ZAPATAS
Z1 1.25 2.00 0.50 10.00
Z2 1.00 1.30 0.50 2.60
Z3 1.00 1.50 0.50 0.75
Z4 0.70 1.50 0.50 0.53
13.88
VIGA DE CIMENTACION
EJE A-A Y B-B 12.80 0.25 0.60 3.84
EJE 2-2 Y 7-7 6.40 0.25 0.60 1.92
EJE 3-3 AL 6-6 6.20 0.25 0.60 3.72
9.48
COLUMNAS Y PLACA
C-1 0.40 0.40 9.15 11.71
C-2 0.30 0.30 9.15 3.29
C-3 0.25 0.15 3.95 2.52
PL-1 1.00 0.15 6.38 1.91
19.44
VIGAS MESANINE
V-100 (0.30X0.20) 19.50 0.30 0.20 1.17
VCH-100 (0.15X0.20) 33.65 0.15 0.20 1.01
VAP (0.15X0.30) 2.00 0.15 0.30 0.09
2.27
TECHO MESANINE
27.55 0.09 2.48
SOBRECIMIENTO ARMADO
CORTE 6-6 25.33 0.15 0.7 2.66
CORTE 7-7 Y 8-8 9.82 0.15 0.85 1.25
3.91
CISTERNA
6.80 1.80 0.20 2.45
4.8 1.80 0.20 1.73
3 2.40 0.20 1.44
3 2.40 0.20 1.44
7.06
75.78 m3
SOBRECIMIENTO ARMADO
CORTE 6-6 0.7 25.33 35.46
CORTE 7-7 Y 8-8 0.85 9.82 16.69
52.16
SOBRECIMIENTO
CORTE 3-3 0.5 28.37 28.37
CISTERNA
3 1.8 10.80
2.4 1.8 8.64
3 2.4 14.40
33.84
553.77 m2
LADRILLO DE TECHO
112.18 8.5 954
MOVIMIENTO DE TIERRAS
ZAPATAS
Z1 1.25 2.00 1.8 36.00
Z2 1.00 1.30 1.8 9.36
Z3 1.00 1.50 1.8 2.70
Z4 0.70 1.50 1.8 1.89
CIMIENTO CORRIDO
CIMENTO DE B=0.60 18.88 0.60 1.5 16.99
CIMENTO DE B=0.50 30.23 0.50 1.5 22.67
CISTERNA
3.4 2.8 1.8 17.14
106.75 m3
CONCRETO CICLOPIO
CIMIENTO CORRIDO
CIMENTO DE B=0.60 18.88 0.60 0.9 10.20
CIMENTO DE B=0.50 30.23 0.50 0.9 13.60
23.80 m3
CONCRETO SIMPLE
SOBRECIMIENTO
CORTE 3-3 28.37 0.15 0.50 2.13
MUROS
MURO DE LADRILLO
279.49 m2
FALSO PISO
FALSO PISO
146.46 m2
ACERO EN ZAPATAS VIGAS COLUMNAS Y LOSA
COLUMNAS Y PLACA
C-1 8 1491.20
C-2 4 281.60
C-3 17 652.80 748.00
PL-1 2 451.20 264.00
VIGA DE CIMENTACION
EJE A-A Y B-B 27.20 290.13
EJE 2-2 Y 7-7 14.40 153.60
EJE 3-3 AL 6-6 28.00 298.67
VIGAS MESANINE
V-100 (0.30X0.20) 20.3 92.03 81.20
VCH-100 (0.15X0.20) 14.26 36.13 57.04
VAP (0.15X0.30) 1.7 6.57 6.80
TECHO MESANINE
4.71 75.36
2.68 42.88
1.8 28.80
0.75 1.50
27.75 m2
AS Y LOSA
5/8" 3/4"
183.20
45.60
13.30
9.80
704.00 352.00
176.00 176.00
217.60
115.20
224.00
81.20
77.60 77.60
274.40
28.00 28.00
2149.90 633.60
238.88 70.40
1.5520 2.2350
5/8" 3/4"
CONTRUCCION DE VIVIENDA
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
2668.76
951.95
499.50
332.17
2013.15
832.50
568.80
2526.96
6102.70
1132.35
2078.00
908.66
2804.50
477.00
811.44
846.00
766.42
5030.78
5697.46
1320.00
2050.44
40419.54
CEMENTO
METRADO (M3) BOL/M3 PRECIO
CONCRETO ARMADO TOTAL 553.77 8 4430.19
CONCRETO SIMPLE TOTAL 25.93 3 77.78
4507.97 22.90
ACERO
N VARILLAS N VARILLA PREIO TOTAL
8mm 72.53 75 8.94 670.5
3/8" 508.65 510 12 6120
1/2" 117.15 120 21 2520
5/8" 238.88 240 33 7920
3/4" 70.40 72 49.39 3556.08
103232.54
7189.74
12183.03
226.86
670.5
6120
2520
7920
3556.08
20786.58
143618.75
40419.54
184038.29
1435.66807
448.646272