The Geoblock Solution

Stabilization of
Drilling Platforms with

the Geoblock System

1 Solutions by Presto Geosystems


The Geoblock Solution Area of Exploration

2 Solutions by Presto Geosystems


The Geoblock Solution Exploration / Production Blocks

Pecom

Perenco
AEC
AEC

Pecom
Perenco
AEC

3 Solutions by Presto Geosystems


The Geoblock Solution Oxy Test 1

4 Solutions by Presto Geosystems


The Geoblock Solution Oxy Test 1

5 Solutions by Presto Geosystems


The Geoblock Solution Oxy Test 1

6 Solutions by Presto Geosystems


The Geoblock Solution Oxy Test 1

7 Solutions by Presto Geosystems


The Geoblock Solution Oxy Test 3

8 Solutions by Presto Geosystems


The Geoblock Solution Oxy Test 3

9 Solutions by Presto Geosystems


The Geoblock Solution Oxy Test 3

10 Solutions by Presto Geosystems


The Geoblock Solution Block 31 Minta Site 8th Test

Geoblock test area

11 Solutions by Presto Geosystems


The Geoblock Solution Transportation Method

12 Solutions by Presto Geosystems


The Geoblock Solution Wood Plank System

13 Solutions by Presto Geosystems


The Geoblock Solution Wood Plank System

Three layers of planks nailed together


over a geotextile
14 Solutions by Presto Geosystems
Wood Plank System Costs
All Costs per Pecom
Item Unit Quantity $ / Unit Total
Materials for 5,000 square meters of Surface Stabilization
Geotextile sq meter 5,000 $ 1.00 $ 5,000
Planks (8 ft x 10 in x 2 in) each 30,000 $ 7.15 $ 214,500
The Geoblock Solution

Nails pound 4,000 $ 0.25 $ 1,000

Transportation of Materials
Helicopter use hour 100 $ 7,500 $ 750,000

Workers Associated with Construction


Workers required 60
Pay day 30 $ 9.00 $ 16,200
Room & Board day 30 $ 22.00 $ 39,600
Transportation in & out man-trip 2 $ 150.00 $ 18,000

Workers Associated with Maintenance


Workers required 12
Pay day 60 $ 9.00 $ 6,480
Room & Board day 60 $ 22.00 $ 15,840
Transportation in & out man-trip 3 $ 150.00 $ 5,400

Removal of Materials if Well is Dry


Helicopter use hour 5 $ 7,500 $ 37,500

Grand Total $ 1,109,520

NOTES
1 Timber planks weigh approximately 65 pounds each.

2 Maximum safe weight for helicopter is 17,800 pounds.

3 Removal of geosynthetics and nails required if well is dry.

15 Solutions by Presto Geosystems


The Geoblock Solution The Geoblock System

Geotextile / Geonet for separation and


drainage
16 Solutions by Presto Geosystems
The Geoblock Solution Pre-assembled Geoblock Section

15 Individual Geoblock Units bolted together to form a


2.5 m x 4.0 m section and one loose Unit for side-by-
side attachment.
Total area = 8 sq m, total weight of 160 lb.
Sections bundled 40 - 50 per shipping package.
17 Solutions by Presto Geosystems
The Geoblock Solution The Geoblock System

18 Solutions by Presto Geosystems


The Geoblock Solution The Geoblock System

19 Solutions by Presto Geosystems


The Geoblock Solution The Geoblock System

20 Solutions by Presto Geosystems


The Geoblock Solution The Geoblock System

21 Solutions by Presto Geosystems


The Geoblock Solution The Geoblock System

22 Solutions by Presto Geosystems


The Geoblock System Costs
Item Unit Quantity $ / Unit Total
Materials for 5,000 square meters of Surface Stabilization
Geotextile / Geonet sq meter 5,000 $ -
Geoblock Preassembled each 625 $ -
See NOTE 1 sq meter 5,000 $ 53.00 $ 265,000
The Geoblock Solution

Transportation of Materials
Helicopter use hour 5 $ 7,500 $ 35,000

Workers Associated with Construction


Workers required 10
Pay day 5 $ -
Room & Board day 5 $ -
Transportation in & out man-trip 1 $ 150.00 $ 1,500

Workers Associated with Maintenance


Workers required 3
Pay day 60 $ -
Room & Board day 60 $ -
Transportation in & out man-trip 3 $ 150.00 $ 1,350

Removal of Materials if Well is Dry


Helicopter use hour 5 $ 7,500 $ 37,500

Grand Total $ 340,350

NOTES
1 The unit cost includes all system materials, construction, maintenance and
disassembly for a period of 90 days.
2 Geoblock units are preassembled by bolting units of 15 blocks each with
one loose Geoblock unit totaling 16 square meters each preassembled unit.
3 Removal of geosynthetics and Geoblock required if well is dry.

23 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

24 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

25 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

26 Solutions by Presto Geosystems


The Geoblock Solution

The Drilling Platform

30 Days of Use

27 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

28 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

29 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

30 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

31 Solutions by Presto Geosystems


The Geoblock Solution Using the Geoblock System

32 Solutions by Presto Geosystems


The Geoblock Solution The Wood Plank System

33 Solutions by Presto Geosystems


The Geoblock Solution The Wood Plank System

34 Solutions by Presto Geosystems


The Geoblock Solution After 90 Days

100% of the Wood Planks are destroyed


80% - 100% of the Geoblock units can
be reused
The environmental cost is reduced with
the re-use of the Geoblock System

35 Solutions by Presto Geosystems


The Geoblock Solution After 90 Days

This test was a complete success


according to the Oil Company
Words used to describe the results
exelente, perfecto, fantastico

36 Solutions by Presto Geosystems


The Geoblock Solution

Geosystems

Partnering Ideas Into Solutions

37 Solutions by Presto Geosystems