PAVIMENTOS Y VEREDAS DE CONCRETO

01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 8.50M. und 1.00 1,365.84
01.02 ALMACEN, OFICINA Y CASETA DE GUARDIANIA mes 3.00 1,200.00
01.03 MOVILIZACION DE EQUIPOS-HERRAMIENTAS PARA LA OBRA GLB 1.00 2,447.69
01.04 TRANSPORTE DE MATERIALES Y EQUIPO kg 189,941.00 0.11
02 PAVIMENTOS Y VEREDAS DE CONCRETO
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 795.01 3.11
02.01.02 TRAZO Y REPLANTEO m2 795.01 1.92
02.02 MOVIMIENTO DE TIERRAS
02.02.01 CORTE SUPERFICIAL MANUAL HASTA 0.20 MT m3 386.37 15.44
02.02.02 RELLENO CON MATERIAL PROPIO m3 1.10 15.86
02.02.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE EQUIPO M m2 795.01 2.02
02.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MA m3 462.32 20.59
02.02.05 BASE GRANULAR E=0.20 M REND.=1760 M2/DIA FACT. COMPACm2 795.01 14.64
02.03 PAVIMENTACION
02.03.01 CONCRETO FC'175 KG/CM2 PARA PAVIMENTOS m3 119.24 480.31
02.03.02 ENCOFRADO Y DESENCOFRADO PARA PAVIMENTOS m2 108.80 44.54
02.03.03 PISO FROTACHADO BRUADO COLOREADO m2 794.91 37.39
02.03.04 JUNTAS CON ASFALTO E= 3/4" m 570.50 4.47
03 VEREDAS DE CONCRETO
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 111.81 3.11
03.01.02 TRAZO Y REPLANTEO m2 111.81 1.92
03.02 MOVIMIENTO DE TIERRAS
03.02.01 CORTE SUPERFICIAL MANUAL HASTA 0.20 MT m3 22.36 15.44
03.02.02 NIVELACION y COMPACTACIN MANUAL DE SUBRASANTE m2 111.81 2.43
03.02.03 RELLENO CON MATERIAL ARCILLA SELECCIONADA m3 11.18 60.44
03.02.04 RELLENO CON MATERIAL PROPIO m3 2.05 15.86
03.03 VEREDAS
03.03.01 VEREDA DE CONCRETO DE 4" m2 111.81 64.46
03.03.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS (a=1.20 e=0.15 m2 36.81 19.69
03.03.03 JUNTAS CON ASFALTO E= 3/4" m 32.70 4.47
INSTALACION TUBERIAS RIEGO
04 TRABAJOS PRELIMINARES
04.01 LIMPIEZA DE TERRENO MANUAL m2 172.40 3.11
04.02 TRAZO Y REPLANTEO m2 172.40 1.92
05 MOVIMIENTO DE TIERRAS
05.01 EXCAVACION DE ZANJA MANUAL TERRENO CALICHOSO m3 68.96 49.40
05.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 86.20 5.34
05.03 RELLENO SELECCIONADO CON "CAMA" P/TUBERIA m 172.40 5.80
05.04 RELLENO CON MATERIAL PROPIO m3 38.25 15.86
05.05 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO m3 36.85 20.59
06 INSTALACION TUBERIAS RIEGO
06.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 4" m 172.40 20.19
MUROS DE CONTENCION
07 TRABAJOS PRELIMINARES
07.01 TRAZO Y REPLANTEO m2 216.56 1.92
07.02 LIMPIEZA DE TERRENO MANUAL m2 495.40 3.11
08 MOVIMIENTO DE TIERRAS
08.01 EXCAVACION DE ZANJA MANUAL TERRENO CALICHOSO m3 178.02 49.40
08.02 RELLENO CON MATERIAL PROPIO m3 612.94 15.86
08.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 164.47 5.34
08.04 RELLENO CON MATERIAL DE PRESTAMO MANUAL m3 456.67 32.59
09 CONCRETO SIMPLE
09.01 Muro de Contencin - Encofrado y desencofrado m2 228.22 48.79
09.02 Muro de Contencin de Concreto Ciclopeo C:H 1:8 + 30% de Piedra m3 126.99 227.63
10 CONCRETO ARMADO
10.01 COLUMNAS
10.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 0.91 534.69
10.01.02 ENCOFRADO Y DESENCOFRADO COLUMNAS m2 14.54 73.62
10.01.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 162.39 4.13
10.02 MUROS DE CONTENCION REFORZADOS
10.02.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 m3 173.72 520.54
10.02.02 ENCOFRADO Y DESENCOFRADO MUROS DE CONTENCION m2 832.29 74.79
10.02.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 8,021.92 4.25
11 ALBAILERIA
11.01 MURO DE LADRILLO CARAVISTA SUPER KING KONG .15x.25x.10 m2 47.31 128.56
12 REVESTIMIENTOS
12.01 Revestimiento y Forjado de muros,columnas, acabado frotachado m m2 99.47 49.72
13 CARPINTERIA METALICA
13.01 CERCO DE REJA TRANSPARENTE m2 47.31 265.78
14 PINTURA
14.01 PINTURA ESMALTE EN MUROS m2 578.39 11.32
14.02 PINTURA EN METAL ANTICORROSIVA Y ESMALTE 02 MANOS m2 47.31 51.55
15 INSTALACION TUBERIAS RIEGO
15.01 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 3/4" m 38.80 28.02
15.02 GRIFO DE RIEGO BRONCE DE 1/2" und 2.00 72.14
16 AREAS VERDES
16.01 RELLENO CON TIERRA DE CHACRA m3 49.14 61.71
16.02 Sembrado de bloques de grass m2 491.41 16.69
17 MITIGACION DE IMPACTO AMBIENTAL
17.01 READECUACION AMBIENTAL DE CANTERAS m2 250.00 5.50
28,307.04
1,365.84
3,600.00
2,447.69
20,893.51
127,135.87
3,998.90
2,472.48
1,526.42
28,747.04
5,965.55
17.45
1,605.92
9,519.17
11,638.95
94,389.93
57,272.16
4,845.95
29,721.68
2,550.14
9,965.81
562.41
347.73
214.68
1,325.17
345.24
271.70
675.72
32.51
8,078.23
7,207.27
724.79
146.17

867.17
536.16
331.01
6,232.24
3,406.62
460.31
999.92
606.65
758.74
3,480.76
3,480.76

1,956.49
415.80
1,540.69
34,276.57
8,794.19
9,721.23
878.27
14,882.88
40,041.58
11,134.85
28,906.73
188,996.01
2,227.67
486.57
1,070.43
670.67
186,768.34
90,428.21
62,246.97
34,093.16
6,082.17
6,082.17
4,945.65
4,945.65
12,574.05
12,574.05
8,986.20
6,547.37
2,438.83
1,231.46
1,087.18
144.28
11,234.06
3,032.43
8,201.63
1,375.00
1,375.00
"Mejoramiento de la transitabilidad vehicular y peatonal de las Calles 1 y 4 en el Centro Poblado de Paracolca del Distrito de Tipan, Provincia de Castilla - Arequipa"

DIAGRAMA DE BARRAS DE EJECUCIN DE OBRA


PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES 1,4 EN EL CENTRO POBLADO PARACOLCA DEL DISTRITO DE TIPAN
UBICACIN
PROVINCIA:Castilla PLAZO DE EJECUCION 90
DISTRITO:Tipan
LOCALIDAD:Centro poblado Paracolca
N PARTIDAS MONTO 30 DIAS 60 DIAS 90 DIAS
PAVIMENTO Y VEREDAS DE CONCRETO
### ###
01 OBRAS PROVISIONALES 28307.04 ###
### ### ###
PAVIMENTOS Y VEREDAS DE CONCRETO ###
3998.90 ### ###
02 TRABAJOS PRELIMINARES 3998.90 ###
3797.95 24949.09 0.00 ###
03 MOVIMIENTO DE TIERRAS 28747.04 ###
### 969.19 93420.74 ###
04 PAVIMENTACION 94389.93 ###
### ### ### ###
VEREDAS DE CONCRETO ###
562.41 ### ###
05 TRABAJOS PRELIMINARES 562.41 ###
1325.17 ###
06 MOVIMIENTO DE TIERRAS 1325.17 ###
### 8078.23 ###
07 VEREDAS 8078.23 ###
### ### ###
INSTALACION TUBERIAS RIEGO ###
867.17 ### ### ### ###
08 TRABAJOS PRELIMINARES 867.17 ###
6232.24 ### ### ### ### ###
09 MOVIMIENTO DE TIERRAS 6232.24
3480.76 ### ### ###
10 INSTALACION TUBERIAS RIEGO 3480.76 ###
### ###
MUROS DE CONTENCION ###
1956.49 ### ###
11 TRABAJOS PRELIMINARES 1956.49 ###
34276.57 ### ### ###
12 MOVIMIENTO DE TIERRAS 34276.57 ###
8008.32 32033.26 ### ###
13 CONCRETO SIMPLE 40041.58 ###
37353.67 151642.34 ### ###
14 CONCRETO ARMADO 188996.01 ###
6082.17 ### ###
15 ALBAILERIA 6082.17 ###
4945.65 ### ### ###
16 REVESTIMIENTOS 4945.65 ###
###### 12574.05### ###
17 CARPINTERIA METALICA 12574.05 ###
###### ### 8986.20 ###
18 PINTURA 8986.20 ###
###### 1231.46 ### ###
19 INSTALACION TUBERIAS RIEGO 1231.46 ###
###### 11234.06### ###
20 AREAS VERDES 11234.06 ###
###### 687.50 687.50 ### ###
21 MITIGACION DE IMPACTO AMBIENTAL 1375.00 ###

Municipalidad distrital de Tipan, Ing Geronimo Canaza Zamata,CIP 60860


"Mejoramiento de la transitabilidad vehicular y peatonal de las Calles 1 y 4 en el Centro Poblado de Paracolca del Distrito de Tipan, Provincia de Castilla - Arequipa"

COSTO DIRECTO 487688.13 127655.11 325319.75 34713.27


Gastos Generales 10% 48768.81 12765.51 32531.97 3471.33
Supervision 5% 24384.41 6382.76 16265.99 1735.66
Expediente tecnico 12192.20 12192.20
Liquidacion 1% 4876.88 4876.88
TOTAL PRESUPUESTO 577910.43 158995.58 374117.71 44797.14
PORCENTAJE PARCIAL 27.51% 64.74% 7.75%