Está en la página 1de 1

29 22

988.98 989.07
ESQ CAJA BALVU SER 23
988.74
TAPIAL

1
B.M. 989.00
.

26
104 988.97
20BALVU
ESQ CAJA
988.99 988.63 988.54
ESQ CONT ESQ CAJA BALVU
SER

MURO DE PIEDRA 103 988.67


EXISTENTE 989.03 S MUR
28
ESQ CONT 27
102 988.97
9 ESQ CAJA BALVU 988.98
1 PENDIENT
E DE 1%
988.99
ESQ CONT
988.82
P ELEC
ESQ CAJA BALVU

PENDIENT 19
MURO "M-1" E DE 1%
MURO "M-2" 987.85
MURO "M-4" SER

CF - 1
CF - 2
MURO "M-3" 11.79 8 18
988.17 987.39
TAPIAL P ELEC SER
6.15
3.40 EXISTENTE 987.72 987.08
4.75 P B0R
17 POZO A P
987.33 11
8.15 TAPIAL 986.36
SER
EXISTENTE 0 CALLE FINAL
2.00 24
16 987.55
987.31 TAPIAL
LOTE #2 TAPIAL
EXISTENTE
SER
1
6
LOTE #3 T=987.17 986.22

PV
F=982.57 12

C
986.34 POZO A P

24
0 CALLE FINAL

PU
LG
LOTE #4

.
14
986.63
TAPIAL

13
985.02
0 CALLE

PV
C
24
PU
LG
.
PLANTA PROPUESTA DE MUROS
Esc.1:125 10
984.01
POZO A LL

CASA #4 CASA #3 CASA #2


APROX. APROX. APROX.

8.15

3.38

2.00

NIVEL DE TERRENO

0.97
N=987.17
TAPADERA 0.62
DE POZO

0.60 S=1% PENDIENTE DE TERRENO PROYECTADO


1.61
8.00

S=1% TUBERIA HACIA POZO DE A.LL


PROYECCON DE POZO

2.95
2.80

3.34
3.30
3.23
NIVEL INTERNO DE VIVIENDAS LOTE #4

NIVEL INTERNO DE VIVIENDAS LOTE #3


NIVEL INTERNO DE VIVIENDAS LOTE #2
1.00

N=982.57
TAPADERA
DE POZO

5.00 5.00 10.00 10.00

SECCION 1 - 1
Esc. 1:200

ING.JAIME HERNANDEZ

MUROS A CONSTRUIR SAN SALVADOR


ING. CELSO ALFARO

MAYO
HOJA
PLANTA DE MUROS
ARQ. OSCAR CRUZ
2017
1/2
"" SECCION DE TERRENO INDICADAS

También podría gustarte