Está en la página 1de 2

FORMER BUDGET TERMINAL FUEL HYDRANT EXTENSION BAYS G15, G16 & G17

FIT-UP & WELDING VISUAL INSPECTION REPORT


CLIENT: CAFHI
MAIN CONTRACTOR: WEC A
PROJECT NO: P4218

AREA:

ISO DWG NO.: D B DATE :

LINE CLASS: REPORT NO. :


SPOOL NO.: PREPARE BY :

C
CAPPING FINAL
ROOT WELDER WELDER VISUALCHECKED
SIZE FIT UP GAP (MM) FIT UP CHECKED BY NUMBER CHECKED BY NUMBER BY
PIPE LGHT. WPS TYPE OF
S.NO JOINT NO. (mm) HEAT NO-1 HEAT NO-2 DIA THK . NO WELD A B C D DATE WEC CAFHI W1 W2 WELD DATE WEC CAFHI W1 W2 WELD DATE WEC CAFHI

NOTE:
DURING FIT UP JOINTS SHALL BE FREE FROM RUST

PIPE INTERNAL CLEANLINESS CHECKED

ONLY QUALIFIED WELDER WILL BE USED

FILLER WIRE / ELECTRODE BATCH:

INTERPASS TEMP. MAINTAINED:

CHECKED BY:WEC QA/QC INSPECTOR REVIEWED & APPROVED BY:CAFHI

NAME: NAME:

DESIGNATION DESIGNATION

SIGNATURE SIGNATURE

DATE DATE
REMARKS

También podría gustarte