MANO DE OBRA
CAPATAZ hh 768.0737 16.01 12,296.86
OPERARIO hh 2,159.9429 14.37 31,038.38
OFICIAL hh 3,122.7304 12.61 39,377.63
PEON hh 5,533.1605 11.40 63,078.03
CONTROLADOR OFICIAL hh 69.0381 12.61 870.57
PRUEBA DE DENSIDAD INSITU und 4.0000 30.00 120.00
PRUEBA EN ENSAYO CBR und 2.0000 297.50 595.00
DISEO DE MEZCLAS und 4.0000 300.00 1,200.00
PRUEBAS DE ENSAYO/COMPRESION und 16.0000 12.50 200.00
SIMPLE(ROTURA
PRUEBAS DE BRIQUETAS)
DE ENSAYO SLUMP und 8.0000 15.00 120.00
PRUEBAS DE ENSAYO BRIQUETAS und 16.0000 13.00 208.00
149,104.47
MATERIALES
GASOLINA gal 69.7426 13.10 913.63
PETROLEO D-2 gal 487.1989 13.10 6,382.31
ASFALTO RC-250 gal 2.7413 7.50 20.56
NEOPRENE PLANCHA dm3 4.0000 250.00 1,000.00
ALAMBRE NEGRO RECOCIDO N 8 kg 498.1468 7.70 3,835.73
ALAMBRE NEGRO RECOCIDO N 16 kg 602.0662 8.00 4,816.53
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 12,643.4070 3.90 49,309.29
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 23.3753 3.90 91.16
CLAVOS PARA MADERA CON CABEZA DE 3" kg 607.2634 8.20 4,979.56
TUBERIA PVC-SAL 2" X 3 m m 8.0000 3.69 29.52
PIEDRA CHANCADA m3 32.8185 22.41 735.46
PIEDRA CHANCADA 1/2" m3 157.8076 125.00 19,725.95
PIEDRA MEDIANA DE 6" m3 284.1030 40.00 11,364.12
ARENA FINA m3 0.0576 130.00 7.49
ARENA GRUESA m3 110.5633 125.00 13,820.41
HORMIGON m3 70.3923 18.51 1,302.96
MATERIAL GRANULAR m3 344.1130 13.66 4,700.58
AGUA PUESTA EN OBRA m3 65.5919 25.24 1,655.54
TECNOPOR DE e = 1" 0.60 X 1.20 m pln 30.8200 25.00 770.50
CEMENTO PORTLAND TIPO I (42.5 kg) bol 2,351.9033 27.40 64,442.15
YESO kg 1.8548 12.00 22.26
YESO BOLSA 28 kg bol 1.7414 12.00 20.90
ADITIVO DESMOLDEADOR DE ENCOFRADOS gal 1.0404 145.00 150.86
ADITIVO INCORPORADOR DE AIRE gal 3.0870 19.40 59.89
MADERA TORNILLO p2 8,103.4322 5.60 45,379.22
TRIPLAY pln 36.9840 120.00 4,438.08
TRIPLAY LUPUNA 4 x 8 x 19 mm pln 146.6752 148.60 21,795.93
PINTURA ESMALTE gal 4.1962 35.00 146.87
PINTURA ANTICORROSIVA gal 1.3200 32.80 43.30
THINNER gal 1.3200 20.00 26.40
LACA DESMOLDEADORA gal 91.6720 160.70 14,731.69
DESMODEADOR PARA ENCOFRADO gal 3.6984 145.00 536.27
SOLDADURA SUPERCITO PUNTO AZUL 3/32" kg 13.2000 21.00 277.20
CONCRETO FC =140KG/CM2 m3 50.4350 457.21 23,059.39
CONCRETO FC=175 KG/CM2 m3 19.1800 498.18 9,555.09
PLATINA DE ACERO 2"X 3/18X 6m m 20.0000 7.93 158.60
PLANCHA METALICA 1.20m X 2.40m X 3/8" p 0.8400 227.78 191.34
PLANCHA METALICA 1.2m X 2.4m X 1/4 p 4.8800 170.83 833.65
TUBO FIERRO NEGRO REDONDO 1 1/2" e=2mm m 60.0000 13.37 802.20
Fecha : 02/07/2013 09:30:47a.m.
Precios y cantidades de recursos requeridos por tipo
Obra 0201005 CONSTRUCCCION DE LA CARRTERA SAN CRISTOBAL EMPALME A LA