINE
27.55 0.09 2.48

VIUGAS PRIMER PISO


VAP 101 (0.25X0.80) 18.60 0.25 0.80 3.72
VAP 103 (0.30X0.40) 38.40 0.30 0.40 4.61
VAP 102 (0.40X0.40) 6.20 0.40 0.40 0.99
VAP (0.15X0.30) 2.00 0.15 0.30 0.09
VCH-100 (0.15X0.20) 8.00 0.15 0.20 0.24
9.65
TECHO PRIMER PISO
84.63 0.09 7.62

SOBRECIMIENTO ARMADO
CORTE 6-6 25.33 0.15 0.7 2.66
CORTE 7-7 Y 8-8 9.82 0.15 0.85 1.25
3.91
CISTERNA
6.80 1.80 0.20 2.45
4.8 1.80 0.20 1.73
3 2.40 0.20 1.44
3 2.40 0.20 1.44
7.06
75.78 m3

ENCOFRADO DE COLUMNAS VIGAS Y LOSA


COLUMNAS Y PLACA
C-1 1.60 9.15 117.12
C-2 1.20 9.15 43.92
C-3 0.80 3.95 53.72
PL-1 2.30 6.38 29.35
244.11
VIGAS MESANINE
V-100 (0.30X0.20) 0.30 19.50 5.85
VCH-100 (0.15X0.20) 0.40 33.65 13.46
VAP (0.15X0.30) 0.45 2.00 0.90
20.21
TECHO MESANINE
27.55 27.55

VIUGAS PRIMER PISO


VAP 101 (0.25X0.80) 1.45 18.60 26.97
VAP 103 (0.30X0.40) 0.70 38.40 26.88
VAP 102 (0.40X0.40) 0.80 6.20 4.96
VAP (0.15X0.30) 0.45 2.00 0.90
VCH-100 (0.15X0.20) 0.40 8.00 3.20
62.91
TECHO PRIMER PISO
84.63 84.63

SOBRECIMIENTO ARMADO
CORTE 6-6 0.7 25.33 35.46
CORTE 7-7 Y 8-8 0.85 9.82 16.69
52.16
SOBRECIMIENTO
CORTE 3-3 0.5 28.37 28.37

CISTERNA
3 1.8 10.80
2.4 1.8 8.64
3 2.4 14.40
33.84
553.77 m2

LADRILLO DE TECHO
112.18 8.5 954
MOVIMIENTO DE TIERRAS
ZAPATAS
Z1 1.25 2.00 1.8 36.00
Z2 1.00 1.30 1.8 9.36
Z3 1.00 1.50 1.8 2.70
Z4 0.70 1.50 1.8 1.89

CIMIENTO CORRIDO
CIMENTO DE B=0.60 18.88 0.60 1.5 16.99
CIMENTO DE B=0.50 30.23 0.50 1.5 22.67

CISTERNA
3.4 2.8 1.8 17.14

106.75 m3

CONCRETO CICLOPIO
CIMIENTO CORRIDO
CIMENTO DE B=0.60 18.88 0.60 0.9 10.20
CIMENTO DE B=0.50 30.23 0.50 0.9 13.60

23.80 m3

CONCRETO SIMPLE
SOBRECIMIENTO
CORTE 3-3 28.37 0.15 0.50 2.13

MUROS
MURO DE LADRILLO

CORTE 3-3 28.37 4.4 124.83


CORTE 6-6 25.33 4.4 111.45
CORTE 7-7 Y 8-8 9.82 4.4 43.21

279.49 m2

FALSO PISO
FALSO PISO
146.46 m2
ACERO EN ZAPATAS VIGAS COLUMNAS Y LOSA

ZAPATAS N /L 8mm 3/8" 12mm 1/2"


Z1 8
Z2 4
Z3 1
Z4 1

COLUMNAS Y PLACA
C-1 8 1491.20
C-2 4 281.60
C-3 17 652.80 748.00
PL-1 2 451.20 264.00

VIGA DE CIMENTACION
EJE A-A Y B-B 27.20 290.13
EJE 2-2 Y 7-7 14.40 153.60
EJE 3-3 AL 6-6 28.00 298.67

VIGAS MESANINE
V-100 (0.30X0.20) 20.3 92.03 81.20
VCH-100 (0.15X0.20) 14.26 36.13 57.04
VAP (0.15X0.30) 1.7 6.57 6.80

TECHO MESANINE
4.71 75.36
2.68 42.88
1.8 28.80
0.75 1.50

VIUGAS PRIMER PISO


VAP 101 (0.25X0.80) 19.40 307.81
VAP 103 (0.30X0.40) 39.20 282.24
VAP 102 (0.40X0.40) 7.00 59.73
VAP (0.15X0.30) 2.80 10.83 11.20
VCH-100 (0.15X0.20) 8.80 22.29 35.20

TECHO PRIMER PISO


1.1 17.60
2.05 32.80
2.05 32.80
2.05 32.80
2.05 32.80
1.65 26.40
1.1 17.60
9 144.00
7.1 113.60
3 21.00
3.1 24.80

652.80 4577.83 1054.38

N VARILLAS 72.53 508.65 117.15


0.3950 0.5600 0.9940
8mm 3/8" 12mm 1/2"

kg 28.65 284.84 116.45


SOLADO
ZAPATAS
Z1 1.25 2.00 20.00
Z2 1.00 1.30 5.20
Z3 1.00 1.50 1.50
Z4 0.70 1.50 1.05

27.75 m2
AS Y LOSA

5/8" 3/4"
183.20
45.60
13.30
9.80

704.00 352.00
176.00 176.00

217.60
115.20
224.00

81.20

77.60 77.60
274.40
28.00 28.00
2149.90 633.60

238.88 70.40
1.5520 2.2350
5/8" 3/4"

370.74 157.34 958.03


MANO DE OBRA

CONTRUCCION DE VIVIENDA

OBRA: CONSTRUCCION DE VIVIDAN DEPOSITO


PROPIETARIO:
UBICACIN:
ITEM DESCRIPCION UNIDAD PRECIO METRADO

ESTRUCTURAS

MOVIMIENTO DE TIERRAS

EXCAVACION EN TERRENO NATURAL CON MANO DE OBRA. M3 25 106.75


OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS - MEZCLA 1/10 C-HOM + 30 % P.G. M3 40 23.80
SOLADO 1:12, M2 18 27.75
SOBRECIMIENTO

CONCREO EN SOBRECIMIENTO 1/8 C-HORM + 30% P ( MAX 3"). M3 55 6.04


ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO
M2 25 80.53
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS Fc: 210 Kg/cm2.
M3 60 13.88
VIGA DE CIMENTACION
CONCRETO EN VIGA DE CIMENTACION Fc: 210 Kg/cm2.
M3 60 9.48
COLUMNAS Y PLACAS
CONCRETO EN COLUMNAS Fc: 210 Kg/cm2.
M3 130 19.44
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
M2 25 244.11
VIGA
CONCRETO EN VIGAS Fc: 210 Kg/cm2.
M3 95 11.92
ENCOFRADO Y DESENCOFRADO EN VIGAS M2 25 83.12
LOSA ALIGERADA
CONCRETO EN LOSA Fc: 210 Kg/cm2. M3 90 10.10
ENCOFRADO Y DESENCOFRADO EN LOSA M2 25 112.18
LADRILLO DE TECHO 30 x 30 x 15 UND 0.5 954.00
CISTERNA
CONCRETO EN CISTERNA Fc: 210 Kg/cm2. M3 115 7.06
ENCOFRADO Y DESENCOFRADO EN CISTERNA M2 25 33.84
ACERO TOTAL KG 0.8 958.03
ARQUITECTURA
MUROS Y TABIQUERIAS DE ALBAILERIA
MUROS DE LADRILLO KING KONG DE ARCILLA, ASENTADO DE SOGA
M2 18 279.49
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES
M2 12 474.79
TARRAJEO EN EXTERIORES
M2 22 60.00
PISOS Y PAVIMENTOS
FALSO PISO 4"
M2 14 146.46
SUB TOTAL
TOTAL

2668.76

951.95
499.50

332.17
2013.15

832.50

568.80

2526.96
6102.70

1132.35
2078.00

908.66
2804.50
477.00

811.44
846.00
766.42

5030.78

5697.46
1320.00

2050.44
40419.54
CEMENTO
METRADO (M3) BOL/M3 PRECIO
CONCRETO ARMADO TOTAL 553.77 8 4430.19
CONCRETO SIMPLE TOTAL 25.93 3 77.78
4507.97 22.90

AGREGADOS FINO (ARENA)


CONCRETO ARMADO TOTAL 553.77 0.4 221.51
CONCRETO SIMPLE TOTAL 25.93 0.7 18.15
239.66 30

AGREGADOS GRUESO (PIEDRA)


CONCRETO ARMADO TOTAL 553.77 0.4 221.51
221.51 55

PIEDRA GRANDE MAX 8"


CONCRETO SIMPLE TOTAL 25.93 0.35 9.07
9.07 25

ACERO
N VARILLAS N VARILLA PREIO TOTAL
8mm 72.53 75 8.94 670.5
3/8" 508.65 510 12 6120
1/2" 117.15 120 21 2520
5/8" 238.88 240 33 7920
3/4" 70.40 72 49.39 3556.08
103232.54

7189.74

12183.03

226.86

670.5
6120
2520
7920
3556.08
20786.58

143618.75
40419.54
184038.29
1435.66807
448.646272