V du remblai (m3)

V du deblai (m3)
CP CTN
300 50 40
Voie-1

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 27.42 27.39 0.4


P1.1 5.74 27.49 27.33 0.4
P2 4.26 27.54 27.28 0.4
P3 1.05 27.55 27.27 0.4
P4 4.28 27.62 27.22 0.4
P5 4.67 27.64 27.17 0.4
P6 10.00 27.52 27.03 0.4
P7 11.89 27.51 26.84 0.4
P7.1 7.09 27.63 26.73 0.4
P8 1.03 27.65 26.72 0.4
P9 10.00 27.79 26.56 0.4
P10 6.44 27.88 26.46 0.4
P10.1 2.77 27.88 26.42 0.4
P11 0.79 27.87 26.41 0.4
P12 8.69 27.67 26.27 0.4
P13 12.26 27.02 26.07 0.4
P14 9.05 26.36 25.93 0.4
P15 3.69 25.95 25.87 0.4
P16 6.31 25.15 25.76 0.4
P17 6.41 24.17 25.64 0.4
Voie-1
P18 3.59 23.56 25.58 0.4
P19 8.64 22.24 25.43 0.4
P19.1 5.93 21.74 25.32 0.4
P20 6.29 21.50 25.21 0.4
P21 9.14 21.62 25.05 0.4
P22 3.08 21.78 25.00 0.4
P22.1 1.51 21.86 24.97 0.4
P23 5.41 22.19 24.88 0.4
P24 5.31 22.72 24.78 0.4
P25 4.69 23.22 24.70 0.4
P26 7.53 24.14 24.57 0.4
P27 12.61 26.00 24.35 0.4
P28 1.57 25.94 24.32 0.4
P29 3.29 25.71 24.26 0.4
P30 5.00 25.33 24.17 0.4
P31 10.00 24.67 24.00 0.4
P32 10.00 24.34 23.82 0.4
P33 10.00 24.18 23.64 0.4
P33.1 2.15 24.13 23.61 0.4
P34 5.47 23.89 23.51 0.4

voie-2

Designation N PT N PK DP COTE TN C.Projet CC

P1 0 22.42 24.84 0.4


Voie-2
P2 31.56 24.14 24.57 0.40

CP-1

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 27.48 29.92 0.4


CP-1
P2 5.84 27.51 29.85 0.40

CP-2

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 27.73 26.82 0.4


CP-2
P2 10.48 27.88 26.46 0.40

CP-3

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 27.78 26.75 0.4


CP-3
P2 12.78 27.67 26.27 0.40

CP-4

Designation N PT N PK DP COTE TN C.Projet CC


Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 27.24 26.61 0.4


CP-4
P2 15.14 27.02 26.07 0.40

CP-5

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 25.16 25.78 0.4


CP-4
P2 20.00 24.17 25.64 0.40

CP-6

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 23.25 25.66 0.4


CP-6
P2 22.31 22.24 25.47 0.40

CP-7

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 21.34 25.39 0.4


CP-7
P2 24.61 21.50 25.21 0.40

CP-8

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 21.13 25.24 0.4


CP-8
P2 26.91 21.78 25.04 0.40

CP-9

Designation N PT N PK DP COTE TN C.Projet CC


Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 21.39 25.07 0.4


CP-9
P2 29.22 22.72 24.82 0.40

CP-10

Designation N PT N PK DP COTE TN C.Projet CC

P1 0.00 22.42 24.84 0.4


CP-10
P2 31.56 24.14 24.57 0.40
Metr de la Voirie

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 5 10 5 0.15 -0.42 0.00
6 5 10 5 0.15 -0.57 0.00
6 5 10 5 0.15 -0.66 0.00
6 5 10 5 0.15 -0.68 0.00
6 5 10 5 0.15 -0.80 0.00
6 5 10 5 0.15 -0.87 0.00
6 5 10 5 0.15 -0.89 0.00
6 5 10 5 0.15 -1.07 0.00
6 5 10 5 0.15 -1.30 0.00
6 5 10 5 0.15 -1.34 0.00
6 5 10 5 0.15 -1.63 0.00
6 5 10 5 0.15 -1.82 0.00
6 5 10 5 0.15 -1.86 0.00
6 5 10 5 0.15 -1.86 0.00
6 5 10 5 0.15 -1.80 0.00
6 5 10 5 0.15 -1.35 0.00
6 5 10 5 0.15 -0.83 0.00
6 5 10 5 0.15 -0.49 0.00
6 5 10 5 0.15 0.21 1.32
6 5 10 5 0.15 1.07 9.96
6 5 10 5 0.15 1.62 15.43
6 5 10 5 0.15 2.79 27.12
6 5 10 5 0.15 3.19 31.14
6 5 10 5 0.15 3.32 32.41
6 5 10 5 0.15 3.03 29.54
6 5 10 5 0.15 2.81 27.38
6 5 10 5 0.15 2.71 26.32
6 5 10 5 0.15 2.29 22.10
6 5 10 5 0.15 1.66 15.90
6 5 10 5 0.15 1.08 10.07
6 5 10 5 0.15 0.03 -0.44
6 5 10 5 0.15 -2.06 0.00
6 5 10 5 0.15 -2.03 0.00
6 5 10 5 0.15 -1.85 0.00
6 5 10 5 0.15 -1.56 0.00
6 5 10 5 0.15 -1.08 0.00
6 5 10 5 0.15 -0.92 0.00
6 5 10 5 0.15 -0.93 0.00
6 5 10 5 0.15 -0.93 0.00
6 5 10 5 0.15 -0.78 0.00

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 2.01 11.81
6.00 3.00 6.00 3.00 0.09 0.04 -0.05

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 2.04 11.96
6.00 3.00 6.00 3.00 0.09 1.94 11.36

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 -1.32 0.00
6.00 3.00 6.00 3.00 0.09 -1.82 0.00

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 -1.43 0.00
6.00 3.00 6.00 3.00 0.09 -1.80 0.00

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
(TN)
(C.Projet-CC)
EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 -1.04 0.00
6.00 3.00 6.00 3.00 0.09 -1.35 0.00

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 0.22 1.04
6.00 3.00 6.00 3.00 0.09 1.06 6.11

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 2.01 11.79
6.00 3.00 6.00 3.00 0.09 2.83 16.70

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 3.65 21.66
6.00 3.00 6.00 3.00 0.09 3.31 19.62

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 3.71 21.99
6.00 3.00 6.00 3.00 0.09 2.86 16.87

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
(TN)
(C.Projet-CC)
EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 3.28 19.43
6.00 3.00 6.00 3.00 0.09 1.70 9.95

Largeur d'encaissement (C.Projet-CC)


EMP L*0.015 -
L.Gauche Larg Totale L,droite (TN) Remblai
6 3 6 3 0.09 2.01 11.81
6.00 3.00 6.00 3.00 0.09 0.04 -0.05
Surfaces Volumes

SURFACE SURFACE SURFACE SURFACE


Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
0.00 0.00 5.00 2.50 2.50 0.00
0.00 0.00 6.40 3.20 3.20 0.00
0.00 0.00 7.36 3.68 3.68 0.00
0.00 0.00 7.54 3.77 3.77 0.00
0.00 0.00 8.74 4.37 4.37 0.00
0.00 0.00 9.49 4.75 4.75 0.00
0.00 0.00 9.65 4.83 4.83 0.00
0.00 0.00 11.41 5.70 5.70 0.00
0.00 0.00 13.75 6.87 6.87 0.00
0.00 0.00 14.10 7.05 7.05 0.00
0.00 0.00 17.01 8.50 8.50 0.00
0.00 0.00 18.93 9.47 9.47 0.00
0.00 0.00 19.38 9.69 9.69 0.00
0.00 0.00 19.38 9.69 9.69 0.00
0.00 0.00 18.76 9.38 9.38 0.00
0.00 0.00 14.23 7.11 7.11 0.00
0.00 0.00 9.10 4.55 4.55 0.00
0.00 0.00 5.61 2.81 2.81 0.00
0.66 0.66 0.00 0.00 0.00 8.31
4.98 4.98 0.00 0.00 0.00 63.88
7.72 7.72 0.00 0.00 0.00 55.33
13.56 13.56 0.00 0.00 0.00 234.37
15.57 15.57 0.00 0.00 0.00 184.58
16.21 16.21 0.00 0.00 0.00 203.96
14.77 14.77 0.00 0.00 0.00 269.94
13.69 13.69 0.00 0.00 0.00 84.40
13.16 13.16 0.00 0.00 0.00 39.63
11.05 11.05 0.00 0.00 0.00 119.64
7.95 7.95 0.00 0.00 0.00 84.35
5.03 5.03 0.00 0.00 0.00 47.25
-0.22 -0.22 0.00 0.00 0.00 -3.31
0.00 0.00 21.31 10.65 10.65 0.00
0.00 0.00 21.01 10.50 10.50 0.00
0.00 0.00 19.23 9.61 9.61 0.00
0.00 0.00 16.34 8.17 8.17 0.00
0.00 0.00 11.52 5.76 5.76 0.00
0.00 0.00 9.94 4.97 4.97 0.00
0.00 0.00 10.10 5.05 5.05 0.00
0.00 0.00 10.02 5.01 5.01 0.00
0.00 0.00 8.52 4.26 4.26 0.00
1392.32

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
5.90 5.90 0.00 0.00 0.00 0.00
-0.02 -0.02 0.00 0.00 0.00 -1.47
-1.47

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
5.98 5.98 0.00 0.00 0.00 0.00
5.68 5.68 0.00 0.00 0.00 66.40
66.40

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
0.00 0.00 8.16 4.08 4.08 0.00
0.00 0.00 11.18 5.59 5.59 0.00
0.00

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
0.00 0.00 8.82 4.41 4.41 0.00
0.00 0.00 11.06 5.53 5.53 0.00
0.00

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
0.00 0.00 6.51 3.25 3.25 0.00
0.00 0.00 8.36 4.18 4.18 0.00
0.00

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
0.52 0.52 0.00 0.00 0.00 0.00
3.06 3.06 0.00 0.00 0.00 122.28
122.28

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
5.89 5.89 0.00 0.00 0.00 0.00
8.35 8.35 0.00 0.00 0.00 372.63
372.63

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
10.83 10.83 0.00 0.00 0.00 0.00
9.81 9.81 0.00 0.00 0.00 482.78
482.78

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
10.99 10.99 0.00 0.00 0.00 0.00
8.44 8.44 0.00 0.00 0.00 454.02
454.02

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
9.72 9.72 0.00 0.00 0.00 0.00
4.98 4.98 0.00 0.00 0.00 290.77
290.77

Surfaces Volumes
SURFACE SURFACE SURFACE SURFACE
Deblai Remblai
GAUCHE DROITE GAUCHE DROITE
5.90 5.90 0.00 0.00 0.00 0.00
-0.02 -0.02 0.00 0.00 0.00 -1.47
-1.47
Volumes

Deblai
0.00
36.79
31.30
7.93
37.42
44.33
96.52
135.61
97.44
14.47
170.06
121.99
53.60
15.31
163.04
174.40
82.36
20.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
268.67
33.04
63.24
81.68
115.23
99.41
100.96
21.53
46.61
2133.68

Volumes

Deblai
0.00
0.00
0.00

Volumes

Deblai
0.00
0.00
0.00

Volumes

Deblai
0.00
117.11
117.11

Volumes

Deblai
0.00
141.32
141.32

Volumes
Deblai
0.00
126.50
126.50

Volumes

Deblai
0.00
0.00
0.00

Volumes

Deblai
0.00
0.00
0.00

Volumes

Deblai
0.00
0.00
0.00

Volumes

Deblai
0.00
0.00
0.00

Volumes
Deblai
0.00
0.00
0.00

Volumes

Deblai
0.00
0.00
0.00
Epaisseur du GN
Epaisseur du GN
Epaisseur de l'enro
Pente

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.74 6.00 6.89 5.17 1.55
P1.1 10.00 6.00 12.00 9.00 2.70
P2 5.31 6.00 6.37 4.78 1.43
P3 5.33 6.00 6.40 4.80 1.44
P4 8.95 6.00 10.74 8.05 2.42
P5 14.67 6.00 17.60 13.20 3.96
P6 21.89 6.00 26.26 19.70 5.91
P7 18.97 6.00 22.77 17.08 5.12
P7.1 8.11 6.00 9.74 7.30 2.19
P8 11.03 6.00 13.23 9.92 2.98
P9 16.44 6.00 19.73 14.80 4.44
P10 9.21 6.00 11.05 8.29 2.49
P10.1 3.56 6.00 4.27 3.20 0.96
P11 9.48 6.00 11.38 8.53 2.56
P12 20.95 6.00 25.14 18.85 5.66
P13 21.31 6.00 25.57 19.18 5.75
P14 12.74 6.00 15.29 11.47 3.44
P15 10.00 6.00 12.00 9.00 2.70
P16 12.72 6.00 15.27 11.45 3.44
P17 10.00 6.00 12.00 9.00 2.70
P18 12.23 6.00 14.67 11.01 3.30
P19 14.57 6.00 17.48 13.11 3.93
P19.1 12.22 6.00 14.66 11.00 3.30
P20 15.43 6.00 18.52 13.89 4.17
P21 12.22 6.00 14.66 11.00 3.30
P22 4.59 6.00 5.51 4.13 1.24
P22.1 6.92 6.00 8.30 6.23 1.87
P23 10.72 6.00 12.86 9.65 2.89
P24 10.00 6.00 12.00 9.00 2.70
P25 12.23 6.00 14.67 11.00 3.30
P26 20.14 6.00 24.17 18.13 5.44
P27 14.18 6.00 17.02 12.76 3.83
P28 4.86 6.00 5.83 4.38 1.31
P29 8.29 6.00 9.94 7.46 2.24
P30 15.00 6.00 18.00 13.50 4.05
P31 20.00 6.00 24.00 18.00 5.40
P32 20.00 6.00 24.00 18.00 5.40
P33 12.15 6.00 14.58 10.93 3.28
P33.1 7.62 6.00 9.14 6.86 2.06
P34 5.47 6.00 6.56 4.92 1.48
570.29 427.71 128.31

voie-2

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
n GNF (m3) GNA (m3) (m3)
P1 0 6.00 0.00 0.00 0.00
P2 31.5639191 6.00 37.88 28.41 8.52
37.88 28.41 8.52

CP-1

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 5.84 6.00 7.01 5.26 1.58
7.01 5.26 1.58

CP-2

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 10.48 6.00 12.57 9.43 2.83
12.57 9.43 2.83

CP-3
Profil n Longueur Volume du Volume de
Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 12.78 6.00 15.33 11.50 3.45
15.33 11.50 3.45

CP-4

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 15.14 6.00 18.17 13.63 4.09
18.17 13.63 4.09

CP-5

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 20.00 6.00 24.00 18.00 5.40
24.00 18.00 5.40

CP-6

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 22.31 6.00 26.77 20.08 6.02
26.77 20.08 6.02

CP-7
Profil n Longueur Volume du Volume de
Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 24.61 6.00 29.53 22.15 6.64
29.53 22.15 6.64

CP-8

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 26.91 6.00 32.29 24.22 7.27
32.29 24.22 7.27

CP-9

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 29.22 6.00 35.06 26.29 7.89
35.06 26.29 7.89

CP-10

Profil n Longueur Volume du Volume de


Volume du
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 0.00 6.00 0.00 0.00 0.00
P2 31.56 6.00 37.88 28.41 8.52
37.88 28.41 8.52
Epaisseur du GNF 0.2
Epaisseur du GNA 0.15
Epaisseur de l'enrob 0.05
Pente 0.015

Bordure T3 Semelle Trottoir


Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00


Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00


Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00

Bordure T3 Semelle Trottoir

0.00 0.00 0.00


Remblai Dblai GNF GNA Enrob Bordure T3 Semelle

3178.26 2518.61 846.77 661.37 198.41 0.00 0.00


Trottoir

0.00
N Designation unit Quantit
Prix Unitaire DH HTVA

Terrassement en tranches toute


1 profondeur et en terrain de toute nature y M3 50
compris le rocher,

2 M3 25
Dblai
Couche de chausse
GNF M3
3
GNA M3
Enrob M3
Fourniture chausse
Bordures T3 U
4
Semelle U
Trottoir
Montant

0
0
0

0
0
0
Voie 1

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 27.46 27.19 0.4 6


P2 10.00 27.49 27.11 0.4 6
P3 10.00 27.53 27.03 0.4 6
P4 10.00 27.61 26.96 0.4 6
P5 10.00 27.64 26.88 0.4 6
P6 10.00 27.58 26.80 0.4 6
P7 10.00 27.52 26.72 0.4 6
P8 10.00 27.52 26.64 0.4 6
P9 6.90 27.50 26.57 0.4 6
P10 5.00 27.51 26.54 0.4 6
P11 8.17 27.56 26.49 0.4 6
P12 10.00 27.66 26.41 0.4 6
P13 9.93 27.73 26.33 0.4 6
P14 10.00 27.79 26.25 0.4 6
P15 6.43 27.86 26.18 0.4 6
P16 3.08 27.88 26.15 0.4 6
P17 3.57 27.89 26.13 0.4 6
P18 6.92 27.87 26.10 0.4 6
P19 8.68 27.78 26.02 0.4 6
P20 10.00 27.67 25.96 0.4 6
Voie-1
P21 12.25 27.37 25.86 0.4 6
P22 10.00 27.02 25.77 0.4 6
P23 9.08 26.78 25.71 0.4 6
P24 8.65 26.36 25.63 0.4 6
P25 10.00 25.96 25.57 0.4 6
P26 12.72 25.15 25.47 0.4 6
P27 10.00 24.19 25.37 0.4 6
P28 8.63 23.57 25.32 0.4 6
P29 8.59 22.79 25.24 0.4 6
P30 10.29 22.25 25.18 0.4 6
P31 12.20 21.68 25.08 0.4 6
P32 9.71 21.49 24.99 0.4 6
P33 9.20 21.46 24.93 0.4 6
P34 8.02 21.62 24.85 0.4 6
P35 3.31 21.78 24.80 0.4 6
P36 6.98 21.79 24.80 0.4 6
P37 11.92 22.19 24.69 0.4 6
P38 10.00 22.71 24.61 0.4 6
P39 9.77 23.21 24.54 0.4 6
P40 7.47 23.78 24.46 0.4 6
P41 5.00 24.12 24.42 0.4 6
P42 7.53 24.50 24.38 0.4 6
P43 10.00 25.25 24.30 0.4 6
P44 10.00 25.93 24.22 0.4 6
P45 10.00 25.65 24.15 0.4 6
P46 10.00 25.27 24.07 0.4 6
P47 10.00 24.95 23.99 0.4 6
P48 10.00 24.62 23.91 0.4 6
P49 10.00 24.46 23.83 0.4 6
P50 10.00 24.34 23.76 0.4 6
P51 10.00 24.27 23.68 0.4 6
P52 10.00 24.16 23.60 0.4 6
P53 6.55 24.04 23.52 0.4 6
P54 1.55 23.92 23.50 0.4 6

VOIE 2

Designation N PT N PK DP COTE TN C.Projet CC EMP

Voie-2 P1 4.44 27.48 26.73 0.4 6


P2 6.04 27.50 26.59 0.4 6
P3 1.61 27.51 26.54 0.4 6

Voie3

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 27.73 26.55 0.4 6


VOIE3 P2 8.99 27.81 26.36 0.40 6.00
P3 5.53 27.87 26.21 0.4 6
P4 1.54 27.88 26.15 0.40 6.00

Voie 4

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 27.78 26.05 0.4 6


VOIE4 P2 11.26 27.77 26.01 0.40 6.00
P3 7.81 27.69 25.97 0.4 6
P4 1.55 27.67 25.96 0.40 6.00

Voie 5

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 27.25 25.87 0.4 6


VOIE5 P2 10.00 27.18 25.83 0.40 6.00
P3 8.54 27.11 25.80 0.4 6
P4 5.12 27.05 25.78 0.40 6.00
P5 1.58 27.02 25.77 0.4 6

Voie 6

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 26.42 26.42 0.4 6


VOIE 6 P2 10.00 26.29 26.28 0.40 6.00
P3 10.00 26.30 26.14 0.4 6
P4 10.00 26.29 26.00 0.40 6.00
P5 10.00 26.21 25.86 0.4 6
P6 10.00 26.09 25.72 0.4 6
P7 5.71 25.98 25.59 0.40 6.00
P8 0.71 25.96 25.57 0.4 6

Voie 7

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 25.16 25.48 0.4 6


VOIE 7 P2 10.00 25.07 25.45 0.40 6.00
P3 10.00 24.81 25.42 0.4 6
P4 8.27 24.52 25.39 0.40 6.00
P5 4.85 24.32 25.38 0.4 6
P6 1.58 24.19 25.37 0.4 6

Voie 8

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 23.25 25.32 0.4 6


VOIE 8
VOIE 8 P2 10.00 23.05 25.28 0.40 6.00
P3 10.00 22.84 25.25 0.4 6
P4 10.54 22.58 25.22 0.40 6.00
P5 7.15 22.31 25.19 0.4 6
P6 1.61 22.25 25.18 0.4 6

Voie 9

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 21.34 24.86 0.4 6


VOIE 9 P2 10.00 21.31 24.89 0.40 6.00
P3 10.00 21.31 24.91 0.4 6
P4 10.00 21.33 24.94 0.40 6.00
P5 7.81 21.41 24.97 0.4 6
P6 4.39 21.46 24.98 0.4 6
P7 1.59 21.49 24.99 0.4 6

Voie 10

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 21.13 24.96 0.4 6


VOIE 10 P2 10.00 21.21 24.93 0.40 6.00
P3 10.00 21.23 24.90 0.4 6
P4 10.00 21.32 24.87 0.40 6.00
P5 10.04 21.45 24.84 0.4 6
P6 6.71 21.72 24.81 0.4 6
P7 1.68 21.78 24.80 0.4 6

Voie 11

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 21.39 24.77 0.4 6


VOIE 11 P2 10.00 21.54 24.74 0.40 6.00
P3 10.00 21.74 24.71 0.4 6
P4 10.00 21.97 24.68 0.40 6.00
P5 10.00 22.21 24.66 0.4 6
P6 7.32 22.50 24.63 0.4 6
P7 3.97 22.64 24.62 0.40 6.00
P8 1.66 22.71 24.61 0.4 6
Voie 12

Designation N PT N PK DP COTE TN C.Projet CC EMP

P1 5.00 22.42 24.59 0.4 6


VOIE 12 P2 10.00 22.56 24.57 0.40 6.00
P3 10.00 22.74 24.54 0.4 6
P4 10.00 22.96 24.51 0.40 6.00
P5 10.00 23.23 24.48 0.4 6
P6 9.61 23.66 24.46 0.4 6
P7 6.35 24.02 24.43 0.40 6.00
P8 1.74 24.12 24.42 0.4 6
Largeur d'encaissement (C.Projet- Surfaces
CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
5 10 5 0.15 -0.67 0.00 0.00 0.00
5 10 5 0.15 -0.78 0.00 0.00 0.00
5 10 5 0.15 -0.90 0.00 0.00 0.00
5 10 5 0.15 -1.05 0.00 0.00 0.00
5 10 5 0.15 -1.16 0.00 0.00 0.00
5 10 5 0.15 -1.18 0.00 0.00 0.00
5 10 5 0.15 -1.20 0.00 0.00 0.00
5 10 5 0.15 -1.27 0.00 0.00 0.00
5 10 5 0.15 -1.34 0.00 0.00 0.00
5 10 5 0.15 -1.38 0.00 0.00 0.00
5 10 5 0.15 -1.47 0.00 0.00 0.00
5 10 5 0.15 -1.65 0.00 0.00 0.00
5 10 5 0.15 -1.79 0.00 0.00 0.00
5 10 5 0.15 -1.94 0.00 0.00 0.00
5 10 5 0.15 -2.08 0.00 0.00 0.00
5 10 5 0.15 -2.13 0.00 0.00 0.00
5 10 5 0.15 -2.16 0.00 0.00 0.00
5 10 5 0.15 -2.17 0.00 0.00 0.00
5 10 5 0.15 -2.16 0.00 0.00 0.00
5 10 5 0.15 -2.11 0.00 0.00 0.00
5 10 5 0.15 -1.91 0.00 0.00 0.00
5 10 5 0.15 -1.65 0.00 0.00 0.00
5 10 5 0.15 -1.47 0.00 0.00 0.00
5 10 5 0.15 -1.13 0.00 0.00 0.00
5 10 5 0.15 -0.78 0.00 0.00 0.00
5 10 5 0.15 -0.08 0.00 0.00 0.00
5 10 5 0.15 0.79 7.12 3.56 3.56
5 10 5 0.15 1.35 12.74 6.37 6.37
5 10 5 0.15 2.05 19.77 9.88 9.88
5 10 5 0.15 2.53 24.59 12.30 12.30
5 10 5 0.15 2.99 29.18 14.59 14.59
5 10 5 0.15 3.10 30.26 15.13 15.13
5 10 5 0.15 3.07 29.90 14.95 14.95
5 10 5 0.15 2.83 27.55 13.78 13.78
5 10 5 0.15 2.62 25.48 12.74 12.74
5 10 5 0.15 2.60 25.28 12.64 12.64
5 10 5 0.15 2.10 20.30 10.15 10.15
5 10 5 0.15 1.50 14.30 7.15 7.15
5 10 5 0.15 0.92 8.46 4.23 4.23
5 10 5 0.15 0.28 2.04 1.02 1.02
5 10 5 0.15 -0.10 0.00 0.00 0.00
5 10 5 0.15 -0.52 0.00 0.00 0.00
5 10 5 0.15 -1.35 0.00 0.00 0.00
5 10 5 0.15 -2.11 0.00 0.00 0.00
5 10 5 0.15 -1.91 0.00 0.00 0.00
5 10 5 0.15 -1.60 0.00 0.00 0.00
5 10 5 0.15 -1.36 0.00 0.00 0.00
5 10 5 0.15 -1.11 0.00 0.00 0.00
5 10 5 0.15 -1.03 0.00 0.00 0.00
5 10 5 0.15 -0.98 0.00 0.00 0.00
5 10 5 0.15 -1.00 0.00 0.00 0.00
5 10 5 0.15 -0.96 0.00 0.00 0.00
5 10 5 0.15 -0.92 0.00 0.00 0.00
5 10 5 0.15 -0.82 0.00 0.00 0.00

(C.Projet-
Largeur
CC)
d'encaisseme L*0.015 Surfaces
-
nt SURFACE SURFACE
L.Gauche Larg Totale L,droite (TN) Remblai
GAUCHE DROITE
3 6 3 0.09 -1.15 0.00 0.00 0.00
3 6 3 0.09 -1.31 0.00 0.00 0.00
3 6 3 0.09 -1.37 0.00 0.00 0.00

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 -1.58 0.00 0.00 0.00
3.00 6.00 3.00 0.09 -1.85 0.00 0.00 0.00
3 6 3 0.09 -2.06 0.00 0.00 0.00
3.00 6.00 3.00 0.09 -2.13 0.00 0.00 0.00

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 -2.13 0.00 0.00 0.00
3 6 3 0.09 -2.16 0.00 0.00 0.00
3 6 3 0.09 -2.12 0.00 0.00 0.00
3 6 3 0.09 -2.11 0.00 0.00 0.00

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 -1.78 0.00 0.00 0.00
3 6 3 0.09 -1.74 0.00 0.00 0.00
3 6 3 0.09 -1.71 0.00 0.00 0.00
3 6 3 0.09 -1.67 0.00 0.00 0.00
3 6 3 0.09 -1.65 0.00 0.00 0.00

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 -0.40 0.00 0.00 0.00
3 6 3 0.09 -0.41 0.00 0.00 0.00
3 6 3 0.09 -0.55 0.00 0.00 0.00
3 6 3 0.09 -0.68 0.00 0.00 0.00
3 6 3 0.09 -0.75 0.00 0.00 0.00
3 6 3 0.09 -0.77 0.00 0.00 0.00
3 6 3 0.09 -0.79 0.00 0.00 0.00
3 6 3 0.09 -0.79 0.00 0.00 0.00

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 -0.09 0.00 0.00 0.00
3 6 3 0.09 -0.02 0.00 0.00 0.00
3 6 3 0.09 0.21 0.97 0.49 0.49
3 6 3 0.09 0.48 2.59 1.29 1.29
3 6 3 0.09 0.65 3.64 1.82 1.82
3 6 3 0.09 0.78 4.41 2.20 2.20

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 1.67 9.73 4.86 4.86
3 6 3 0.09 1.83 10.71 5.36 5.36
3 6 3 0.09 2.01 11.80 5.90 5.90
3 6 3 0.09 2.24 13.20 6.60 6.60
3 6 3 0.09 2.48 14.60 7.30 7.30
3 6 3 0.09 2.53 14.91 7.46 7.46

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 3.12 18.47 9.23 9.23
3 6 3 0.09 3.18 18.82 9.41 9.41
3 6 3 0.09 3.20 18.95 9.48 9.48
3 6 3 0.09 3.21 18.98 9.49 9.49
3 6 3 0.09 3.16 18.70 9.35 9.35
3 6 3 0.09 3.13 18.49 9.25 9.25
3 6 3 0.09 3.10 18.33 9.17 9.17

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 3.43 20.29 10.15 10.15
3 6 3 0.09 3.32 19.65 9.82 9.82
3 6 3 0.09 3.27 19.32 9.66 9.66
3 6 3 0.09 3.15 18.62 9.31 9.31
3 6 3 0.09 2.99 17.65 8.82 8.82
3 6 3 0.09 2.69 15.88 7.94 7.94
3 6 3 0.09 2.62 15.45 7.73 7.73

Largeur d'encaissement (C.Projet- Surfaces


CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 2.98 17.58 8.79 8.79
3 6 3 0.09 2.80 16.54 8.27 8.27
3 6 3 0.09 2.57 15.17 7.58 7.58
3 6 3 0.09 2.32 13.63 6.81 6.81
3 6 3 0.09 2.05 12.01 6.01 6.01
3 6 3 0.09 1.73 10.10 5.05 5.05
3 6 3 0.09 1.58 9.20 4.60 4.60
3 6 3 0.09 1.50 8.73 4.37 4.37
Largeur d'encaissement (C.Projet- Surfaces
CC)
L*0.015 SURFACE SURFACE
L.Gauche Larg Totale L,droite - Remblai
(TN) GAUCHE DROITE
3 6 3 0.09 1.77 10.36 5.18 5.18
3 6 3 0.09 1.61 9.38 4.69 4.69
3 6 3 0.09 1.40 8.11 4.06 4.06
3 6 3 0.09 1.15 6.61 3.31 3.31
3 6 3 0.09 0.85 4.85 2.42 2.42
3 6 3 0.09 0.40 2.13 1.07 1.07
3 6 3 0.09 0.01 -0.19 -0.09 -0.09
3 6 3 0.09 -0.10 0.00 0.00 0.00
Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
7.45 3.73 3.73 0.00 37.25
8.51 4.25 4.25 0.00 85.07
9.71 4.86 4.86 0.00 97.11
11.26 5.63 5.63 0.00 112.65
12.35 6.17 6.17 0.00 123.49
12.54 6.27 6.27 0.00 125.35
12.73 6.36 6.36 0.00 127.29
13.48 6.74 6.74 0.00 134.78
14.10 7.05 7.05 0.00 97.36
14.53 7.26 7.26 0.00 72.64
15.47 7.74 7.74 0.00 126.36
17.24 8.62 8.62 0.00 172.39
18.69 9.34 9.34 0.00 185.60
20.10 10.05 10.05 0.00 201.04
21.58 10.79 10.79 0.00 138.72
22.03 11.02 11.02 0.00 67.89
22.39 11.20 11.20 0.00 79.97
22.46 11.23 11.23 0.00 155.43
22.32 11.16 11.16 0.00 193.68
21.81 10.91 10.91 0.00 218.13
19.86 9.93 9.93 0.00 243.13
17.24 8.62 8.62 0.00 172.40
15.44 7.72 7.72 0.00 140.21
12.05 6.03 6.03 0.00 104.28
8.59 4.30 4.30 0.00 85.92
1.51 0.75 0.75 0.00 19.20
0.00 0.00 0.00 71.19 0.00
0.00 0.00 0.00 109.97 0.00
0.00 0.00 0.00 169.84 0.00
0.00 0.00 0.00 253.15 0.00
0.00 0.00 0.00 356.19 0.00
0.00 0.00 0.00 293.70 0.00
0.00 0.00 0.00 275.18 0.00
0.00 0.00 0.00 221.11 0.00
0.00 0.00 0.00 84.23 0.00
0.00 0.00 0.00 176.37 0.00
0.00 0.00 0.00 241.94 0.00
0.00 0.00 0.00 142.98 0.00
0.00 0.00 0.00 82.73 0.00
0.00 0.00 0.00 15.21 0.00
1.77 0.89 0.89 0.00 8.87
5.97 2.98 2.98 0.00 44.96
14.21 7.11 7.11 0.00 142.11
21.84 10.92 10.92 0.00 218.41
19.81 9.90 9.90 0.00 198.06
16.80 8.40 8.40 0.00 168.00
14.31 7.15 7.15 0.00 143.07
11.87 5.94 5.94 0.00 118.71
11.06 5.53 5.53 0.00 110.61
10.58 5.29 5.29 0.00 105.75
10.72 5.36 5.36 0.00 107.21
10.38 5.19 5.19 0.00 103.81
9.92 4.96 4.96 0.00 64.99
8.95 4.48 4.48 0.00 13.87
2493.79 4865.75

Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
7.16 3.58 3.58 0.00 31.76
8.11 4.06 4.06 0.00 49.03
8.49 4.25 4.25 0.00 13.64
0.00 94.43

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
9.73 4.86 4.86 0.00 48.64
11.36 5.68 5.68 0.00 102.11
12.61 6.30 6.30 0.00 69.71
13.05 6.53 6.53 0.00 20.09
0.00 240.54

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
13.06 6.53 6.53 0.00 65.28
13.23 6.62 6.62 0.00 149.05
13.00 6.50 6.50 0.00 101.52
12.93 6.47 6.47 0.00 20.01
0.00 335.86

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
10.95 5.47 5.47 0.00 54.73
10.74 5.37 5.37 0.00 107.35
10.52 5.26 5.26 0.00 89.86
10.31 5.15 5.15 0.00 52.81
10.17 5.08 5.08 0.00 16.07
0.00 320.83

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
2.67 1.34 1.34 0.00 13.35
2.72 1.36 1.36 0.00 27.15
3.60 1.80 1.80 0.00 35.97
4.37 2.19 2.19 0.00 43.72
4.76 2.38 2.38 0.00 47.55
4.88 2.44 2.44 0.00 48.85
5.03 2.51 2.51 0.00 28.71
5.01 2.50 2.50 0.00 3.56
0.00 248.87

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
0.80 0.40 0.40 0.00
0.38 0.19 0.19 0.00 3.98
0.00 0.00 0.00 9.73 3.82
0.00 0.00 0.00 21.40 0.00
0.00 0.00 0.00 17.66 0.00
0.00 0.00 0.00 6.95 0.00
55.73 7.80

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
0.00 0.00 0.00 48.64
0.00 0.00 0.00 107.13 0.00
0.00 0.00 0.00 117.97 0.00
0.00 0.00 0.00 139.13 0.00
0.00 0.00 0.00 104.43 0.00
0.00 0.00 0.00 24.05 0.00
541.36 0.00

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
0.00 0.00 0.00 92.33 0.00
0.00 0.00 0.00 188.16 0.00
0.00 0.00 0.00 189.55 0.00
0.00 0.00 0.00 189.81 0.00
0.00 0.00 0.00 146.02 0.00
0.00 0.00 0.00 81.23 0.00
0.00 0.00 0.00 29.07 0.00
887.10 0.00

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
0.00 0.00 0.00 101.47 0.00
0.00 0.00 0.00 196.49 0.00
0.00 0.00 0.00 193.25 0.00
0.00 0.00 0.00 186.24 0.00
0.00 0.00 0.00 177.15 0.00
0.00 0.00 0.00 106.65 0.00
0.00 0.00 0.00 25.91 0.00
961.24 0.00

Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
0.00 0.00 0.00 87.92 0.00
0.00 0.00 0.00 165.44 0.00
0.00 0.00 0.00 151.69 0.00
0.00 0.00 0.00 136.29 0.00
0.00 0.00 0.00 120.11 0.00
0.00 0.00 0.00 73.86 0.00
0.00 0.00 0.00 36.58 0.00
0.00 0.00 0.00 14.49 0.00
661.45 0.00
Surfaces Volumes
SURFACE SURFACE
Deblai Remblai Deblai
GAUCHE DROITE
0.00 0.00 0.00 51.79 0.00
0.00 0.00 0.00 93.82 0.00
0.00 0.00 0.00 81.15 0.00
0.00 0.00 0.00 66.14 0.00
0.00 0.00 0.00 48.49 0.00
0.00 0.00 0.00 20.50 0.00
0.00 0.00 0.00 -1.20 0.00
0.87 0.43 0.43 0.00 1.52
341.39 1.52
Epaisseur du GNF
Epaisseur du GNA
Epaisseur de l'enrob
Pente

Voie 1

Profil n Longueur Volume du Volume du Volume de


d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 10.00 6.00 12.00 9.00 2.70
P5 10.00 6.00 12.00 9.00 2.70
P6 10.00 6.00 12.00 9.00 2.70
P7 10.00 6.00 12.00 9.00 2.70
P8 10.00 6.00 12.00 9.00 2.70
P9 6.90 6.00 8.28 6.21 1.86
P10 5.00 6.00 6.00 4.50 1.35
P11 8.17 6.00 9.80 7.35 2.21
P12 10.00 6.00 12.00 9.00 2.70
P13 9.93 6.00 11.92 8.94 2.68
P14 10.00 6.00 12.00 9.00 2.70
P15 6.43 6.00 7.71 5.79 1.74
P16 3.08 6.00 3.70 2.77 0.83
P17 3.57 6.00 4.29 3.21 0.96
P18 6.92 6.00 8.30 6.23 1.87
P19 8.68 6.00 10.41 7.81 2.34
P20 10.00 6.00 12.00 9.00 2.70
P21 12.25 6.00 14.69 11.02 3.31
P22 10.00 6.00 12.00 9.00 2.70
P23 9.08 6.00 10.89 8.17 2.45
P24 8.65 6.00 10.38 7.79 2.34
P25 10.00 6.00 12.00 9.00 2.70
P26 12.72 6.00 15.26 11.44 3.43
P27 10.00 6.00 12.00 9.00 2.70
P28 8.63 6.00 10.36 7.77 2.33
P29 8.59 6.00 10.31 7.73 2.32
P30 10.29 6.00 12.35 9.26 2.78
P31 12.20 6.00 14.65 10.98 3.30
P32 9.71 6.00 11.65 8.74 2.62
P33 9.20 6.00 11.04 8.28 2.48
P34 8.02 6.00 9.63 7.22 2.17
P35 3.31 6.00 3.97 2.98 0.89
P36 6.98 6.00 8.37 6.28 1.88
P37 11.92 6.00 14.30 10.73 3.22
P38 10.00 6.00 12.00 9.00 2.70
P39 9.77 6.00 11.73 8.80 2.64
P40 7.47 6.00 8.96 6.72 2.02
P41 5.00 6.00 6.00 4.50 1.35
P42 7.53 6.00 9.04 6.78 2.03
P43 10.00 6.00 12.00 9.00 2.70
P44 10.00 6.00 12.00 9.00 2.70
P45 10.00 6.00 12.00 9.00 2.70
P46 10.00 6.00 12.00 9.00 2.70
P47 10.00 6.00 12.00 9.00 2.70
P48 10.00 6.00 12.00 9.00 2.70
P49 10.00 6.00 12.00 9.00 2.70
P50 10.00 6.00 12.00 9.00 2.70
P51 10.00 6.00 12.00 9.00 2.70
P52 10.00 6.00 12.00 9.00 2.70
P53 6.55 6.00 7.86 5.89 1.77
P54 1.55 6.00 1.86 1.39 0.42
567.72 425.79 127.74

Voie2

Profil n Longueur Volume du Volume du Volume de


d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 4.44 6.00 5.32 3.99 1.20
P2 6.04 6.00 7.25 5.44 1.63
P3 1.61 6.00 1.93 1.45 0.43
14.50 10.88 3.26

Voie 3

Profil n Longueur Volume du Volume du Volume de


d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 8.99 6.00 10.79 8.09 2.43
P3 5.53 6.00 6.64 4.98 1.49
P4 1.54 6.00 1.85 1.39 0.42
25.27 18.95 5.69
Voie 4
Profil n Longueur Volume du Volume du Volume de
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 11.26 6.00 13.52 10.14 3.04
P3 7.81 6.00 9.37 7.03 2.11
P4 1.55 6.00 1.86 1.39 0.42
30.75 23.06 6.92
Voie 5

Profil n Longueur Volume du Volume du Volume de


d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 8.54 6.00 10.25 7.69 2.31
P4 5.12 6.00 6.15 4.61 1.38
P5 1.58 6.00 1.90 1.42 0.43
36.30 27.22 8.17
Voie 6

Profil n Longueur Volume du Volume du Volume de


d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 10.00 6.00 12.00 9.00 2.70
P5 10.00 6.00 12.00 9.00 2.70
P6 10.00 6.00 12.00 9.00 2.70
P7 5.71 6.00 6.85 5.14 1.54
P8 0.71 6.00 0.85 0.64 0.19
73.71 55.28 16.58

Voie 7
Profil n Longueur Volume du Volume du Volume de
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 8.27 6.00 9.93 7.45 2.23
P5 4.85 6.00 5.82 4.36 1.31
P6 1.58 6.00 1.89 1.42 0.43
47.64 35.73 10.72

Voie 8
Profil n Longueur Volume du Volume du Volume de
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 10.54 6.00 12.65 9.49 2.85
P5 7.15 6.00 8.59 6.44 1.93
P6 1.61 6.00 1.94 1.45 0.44
53.17 39.88 11.96
Voie 9
Profil n Longueur Volume du Volume du Volume de
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 10.00 6.00 12.00 9.00 2.70
P5 7.81 6.00 9.37 7.03 2.11
P6 4.39 6.00 5.27 3.95 1.19
P7 1.59 6.00 1.90 1.43 0.43
58.54 43.91 13.17

Voie 10
Profil n Longueur Volume du Volume du Volume de
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 10.00 6.00 12.00 9.00 2.70
P5 10.04 6.00 12.04 9.03 2.71
P6 6.71 6.00 8.06 6.04 1.81
P7 1.68 6.00 2.01 1.51 0.45
64.11 48.09 14.43
Voie 11

Profil n Longueur Volume du Volume du Volume de


d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 10.00 6.00 12.00 9.00 2.70
P5 10.00 6.00 12.00 9.00 2.70
P6 7.32 6.00 8.78 6.58 1.98
P7 3.97 6.00 4.77 3.58 1.07
P8 1.66 6.00 1.99 1.49 0.45
69.54 52.15 15.65

Voie 12
Profil n Longueur Volume du Volume du Volume de
d'applicatio L'emprise l'enrob
GNF (m3) GNA (m3)
n (m3)
P1 5.00 6.00 6.00 4.50 1.35
P2 10.00 6.00 12.00 9.00 2.70
P3 10.00 6.00 12.00 9.00 2.70
P4 10.00 6.00 12.00 9.00 2.70
P5 10.00 6.00 12.00 9.00 2.70
P6 9.61 6.00 11.53 8.65 2.59
P7 6.35 6.00 7.62 5.72 1.71
P8 1.74 6.00 2.09 1.57 0.47
75.24 56.43 16.93
Epaisseur du GNF 0.2
Epaisseur du GNA 0.15
Epaisseur de l'enrob 0.05
Pente 0.015

Bordure T3 Semelle Trottoir


Bordure T3 Semelle Trottoir

Bordure T3 Semelle Trottoir


Bordure T3 Semelle Trottoir

Bordure T3 Semelle Trottoir

Bordure T3 Semelle Trottoir

Bordure T3 Semelle Trottoir


Bordure T3 Semelle Trottoir

Bordure T3 Semelle Trottoir

Bordure T3 Semelle Trottoir

Bordure T3 Semelle Trottoir


Bordure T3 Semelle Trottoir
Remblai Dblai GNF GNA Enrob Bordure T3
5942.06 6115.61 1116.49 837.37 251.21