Cyclic operating
conditions are placing Increased pressure on
more stresses on gearboxes
turbines
12 80
70
10
60
Oil stress index, MW m-3
Oil temperature, C
50
6 40
30
4
20
2
10
0 0
8C GE fr 5 GE fr 6A GE fr 6B GE fr 9E
Prevention of metal-to-metal
contact in hydrodynamic
lubrication regime and control
valve sticking both during start
up and shut down and across
the range of operating
temperatures
4/01/2016
Shell Turbo . .4
WHY THE LUBRICANT IS IMPORTANT
EFFICIENCY
Deposit build-up on metal surfaces
4/01/2016
Shell Turbo . .6
TYPICAL TURBINE OIL COMPOSITION
Base Oil
98-99%
Antioxidants
R&O
Additive
System Rust Inhibitor
< 1-2% Corrosion Inhibitor
Others *
4/01/2016 7
GAS-TO-LIQUIDS (GTL) BASE OIL
TECHNOLOGY
Catalytic process converting gas to oil products
Test Conditions
Temperature 120C (248F)
Copper and steel catalyst
Evaluate the sample at 1008 hrs
1000
5000 Dry TOST Evaluation at 1008 hrs (D7873)
800
4000
Better Performance
Sludge, mg/kg
600
400
200
0
Turbo S4
GtL-based Oil Oil A Oil B Oil C Oil D Oil E
Measurable:
Sludge, mg/kg
Volatility of base oil and formulation
This thermal stability test assesses the oils short term deposit resistance when
exposed to very high temperatures.
The test result indicates the oils resistance against sludge formation and is key to
obtaining MAN Turbo approval.
The lower the sludge levels in the oil at the end of test the better the performance.
Better Performance
1,500
Sludge, mg
1,000
0
GtL-based Oil
Shell Turbo Oil A Oil B Oil C Oil D Oil E
S4
*Source: Shell test data
4/01/2016
.14
EFFICIENCY BENEFITS OF GTL BASED TURBINE
OILS AIR RELEASE AND FOAMING
Turbine oil reservoirs are circulating oil system and entrainment of air
and foaming is possible
Important to consider residence time of oil in tank to help settle
contaminants (including air, water)
Turbine oils formulated with GTL base oils can significantly improve air
release times and reduce foaming potential
4/01/2016
. .20
SHELL TURBO S4 SERIES: FIELD EXPERIENCE TO
DATE
4/01/2016 21
Current Usage of Turbo S4 X 32 & S4 X46
Shell Turbo S4 X 32 Location Equipment Start Notes
Shell Technology Drain and fill
Centre Houston USA Solar Taurus C 60 GT Since 2012
4/01/2016 22
Current Usage of Turbo S4 GX 32/46
Shell Turbo S4 GX Location Equipment Start Notes
ABB V32A Steam Drain and fill
Stadtwerke Rostock Germany Turbine Since 2015
Stadtwerke Rostock Germany Siemens SGT 600 GT Since 2015 Drain and fill
4/01/2016 23
Dominion Energy
First field trial candidate selected in US
Heavy duty gas turbine GE frame 7 FA
Power Generation service
Product: Shell TURBO S4 X 32
Field trial started mid April 2013
In service > 2 year with Shell Turbo S4 X 32
Peaking Power Plant - low operational hours (~2,628)
Peaking and cylic duty is more severe on lubricant performance than base
load - Starts= 279
Overall oil condition very good
No filterability or servo valve varnish issues
Good foaming & water separation characteristics
Air release < 2 minutes
MPC < 10; RPVOT retention >95% (1426 minutes)