METRADO DE CARGAS DE LA COLUMNA

COLUMNA
3.25 t1 0.25
t2 0.25

3.62

DATOS
COLUMNA 0.25 X 0.25 m2
VIGA PRINCIPAL 0.25 X 0.5 m2
VIGA SECUNDARIA 0.25 X 0.25 m2
ESPESOR DE LOSA 0.25 = 350 kg/m2 Segn NTP E.020
S/C PARA VIVIENDA 200 gk/m2 Segn NTP E.020
H. COLUMNA 1er 4 m2
H. COLUMNA 2do. 2.7 m2
H. COLUMNA 3er 2.7 m2

PRIMER NIVEL
CARGA MUERTA
peso de losa 350.00 3.37 3.00 3538.50 kg/m2
peso de viga principal 0.13 3.62 2400.00 1086.00 kg/m2
peso de viga secundaria 0.06 3.00 2400.00 450.00 kg/m2
peso de columna 0.06 4.00 2400.00 600.00 kg/m2

CARGA VIVA
sobrecarga 3.25 3.62 200 2353 kg/m2

SEGUNDO NIVEL
CARGA MUERTA
peso de losa 350.00 3.37 3.00 3538.50 kg/m2
peso de viga principal 0.13 3.62 2400.00 1086.00 kg/m2
peso de viga secundaria 0.06 3.00 2400.00 450.00 kg/m2
peso de columna 0.06 2.70 2400.00 405.00 kg/m2

CARGA VIVA
sobrecarga 3.25 3.62 200 2353 kg/m2
TERCER VINEL
CARGA MUERTA
peso de losa 350.00 3.37 3.00 3538.50 kg/m2
peso de viga principal 0.13 3.62 2400.00 1086.00 kg/m2
peso de viga secundaria 0.06 3.00 2400.00 450.00 kg/m2
peso de columna 0.06 2.70 2400.00 405.00 kg/m2

CARGA VIVA
sobrecarga 3.25 3.62 100 1176.5 kg/m2

RESUMEN DE CARGAS

PISO PM PV
1ro 5674.50 2353
2do. 5479.50 2353
3ro. 5479.50 1176.5
SUMA T 16633.50 5882.5

DISEO DE ZAPATAS (ACI 318S-08 )

DATOS
PM = 16633.50 Kg
PV = 5882.5 Kg
hf = 1.30 m
S/C = 200 Kg/m
t1 = 0.25 m
t2 = 0.25 m
m = 1.8 Kg/m
t = 0.75 Kg/cm
f'c = 210 Kg/cm
fy = 4200 Kg/cm

1 Halla el Esfuerzo Neto del Terreno


_=__/
n= 7.5Tn/m2 - 1.3mX1.8Tn/m3 - 0.2Tn/m2
n= 4.96 Tn/m2 Debe Cumplir que Lv1 = Lv2=m:

2 Area de la Zapata
Az=P/_

P=Pm+Pv+ 5%(Pm+Pv) 23.64 Tn


P=Pm+Pv+ 5%(Pm+Pv)
Az= 4.77 m2

3 Hallando S y T
=2+0.25

T=2+0.25 S= 2.19 m
T= 2.19 m
SXT=(2+0.25)(2+0.25)
4.77 = 4m2+0.5m+0.5m+0.0625

m= 0.97 m

4 Dimensionamiento de la altura hz de la Zapata


_=1.2_+1.6_ 31808

Pu= 29372.2
Wu=Wamp/Az
Wu= 6162.6951 Wu= 6.16 Tn/m2

Verificacin por Cortante que Resiste el Concreto __


_=0.53()............(1) condicin
=0.85
Vc= 6.53 Kg/cm2
_=()/d.................(2)
igualando (1) a (2)

65.3=6.16(0.97)/d d=0.08m
Por Punzonamiento
_Vact condicin

1: = 0.27[2+4/](^ )

Vc= 19.95 Kg/cm2

2: =0.27[/+2](^
)
Vc= ?
3: =1.1(^ ) Apz = bo*d

_=2(1+)+2(2+)
Vc= 13.55 Kg/cm2 .(1)

=[(+1)(d+t2)]/Apz .............(2)
=[(+1)(d+t2)]/Apz .............(2)

Igualando (1) en (2)

d= 0.14

5 Verificacion por Cortante d=0.14 m = 0.75 _Vn condicin

Vdu = (WuxS) (m - d)

Vdu = (6.16*2.18)(0.97-0.14)
Vdu = 11.26
Vn = Vdu /

Vn = 15.00789

La Condicion se Cumple Vc Vn
Vc = 0.53*(^ )*S*d

Vc= 22.87539

6 Chequeo por Flexin

Mmax= = Wu*m2/2*S

Mmax= 6.35

Mtodo del tanteo

= 0.9 (a = d/5)

As = Mmax / *Fy(d-a/2) a = (As*Fs)/0.85*Fc*S

As1 = 6.35 / 0.9*4200*(14-14/5) a1 = (14.99*4200)/0.85*210*219

As1= 14.99 m2 a1= 1.61 m

As2 = Mmax / *Fy(d-a/2) a2 = (As*Fs)/0.85*Fc*S

As2= 12.73 m2 a2= 1.36 m

As3= Mmax / *Fy(d-a/2) a3 = (As*Fs)/0.85*Fc*S

As3= 12.61 m2 a3= 1.35 m


Verificacin del Acero Mnimo

Asmn = tem*S*d tem=0.008

Asmn = 0.008*219*14 = 24.53 cm2

Asumimos = 1/2 = 1.26 cm2

Hallar el Numero de Varillas


n=As/A

n= 10.01

Hallanado Espaciamineto

S = (b 2r ) / 1-n

S= 22.53 cm

Se Usara= 101/2 @ 22.5cm

Acero Transversal

As= 12.61*2.19/2.19 As= 12.61 m2

Hallar el Numero de Varillas


n= 12.61/1.26
n= 10.01
Hallar el Espaciamineto
S = (b 2r ) / 1-n

S= 22.530 cm

Se Usara= 101/2 @ 22.5cm