Está en la página 1de 68

RESUMEN DE METRADOS ESTRUCTURAS

Obra CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


Frmula ESTRUCTURAS
Ubicacin RIMAC - LIMA - LIMA

PARTIDA DESCRIPCION UND TOTAL

1.00 OBRAS PROVISIONALES


1.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA glb #REF!
1.02 CARTEL DE OBRA 2.40x3.60m und #REF!
1.03 CERCO PROVISIONAL DE TRIPLAY H=2.40m m #REF!
1.04 SERVICIOS HIGIENICOS glb #REF!
1.05 AGUA PARA LA CONSTRUCCION glb #REF!

2.00 TRABAJOS PRELIMINARES


2.01 TRANSPORTE DE EQUIPO Y MAQUINARIAS glb #REF!
2.02 TRAZO Y REPLANTEO PRELIMINAR m #REF!

3.00 MOVIMIENTO DE TIERRA


3.01 CORTE DE TERRENO A NIVEL DE SUB-RASANTE C/EQUIPO, RT=1.16 Kg/cm m 0.00
3.02 EXCAVACION DE ZANJA PARA CISTERNA m 0.00
3.03 EXCAVACIN MANUAL DE ZANJAS Y ZAPATAS RT=1.00 Kg/cm hasta h=1.10m m 1.13
3.04 RELLENO COMPACTADO DE TERRENO C/EQUIPO HASTA NIVEL DE SUB-RASANTEm 83.10
3.05 AFIRMADO PARA PISOS Y PAVIMENTOS e=12" m 707.97
3.06 ACARREO INTERNO DE MATERIAL EXCEDENTE DE EXCAVACIONES m -106.56
3.07 ELIMINACION DE MATERIAL EXCEDENTE ACARREADO m -106.56
3.08 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO m 0.00
3.09 NIVELACIN INTERIOR Y APISONADO m 707.97

4.00 OBRAS DE CONCRETO SIMPLE


4.01 SOLADOS PARA ZAPATAS f'c=100 Kg/cm, e=2'' m 51.55
4.02 CIMIENTOS CORRIDOS - CONCRETO f'c=100 Kg/cm + 30% P.G. m 85.39
4.03 SOBRECIMIENTOS - CONCRETO f'c=100 Kg/cm+25% P.M. m 32.43
4.04 SOBRECIMIENTOS.- ENCOFRADO Y DESENCOFRADO m 379.50
4.05 FALSO PISO CONCRETO f'c=140 Kg/cm,e=4'' m 500.48

5.00 OBRAS DE CONCRETO ARMADO


5.01 ZAPATAS, CONCRETO f'c=210 Kg/cm m 29.80
5.02 ZAPATAS, ACERO fy=4200 Kg/cm Kg 488.00
5.03 COLUMNAS, CONCRETO f'c=210 Kg/cm m 80.19
5.04 COLUMNAS, ENCOFRADO Y DESENCOFRADO m 1,237.30
5.05 COLUMNAS, ACERO fy=4200 Kg/cm Kg 13,156.00
5.06 PLACAS, CONCRETO f'c=210 Kg/cm m 36.38
5.07 PLACAS, ENCOFRADO Y DESENCOFRADO m 308.42
5.08 PLACAS, ACERO fy=4200 Kg/cm Kg 2,388.00
5.09 VIGAS, CONCRETO f'c=210 Kg/cm m 90.90
5.10 VIGAS, ENCOFRADO Y DESENCOFRADO m 739.39
5.11 VIGAS, ACERO fy=4200 Kg/cm Kg 11,612.00
5.12 LOSAS ALIGERADAS, CONCRETO f'c=210 Kg/cm m 89.90
5.13 LOSAS ALIGERADAS, ENCOFRADO Y DESENCOFRADO m 1,033.56
5.14 LOSAS ALIGERADAS, ACERO fy=4200 Kg/cm Kg 4,723.00
5.15 LOSAS ALIGERADAS, LADRILLOS .P/TECHO 30x30x15cm und 8,611.00
5.16 LOSAS MACIZAS, CONCRETO f'c=210 Kg/cm m 9.42
5.17 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO m 77.83
5.18 LOSAS MACIZAS, ACERO fy=4200 Kg/cm Kg 632.00
5.19 ESCALERAS, CONCRETO f'c=210 Kg/cm m 11.16

Pgina 1 de 68
RESUMEN DE METRADOS ESTRUCTURAS
Obra CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
Frmula ESTRUCTURAS
Ubicacin RIMAC - LIMA - LIMA

PARTIDA DESCRIPCION UND TOTAL

5.20 ESCALERAS, ENCOFRADO Y DESENCOFRADO m 85.79


5.21 ESCALERAS, ACERO fy=4200 Kg/cm Kg 579.00
5.22 CISTERNAS, CONCRETO f'c=210 Kg/cm m 7.87
5.23 CISTERNAS, ENCOFRADO Y DESENCOFRADO m 73.28
5.24 CISTERNAS, ACERO fy=4200 Kg/cm Kg 1,361.00

7.00 MUROS Y TABIQUES DE ALBAILERIA


7.01 MUROS DE LADRILLO KK SOGA m 1,486.46
7.02 MUROS DE LADRILLO KK CABEZA m 411.11

Pgina 2 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA

3.00 MOVIMIENTO DE TIERRA


EXCAVACIN A NIVEL DE SUB-RASANTE C/EQUIPO, RT=1.16
3.01 m 0.00
Kg/cm
de zona de trabajo 0.00

3.02 EXCAVACION DE ZANJA PARA CISTERNA m


0.00 0.00

EXCAVACIN MANUAL DE ZANJAS Y ZAPATAS RT=2.75 Kg/cm


3.03 m 1.13
hasta h=1.20m
1.25 0.75 1.20 1.13

Pgina 3 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA

Pgina 4 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA

RELLENO COMPACTADO DE TERRENO C/EQUIPO HASTA NIVEL


3.04 m
DE SUB-RASANTE C/MAT. PROPIO 83.10
bloque 2 pisos ensanches de cimientos 1.25 0.60 0.50 0.38
1.45 0.60 0.50 0.44
1.25 0.60 0.50 0.38
1.25 0.60 0.50 0.38
1.25 0.60 0.50 0.38
1.45 0.60 0.50 0.44
1.25 0.60 0.50 0.38
1.25 0.60 0.50 0.38
1.45 0.60 0.50 0.44
1.25 0.60 0.50 0.38
1.25 0.60 0.50 0.38
1.30 0.60 0.50 0.39
zapatas 1.00 1.00 0.60 0.60
0.90 0.90 0.60 0.49
1.20 1.20 0.60 0.86
1.20 1.20 0.60 0.86
1.40 0.70 0.60 0.59
1.40 0.70 0.60 0.59
cimientos corridos - x 1.40 0.30 0.50 0.21
0.60 0.30 0.50 0.09
4.96 0.30 0.50 0.74
0.60 0.30 0.50 0.09
4.76 0.30 0.50 0.71
0.60 0.30 0.50 0.09
6.29 0.30 0.50 0.94
0.70 0.30 0.50 0.11
0.90 0.30 0.50 0.14
0.90 0.30 0.50 0.14
0.90 0.30 0.50 0.14
2.84 0.30 0.50 0.43
25.80 0.30 0.50 3.87
20.45 0.30 0.50 3.07
0.70 0.30 0.50 0.11
0.90 0.30 0.50 0.14
1.40 0.30 0.50 0.21
0.90 0.30 0.50 0.14
4.96 0.30 0.50 0.74
0.75 0.30 0.50 0.11
6.55 0.30 0.50 0.98
1.30 0.30 0.50 0.20
cimientos corridos - y 8.50 0.30 0.50 1.28
10.20 0.30 0.50 1.53
4.05 0.30 0.50 0.61
4.05 0.30 0.50 0.61
10.20 0.30 0.50 1.53
10.20 0.30 0.50 1.53
10.20 0.30 0.50 1.53
4.05 0.30 0.50 0.61
4.20 0.30 0.50 0.63
4.20 0.30 0.50 0.63
2.10 0.30 0.50 0.32
4.20 0.30 0.50 0.63
0.60 0.30 0.50 0.09
2.35 0.30 0.50 0.35
4.05 0.30 0.50 0.61
4.20 0.30 0.50 0.63
1.90 0.30 0.50 0.29
2.40 0.30 0.50 0.36
bloque 3 pisos zapatas 1.00 0.90 0.60 0.54
1.15 0.95 0.60 0.66
1.05 0.90 0.60 0.57
0.90 1.00 0.60 0.54
0.90 1.00 0.60 0.54
1.30 0.85 0.60 0.66
1.40 1.10 0.60 0.92
1.05 0.90 0.60 0.57
1.50 0.90 0.60 0.81
0.95 0.95 0.60 0.54

Pgina 5 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
1.50 0.95 0.60 0.86
0.95 0.75 0.60 0.43
1.40 0.90 0.60 0.76
1.05 0.90 0.60 0.57
1.35 0.95 0.60 0.77
0.65 0.95 0.60 0.37
1.90 0.90 0.60 1.03
1.40 1.40 0.60 1.18
1.40 1.40 0.60 1.18
1.40 1.40 0.60 1.18
1.00 0.75 0.60 0.45
0.90 0.85 0.60 0.46
1.20 1.00 0.60 0.72
1.00 0.85 0.60 0.51
1.00 1.00 0.60 0.60
1.05 0.90 0.60 0.57
1.05 0.85 0.60 0.54
1.35 0.90 0.60 0.73
1.80 0.85 0.60 0.92
zapata ascensor 4.05 2.80 1.35 15.31
cimientos corridos - x corte 2-2 2.55 0.25 0.10 0.06
corte 5-5 3.75 0.25 0.45 0.42
corte 6-6 0.35 0.15 0.45 0.02
0.90 0.15 0.45 0.06
0.85 0.15 0.45 0.06
1.23 0.15 0.45 0.08
corte 7-7 3.63 0.25 0.45 0.41
2.78 0.25 0.45 0.31
corte 8-8 0.73 0.25 0.45 0.08
0.60 0.25 0.45 0.07
0.83 0.25 0.45 0.09
corte 10-10 1.60 0.20 0.45 0.14
corte 6-6 1.90 0.15 0.45 0.13
0.93 0.15 0.45 0.06
corte 8-8 0.63 0.25 0.45 0.07
0.33 0.25 0.45 0.04
2.18 0.25 0.45 0.25
corte 9-9 3.15 0.30 0.45 0.43
4.00 0.30 0.45 0.54
corte 7-7 2.50 0.25 0.45 0.28
corte 9-9 4.00 0.30 0.45 0.54
corte 8-8 0.98 0.25 0.45 0.11
corte 7-7 1.30 0.25 0.45 0.15
0.75 0.25 0.45 0.08
2.15 0.25 0.45 0.24
2.72 0.25 0.45 0.31
corte 8-8 6.63 0.25 0.45 0.75
corte 9-9 5.93 0.30 0.45 0.80
cimientos corridos - y corte 12-12 1.53 0.30 0.45 0.21
corte 1-1 1.63 0.25 0.10 0.04
corte 2-2 0.83 0.25 0.10 0.02
corte 10-10 3.63 0.20 0.45 0.33
corte 7-7 2.45 0.25 0.45 0.28
3.40 0.25 0.45 0.38
8.85 0.25 0.45 1.00
1.55 0.25 0.45 0.17
2.85 0.25 0.45 0.32
corte 8-8 2.85 0.25 0.45 0.32
0.90 0.25 0.45 0.10
0.25 0.25 0.45 0.03
1.90 0.25 0.45 0.21
corte 7-7 1.83 0.25 0.45 0.21
2.95 0.25 0.45 0.33
1.10 0.25 0.45 0.12
1.92 0.25 0.45 0.22
corte 10-10 0.33 0.20 0.45 0.03
3.53 0.20 0.45 0.32
5.51 0.20 0.45 0.50
1.00 0.20 0.45 0.09
0.23 0.20 0.45 0.02
0.23 0.20 0.45 0.02

AFIRMADO PARA PISOS Y PAVIMENTOS CON EQUIPO MATERIAL


3.05
DE PRSTAMO EN CAPAS DE 25cm,h=0.10m m 707.97

Pgina 6 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
de falsos pisos 500.48 500.48
de veredas exteriores 207.48 207.48

ACARREO INTERNO DE MATERIAL EXCEDENTE DE


3.06
EXCAVACIONES m -106.56
de excavacin de zanjas 1.3 1.13 m 1.46
de excavacin para cisterna 1.3 0.00 0.00
de relleno con material propio -1.3 83.10 m -108.02

3.07 ELIMINACION DE MATERIAL EXCEDENTE ACARREADO m -106.56


Segn partida 3.06 1 -106.56 m -106.56

3.08 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO m


de corte de terreno c/mquina 1.3 0.00 0.00 0.00

3.08 NIVELACIN INTERIOR Y APISONADO


de afirmado para pisos 707.97 707.97 707.97

4.00 OBRAS DE CONCRETO SIMPLE


4.02 SOLADOS PARA ZAPATAS C:H 1:12 e=4'' m 51.55
bloque 2 pisos zapatas 1.00 1.00 1.00
0.90 0.90 0.81
1.20 1.20 1.44
1.20 1.20 1.44
1.40 0.70 0.98
1.40 0.70 0.98
bloque 3 pisos zapatas 1.00 0.90 0.90
1.15 0.95 1.09
1.05 0.90 0.95
0.90 1.00 0.90
0.90 1.00 0.90
1.30 0.85 1.11
1.40 1.10 1.54
1.05 0.90 0.95
1.50 0.90 1.35
0.95 0.95 0.90
1.50 0.95 1.43
0.95 0.75 0.71
1.40 0.90 1.26
1.05 0.90 0.95
1.35 0.95 1.28
0.65 0.95 0.62
1.90 0.90 1.71
1.40 1.40 1.96
1.40 1.40 1.96
1.40 1.40 1.96
1.00 0.75 0.75
0.90 0.85 0.77
1.20 1.00 1.20
1.00 0.85 0.85
1.00 1.00 1.00
1.05 0.90 0.95
1.05 0.85 0.89
1.35 0.90 1.22
1.80 0.85 1.53
zapata ascensor 4.05 2.80 11.34

85.39
4.03 CIMIENTOS CORRIDOS - CONCRETO f'c=100 Kg/cm + 30% P.G.
bloque 2 pisos ensanches de cimientos 1.25 0.75 0.60 0.56
1.45 0.75 0.60 0.65
1.25 0.75 0.60 0.56
1.25 0.75 0.60 0.56
1.25 0.75 0.60 0.56
1.45 0.75 0.60 0.65
1.25 0.75 0.60 0.56
1.25 0.75 0.60 0.56
1.45 0.75 0.60 0.65
1.25 0.75 0.60 0.56
1.25 0.75 0.60 0.56
1.30 0.75 0.60 0.59
cimientos corridos - x 1.40 0.45 0.60 0.38
0.60 0.45 0.60 0.16
4.96 0.45 0.60 1.34

Pgina 7 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
0.60 0.45 0.60 0.16
4.76 0.45 0.60 1.29
0.60 0.45 0.60 0.16
6.29 0.45 0.60 1.70
0.70 0.45 0.60 0.19
0.90 0.45 0.60 0.24
0.90 0.45 0.60 0.24
0.90 0.45 0.60 0.24
2.84 0.45 0.60 0.77
25.80 0.45 0.60 6.97
20.45 0.45 0.60 5.52
0.70 0.45 0.60 0.19
0.90 0.45 0.60 0.24
1.40 0.45 0.60 0.38
0.90 0.45 0.60 0.24
4.96 0.45 0.60 1.34
0.75 0.45 0.60 0.20
6.55 0.45 0.60 1.77
1.30 0.45 0.60 0.35
cimientos corridos - y 8.50 0.45 0.60 2.30
10.20 0.45 0.60 2.75
4.05 0.45 0.60 1.09
4.05 0.45 0.60 1.09
10.20 0.45 0.60 2.75
10.20 0.45 0.60 2.75
10.20 0.45 0.60 2.75
4.05 0.45 0.60 1.09
4.20 0.45 0.60 1.13
4.20 0.45 0.60 1.13
2.10 0.45 0.60 0.57
4.20 0.45 0.60 1.13
0.60 0.45 0.60 0.16
2.35 0.45 0.60 0.63
4.05 0.45 0.60 1.09
4.20 0.45 0.60 1.13
1.90 0.45 0.60 0.51
2.40 0.45 0.60 0.65
bloque 3 pisos cimientos corridos - x corte 2-2 2.55 0.40 0.60 0.61
corte 5-5 3.75 0.40 0.60 0.90
corte 6-6 0.35 0.40 0.60 0.08
0.90 0.40 0.60 0.22
0.85 0.40 0.60 0.20
1.23 0.40 0.60 0.30
corte 7-7 3.63 0.50 0.60 1.09
2.78 0.50 0.60 0.83
corte 8-8 0.73 0.50 0.60 0.22
0.60 0.50 0.60 0.18
0.83 0.50 0.60 0.25
corte 10-10 1.60 0.45 0.60 0.43
corte 6-6 1.90 0.40 0.60 0.46
0.93 0.40 0.60 0.22
corte 8-8 0.63 0.50 0.60 0.19
0.33 0.50 0.60 0.10
2.18 0.50 0.60 0.65
corte 9-9 3.15 0.45 0.60 0.85
4.00 0.45 0.60 1.08
corte 7-7 2.50 0.40 0.60 0.60
corte 9-9 4.00 0.45 0.60 1.08
corte 8-8 0.98 0.50 0.60 0.29
corte 7-7 1.30 0.40 0.60 0.31
0.75 0.40 0.60 0.18
2.15 0.40 0.60 0.52
2.72 0.40 0.60 0.65
corte 8-8 6.63 0.50 0.60 1.99
corte 9-9 5.93 0.45 0.60 1.60
cimientos corridos - y corte 12-12 1.53 0.75 0.60 0.69
corte 1-1 1.63 0.40 0.60 0.39
corte 2-2 0.83 0.40 0.60 0.20
corte 10-10 3.63 0.45 0.60 0.98
corte 7-7 2.45 0.40 0.60 0.59
3.40 0.40 0.60 0.82
8.85 0.40 0.60 2.12
1.55 0.40 0.60 0.37
2.85 0.40 0.60 0.68

Pgina 8 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
corte 8-8 2.85 0.50 0.60 0.86
0.90 0.50 0.60 0.27
0.25 0.50 0.60 0.08
1.90 0.50 0.60 0.57
corte 7-7 1.83 0.40 0.60 0.44
2.95 0.40 0.60 0.71
1.10 0.40 0.60 0.26
1.92 0.40 0.60 0.46
corte 10-10 0.33 0.45 0.60 0.09
3.53 0.45 0.60 0.95
5.51 0.45 0.60 1.49
1.00 0.45 0.60 0.27
0.23 0.55 0.60 0.08
0.23 0.55 0.60 0.08
SOBRECIMIENTOS - CONCRETO C:H 1:8 f'c=100 Kg/cm+25%
4.06 P.M. m
bloque 2 pisos ejes - y 2.55 0.80 0.15 0.31
1.20 0.80 0.15 0.14
2.55 0.80 0.15 0.31
1.75 0.80 0.15 0.21
2.45 0.80 0.15 0.29
2.45 0.80 0.15 0.29
1.75 0.80 0.15 0.21
2.50 0.80 0.15 0.30
0.70 0.80 0.15 0.08
0.70 0.80 0.15 0.08
2.50 0.80 0.15 0.30
2.00 0.80 0.15 0.24
0.70 0.80 0.15 0.08
0.70 0.80 0.15 0.08
2.00 0.80 0.15 0.24
2.00 0.80 0.15 0.24
2.20 0.80 0.15 0.26
2.20 0.80 0.15 0.26
2.00 0.80 0.15 0.24
2.00 0.80 0.15 0.24
2.20 0.80 0.15 0.26
1.80 0.80 0.15 0.22
2.15 0.80 0.15 0.26
0.70 0.80 0.15 0.08
2.00 0.80 0.15 0.24
2.00 0.80 0.15 0.24
1.20 0.80 0.15 0.14
2.00 0.80 0.15 0.24
1.20 0.80 0.15 0.14
2.20 0.80 0.15 0.26
2.00 0.80 0.15 0.24
0.50 0.80 0.15 0.06
3.00 0.80 0.15 0.36
0.70 0.80 0.15 0.08
2.50 0.80 0.15 0.30
0.70 0.80 0.15 0.08
2.00 0.80 0.15 0.24
1.65 0.80 0.15 0.20
0.78 0.80 0.15 0.09
0.78 0.80 0.15 0.09
0.90 0.80 0.15 0.11
3.00 0.80 0.15 0.36
2.45 0.80 0.15 0.29
ejes - x 0.74 0.80 0.15 0.09
0.68 0.80 0.15 0.08
0.68 0.80 0.15 0.08
0.74 0.80 0.15 0.09
2.00 0.80 0.15 0.24
2.70 0.80 0.15 0.32
2.00 0.80 0.15 0.24
1.35 0.80 0.15 0.16
2.80 0.80 0.15 0.34
1.20 0.80 0.15 0.14
1.20 0.80 0.15 0.14
1.00 0.80 0.15 0.12
0.40 0.80 0.15 0.05
2.25 0.80 0.15 0.27
1.70 0.80 0.15 0.20

Pgina 9 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
1.75 0.80 0.15 0.21
0.90 0.80 0.15 0.11
1.35 0.80 0.15 0.16
2.55 0.80 0.15 0.31
2.25 0.80 0.15 0.27
1.70 0.80 0.15 0.20
1.35 0.80 0.15 0.16
0.90 0.80 0.15 0.11
1.55 0.80 0.15 0.19
1.20 0.80 0.15 0.14
1.05 0.80 0.15 0.13
1.55 0.80 0.15 0.19
0.40 0.80 0.15 0.05
0.40 0.80 0.15 0.05
1.95 0.80 0.15 0.23
1.20 0.80 0.15 0.14
1.20 0.80 0.15 0.14
1.20 0.80 0.15 0.14
2.00 0.80 0.15 0.24
2.70 0.80 0.15 0.32
2.00 0.80 0.15 0.24
2.70 0.80 0.15 0.32
2.00 0.80 0.15 0.24
2.70 0.80 0.15 0.32
2.00 0.80 0.15 0.24
bloque 3 pisos ejes - y corte 12-12 2.20 0.75 0.45 0.74
corte 1-1 1.70 0.80 0.15 0.20
corte 2-2 1.35 0.80 0.15 0.16
corte 10-10 2.80 0.75 0.25 0.53
0.95 0.75 0.25 0.18
corte 7-7 2.70 0.75 0.15 0.30
1.30 0.75 0.15 0.15
1.25 0.75 0.15 0.14
2.25 0.75 0.15 0.25
0.48 0.75 0.15 0.05
1.05 0.75 0.15 0.12
corte 8-8 0.85 0.75 0.25 0.16
3.50 0.75 0.25 0.66
corte 7-7 1.45 0.75 0.15 0.16
2.20 0.75 0.15 0.25
0.80 0.75 0.15 0.09
3.20 0.75 0.15 0.36
1.05 0.75 0.15 0.12
1.05 0.75 0.15 0.12
1.05 0.75 0.15 0.12
corte 8-8 1.35 0.75 0.25 0.25
0.65 0.75 0.25 0.12
0.90 0.75 0.25 0.17
1.55 0.75 0.25 0.29
corte 7-7 2.40 0.75 0.15 0.27
0.65 0.75 0.15 0.07
0.95 0.75 0.15 0.11
1.33 0.75 0.15 0.15
1.42 0.75 0.15 0.16
corte 10-10 1.00 0.75 0.25 0.19
2.25 0.75 0.25 0.42
0.40 0.75 0.25 0.08
0.90 0.75 0.25 0.17
1.60 0.75 0.25 0.30
1.60 0.75 0.25 0.30
1.00 0.75 0.25 0.19
0.40 0.75 0.25 0.08
ejes - x corte 8-8 2.15 0.75 0.25 0.40
2.10 0.75 0.25 0.39
1.40 0.75 0.25 0.26
corte 9-9 0.40 0.75 0.15 0.05
0.40 0.75 0.15 0.05
1.00 0.75 0.15 0.11
2.00 0.75 0.15 0.23
0.90 0.75 0.15 0.10
corte 7-7 1.55 0.75 0.15 0.17
2.45 0.75 0.15 0.28
corte 8-8 1.25 0.75 0.25 0.23
1.75 0.75 0.25 0.33

Pgina 10 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
2.45 0.75 0.25 0.46
corte 7-7 1.05 0.75 0.15 0.12
0.75 0.75 0.15 0.08
corte 9-9 1.80 0.75 0.15 0.20
1.05 0.75 0.15 0.12
0.95 0.75 0.15 0.11
corte 8-8 1.20 0.75 0.25 0.23
1.15 0.75 0.25 0.22
corte 7-7 0.90 0.75 0.15 0.10
1.40 0.75 0.15 0.16
corte 8-8 1.40 0.75 0.25 0.26
1.20 0.75 0.25 0.23
0.60 0.75 0.25 0.11
corte 10-10 2.25 0.75 0.25 0.42
corte 7-7 2.40 0.75 0.15 0.27
4.10 0.75 0.15 0.46
corte 1-1 0.63 0.80 0.15 0.08
corte 5-5 1.93 0.75 0.15 0.22
corte 6-6 0.40 0.75 0.25 0.08
0.40 0.75 0.25 0.08
1.60 0.75 0.25 0.30
1.60 0.75 0.25 0.30
0.40 0.75 0.25 0.08
1.25 0.75 0.25 0.23
corte 2-2 2.40 0.80 0.15 0.29 32.43

4.07 SOBRECIMIENTOS.- ENCOFRADO Y DESENCOFRADO m


bloque 2 pisos ejes - y 2 2.55 0.80 4.08
2 1.20 0.80 1.92
2 2.55 0.80 4.08
2 1.75 0.80 2.80
2 2.45 0.80 3.92
2 2.45 0.80 3.92
2 1.75 0.80 2.80
2 2.50 0.80 4.00
2 0.70 0.80 1.12
2 0.70 0.80 1.12
2 2.50 0.80 4.00
2 2.00 0.80 3.20
2 0.70 0.80 1.12
2 0.70 0.80 1.12
2 2.00 0.80 3.20
2 2.00 0.80 3.20
2 2.20 0.80 3.52
2 2.20 0.80 3.52
2 2.00 0.80 3.20
2 2.00 0.80 3.20
2 2.20 0.80 3.52
2 1.80 0.80 2.88
2 2.15 0.80 3.44
2 0.70 0.80 1.12
2 2.00 0.80 3.20
2 2.00 0.80 3.20
2 1.20 0.80 1.92
2 2.00 0.80 3.20
2 1.20 0.80 1.92
2 2.20 0.80 3.52
2 2.00 0.80 3.20
2 0.50 0.80 0.80
2 3.00 0.80 4.80
2 0.70 0.80 1.12
2 2.50 0.80 4.00
2 0.70 0.80 1.12
2 2.00 0.80 3.20
2 1.65 0.80 2.64
2 0.78 0.80 1.25
2 0.78 0.80 1.25
2 0.90 0.80 1.44
2 3.00 0.80 4.80
2 2.45 0.80 3.92
ejes - x 2 0.74 0.80 1.18
2 0.68 0.80 1.09
2 0.68 0.80 1.09
2 0.74 0.80 1.18

Pgina 11 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
2 2.00 0.80 3.20
2 2.70 0.80 4.32
2 2.00 0.80 3.20
2 1.35 0.80 2.16
2 2.80 0.80 4.48
2 1.20 0.80 1.92
2 1.20 0.80 1.92
2 1.00 0.80 1.60
2 0.40 0.80 0.64
2 2.25 0.80 3.60
2 1.70 0.80 2.72
2 1.75 0.80 2.80
2 0.90 0.80 1.44
2 1.35 0.80 2.16
2 2.55 0.80 4.08
2 2.25 0.80 3.60
2 1.70 0.80 2.72
2 1.35 0.80 2.16
2 0.90 0.80 1.44
2 1.55 0.80 2.48
2 1.20 0.80 1.92
2 1.05 0.80 1.68
2 1.55 0.80 2.48
2 0.40 0.80 0.64
2 0.40 0.80 0.64
2 1.95 0.80 3.12
2 1.20 0.80 1.92
2 1.20 0.80 1.92
2 1.20 0.80 1.92
2 2.00 0.80 3.20
2 2.70 0.80 4.32
2 2.00 0.80 3.20
2 2.70 0.80 4.32
2 2.00 0.80 3.20
2 2.70 0.80 4.32
2 2.00 0.80 3.20
bloque 3 pisos ejes - y corte 12-1 2 2.20 0.75 3.30
corte 1-1 2 1.70 0.80 2.72
corte 2-2 2 1.35 0.80 2.16
corte 10-1 2 2.80 0.75 4.20
2 0.95 0.75 1.43
corte 7-7 2 2.70 0.75 4.05
2 1.30 0.75 1.95
2 1.25 0.75 1.88
2 2.25 0.75 3.38
2 0.48 0.75 0.72
2 1.05 0.75 1.58
corte 8-8 2 0.85 0.75 1.28
2 3.50 0.75 5.25
corte 7-7 2 1.45 0.75 2.18
2 2.20 0.75 3.30
2 0.80 0.75 1.20
2 3.20 0.75 4.80
2 1.05 0.75 1.58
2 1.05 0.75 1.58
2 1.05 0.75 1.58
corte 8-8 2 1.35 0.75 2.03
2 0.65 0.75 0.98
2 0.90 0.75 1.35
2 1.55 0.75 2.33
corte 7-7 2 2.40 0.75 3.60
2 0.65 0.75 0.98
2 0.95 0.75 1.43
2 1.33 0.75 2.00
2 1.42 0.75 2.13
corte 10-1 2 1.00 0.75 1.50
2 2.25 0.75 3.38
2 0.40 0.75 0.60
2 0.90 0.75 1.35
2 1.60 0.75 2.40
2 1.60 0.75 2.40
2 1.00 0.75 1.50
2 0.40 0.75 0.60
ejes - x corte 8-8 2 2.15 0.75 3.23

Pgina 12 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
2 2.10 0.75 3.15
2 1.40 0.75 2.10
corte 9-9 2 0.40 0.75 0.60
2 0.40 0.75 0.60
2 1.00 0.75 1.50
2 2.00 0.75 3.00
2 0.90 0.75 1.35
corte 7-7 2 1.55 0.75 2.33
2 2.45 0.75 3.68
corte 8-8 2 1.25 0.75 1.88
2 1.75 0.75 2.63
2 2.45 0.75 3.68
corte 7-7 2 1.05 0.75 1.58
2 0.75 0.75 1.13
corte 9-9 2 1.80 0.75 2.70
2 1.05 0.75 1.58
2 0.95 0.75 1.43
corte 8-8 2 1.20 0.75 1.80
2 1.15 0.75 1.73
corte 7-7 2 0.90 0.75 1.35
2 1.40 0.75 2.10
corte 8-8 2 1.40 0.75 2.10
2 1.20 0.75 1.80
2 0.60 0.75 0.90
corte 10-1 2 2.25 0.75 3.38
corte 7-7 2 2.40 0.75 3.60
2 4.10 0.75 6.15
corte 1-1 2 0.63 0.80 1.01
corte 5-5 2 1.93 0.75 2.90
corte 6-6 2 0.40 0.75 0.60
2 0.40 0.75 0.60
2 1.60 0.75 2.40
2 1.60 0.75 2.40
2 0.40 0.75 0.60
2 1.25 0.75 1.88
corte 2-2 2 2.40 0.80 3.84 379.50

4.10 FALSO PISO CONCRETO f'c=140 Kg/cm,e=4'' m


bloque 2 pisos botadero 3.03 3.03
0.80 0.15 0.12
consultorio TBC adulto 3.20 4.50 14.40
1.20 0.15 0.18
1.00 0.15 0.15
2.20 1.20 2.64
1.50 0.15 0.23
sshh consultorio TBC adulto 1.60 1.20 1.92
0.80 0.15 0.12
sala de procedimientos 4.50 3.20 14.40
1.20 0.15 0.18
consultorio TBC nio 4.50 3.20 14.40
1.20 0.15 0.18
consultorio de capacitacin 2.20 1.20 2.64
1.50 0.15 0.23
4.50 3.20 14.40
1.20 0.15 0.18
sshh consultorio de capacitacin 1.60 1.20 1.92
0.80 0.15 0.12
sala de reposo 4.50 3.20 14.40
1.20 0.15 0.18
1.00 0.15 0.15
tpico 2.20 1.20 2.64
1.50 0.15 0.23
4.50 3.20 14.40
1.20 0.15 0.18
1.00 0.15 0.15
sshh tpico 1.60 1.20 1.92
0.80 0.15 0.12
triaje 3.15 2.70 8.51
0.90 0.15 0.14
atencin 3.30 1.80 5.94
corredor 29.20 2.40 70.08
cto limpio 3.03 3.03
sala de procedimientos espirometra 4.50 3.20 14.40
1.20 0.15 0.18

Pgina 13 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
1.00 0.15 0.15
sala de espirometra 2.20 1.20 2.64
1.50 0.15 0.23
4.50 3.20 14.40
1.20 0.15 0.18
sshh sala de espirometra 1.60 1.20 1.92
0.80 0.15 0.12
sala de broncoscopa 4.50 3.20 14.40
1.00 0.15 0.15
sshh hombres 3.95 2.85 11.26
1.50 0.55 0.83
1.00 0.15 0.15
corredor 4.80 1.80 8.64
sshh mujeres 4.50 2.95 13.28
1.00 0.15 0.15
sala de espera 7.85 4.10 32.19
6.55 0.55 3.60
bloque 3 pisos centro de oxigeno y vaco 4.20 1.70 7.14
1.20 0.15 0.18
camillas silla de ruedas 2.70 1.95 5.27
1.20 0.15 0.18
almacn 3.60 1.40 5.04
0.90 0.15 0.14
sshh 1.40 1.05 1.47
0.70 0.15 0.11
entrevista de pacientes 3.90 3.60 14.04
0.92 0.25 0.23
toma de medicamentos 3.90 2.40 9.36
0.90 0.25 0.23
vestidor 1.30 2.12 2.76
0.90 0.15 0.14
sshh 1.10 2.12 2.33
0.70 0.15 0.11
depsito 1.30 1.33 1.73
0.70 0.15 0.11
toma de muestras 1.35 1.33 1.80
recepcin y entrega de muestras 2.55 2.40 6.12
0.90 0.25 0.23
rayos x 3.60 1.20 4.32
4.70 4.00 18.80
vestidor 1.15 1.05 1.21
mando 1.60 1.55 2.48
0.70 0.15 0.11
cuarto oscuro 2.75 2.15 5.91
0.90 0.15 0.14
archivo 1.55 0.90 1.40
0.80 0.15 0.12
centro de computo 2.26 1.55 3.50
0.70 0.15 0.11
hall 3.60 1.20 4.32
1.45 2.90 4.21
0.5 4.10 1.80 3.69
sshh mujeres 2.65 1.20 3.18
0.80 0.15 0.12
sshh hombres 2.45 1.20 2.94
0.800 0.150 0.12
servicio social 2.250 3.200 7.20
0.900 0.150 0.14
psicologa nutricin 2.150 3.200 6.88
0.900 0.150 0.14
oficina administracin 4.500 2.600 11.70
0.5 7.24 1.75 6.34
corredor 4.350 4.200 18.27
1.650 3.750 6.19
6.750 2.300 15.53
1.800 0.250 0.45 500.48

7.00 MUROS Y TABIQUES DE ALBAILERIA


7.01 MUROS DE LADRILLO KK SOGA m
1er piso
Pab 2 pisos 0.55 2.85 1.57

Pgina 14 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
2.00 0.85 1.70
0.60 3.00 1.80
1.40 2.85 3.99
0.40 2.85 1.14
1.40 2.85 3.99
1.40 2.85 3.99
2.05 2.85 5.84
0.40 2.85 1.14
1.40 2.85 3.99
0.50 2.85 1.43
0.60 3.00 1.80
1.40 2.85 3.99
0.40 2.85 1.14
1.40 2.85 3.99
1.40 2.85 3.99
2.05 2.85 5.84
0.40 2.85 1.14
1.40 2.85 3.99
0.50 2.85 1.43
Pab 2 2.95 2.85 8.41
1.35 2.85 3.85
0.25 2.85 0.71
1.10 3.15 3.47
1.30 3.15 4.10
0.45 3.15 1.42
0.40 3.15 1.26
1.55 3.15 4.88
0.85 3.15 2.68
0.45 3.15 1.42
1.85 3.15 5.83
2.15 3.15 6.77
1.10 3.15 3.47
0.25 3.15 0.79
0.25 3.15 0.79
1.10 2.85 3.14
0.90 2.85 2.57
1.90 3.15 5.99
1.90 3.15 5.99
0.30 3.15 0.95
0.55 3.15 1.73
1.10 3.15 3.47
1.40 2.85 3.99
1.65 2.85 4.70
0.95 2.85 2.71
1.95 2.85 5.56
1.00 2.85 2.85
1.60 3.15 5.04
1.95 3.15 6.14
0.60 3.15 1.89
0.55 0.85 0.47
0.85 0.85 0.72
2.35 2.85 6.70
1.95 0.85 1.66
0.65 3.15 2.05
2.43 3.15 7.65
0.80 3.15 2.52
0.80 3.15 2.52
0.90 3.15 2.84
2.70 3.15 8.51
0.60 2.85 1.71
1.20 0.85 1.02
2.55 0.85 2.17
0.30 2.85 0.86
1.25 2.85 3.56
0.65 0.85 0.55
2.10 0.85 1.79
0.45 2.85 1.28
1.20 0.85 1.02
0.75 2.85 2.14
2.00 2.85 5.70
0.95 2.85 2.71
1.40 0.85 1.19
0.20 2.85 0.57
2.10 0.85 1.79

Pgina 15 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
0.65 0.85 0.55
0.60 2.85 1.71
0.60 2.85 1.71
2.05 2.85 5.84
0.40 2.85 1.14
1.20 2.85 3.42
2.10 0.85 1.79
0.65 0.85 0.55
1.40 0.85 1.19
0.20 2.85 0.57
0.75 2.85 2.14
2.00 2.85 5.70
0.95 2.85 2.71
1.20 0.85 1.02
0.20 2.85 0.57
0.60 2.85 1.71
0.60 2.85 1.71
2.10 0.85 1.79
0.65 0.85 0.55
1.20 2.85 3.42
0.40 2.85 1.14
0.45 2.85 1.28
2.10 0.85 1.79
0.65 0.85 0.55
1.20 0.85 1.02
0.20 2.85 0.57
0.75 2.85 2.14
2.00 2.85 5.70
0.95 2.85 2.71
2.10 0.85 1.79
0.65 0.85 0.55
0.45 2.85 1.28
0.15 2.85 0.43
1.70 2.85 4.85
0.80 2.85 2.28
2.25 2.85 6.41
0.80 2.85 2.28
0.86 2.85 2.45
2.06 2.85 5.87
1.73 2.85 4.93
1.50 2.85 4.28
2.48 2.85 7.07
0.60 2.85 1.71
0.45 2.85 1.28
1.10 2.85 3.14
1.60 2.85 4.56
1.50 2.85 4.28
2.35 2.85 6.70
1.70 2.85 4.85
2.50 2.85 7.13
2.50 2.85 7.13
0.80 2.85 2.28
1.10 2.85 3.14
0.90 2.85 2.57
1.20 0.85 1.02
0.30 2.85 0.86
2.10 0.85 1.79
0.65 0.85 0.55
0.60 2.85 1.71
0.60 2.85 1.71
0.60 2.85 1.71
0.45 2.85 1.28
0.40 2.85 1.14
1.20 2.85 3.42
2.10 0.85 1.79
0.65 0.85 0.55
1.20 0.85 1.02
0.20 2.85 0.57
0.90 2.85 2.57
2.00 2.85 5.70
0.90 2.85 2.57
1.20 0.85 1.02
0.20 2.85 0.57
2.10 0.85 1.79

Pgina 16 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
0.65 0.85 0.55
0.60 2.85 1.71
0.60 2.85 1.71
0.60 2.85 1.71
0.45 2.85 1.28
0.40 2.85 1.14
1.20 2.85 3.42
2.10 0.85 1.79
0.65 0.85 0.55
1.20 0.85 1.02
2.00 2.85 5.70
0.90 2.85 2.57
0.60 2.85 1.71
0.45 2.85 1.28
0.40 2.85 1.14
1.20 2.85 3.42
2.10 0.85 1.79
0.65 0.85 0.55
1.20 0.85 1.02
2.00 2.85 5.70
0.90 2.85 2.57
2do piso
Pab 1 3.45 3.15 10.87
4.55 3.15 14.33
4.55 3.15 14.33
2.95 3.15 9.29
2.90 3.15 9.14
1.80 3.15 5.67
1.85 3.15 5.83
8.40 2.85 23.94
4.10 3.15 12.92
1.80 3.15 5.67
0.60 3.15 1.89
3.05 3.15 9.61
1.80 3.15 5.67
4.30 3.15 13.55
1.85 3.15 5.83
6.90 3.15 21.74
3.50 0.85 2.98
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
2.65 2.85 7.55
2.40 0.85 2.04
1.80 3.15 5.67
4.30 3.15 13.55
1.85 3.15 5.83
6.90 3.15 21.74
3.50 0.85 2.98
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
2.65 2.85 7.55
2.40 0.85 2.04
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
2.65 2.85 7.55
2.40 0.85 2.04
1.80 3.15 5.67
4.30 3.15 13.55
1.85 3.15 5.83
6.90 3.15 21.74
3.50 0.85 2.98
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
3er piso 6.90 3.15 21.74
3.50 0.85 2.98
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
2.65 2.85 7.55
2.40 0.85 2.04

Pgina 17 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
1.80 3.15 5.67
4.30 3.15 13.55
1.85 3.15 5.83
6.90 3.15 21.74
3.50 0.85 2.98
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
2.65 2.85 7.55
2.40 0.85 2.04
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
2.65 2.85 7.55
2.40 0.85 2.04
1.80 3.15 5.67
4.30 3.15 13.55
1.85 3.15 5.83
6.90 3.15 21.74
3.50 0.85 2.98
3.00 2.85 8.55
2.20 2.85 6.27
4.60 2.85 13.11
parapeto 2.65 2.85 7.55
2.40 0.85 2.04
13.30 1.35 17.96
4.65 1.35 6.28
3.50 1.35 4.73
8.15 1.35 11.00
1.60 1.35 2.16
11.80 1.35 15.93
5.00 1.35 6.75
2.00 1.35 2.70
2.40 1.35 3.24
2.00 1.35 2.70
4.90 1.35 6.62
3.20 1.35 4.32
0.65 1.35 0.88
1.65 1.35 2.23
0.65 1.35 0.88
12.95 1.35 17.48
10.10 1.35 13.64
25.25 1.35 34.09
4.50 1.35 6.08
4.05 1.35 5.47
1.00 1.35 1.35
21.20 1.35 28.62
4.45 1.35 6.01
21.00 1.35 28.35
4.05 1.35 5.47
1.00 1.35 1.35
21.20 1.35 28.62
4.45 1.35 6.01
21.00 1.35 28.35
3.75 1.35 5.06
3.20 1.35 4.32
22.80 1.35 30.78
4.40 1.35 5.94 1,486.46

7.02 MUROS DE LADRILLO KK CABEZA m


1er piso 1.05 2.85 2.99
Pab 1 2.35 2.85 6.70
0.45 2.85 1.28
1.35 2.85 3.85
0.60 2.85 1.71
0.40 2.85 1.14
1.20 2.85 3.42
0.90 2.85 2.57
1.35 2.85 3.85
0.45 2.85 1.28
1.35 2.85 3.85
0.60 2.85 1.71
0.40 2.85 1.14
1.20 2.85 3.42

Pgina 18 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
0.90 2.85 2.57
1.35 2.85 3.85
1.20 2.85 3.42
0.90 2.85 2.57
1.35 2.85 3.85
0.90 2.85 2.57
Pab 2 1.00 2.85 2.85
0.85 2.85 2.42
0.70 2.85 2.00
1.43 2.85 4.08
1.20 2.85 3.42
1.20 0.85 1.02
1.30 2.85 3.71
0.30 2.85 0.86
1.60 0.85 1.36
0.55 2.85 1.57
1.90 2.85 5.42
2.40 2.85 6.84
1.10 2.85 3.14
1.00 0.85 0.85
0.25 2.85 0.71
2.20 2.85 6.27
2.15 0.85 1.83
1.05 2.85 2.99
1.50 0.85 1.28
0.50 0.85 0.43
1.20 2.85 3.42
1.40 2.85 3.99
0.55 2.85 1.57
0.55 2.85 1.57
0.55 2.85 1.57
0.50 0.85 0.43
1.20 2.85 3.42
1.40 2.85 3.99
0.55 2.85 1.57
0.55 2.85 1.57
0.55 2.85 1.57
0.55 2.85 1.57
0.55 2.85 1.57
0.55 2.85 1.57

2do piso 0.00


Pab 2 3.00 2.85 8.55
3.70 2.85 10.55
2.60 2.85 7.41
6.20 2.85 17.67
2.20 2.85 6.27
0.60 2.85 1.71
2.85 2.85 8.12
2.35 2.85 6.70
0.45 2.85 1.28
7.50 2.85 21.38
0.90 2.85 2.57
2.30 2.85 6.56
2.65 2.85 7.55
0.60 2.85 1.71
2.40 2.85 6.84
0.35 2.85 1.00
4.60 2.85 13.11
3er piso 0.00
Pab 2 3.00 2.85 8.55
3.70 2.85 10.55
2.60 2.85 7.41
6.20 2.85 17.67
2.20 2.85 6.27
0.60 2.85 1.71
2.85 2.85 8.12
2.35 2.85 6.70
0.45 2.85 1.28
7.50 2.85 21.38
0.90 2.85 2.57
2.30 2.85 6.56
2.65 2.85 7.55
0.60 2.85 1.71

Pgina 19 de 68
HOJA DE SUSTENTO DE METRADOS ESTRUCTURAS

PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA


UBICACION: RIMAC - LIMA - LIMA

MEDIDAS
PARTIDA DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA
2.40 2.85 6.84
0.35 2.85 1.00
4.60 2.85 13.11
4.60 2.85 13.11 411.11

Pgina 20 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg

ZAPATAS.- CONCRETO 175 kg/cm2


bloque 2 pisos
1.00 1.00 0.60 0.60 1/2" 5 0.85 4.25
1/2" 5 0.85 4.25
0.90 0.90 0.60 0.49 1/2" 4 0.75 3.00
1/2" 4 0.75 3.00
1.20 1.20 0.60 0.86 1/2" 6 1.05 6.30
1/2" 6 1.05 6.30
1.20 1.20 0.60 0.86 1/2" 6 1.05 6.30
1/2" 6 1.05 6.30
1.40 0.70 0.60 0.59 1/2" 7 0.55 3.85
1/2" 4 1.25 5.00
1.40 0.70 0.60 0.59 1/2" 7 0.55 3.85
1/2" 4 1.25 5.00
bloque 3 pisos
1.00 0.90 0.60 0.54 1/2" 5 0.75 3.75
1/2" 4 0.85 3.40
1.15 0.95 0.60 0.66 1/2" 5 0.80 4.00
1/2" 4 1.00 4.00
1.05 0.90 0.60 0.57 1/2" 5 0.75 3.75
1/2" 4 0.90 3.60
0.90 1.00 0.60 0.54 1/2" 4 0.85 3.40
1/2" 5 0.75 3.75
0.90 1.00 0.60 0.54 1/2" 4 0.85 3.40
1/2" 5 0.75 3.75
1.30 0.85 0.60 0.66 1/2" 6 0.70 4.20
1/2" 4 1.15 4.60
1.40 1.10 0.60 0.92 1/2" 7 0.95 6.65
1/2" 5 1.25 6.25
1.05 0.90 0.60 0.57 1/2" 5 0.75 3.75
1/2" 4 0.90 3.60
1.50 0.90 0.60 0.81 1/2" 7 0.75 5.25
1/2" 4 1.35 5.40
0.95 0.95 0.60 0.54 1/2" 4 0.80 3.20

Pgina 21 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1/2" 4 0.80 3.20
1.50 0.95 0.60 0.86 1/2" 7 0.80 5.60
1/2" 4 1.35 5.40
0.95 0.75 0.60 0.43 1/2" 4 0.60 2.40
1/2" 3 0.80 2.40
1.40 0.90 0.60 0.76 1/2" 7 0.75 5.25
1/2" 4 1.25 5.00
1.05 0.90 0.60 0.57 1/2" 5 0.75 3.75
1/2" 4 0.90 3.60
1.35 0.95 0.60 0.77 1/2" 6 0.80 4.80
1/2" 4 1.20 4.80
0.65 0.95 0.60 0.37 1/2" 3 0.80 2.40
1/2" 4 0.50 2.00
1.90 0.90 0.60 1.03 1/2" 9 0.75 6.75
1/2" 4 1.45 5.80
1.40 1.40 0.60 1.18 1/2" 7 1.25 8.75
1/2" 7 1.25 8.75
1.40 1.40 0.60 1.18 1/2" 7 1.25 8.75
1/2" 7 1.25 8.75
1.40 1.40 0.60 1.18 1/2" 7 1.25 8.75
1/2" 7 1.25 8.75
1.00 0.75 0.60 0.45 1/2" 5 0.60 3.00
1/2" 3 0.85 2.55
0.90 0.85 0.60 0.46 1/2" 4 0.70 2.80
1/2" 4 0.75 3.00
1.20 1.00 0.60 0.72 1/2" 6 0.85 5.10
1/2" 5 1.05 5.25
1.00 0.85 0.60 0.51 1/2" 5 0.70 3.50
1/2" 4 0.85 3.40
1.00 1.00 0.60 0.60 1/2" 5 0.85 4.25
1/2" 5 0.85 4.25
1.05 0.90 0.60 0.57 1/2" 5 0.75 3.75
1/2" 4 0.90 3.60
1.05 0.85 0.60 0.54 1/2" 5 0.70 3.50
1/2" 4 0.90 3.60

Pgina 22 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1.35 0.90 0.60 0.73 1/2" 6 0.75 4.50
1/2" 4 1.20 4.80
1.80 0.85 0.60 0.92 1/2" 9 0.70 6.30
1/2" 4 1.65 6.60
zapata ascensor 4.05 2.80 0.50 5.67 2 3/8" 20 3.80 152
2 3/8" 14 5.05 141.4

TOTAL= 29.80 TOTAL= 0.00 SUBTOTALES (ml) = 0.00 0.00 0.00 293.40 326.50 0.00 0.00 0.00
SUBTOTALES (kg) = 0.00 0.00 0.00 164.30 323.24 0.00 0.00 0.00 488.00

COLUMNAS.- CONCRETO 210 KG/CM2


bloque 2 pisos
1er piso
C-1 10 0.65 0.15 3.45 3.36 10 1.60 3.45 55.20 10 1/2" 8 5.40 432.00
10 1/4" 22 1.60 352
10 1/4" 22 1.00 220
C-2 5 0.85 0.15 3.45 2.20 5 2.00 3.45 34.50 5 1/2" 10 5.40 270.00
5 1/4" 22 2.00 220
5 1/4" 22 1.20 132
5 1/4" 22 0.45 49.5
C-3 3 0.75 0.15 3.45 1.16 3 1.80 3.45 18.63 3 1/2" 8 5.40 129.60
3 1/4" 22 1.80 118.8
3 1/4" 22 1.10 72.6
C-4 2 0.33 0.15 3.45 0.34 2 0.98 3.45 6.76 2 1/2" 4 5.40 43.20
2 1/4" 22 0.98 43.1
C-5 30 0.30 0.15 3.90 5.27 30 0.90 3.90 105.30 30 1/2" 4 5.85 702.00
30 1/4" 24 0.90 648.0
2 0.30 0.15 3.45 0.31 2 0.90 3.45 6.21 2 1/2" 4 5.40 43.20
2 1/4" 22 0.90 39.6
C-6 5 0.80 0.15 3.90 2.34 5 1.90 3.90 37.05 5 1/2" 8 5.85 234.00
5 1/4" 24 1.90 228.0
5 1/4" 24 1.10 132.0
C-7 4 0.25 0.15 3.90 0.59 4 0.80 3.90 12.48 4 1/2" 4 5.85 93.60
4 1/4" 24 0.80 76.8
C-8 1 0.55 0.15 3.90 0.32 1 2.20 3.90 8.58 1 1/2" 11 5.85 64.35

Pgina 23 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 0.40 0.15 3.90 0.23 1 1/4" 24 1.40 33.6
1 1/4" 24 1.40 33.6
1 1/4" 24 0.45 10.8
1 1/4" 24 0.45 10.8
C-9 1 0.40 0.15 3.90 0.23 1 1.10 3.90 4.29 1 1/2" 4 5.85 23.40
1 1/4" 24 1.10 26.4
C-10 1 0.40 0.15 3.70 0.22 1 1.10 3.70 4.07 1 1/2" 4 5.65 22.60
1 1/4" 23 1.10 25.3
C-11 4 0.30 0.30 3.70 1.33 4 1.20 3.70 17.76 4 1/2" 2 5.65 45.20
4 5/8" 4 5.65 90.40
4 3/8" 23 1.10 101.2
C-12 2 0.07 3.70 0.52 2 0.94 3.70 6.97 2 5/8" 6 5.65 67.80
2 3/8" 49 0.94 92.316
C-13 2 0.70 0.15 3.90 0.82 2 1.70 3.90 13.26 2 1/2" 8 5.85 93.60
2 1/4" 24 1.70 81.60
2 1/4" 24 1.00 48.00
C-14 1 0.30 0.15 3.90 0.18 1 0.90 3.90 3.51 1 1/2" 4 5.85 23.40
1 1/4" 24 0.90 21.6
bloque 3 pisos
1er piso
C-1 10 0.30 0.15 3.70 1.67 10 0.90 3.70 33.30 10 1/2" 4 5.65 226.00
10 1/4" 23 0.90 207
C-2 2 0.40 0.25 3.45 0.69 2 1.30 3.45 8.97 2 5/8" 6 5.40 64.80
2 3/8" 22 1.30 57.2
2 3/8" 22 0.55 24.2
C-3 2 0.25 0.20 3.45 0.35 2 0.90 3.45 6.21 2 1/2" 4 5.40 43.20
2 1/4" 22 0.90 39.6
C-4 1 0.70 0.25 3.45 0.60 1 1.90 3.45 6.56 1 5/8" 4 5.40 21.60
1 3/4" 4 5.40 21.6
1 3/8" 22 1.90 41.8
1 3/8" 22 1.20 26.4
C-5 1 0.40 0.25 3.45 0.35 1 1.30 3.45 4.49 1 5/8" 6 5.40 32.40
1 3/8" 22 1.30 28.6
1 3/8" 22 0.65 14.3
C-6 1 0.70 0.25 3.45 0.60 1 3.50 3.45 12.08 1 5/8" 12 5.40 64.80

Pgina 24 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 0.70 0.25 3.45 0.60 1 3/8" 22 1.90 41.8
1 3/8" 22 2.60 57.2
1 3/8" 22 0.65 14.3
1 3/8" 22 0.65 14.3
C-7 2 0.30 0.15 3.45 0.31 2 0.90 3.45 6.21 2 1/2" 4 5.40 43.20
2 1/4" 22 0.90 39.6
C-8 2 0.25 0.20 3.45 0.35 2 0.90 3.45 6.21 2 1/2" 4 5.40 43.20
2 1/4" 22 0.90 39.6
C-9 1 0.45 0.25 3.60 0.41 1 1.40 3.60 5.04 1 5/8" 6 5.40 32.40
1 3/8" 22 1.40 30.8
1 3/8" 22 0.65 14.3
C-10 3 0.35 0.25 3.90 1.02 3 1.20 3.90 14.04 3 5/8" 4 5.40 64.80
3 1/2" 2 5.40 32.40
3 3/8" 22 1.20 79.2
3 3/8" 22 0.65 42.9
C-11 1 0.80 0.15 3.70 0.44 1 2.60 3.70 9.62 1 5/8" 9 5.40 48.60
1 0.25 0.15 3.70 0.14 1 3/8" 23 2.10 48.3
1 3/8" 23 1.30 29.9
1 3/8" 23 0.65 14.95
C-12 1 0.25 0.25 3.70 0.23 1 1.00 3.70 3.70 1 5/8" 4 5.40 21.60
1 1/2" 2 5.40 10.80
1 3/8" 23 1.00 23
C-13 1 0.75 0.25 3.70 0.69 1 2.00 3.70 7.40 1 5/8" 4 5.40 21.60
1 3/4" 4 5.40 21.6
1 3/8" 23 2.00 46
1 3/8" 23 1.20 27.6
C-14 1 1.10 0.25 3.45 0.95 1 2.70 3.45 9.32 1 5/8" 8 5.40 43.20
1 3/4" 4 5.40 21.6
1 3/8" 22 2.70 59.4
1 3/8" 22 1.50 33
1 3/8" 22 1.50 33
C-15 1 0.30 0.15 3.70 0.17 1 2.00 3.70 7.40 1 1/2" 4 5.40 21.60
1 1/4" 23 0.90 20.7
C-16 1 0.80 0.25 3.70 0.74 1 2.10 3.70 7.77 1 5/8" 4 5.40 21.60
1 3/4" 4 5.40 21.6

Pgina 25 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 3/8" 23 2.10 48.3
1 3/8" 23 1.10 25.3
C-17 1 0.85 0.25 3.70 0.79 1 2.20 3.70 8.14 1 5/8" 4 5.40 21.60
1 3/4" 4 5.40 21.6
1 3/8" 23 2.20 50.6
1 3/8" 23 1.20 27.6
C-18 1 0.45 0.25 3.70 0.42 1 2.20 3.70 8.14 1 5/8" 6 5.40 32.40
1 3/8" 23 1.40 32.2
1 3/8" 23 0.55 12.65
C-19 1 0.30 0.25 3.70 0.28 1 1.10 3.70 4.07 1 5/8" 4 5.40 21.60
1 3/8" 23 1.10 25.3
C-20 1 0.45 0.25 3.70 0.42 1 2.10 3.70 7.77 1 5/8" 7 5.40 37.80
1 0.40 0.15 3.70 0.22 1 1/2" 3 5.40 16.20
1 3/8" 23 1.40 32.2
1 3/8" 23 1.10 25.3
1 3/8" 23 1.40 32.2
C-21 3 0.13 3.60 1.36 3 1.26 3.60 13.56 3 3/4" 6 5.40 97.2
3 3/8" 48 1.26 180.864
C-22 1 0.40 0.15 3.70 0.22 1 1.10 3.70 4.07 1 5/8" 4 5.40 21.60
1 8mm 23 1.10 25.30
C-23 1 0.80 0.15 3.70 0.44 1 1.90 3.70 7.03 1 1/2" 8 5.40 43.20
1 1/4" 23 1.90 43.7
1 1/4" 23 1.10 25.3
C-24 1 0.35 0.25 3.90 0.34 1 1.20 3.90 4.68 1 5/8" 4 5.40 21.60
1 1/2" 2 5.40 10.80
1 3/8" 22 1.20 26.4
1 3/8" 22 0.65 14.3
C-25 1 0.70 0.25 3.45 0.60 1 2.20 3.45 7.59 1 5/8" 6 5.40 32.40
1 0.15 0.15 3.45 0.08 1 1/2" 3 5.40 16.20
1 3/8" 22 1.90 41.8
1 3/8" 22 1.10 24.2
1 3/8" 22 0.65 14.3
C-26 1 0.40 0.25 3.90 0.39 1 1.30 3.90 5.07 1 5/8" 4 5.40 21.60
1 1/2" 2 5.40 10.80
1 3/8" 22 1.30 28.6

Pgina 26 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 3/8" 22 0.65 14.3
C-27 1 0.40 0.25 3.45 0.35 1 1.30 3.45 4.49 1 5/8" 4 5.40 21.60
1 1/2" 2 5.40 10.80
1 3/8" 22 1.30 28.6
1 3/8" 22 0.65 14.3
C-28 1 0.30 0.25 3.90 0.29 1 1.10 3.90 4.29 1 5/8" 4 5.40 21.60
1 3/8" 22 1.10 24.2
C-29 1 0.30 0.25 3.90 0.29 1 1.10 3.90 4.29 1 5/8" 4 5.40 21.60
1 3/8" 22 1.10 24.2
C-30 1 0.25 0.25 3.90 0.24 1 1.00 3.90 3.90 1 5/8" 4 5.40 21.60
1 3/8" 22 1.00 22
C-31 1 0.65 0.25 3.90 0.63 1 1.80 3.90 7.02 1 5/8" 8 5.40 43.20
1 3/8" 22 1.80 39.6
1 3/8" 22 1.10 24.2
C-32 1 0.40 0.25 3.45 0.35 1 1.30 3.45 4.49 1 5/8" 4 5.40 21.60
1 1/2" 2 5.40 10.80
1 3/8" 22 1.30 28.6
1 3/8" 22 0.65 14.3
C-33 1 0.35 0.15 3.70 0.19 1 1.60 3.70 5.92 1 1/2" 6 5.40 32.40
1 0.35 0.15 3.70 0.19 1 1/4" 23 1.00 23
1 1/4" 23 1.00 23
C-34 6 0.25 0.25 3.90 1.46 6 1.00 3.90 23.40 6 5/8" 4 5.40 129.60
6 3/8" 22 1.00 132
C-35 1 0.40 0.15 3.90 0.23 1 1.08 3.90 4.21 1 1/2" 4 5.40 21.60
1 1/4" 22 1.08 23.76
C-36 1 0.40 0.25 3.70 0.37 1 1.95 3.70 7.22 1 5/8" 4 5.40 21.60
1 0.35 0.15 3.70 0.19 1 1/2" 2 5.40 10.80
1 3/8" 23 1.30 29.90
1 3/8" 23 1.00 23.00
1 3/8" 23 0.65 14.95
C-37 1 0.60 0.25 3.45 0.52 1 1.70 3.45 5.87 1 5/8" 8 5.40 43.20
1 3/8" 22 1.70 37.4
1 3/8" 22 0.65 14.3
C-38 1 0.25 0.25 3.90 0.24 1 1.00 3.90 3.90 1 5/8" 4 5.40 21.60
1 3/8" 22 1.00 22

Pgina 27 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
C-39 3 0.40 0.15 3.45 0.62 3 1.10 3.45 11.39 3 5/8" 4 5.40 64.80
3 8mm 22 1.10 72.60
C-40 1 1.20 0.25 3.45 1.04 1 2.90 3.45 10.01 1 5/8" 12 5.40 64.80
1 3/8" 22 2.90 63.8
1 3/8" 22 2.30 50.6
1 3/8" 22 1.30 28.6
bloque 2 pisos
2do piso
C-1 10 0.65 0.15 2.85 2.78 10 1.60 2.85 45.60 10 1/2" 8 3.80 304.00
10 1/4" 19 1.60 304
10 1/4" 19 1.00 190
C-2 5 0.85 0.15 2.85 1.82 5 2.00 2.85 28.50 5 1/2" 10 3.80 190.00
5 1/4" 19 2.00 190
5 1/4" 19 1.20 114
5 1/4" 19 0.45 42.75
C-3 3 0.75 0.15 2.85 0.96 3 1.80 2.85 15.39 3 1/2" 8 3.80 91.20
3 1/4" 19 1.80 102.6
3 1/4" 19 1.10 62.7
C-4 2 0.33 0.15 2.85 0.28 2 0.98 2.85 5.59 2 1/2" 4 3.80 30.40
2 1/4" 19 0.98 37.2
C-5 30 0.30 0.15 3.30 4.46 30 0.90 3.30 89.10 30 1/2" 4 3.80 456.00
30 1/4" 21 0.90 567.0
2 0.30 0.15 2.85 0.26 2 0.90 2.85 5.13 2 1/2" 4 3.80 30.40
2 1/4" 19 0.90 34.2
C-6 5 0.80 0.15 3.30 1.98 5 1.90 3.30 31.35 5 1/2" 8 3.80 152.00
5 1/4" 21 1.90 199.5
5 1/4" 21 1.10 115.5
C-7 1 0.25 0.15 3.10 0.12 1 0.80 3.10 2.48 1 1/2" 4 3.80 15.20
1 1/4" 19 0.80 15.2
C-8 1 0.30 0.15 3.10 0.14 1 2.20 3.10 6.82 1 1/2" 4 3.60 14.40
1 1/4" 19 0.90 17.1
C-9 1 0.40 0.15 3.10 0.19 1 1.10 3.10 3.41 1 1/2" 4 3.80 15.20
1 1/4" 19 1.10 20.9
C-10 1 0.40 0.15 3.10 0.19 1 1.10 3.10 3.41 1 1/2" 4 3.80 15.20
1 1/4" 19 1.10 20.9

Pgina 28 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
C-11 4 0.30 0.30 3.10 1.12 4 1.20 3.10 14.88 4 1/2" 2 3.80 30.40
4 5/8" 4 0.70 11.20
4 3/8" 19 1.10 83.6
C-12 2 0.30 0.30 3.10 0.56 2 1.20 3.10 7.44 2 1/2" 2 3.80 15.20
2 5/8" 4 0.70 5.60
2 3/8" 19 1.10 41.8
C-13 2 0.70 0.15 3.10 0.65 2 1.70 3.10 10.54 2 1/2" 8 3.80 60.80
2 1/4" 19 1.70 64.60
2 1/4" 19 1.00 38.00
C-14 1 0.30 0.15 3.10 0.14 1 0.90 3.10 2.79 1 1/2" 4 3.80 15.20
1 1/4" 19 0.90 17.1
bloque 3 pisos
2do piso
C-1 10 0.30 0.15 3.15 1.42 10 0.90 3.15 28.35 10 1/2" 4 3.80 152.00
10 1/4" 19 0.90 171
C-2 2 0.40 0.25 2.85 0.57 2 1.30 2.85 7.41 2 5/8" 6 3.80 45.60
2 3/8" 19 1.30 49.4
2 3/8" 19 0.55 20.9
C-3 2 0.25 0.20 2.85 0.29 2 0.90 2.85 5.13 2 1/2" 4 3.80 30.40
2 1/4" 19 0.90 34.2
C-4 1 0.70 0.25 2.85 0.50 1 1.90 2.85 5.42 1 5/8" 4 3.80 15.20
1 3/4" 4 0.95 3.8
1 3/8" 19 1.90 36.1
1 3/8" 19 1.20 22.8
C-5 1 0.40 0.25 2.85 0.29 1 1.30 2.85 3.71 1 5/8" 6 3.80 22.80
1 3/8" 19 1.30 24.7
1 3/8" 19 0.65 12.35
C-6 1 0.70 0.25 2.85 0.50 1 3.50 2.85 9.98 1 5/8" 12 3.80 45.60
1 0.70 0.25 2.85 0.50 1 3/8" 19 1.90 36.1
1 3/8" 19 2.60 49.4
1 3/8" 19 0.65 12.35
1 3/8" 19 0.65 12.35
C-7 2 0.30 0.15 3.10 0.28 2 0.90 3.10 5.58 2 1/2" 4 3.80 30.40
2 1/4" 20 0.90 36
C-9 1 0.45 0.25 3.30 0.37 1 1.40 3.30 4.62 1 5/8" 6 3.80 22.80

Pgina 29 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 3/8" 19 1.40 26.6
1 3/8" 19 0.65 12.35
C-10 3 0.35 0.25 3.10 0.81 3 1.20 3.10 11.16 3 5/8" 4 3.80 45.60
3 1/2" 2 3.80 22.80
3 3/8" 20 1.20 72
3 3/8" 20 0.65 39
C-11 1 0.50 0.15 3.10 0.23 1 1.30 3.10 4.03 1 5/8" 6 3.80 22.80
1 3/8" 20 1.30 26
1 3/8" 20 0.55 11
C-12 1 0.25 0.25 3.10 0.19 1 1.00 3.10 3.10 1 5/8" 4 3.80 15.20
1 1/2" 2 3.80 7.60
1 3/8" 20 1.00 20
C-13 1 0.45 0.25 3.10 0.35 1 1.40 3.10 4.34 1 5/8" 4 3.80 15.20
1 1/2" 2 3.80 7.60
1 3/8" 20 1.40 28
1 3/8" 20 0.65 13
C-14 1 0.25 0.25 3.10 0.19 1 1.00 3.10 3.10 1 3/4" 4 3.80 15.2
1 3/8" 20 1.00 20
C-15 1 0.30 0.15 3.30 0.15 1 0.90 3.30 2.97 1 1/2" 4 3.80 15.20
1 1/4" 21 0.90 18.9
C-16 1 0.35 0.25 3.10 0.27 1 1.20 3.10 3.72 1 5/8" 4 3.80 15.20
1 1/2" 2 3.80 7.60
1 3/8" 20 1.20 24
1 3/8" 20 0.65 13
C-17 1 0.25 0.25 3.10 0.19 1 1.00 3.10 3.10 1 3/4" 4 3.80 15.2
1 3/8" 23 1.00 23
C-18 1 0.25 0.25 3.10 0.19 1 1.00 3.10 3.10 1 5/8" 4 3.80 15.20
1 3/8" 20 1.00 20
C-21 3 0.13 3.05 1.15 3 1.26 3.05 11.49 3 3/4" 6 3.80 68.4
3 3/8" 41 1.26 154.488
C-22 1 0.40 0.15 3.30 0.20 1 1.10 3.30 3.63 1 5/8" 4 3.80 15.20
1 8mm 21 1.10 23.10
C-24 1 0.35 0.25 3.30 0.29 1 1.20 3.30 3.96 1 5/8" 4 3.80 15.20
1 1/2" 2 3.80 7.60
1 3/8" 21 1.20 25.2

Pgina 30 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 3/8" 21 0.65 13.65
C-27 1 0.25 0.25 3.05 0.19 1 1.30 3.05 3.97 1 5/8" 4 3.80 15.20
1 3/8" 20 1.00 20
C-28 1 0.30 0.25 3.10 0.23 1 1.10 3.10 3.41 1 5/8" 4 3.80 15.20
1 3/8" 20 1.10 22
C-29 1 0.30 0.25 3.10 0.23 1 1.10 3.10 3.41 1 5/8" 4 3.80 15.20
1 3/8" 20 1.10 22
C-30 1 0.25 0.25 3.10 0.19 1 1.00 3.10 3.10 1 5/8" 4 3.80 15.20
1 3/8" 20 1.00 20
C-31 1 0.25 0.25 3.10 0.19 1 1.00 3.10 3.10 1 5/8" 4 3.80 15.20
1 3/8" 20 1.00 20
C-34 6 0.25 0.25 2.85 1.07 6 1.00 2.85 17.10 6 5/8" 4 3.80 91.20
6 3/8" 19 1.00 114
C-36 1 0.40 0.25 3.05 0.31 1 1.95 3.05 5.95 1 5/8" 4 3.80 15.20
1 1/2" 2 3.80 7.60
1 3/8" 23 1.30 29.90
1 3/8" 23 0.65 14.95
C-37 1 0.50 0.25 3.30 0.41 1 1.50 3.30 4.95 1 5/8" 6 3.80 22.80
1 3/8" 21 1.50 31.5
1 3/8" 21 0.65 13.65
C-38 1 0.25 0.25 3.30 0.21 1 1.00 3.30 3.30 1 5/8" 4 3.80 15.20
1 3/8" 21 1.00 21
C-39 3 0.40 0.15 2.85 0.51 3 1.10 2.85 9.41 3 5/8" 4 3.80 45.60
3 8mm 19 1.10 62.70
C-40 1 0.60 0.25 2.85 0.43 1 1.70 2.85 4.85 1 5/8" 8 3.80 30.40
1 3/8" 19 1.70 32.3
1 3/8" 19 1.00 19
bloque 3 pisos
3er piso
C-2 2 0.40 0.25 3.30 0.66 2 1.30 3.30 8.58 2 5/8" 4 3.80 30.40
2 1/2" 2 3.80 15.20
2 3/8" 19 1.30 49.4
2 3/8" 19 0.55 20.9
C-3 2 0.25 0.20 3.30 0.33 2 0.90 3.30 5.94 2 1/2" 4 3.80 30.40
2 1/4" 19 0.90 34.2

Pgina 31 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
C-4 1 0.70 0.25 3.30 0.58 1 1.90 3.30 6.27 1 5/8" 8 3.80 30.40
1 3/8" 19 1.90 36.1
1 3/8" 19 1.20 22.8
C-5 1 0.40 0.25 3.30 0.33 1 1.30 3.30 4.29 1 5/8" 8 3.80 30.40
1 3/8" 19 1.30 24.7
1 3/8" 19 0.65 12.35
C-6 1 0.70 0.25 3.30 0.58 1 3.50 3.30 11.55 1 5/8" 12 3.80 45.60
1 0.70 0.25 3.30 0.58 1 3/8" 19 1.90 36.1
1 3/8" 19 2.60 49.4
1 3/8" 19 0.65 12.35
1 3/8" 19 0.65 12.35
C-9 1 0.45 0.25 3.30 0.37 1 1.40 3.30 4.62 1 5/8" 6 3.80 22.80
1 3/8" 19 1.40 26.6
1 3/8" 19 0.65 12.35
C-10 3 0.35 0.25 3.30 0.87 3 1.20 3.30 11.88 3 5/8" 4 3.80 45.60
3 1/2" 2 3.80 22.80
3 3/8" 20 1.20 72
3 3/8" 20 0.65 39
C-12 1 0.25 0.25 3.30 0.21 1 1.00 3.30 3.30 1 5/8" 4 3.80 15.20
1 3/8" 18 1.00 18
C-13 1 0.45 0.25 3.30 0.37 1 1.40 3.30 4.62 1 5/8" 4 3.80 15.20
1 1/2" 2 3.80 7.60
1 3/8" 20 1.40 28
1 3/8" 20 0.65 13
C-14 1 0.25 0.25 3.30 0.21 1 1.00 3.30 3.30 1 3/4" 4 3.80 15.2
1 3/8" 20 1.00 20
C-17 1 0.25 0.25 3.30 0.21 1 1.00 3.30 3.30 1 3/4" 4 3.80 15.2
1 3/8" 23 1.00 23
C-21 3 0.13 3.30 1.24 3 1.26 3.30 12.43 3 3/4" 6 3.80 68.4
3 3/8" 41 1.26 154.488
C-24 1 0.25 0.25 3.30 0.21 1 1.00 3.30 3.30 1 5/8" 4 3.80 15.20
1 3/8" 21 1.00 21
C-28 1 0.30 0.25 3.10 0.23 1 1.10 3.10 3.41 1 5/8" 4 3.80 15.20
1 3/8" 20 1.10 22
C-30 1 0.25 0.25 3.10 0.19 1 1.00 3.10 3.10 1 5/8" 4 3.80 15.20

Pgina 32 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 3/8" 20 1.00 20
C-34 6 0.25 0.25 2.85 1.07 6 1.00 2.85 17.10 6 5/8" 4 3.80 91.20
6 3/8" 19 1.00 114
C-36 1 0.40 0.25 3.05 0.31 1 1.95 3.05 5.95 1 5/8" 4 3.80 15.20
1 1/2" 2 3.80 7.60
1 3/8" 23 1.30 29.90
1 3/8" 23 0.65 14.95
C-37 1 0.25 0.25 3.30 0.21 1 1.00 3.30 3.30 1 5/8" 4 3.80 15.20
1 3/8" 21 1.00 21
C-40 1 0.60 0.25 2.85 0.43 1 1.70 2.85 4.85 1 5/8" 8 3.80 30.40
1 3/8" 19 1.70 32.3
1 3/8" 19 1.00 19

TOTAL= 80.19 TOTAL= 1237.30 SUBTOTALES (ml) = 183.70 0.00 5556.97 4589.41 4632.15 2361.00 406.60 0.00
SUBTOTALES (kg) = 40.4 0.0 1389.2 2570.1 4585.8 3659.6 910.8 0.0 13156.00

PLACAS.- CONCRETO 210 KG/CM2


1er piso
PL-1 1 3.60 0.25 4.95 4.46 1 4.95 20.62 102.07 3/8" 86 6.45 554.70
1 3.60 0.25 4.95 4.46 1/2" 8 6.45 51.60
1 2.05 0.25 4.95 2.54 3/8" 22 1.66 36.52
1 0.43 0.15 4.95 0.32 3/8" 22 1.66 36.52
1 0.43 0.15 4.95 0.32 3/8" 22 1.00 22.00
3/8" 22 1.00 22.00
3/8" 22 1.00 22.00
3/8" 22 1.00 22.00
3/8" 22 4.10 90.20
3/8" 22 4.10 90.20
3/8" 22 4.10 90.20
3/8" 22 4.10 90.20
3/8" 22 3.05 67.10
3/8" 22 3.05 67.10
2do piso
PL-1 1 3.60 0.25 3.50 3.15 1 3.50 20.62 72.17 3/8" 86 5.00 430.00
1 3.60 0.25 3.50 3.15 1/2" 8 5.00 40.00

Pgina 33 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1 2.05 0.25 3.50 1.79 3/8" 18 1.66 29.88
1 0.43 0.15 3.50 0.22 3/8" 18 1.66 29.88
1 0.43 0.15 3.50 0.22 3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 4.10 73.80
3/8" 18 4.10 73.80
3/8" 18 4.10 73.80
3/8" 18 4.10 73.80
3/8" 18 3.05 54.90
3/8" 18 3.05 54.90

3er piso
PL-1 1 3.60 0.25 3.50 3.15 1 3.50 20.62 72.17 3/8" 86 5.00 430.00
1 3.60 0.25 3.50 3.15 1/2" 8 5.00 40.00
1 2.05 0.25 3.50 1.79 3/8" 18 1.66 29.88
1 0.43 0.15 3.50 0.22 3/8" 18 1.66 29.88
1 0.43 0.15 3.50 0.22 3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 4.10 73.80
3/8" 18 4.10 73.80
3/8" 18 4.10 73.80
3/8" 18 4.10 73.80
3/8" 18 3.05 54.90
3/8" 18 3.05 54.90

Azotea
PL-1 1 2.10 0.25 3.95 2.07 1 3.95 4.70 18.57 3/8" 66 5.00 330.00
1 2.10 0.25 3.95 2.07 1 3.95 4.70 18.57 1/2" 4 5.00 20.00
1 0.35 0.25 3.95 0.35 1 3.95 6.30 24.89 3/8" 18 4.70 84.60
1 0.35 0.15 3.95 0.21 3/8" 18 4.70 84.60
1 2.55 0.25 3.95 2.52 3/8" 18 1.00 18.00

Pgina 34 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 1.20 21.60
3/8" 18 1.20 21.60
3/8" 18 1.00 18.00
3/8" 18 1.00 18.00
3/8" 18 5.60 100.80
3/8" 18 5.60 100.80

TOTAL= 36.38 TOTAL= 308.42 SUBTOTALES (ml) = 0.00 0.00 0.00 3996.26 151.60 0.00 0.00 0.00
SUBTOTALES (kg) = 0.0 0.0 0.0 2237.9 150.1 0.0 0.0 0.0 2388.00

VIGAS.- CONCRETO 210 KG/CM2


1er piso
Pabelln 2 pisos
V-1 3.50 0.15 0.65 0.34 3.50 1.25 4.38 1/2" 4 4.40 17.60
1/4" 19 1.60 30.40
V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
V-1 6.80 0.15 0.65 0.66 6.80 1.25 8.50 1/2" 4 7.70 30.80
1/4" 36 1.60 57.60
V-1 3.50 0.15 0.65 0.34 3.50 1.25 4.38 1/2" 4 4.40 17.60
1/4" 19 1.60 30.40
V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
V-1 0.75 0.15 0.65 0.07 0.75 1.25 0.94 1/2" 4 1.65 6.60
1/4" 6 1.60 9.60
V-1 0.75 0.15 0.65 0.07 0.75 1.25 0.94 1/2" 4 1.65 6.60
1/4" 6 1.60 9.60
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60

Pgina 35 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1/4" 25 0.70 17.50
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 25 0.70 17.50
V-2 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 16 0.70 11.20
V-2 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 16 0.70 11.20
V-2 2.30 0.15 0.20 0.07 2.30 0.20 0.46 1/2" 4 3.20 12.80
1/4" 14 0.70 9.80
V-2 2.30 0.15 0.20 0.07 2.30 0.20 0.46 1/2" 4 3.20 12.80
1/4" 14 0.70 9.80
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 25 0.70 17.50
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 25 0.70 17.50
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 25 0.70 17.50
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 25 0.70 17.50
V-2 2.30 0.15 0.20 0.07 2.30 0.20 0.46 1/2" 4 3.20 12.80
1/4" 14 0.70 9.80
V-2 2.30 0.15 0.20 0.07 2.30 0.20 0.46 1/2" 4 3.20 12.80
1/4" 14 0.70 9.80
V-2 2.30 0.15 0.20 0.07 2.30 0.20 0.46 1/2" 4 3.20 12.80
1/4" 14 0.70 9.80
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 25 0.70 17.50
V-2 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 25 0.70 17.50
V-2 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 16 0.70 11.20
V-2 2.30 0.15 0.20 0.07 2.30 0.20 0.46 1/2" 4 3.20 12.80
1/4" 14 0.70 9.80
V-2 1.95 0.15 0.20 0.06 1.95 0.20 0.39 1/2" 4 2.85 11.40
1/4" 12 0.70 8.40

Pgina 36 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
V-2 2.70 0.15 0.20 0.08 2.70 0.20 0.54 1/2" 4 3.60 14.40
1/4" 16 0.70 11.20
V-2 2.25 0.15 0.20 0.07 2.25 0.20 0.45 1/2" 4 3.15 12.60
1/4" 14 0.70 9.80
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-2 3.00 0.15 0.20 0.09 3.00 0.20 0.60 1/2" 4 3.90 15.60
1/4" 18 0.70 12.60
V-2 8.50 0.15 0.20 0.26 8.50 0.20 1.70 1/2" 4 9.40 37.60
1/4" 43 0.70 30.10
V-2 2.85 0.15 0.20 0.09 2.85 0.20 0.57 1/2" 4 3.75 15.00
1/4" 18 0.70 12.60
V-2 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 18 0.70 12.60
V-2 2.85 0.15 0.20 0.09 2.85 0.20 0.57 1/2" 4 3.75 15.00
1/4" 18 0.70 12.60
V-2 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 18 0.70 12.60
V-2 2.85 0.15 0.20 0.09 2.85 0.20 0.57 1/2" 4 3.75 15.00

Pgina 37 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1/4" 18 0.70 12.60
V-2 2.15 0.15 0.20 0.06 2.15 0.20 0.43 1/2" 4 3.05 12.20
1/4" 15 0.70 10.50
V-2 2.85 0.15 0.20 0.09 2.85 0.20 0.57 1/2" 4 3.75 15.00
1/4" 18 0.70 12.60
V-2 4.35 0.15 0.20 0.13 4.35 0.20 0.87 1/2" 4 5.25 21.00
1/4" 24 0.70 16.80
V-2 3.15 0.15 0.20 0.09 3.15 0.20 0.63 1/2" 4 4.05 16.20
1/4" 19 0.70 13.30
V-2 3.35 0.15 0.20 0.10 3.35 0.20 0.67 1/2" 4 4.25 17.00
1/4" 20 0.70 14.00
V-3 3.50 0.15 0.40 0.21 3.50 0.55 1.93 1/2" 4 4.40 17.60
1/4" 21 0.70 14.70
V-3 3.50 0.15 0.40 0.21 3.50 0.55 1.93 1/2" 4 4.40 17.60
1/4" 21 0.70 14.70
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 1.70 0.15 0.40 0.10 1.70 0.55 0.94 1/2" 4 2.60 10.40
1/4" 13 0.70 9.10
V-3 1.70 0.15 0.40 0.10 1.70 0.55 0.94 1/2" 4 2.60 10.40
1/4" 13 0.70 9.10

Pgina 38 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
V-3 2.20 0.15 0.40 0.13 2.20 0.55 1.21 1/2" 4 3.10 12.40
1/4" 16 0.70 11.20
V-3 2.20 0.15 0.40 0.13 2.20 0.55 1.21 1/2" 4 3.10 12.40
1/4" 16 0.70 11.20
V-3 2.20 0.15 0.40 0.13 2.20 0.55 1.21 1/2" 4 3.10 12.40
1/4" 16 0.70 11.20
V-3 2.20 0.15 0.40 0.13 2.20 0.55 1.21 1/2" 4 3.10 12.40
1/4" 16 0.70 11.20
V-3 2.20 0.15 0.40 0.13 2.20 0.55 1.21 1/2" 4 3.10 12.40
1/4" 16 0.70 11.20
V-3 1.70 0.15 0.40 0.10 1.70 0.55 0.94 1/2" 4 2.60 10.40
1/4" 13 0.70 9.10
V-3 2.20 0.15 0.40 0.13 2.20 0.55 1.21 1/2" 4 3.10 12.40
1/4" 16 0.70 11.20
V-3 2.70 0.15 0.40 0.16 2.70 0.55 1.49 1/2" 4 3.60 14.40
1/4" 19 0.70 13.30
V-3 1.20 0.15 0.40 0.07 1.20 0.55 0.66 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
V-3 0.90 0.15 0.40 0.05 0.90 0.55 0.50 1/2" 4 1.80 7.20
1/4" 9 0.70 6.30
V-4 7.90 0.30 0.40 0.95 7.90 0.70 5.53 5/8" 4 8.70 34.80
5/8" 2 2.60 5.20
5/8" 1 3.05 3.05
3/8" 45 1.40 63.0
V-4' 7.90 0.30 0.40 0.95 7.90 0.70 5.53 5/8" 4 8.70 34.80
5/8" 2 2.60 5.20
5/8" 1 3.05 3.05
3/8" 45 1.40 63.0
V-5 6.85 0.25 0.40 0.69 6.85 0.85 5.82 5/8" 4 7.75 31.00
3/8" 36 1.30 46.8
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40
1/4" 17 0.90 15.3
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40
1/4" 17 0.90 15.3
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40

Pgina 39 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1/4" 17 0.90 15.3
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40
1/4" 17 0.90 15.3
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40
1/4" 17 0.90 15.3
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40
1/4" 17 0.90 15.3
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40
1/4" 17 0.90 15.3
V-6 2.40 0.25 0.20 0.12 2.40 0.25 0.60 1/2" 4 3.10 12.40
1/4" 17 0.90 15.3
V-8 4.75 0.30 0.40 0.57 4.75 0.70 3.33 5/8" 2 7.70 15.40
2.50 0.30 0.20 0.15 2.35 0.30 0.71 5/8" 2 5.55 11.10
1/2" 2 3.60 7.20
3/8" 28 1.40 39.2
1/4" 17 1.00 17
V-9 0.95 0.15 0.40 0.06 0.75 0.25 0.19 1/2" 4 1.65 6.60
1/4" 7 0.90 6.3
V-9 4.20 0.15 0.40 0.25 0.75 0.25 0.19 1/2" 4 4.90 19.60
1/4" 23 0.90 20.7
Pabelln 3 pisos
V-1 4.35 0.15 0.35 0.23 4.35 0.70 3.05 1/2" 4 5.15 20.60
1/4" 24 1.00 24
V-1 1.70 0.15 0.35 0.09 1.70 0.70 1.19 1/2" 4 2.50 10.00
1/4" 13 1.00 13
V-2 8.65 0.25 0.65 1.41 8.65 1.35 11.68 5/8" 4 9.45 37.80
3/8" 88 1.80 158.4
V-2 18.25 0.25 0.65 2.97 18.25 1.35 24.64 5/8" 4 19.55 78.20
3/8" 184 1.80 331.2
V-3 7.20 0.15 0.20 0.22 7.20 0.15 1.08 1/2" 4 7.60 30.40
1/4" 36 0.70 25.2
V-3 2.70 0.15 0.20 0.08 2.70 0.15 0.41 1/2" 4 3.10 12.40
1/4" 16 0.70 11.2
V-3 4.00 0.15 0.20 0.12 4.00 0.15 0.60 1/2" 4 4.40 17.60
1/4" 23 0.70 16.1

Pgina 40 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
V-3 1.35 0.15 0.20 0.04 1.35 0.15 0.20 1/2" 4 1.75 7.00
1/4" 8 0.70 5.6
V-3 2.55 0.15 0.20 0.08 2.55 0.15 0.38 1/2" 4 2.95 11.80
1/4" 15 0.70 10.5
V-3 3.05 0.15 0.20 0.09 3.05 0.15 0.46 1/2" 4 3.45 13.80
1/4" 18 0.70 12.6
V-3 1.35 0.15 0.20 0.04 1.35 0.15 0.20 1/2" 4 1.75 7.00
1/4" 8 0.70 5.6
V-3 1.25 0.15 0.20 0.04 1.25 0.15 0.19 1/2" 4 1.65 6.60
1/4" 8 0.70 5.6
V-3 2.80 0.15 0.20 0.08 2.80 0.15 0.42 1/2" 4 3.20 12.80
1/4" 16 0.70 11.2
V-4 2.20 0.25 0.20 0.11 2.20 0.25 0.55 1/2" 4 2.60 10.40
1/4" 14 0.90 12.6
V-4 0.85 0.25 0.20 0.04 0.85 0.25 0.21 1/2" 4 5.70 22.80
3.50 0.25 0.20 0.18 3.50 0.25 0.88 1/4" 27 0.90 24.3
V-4 4.00 0.25 0.20 0.20 4.00 0.25 1.00 1/2" 4 4.80 19.20
1/4" 29 0.90 26.1
V-4 6.80 0.25 0.20 0.34 6.80 0.25 1.70 1/2" 4 7.60 30.40
1/4" 38 0.90 34.2
V-4 1.40 0.25 0.20 0.07 1.40 0.25 0.35 1/2" 4 1.80 7.20
1/4" 8 0.90 7.2
V-4 1.85 0.25 0.20 0.09 1.85 0.25 0.46 1/2" 4 2.25 9.00
1/4" 10 0.90 9
V-4 3.35 0.25 0.20 0.17 3.35 0.25 0.84 1/2" 4 4.15 16.60
1/4" 20 0.90 18
V-4 4.75 0.25 0.20 0.24 4.75 0.25 1.19 1/2" 4 5.55 22.20
1/4" 27 0.90 24.3
V-5 6.60 0.25 0.40 0.66 6.60 0.65 4.29 5/8" 4 7.40 29.60
3/8" 57 1.80 102.6
V-5 6.60 0.25 0.40 0.66 6.60 0.65 4.29 5/8" 4 7.40 29.60
3/8" 57 1.80 102.6
V-5 1.20 0.25 0.40 0.12 1.20 0.65 0.78 5/8" 4 2.00 8.00
3/8" 12 1.80 21.6
V-5 2.40 0.25 0.40 0.24 2.40 0.65 1.56 5/8" 4 3.20 12.80

Pgina 41 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 26 1.80 46.8
V-5 5.70 0.25 0.40 0.57 5.70 0.65 3.71 5/8" 4 6.50 26.00
3/8" 46 1.80 82.8
V-5 2.30 0.25 0.40 0.23 2.30 0.65 1.50 5/8" 4 3.10 12.40
3/8" 26 1.80 46.8
V-6 1.20 0.25 0.20 0.06 1.20 0.45 0.54 5/8" 2 2.15 4.30
1/2" 2 2.15 4.30
8mm 10 0.90 9.00
V-7 5.75 0.50 0.20 0.58 5.75 0.50 2.88 5/8" 4 6.55 26.20
1/2" 3 6.55 19.65
8mm 36 1.40 50.40
V-7 2.35 0.50 0.20 0.24 2.35 0.50 1.18 5/8" 4 3.75 15.00
1/2" 3 3.75 11.25
8mm 17 1.40 23.80
V-8 2.20 0.25 0.50 0.28 2.20 0.85 1.87 5/8" 4 3.00 12.00
3/8" 21 1.80 37.8
V-9 1.20 0.15 0.40 0.07 1.20 0.55 0.66 5/8" 4 2.00 8.00
8mm 10 1.10 11.00
V-9 1.90 0.15 0.40 0.11 1.90 0.55 1.05 5/8" 4 2.70 10.80
8mm 10 1.10 11.00
V-9 1.20 0.15 0.40 0.07 1.20 0.55 0.66 5/8" 4 2.00 8.00
8mm 10 1.10 11.00
V-9 2.55 0.15 0.40 0.15 2.55 0.55 1.40 5/8" 4 3.35 13.40
8mm 26 1.10 28.60
V-9 1.20 0.15 0.40 0.07 1.20 0.55 0.66 5/8" 4 2.00 8.00
8mm 10 1.10 11.00
V-9 1.60 0.15 0.40 0.10 1.60 0.55 0.88 5/8" 4 2.40 9.60
8mm 11 1.10 12.10
V-9 2.05 0.15 0.40 0.12 2.05 0.55 1.13 5/8" 4 2.85 11.40
8mm 22 1.10 24.20
V-10 6.50 0.25 0.50 0.81 6.50 0.85 5.53 5/8" 4 8.00 32.00
5/8" 1 4.15 4.15
1/2" 1 3.30 3.30
3/8" 46 1.50 69.0
V-10 6.50 0.25 0.50 0.81 6.50 0.85 5.53 5/8" 4 8.00 32.00

Pgina 42 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
5/8" 1 4.15 4.15
1/2" 1 3.30 3.30
3/8" 46 1.50 69.0
V-11 1.20 0.25 0.20 0.06 1.20 0.25 0.30 1/2" 4 2.00 8.00
1/4" 15 0.90 13.5
V-11 1.20 0.25 0.20 0.06 1.20 0.25 0.30 1/2" 4 2.00 8.00
1/4" 15 0.90 13.5
V-12 6.10 0.15 0.65 0.59 6.10 1.25 7.63 5/8" 4 7.25 29.00
8mm 62 1.10 68.20
V-13 4.20 0.25 0.50 0.53 4.20 1.05 4.41 5/8" 4 5.00 20.00
3/8" 26 1.50 39.0
V-14 4.00 0.25 0.20 0.20 4.00 0.25 1.00 1/2" 4 4.90 19.60
1/4" 23 0.90 20.7
V-14 3.60 0.25 0.20 0.18 3.60 0.25 0.90 1/2" 4 5.05 20.20
1/4" 21 0.90 18.9
V-14 6.50 0.25 0.20 0.33 6.50 0.25 1.63 1/2" 4 7.65 30.60
1/4" 34 0.90 30.6
V-14 2.30 0.25 0.20 0.12 2.30 0.25 0.58 1/2" 4 3.30 13.20
1/4" 14 0.90 12.6
V-14 11.15 0.25 0.20 0.56 11.15 0.25 2.79 1/2" 4 13.45 53.80
1/4" 57 0.90 51.3
V-15 4.80 0.15 0.40 0.29 4.80 0.55 2.64 1/2" 4 6.40 25.60
1/4" 40 1.10 44
2do piso
Pabelln 2 pisos
2V-1 3.50 0.15 0.65 0.34 3.50 1.25 4.38 1/2" 4 4.40 17.60
1/4" 19 1.60 30.40
2V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
2V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
2V-1 6.80 0.15 0.65 0.66 6.80 1.25 8.50 1/2" 4 7.70 30.80
1/4" 36 1.60 57.60
2V-1 3.50 0.15 0.65 0.34 3.50 1.25 4.38 1/2" 4 4.40 17.60
1/4" 19 1.60 30.40

Pgina 43 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
2V-1 6.85 0.15 0.65 0.67 6.85 1.25 8.56 1/2" 4 7.75 31.00
1/4" 36 1.60 57.60
2V-1 6.80 0.15 0.65 0.66 6.80 1.25 8.50 1/2" 4 7.70 30.80
1/4" 36 1.60 57.60
2V-1 2.90 0.15 0.65 0.28 2.90 1.25 3.63 1/2" 4 3.80 15.20
1/4" 16 1.60 25.60
2V-1 0.75 0.15 0.65 0.07 0.75 1.25 0.94 1/2" 4 1.65 6.60
1/4" 16 1.40 22.40
2V-1 0.75 0.15 0.65 0.07 0.75 1.25 0.94 1/2" 4 1.65 6.60
1/4" 16 1.40 22.40
2V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
2V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
2V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
2V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
2V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
2V-2 1.20 0.15 0.20 0.04 1.20 0.20 0.24 1/2" 4 2.10 8.40
1/4" 10 0.70 7.00
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20

Pgina 44 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2 1/4" 19 0.70 26.60
2V-3 2 3.15 0.25 0.20 0.32 2 3.15 0.25 1.58 2 1/2" 6 4.05 48.60
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-3 2 3.20 0.25 0.20 0.32 2 3.20 0.25 1.60 2 1/2" 6 4.10 49.20
2 1/4" 19 0.70 26.60
2V-4 1 3.80 0.15 0.40 0.23 1 3.80 0.55 2.09 1 1/2" 4 4.70 18.80
1 1/4" 42 1.10 46.20
2V-4 1 1.80 0.15 0.40 0.11 1 1.80 0.55 0.99 1 1/2" 4 2.70 10.80
1 1/4" 22 1.10 24.20
2V-4 1 3.65 0.15 0.40 0.22 1 3.65 0.55 2.01 1 1/2" 4 4.55 18.20
1 1/4" 40 1.10 44.00
2V-4 1 1.95 0.15 0.40 0.12 1 1.95 0.55 1.07 1 1/2" 4 2.85 11.40
1 1/4" 23 1.10 25.30
2V-4 1 3.50 0.15 0.40 0.21 1 3.50 0.55 1.93 1 1/2" 4 4.40 17.60
1 1/4" 41 1.10 45.10
2V-4 1 1.80 0.15 0.40 0.11 1 1.80 0.55 0.99 1 1/2" 4 2.70 10.80
1 1/4" 22 1.10 24.20
2V-4 1 3.45 0.15 0.40 0.21 1 3.45 0.55 1.90 1 1/2" 4 4.35 17.40
1 1/4" 41 1.10 45.10
2V-4 1 3.80 0.15 0.40 0.23 1 3.80 0.55 2.09 1 1/2" 4 4.70 18.80
1 1/4" 42 1.10 46.20
2V-4 1 1.80 0.15 0.40 0.11 1 1.80 0.55 0.99 1 1/2" 4 2.70 10.80
1 1/4" 22 1.10 24.20
2V-4 1 2.35 0.15 0.40 0.14 1 2.35 0.55 1.29 1 1/2" 4 3.25 13.00
1 1/4" 25 1.10 27.50
2V-4 1 9.85 0.15 0.40 0.59 1 9.85 0.55 5.42 1 1/2" 4 10.75 43.00
1 1/4" 102 1.10 112.20

Pgina 45 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2V-4 1 1.70 0.15 0.40 0.10 1 1.70 0.55 0.94 1 1/2" 4 2.60 10.40
1 1/4" 22 1.10 24.20
2V-4 1 1.70 0.15 0.40 0.10 1 1.70 0.55 0.94 1 1/2" 4 2.60 10.40
1 1/4" 22 1.10 24.20
2V-4 1 4.50 0.15 0.40 0.27 1 4.50 0.55 2.48 1 1/2" 4 5.40 21.60
1 1/4" 48 1.10 52.80
2V-4 1 4.50 0.15 0.40 0.27 1 4.50 0.55 2.48 1 1/2" 4 5.40 21.60
1 1/4" 48 1.10 52.80
2V-4 1 2.20 0.15 0.40 0.13 1 2.20 0.55 1.21 1 1/2" 4 3.10 12.40
1 1/4" 23 1.10 25.30
2V-4 1 2.20 0.15 0.40 0.13 1 2.20 0.55 1.21 1 1/2" 4 3.10 12.40
1 1/4" 23 1.10 25.30
2V-4 1 4.50 0.15 0.40 0.27 1 4.50 0.55 2.48 1 1/2" 4 5.40 21.60
1 1/4" 48 1.10 52.80
2V-4 1 1.70 0.15 0.40 0.10 1 1.70 0.55 0.94 1 1/2" 4 2.60 10.40
1 1/4" 22 1.10 24.20
2V-5 3.00 0.15 0.20 0.09 3.00 0.20 0.60 1/2" 4 3.90 15.60
1/4" 16 0.70 11.20
2V-5 3.00 0.15 0.20 0.09 3.00 0.20 0.60 1/2" 4 3.90 15.60
1/4" 16 0.70 11.20
2V-5 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 28 0.70 19.60
2V-5 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 28 0.70 19.60
2V-5 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 16 0.70 11.20
2V-5 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 16 0.70 11.20
2V-5 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 28 0.70 19.60
2V-5 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 28 0.70 19.60
2V-5 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 16 0.70 11.20
2V-5 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80

Pgina 46 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1/4" 16 0.70 11.20
2V-5 1.65 0.15 0.20 0.05 1.65 0.20 0.33 1/2" 4 2.55 10.20
1/4" 9 0.70 6.30
2V-5 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 28 0.70 19.60
2V-5 2.80 0.15 0.20 0.08 2.80 0.20 0.56 1/2" 4 3.70 14.80
1/4" 16 0.70 11.20
2V-5 1.65 0.15 0.20 0.05 1.65 0.20 0.33 1/2" 4 2.55 10.20
1/4" 9 0.70 6.30
2V-5 4.50 0.15 0.20 0.14 4.50 0.20 0.90 1/2" 4 5.40 21.60
1/4" 28 0.70 19.60
2V-5 2.85 0.15 0.20 0.09 2.85 0.20 0.57 1/2" 4 3.75 15.00
1/4" 16 0.70 11.20
2V-5 4.05 0.15 0.20 0.12 4.05 0.20 0.81 1/2" 4 4.35 17.40
1/4" 27 0.70 18.90
2V-5 2.25 0.15 0.20 0.07 2.25 0.20 0.45 1/2" 4 3.15 12.60
1/4" 14 0.70 9.80
2V-5 1.70 0.15 0.20 0.05 1.70 0.20 0.34 1/2" 4 2.60 10.40
1/4" 10 0.70 7.00
2V-5 0.90 0.15 0.20 0.03 0.90 0.20 0.18 1/2" 4 1.80 7.20
1/4" 6 0.70 4.20
2V-5 1.55 0.15 0.20 0.05 1.55 0.20 0.31 1/2" 4 2.45 9.80
1/4" 9 0.70 6.30
2V-5 0.90 0.15 0.20 0.03 0.90 0.20 0.18 1/2" 4 1.80 7.20
1/4" 6 0.70 4.20
2V-5 1.55 0.15 0.20 0.05 1.55 0.20 0.31 1/2" 4 2.45 9.80
1/4" 9 0.70 6.30
2V-5 2.25 0.15 0.20 0.07 2.25 0.20 0.45 1/2" 4 3.15 12.60
1/4" 14 0.70 9.80
2V-5 1.70 0.15 0.20 0.05 1.70 0.20 0.34 1/2" 4 2.60 10.40
1/4" 10 0.70 7.00
2V-5 2.20 0.15 0.20 0.07 2.20 0.20 0.44 1/2" 4 3.10 12.40
1/4" 12 0.70 8.40
2V-6 5.15 0.30 0.40 0.62 5.15 0.70 3.61 1/2" 4 6.05 24.20
3/8" 29 0.70 20.30

Pgina 47 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2V-7 2.40 0.15 0.20 0.07 2.40 0.45 1.08 1/2" 4 3.10 12.40
1/4" 13 0.70 9.10
2V-7 2.40 0.15 0.20 0.07 2.40 0.45 1.08 1/2" 4 3.10 12.40
1/4" 13 0.70 9.10
2V-7 2.40 0.15 0.20 0.07 2.40 0.45 1.08 1/2" 4 3.10 12.40
1/4" 13 0.70 9.10
2V-7 2.40 0.15 0.20 0.07 2.40 0.45 1.08 1/2" 4 3.10 12.40
1/4" 13 0.70 9.10
2V-7 2.40 0.15 0.20 0.07 2.40 0.45 1.08 1/2" 4 3.10 12.40
1/4" 13 0.70 9.10
2V-7 2.40 0.15 0.20 0.07 2.40 0.45 1.08 1/2" 4 3.10 12.40
1/4" 13 0.70 9.10
2V-8 24 2.00 0.15 0.20 1.44 24 2.00 0.40 19.20 24 1/2" 4 2.90 278.40
24 1/4" 16 0.70 268.80
2V-9 1 4.50 0.15 0.40 0.27 1 4.50 0.70 3.15 1 1/2" 4 5.40 21.60
1 1/4" 26 1.10 28.60
2V-9 1 2.85 0.15 0.40 0.17 1 2.85 0.70 2.00 1 1/2" 4 3.75 15.00
1 1/4" 16 1.10 17.60
2V-9 1 2.85 0.15 0.40 0.17 1 2.85 0.70 2.00 1 1/2" 4 3.75 15.00
1 1/4" 16 1.10 17.60
2V-9 1 4.20 0.15 0.40 0.25 1 4.20 0.70 2.94 1 1/2" 4 5.10 20.40
1 1/4" 25 1.10 27.50
2V-10 4.50 0.25 0.40 0.45 4.50 0.65 2.93 5/8" 5 5.30 26.50
3/8" 26 1.80 46.8
2V-11 2.40 0.55 0.20 0.26 2.40 0.75 1.80 1/2" 6 3.10 18.60
1/4" 13 1.50 19.50
2V-11 2.40 0.55 0.20 0.26 2.40 0.75 1.80 1/2" 6 3.10 18.60
1/4" 13 1.50 19.50
2V-12 4.35 0.30 0.40 0.52 4.35 0.70 3.05 5/8" 2 5.60 11.20
5/8" 2 5.60 11.20
3/8" 30 1.40 42.0
Pabelln 3 pisos
2V-1 4.35 0.15 0.50 0.33 4.35 1.00 4.35 5/8" 4 5.15 20.60
8mm 24 1.30 31.20
2V-2 8.65 0.25 0.65 1.41 8.65 1.35 11.68 5/8" 4 9.45 37.80

Pgina 48 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 88 1.80 158.4
2V-2 4.00 0.25 0.65 0.65 4.00 1.35 5.40 5/8" 4 4.80 19.20
3/8" 43 1.80 77.4
2V-2 8.00 0.25 0.65 1.30 8.00 1.35 10.80 5/8" 4 8.80 35.20
3/8" 84 1.80 151.2
2V-2 3.60 0.25 0.65 0.59 3.60 1.35 4.86 5/8" 4 4.90 19.60
3/8" 42 1.80 75.6
2V-2 2.50 0.25 0.65 0.41 2.50 1.35 3.38 5/8" 4 3.80 15.20
3/8" 27 1.80 48.6
2V-3 8.40 0.25 0.40 0.84 8.40 0.65 5.46 5/8" 4 8.80 35.20
3/8" 86 1.30 111.8
2V-3 7.50 0.25 0.40 0.75 7.50 0.65 4.88 5/8" 4 8.80 35.20
3/8" 86 1.30 111.8
2V-4 2.20 0.25 0.60 0.33 2.20 1.25 2.75 5/8" 4 2.15 8.60
3/8" 11 1.70 18.7
2V-5 5.75 0.50 0.20 0.58 5.75 0.50 2.88 5/8" 4 6.55 26.20
1/2" 3 6.55 19.65
8mm 36 1.40 50.40
2V-5 2.35 0.50 0.20 0.24 2.35 0.50 1.18 5/8" 4 3.75 15.00
1/2" 3 3.75 11.25
8mm 17 1.40 23.80
2V-6 13.65 0.25 0.50 1.71 13.65 0.85 11.60 5/8" 2 8.35 16.70
5/8" 2 3.50 7.00
5/8" 2 5.85 11.70
5/8" 2 5.40 10.80
5/8" 1 2.45 2.45
1/2" 1 3.10 3.10
3/8" 68 1.50 102.0
2V-7 4.70 0.15 0.40 0.28 4.70 0.55 2.59 5/8" 4 6.00 24.00
8mm 49 1.10 53.90
2V-7 4.80 0.15 0.40 0.29 4.80 0.55 2.64 5/8" 4 6.00 24.00
8mm 50 1.10 55.00
2V-8 2.80 0.45 0.20 0.25 2.80 0.45 1.26 5/8" 5 3.70 18.50
1/2" 1 3.70 3.70
8mm 19 1.30 24.70

Pgina 49 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2V-9 1.20 0.15 0.20 0.04 1.20 0.15 0.18 1/2" 4 6.00 24.00
1/4" 14 0.70 9.8
2V-10 6.95 0.25 0.50 0.87 6.95 0.85 5.91 5/8" 2 8.20 16.40
5/8" 2 8.20 16.40
3/4" 2 5.55 11.10
5/8" 2 3.10 6.20
3/8" 48 1.50 72.0
2V-11 6.95 0.25 0.50 0.87 6.95 0.85 5.91 5/8" 2 8.20 16.40
5/8" 2 8.20 16.40
5/8" 2 4.25 8.50
5/8" 1 3.10 3.10
3/8" 48 1.50 72.0
2V-12 4.50 0.15 0.65 0.44 4.50 1.25 5.63 5/8" 4 5.90 23.60
8mm 34 1.60 54.40
2V-12 11.65 0.15 0.65 1.14 11.65 1.25 14.56 5/8" 4 5.90 23.60
8mm 82 1.60 131.20
2V-13 4.20 0.15 0.65 0.41 4.20 1.25 5.25 5/8" 4 5.90 23.60
8mm 35 1.60 56.00
2V-13 3.35 0.15 0.65 0.33 3.35 1.25 4.19 5/8" 4 5.90 23.60
8mm 28 1.60 44.80
2V-13 2.40 0.15 0.65 0.23 2.40 1.25 3.00 5/8" 4 5.90 23.60
8mm 12 1.60 19.20
2V-13 2.30 0.15 0.65 0.22 2.30 1.25 2.88 5/8" 4 5.90 23.60
8mm 12 1.60 19.20
2V-14 2.55 0.25 0.20 0.13 2.55 0.40 1.02 1/2" 4 3.95 15.80
1/4" 21 0.90 18.9
2V-14 4.70 0.25 0.20 0.24 4.70 0.40 1.88 1/2" 4 6.10 24.40
1/4" 38 0.90 34.2
2V-14 2.95 0.25 0.20 0.15 2.95 0.40 1.18 1/2" 4 4.35 17.40
1/4" 26 0.90 23.4
2V-15 4.85 0.25 0.50 0.61 1.25 0.85 1.06 5/8" 3 6.25 18.75
5/8" 2 6.25 12.50
3/8" 30 1.50 45.0
2V-16 4.00 0.25 0.20 0.20 4.00 0.25 1.00 1/2" 5 5.40 27.00
1/4" 22 0.90 19.8

Pgina 50 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2V-16 4.00 0.25 0.20 0.20 4.00 0.25 1.00 1/2" 5 5.40 27.00
1/4" 22 0.90 19.8
2V-16 3.60 0.25 0.20 0.18 3.60 0.25 0.90 1/2" 5 5.00 25.00
1/4" 18 0.90 16.2
2V-16 3.10 0.25 0.20 0.16 3.10 0.25 0.78 1/2" 5 4.50 22.50
1/4" 16 0.90 14.4
2V-16 11.15 0.25 0.20 0.56 11.15 0.25 2.79 1/2" 5 12.55 62.75
1/4" 52 0.90 46.8
2V-16 3.20 0.25 0.20 0.16 3.20 0.25 0.80 1/2" 5 4.60 23.00
1/4" 16 0.90 14.4
2V-16 6.25 0.25 0.20 0.31 6.25 0.25 1.56 1/2" 5 7.65 38.25
1/4" 32 0.90 28.8
2V-17 5.65 0.25 0.50 0.71 5.65 0.85 4.80 5/8" 2 7.15 14.30
5/8" 2 7.15 14.30
5/8" 1 4.45 4.45
3/8" 35 1.50 52.5
2V-18 3.05 0.25 0.50 0.38 3.05 0.85 2.59 5/8" 2 4.45 8.90
5/8" 2 4.45 8.90
5/8" 1 2.05 2.05
5/8" 1 2.05 2.05
5/8" 1 2.05 2.05
3/8" 33 1.50 49.5
2V-19 5.90 0.25 0.50 0.74 5.90 0.85 5.02 5/8" 2 7.30 14.60
5/8" 2 7.30 14.60
5/8" 1 3.30 3.30
5/8" 1 5.80 5.80
3/8" 40 1.50 60.0

3er piso
Pabelln 3 pisos
VA-1 4.35 0.15 1.00 0.65 4.35 1.95 8.48 5/8" 4 5.35 21.40
3/8" 4 5.35 21.4
8mm 20 2.30 46.00
VA-2 8.65 0.35 0.20 0.61 8.65 0.55 4.76 1/2" 6 9.65 57.90
1/4" 51 1.10 56.1

Pgina 51 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
VA-3 12.50 0.25 0.80 2.50 12.50 1.45 18.13 3/4" 4 14.50 58.00
3/8" 4 14.50 58.0
3/8" 49 2.10 102.9
VA-4 2.20 0.25 0.50 0.28 2.20 1.05 2.31 5/8" 4 2.15 8.60
3/8" 11 1.50 16.5
VA-5 7.75 0.40 0.23 0.71 7.75 0.40 3.10 5/8" 4 9.25 37.00
1/2" 2 9.25 18.50
8mm 44 1.26 55.44
VA-6 7.00 0.25 0.50 0.88 7.00 1.05 7.35 3/4" 2 8.25 16.50
3/4" 2 8.25 16.50
3/4" 2 5.20 10.40
3/8" 40 1.50 60.0
VA-7 4.40 0.35 0.20 0.31 4.40 0.35 1.54 5/8" 2 5.90 11.80
1/2" 4 5.90 23.60
8mm 25 1.26 31.50
VA-7 4.40 0.35 0.20 0.31 4.40 0.35 1.54 5/8" 2 5.90 11.80
1/2" 4 5.90 23.60
8mm 25 1.26 31.50
VA-7 4.40 0.35 0.20 0.31 4.40 0.35 1.54 5/8" 2 5.90 11.80
1/2" 4 5.90 23.60
8mm 25 1.26 31.50
VA-7 4.40 0.35 0.20 0.31 4.40 0.35 1.54 5/8" 2 5.90 11.80
1/2" 4 5.90 23.60
8mm 25 1.26 31.50
VA-8 2.30 0.40 0.15 0.14 2.30 0.75 1.73 5/8" 4 3.80 15.20
8mm 27 1.26 34.02
VA-9 5.45 0.25 0.50 0.68 5.45 0.85 4.63 5/8" 2 6.95 13.90
5/8" 2 6.95 13.90
5/8" 2 4.25 8.50
3/8" 35 1.50 52.5
VA-10 2.50 0.15 0.20 0.08 2.50 0.35 0.88 1/2" 4 3.15 12.60
1/4" 26 0.70 18.2
VA-11 7.00 0.25 0.50 0.88 7.00 1.05 7.35 3/4" 2 8.25 16.50
3/4" 2 8.25 16.50
3/4" 2 5.20 10.40

Pgina 52 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 40 1.50 60.0
VA-12 14.40 0.25 0.50 1.80 14.40 0.85 12.24 5/8" 4 16.50 66.00
3/8" 86 1.50 129.0
VA-12 5.45 0.25 0.50 0.68 5.45 0.85 4.63 5/8" 4 6.75 27.00
3/8" 34 1.50 51.0
VA-12 2.40 0.25 0.50 0.30 2.40 0.85 2.04 5/8" 4 3.40 13.60
3/8" 17 1.50 25.5
VA-13 7.00 0.25 0.50 0.88 7.00 1.05 7.35 5/8" 2 8.25 16.50
5/8" 2 8.25 16.50
3/8" 42 1.50 63.0
VA-14 7.75 0.25 0.80 1.55 7.75 1.65 12.79 3/4" 4 8.25 33.00
3/8" 2 8.25 16.5
3/8" 34 2.10 71.4
VA-15 4.50 0.25 0.23 0.26 4.50 0.48 2.16 5/8" 4 5.40 21.60
8mm 28 0.96 26.88
VA-16 4.00 0.25 0.50 0.50 4.00 1.05 4.20 5/8" 4 5.60 22.40
3/8" 26 1.50 39.0
VA-16 4.20 0.25 0.50 0.53 4.20 1.05 4.41 5/8" 4 5.80 23.20
3/8" 26 1.50 39.0
VA-17 4.00 0.25 0.20 0.20 4.00 0.25 1.00 1/2" 4 5.60 22.40
3/8" 26 0.90 23.4
VA-17 4.00 0.25 0.20 0.20 4.00 0.25 1.00 1/2" 4 5.60 22.40
3/8" 26 0.90 23.4
VA-17 3.10 0.25 0.20 0.16 3.10 0.25 0.78 1/2" 4 4.70 18.80
3/8" 18 0.90 16.2
VA-17 3.10 0.25 0.20 0.16 3.10 0.25 0.78 1/2" 4 4.70 18.80
3/8" 18 0.90 16.2
VA-17 3.75 0.25 0.20 0.19 3.75 0.25 0.94 1/2" 4 5.35 21.40
3/8" 24 0.90 21.6
VA-17 3.75 0.25 0.20 0.19 3.75 0.25 0.94 1/2" 4 5.35 21.40
3/8" 24 0.90 21.6
VA-17 7.75 0.25 0.20 0.39 7.75 0.25 1.94 1/2" 4 10.40 41.60
3/8" 41 0.90 36.9
VA-18 4.85 0.25 1.00 1.21 4.85 2.05 9.94 3/4" 4 6.45 25.80
3/8" 4 6.45 25.8

Pgina 53 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 26 2.50 65.0
VA-19 4.60 0.25 0.20 0.23 4.60 0.25 1.15 1/2" 4 5.60 22.40
1/4" 25 1.10 27.5
VA-21 11.15 0.40 0.20 0.89 11.15 0.40 4.46 5/8" 6 12.05 72.30
8mm 60 1.20 72.00
VA-22 11.15 0.15 0.50 0.84 11.15 0.95 10.59 5/8" 4 12.05 48.20
8mm 60 1.30 78.00
Techo cuarto de mquinas
VCM-1 3.50 0.15 0.40 0.21 3.50 0.95 3.33 5/8" 2 4.35 8.70
5/8" 2 4.35 8.70
8mm 29 1.10 31.90
VCM-1 3.50 0.15 0.40 0.21 3.50 0.95 3.33 5/8" 2 4.35 8.70
5/8" 2 4.35 8.70
8mm 29 1.10 31.90
VCM-1 1.55 0.15 0.40 0.09 1.55 0.95 1.47 5/8" 2 2.45 4.90
5/8" 2 2.45 4.90
8mm 11 1.10 12.10
VCM-2 0.90 0.25 0.40 0.09 0.90 1.05 0.95 5/8" 2 6.05 12.10
1.85 0.25 0.40 0.19 1.85 1.05 1.94 5/8" 2 6.05 12.10
5/8" 1 2.60 2.60
8mm 22 1.10 24.20
VCM-2 0.90 0.25 0.40 0.09 0.90 1.05 0.95 5/8" 2 6.05 12.10
1.85 0.25 0.40 0.19 1.85 1.05 1.94 5/8" 2 6.05 12.10
5/8" 1 2.60 2.60
8mm 22 1.10 24.20
VCM-3 3.50 0.25 0.20 0.18 3.50 0.45 1.58 1/2" 2 4.35 8.70
1/2" 2 4.35 8.70
8mm 29 0.90 26.10
VCM-3 3.50 0.25 0.20 0.18 3.50 0.45 1.58 1/2" 2 4.35 8.70
1/2" 2 4.35 8.70
1/4" 29 0.90 26.1
VCM-4 1.55 0.15 0.20 0.05 1.55 0.35 0.54 3/8" 4 2.45 9.8
1/4" 11 0.70 7.7
VCM-3 0.90 0.25 0.20 0.05 0.90 0.45 0.41 1/2" 2 6.05 12.10
1.85 0.25 0.20 0.09 1.85 0.45 0.83 1/2" 2 6.05 12.10

Pgina 54 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1/4" 22 0.90 19.8
VCM-3 0.90 0.25 0.20 0.05 0.90 0.45 0.41 1/2" 2 6.05 12.10
1.85 0.25 0.20 0.09 1.85 0.45 0.83 1/2" 2 6.05 12.10
1/4" 22 0.90 19.8

TOTAL= 90.90 TOTAL= 739.39 SUBTOTALES (ml) = 1412.84 0.00 4500.90 3700.80 4567.20 2000.60 214.70 0.00
SUBTOTALES (kg) = 310.82 0.00 1125.23 2072.45 4521.53 3100.93 480.93 0.00 11612.00

LOSA ALIGERADA.- CONCRETO 210 KG/CM2


1er piso
Pabelln 2 pisos
2.60 1.25 3.25 3/8" 2 3.85 7.70
2.40 1.55 3.72 3/8" 2 1.00 2.00
2.60 1.25 3.25 3/8" 2 1.00 2.00
4.50 3.20 14.40 3/8" 2 7.20 14.40
2.40 3.10 7.44 3/8" 2 1.00 2.00
4.50 3.20 14.40 3/8" 2 1.00 2.00
1.60 1.20 1.92 1/2" 2 2.15 4.30
2.20 1.20 2.64 3/8" 2 7.20 14.40
2.40 1.00 2.40 3/8" 2 1.00 2.00
2.20 1.20 2.64 3/8" 2 1.00 2.00
1.60 1.20 1.92 1/2" 2 2.15 4.30
4.50 3.20 14.40 3/8" 2 7.20 14.40
2.40 3.20 7.68 3/8" 2 1.00 2.00
4.50 3.20 14.40 3/8" 2 1.00 2.00
4.50 3.20 14.40 1/2" 2 2.15 4.30
2.40 3.10 7.44 3/8" 2 7.20 14.40
4.50 3.20 14.40 3/8" 2 1.00 2.00
1.60 1.20 1.92 3/8" 2 1.00 2.00
2.20 1.20 2.64 1/2" 2 2.15 4.30
2.40 2.65 6.36 3/8" 1 7.20 7.20
3.95 2.85 11.26 3/8" 1 3.40 3.40
1.50 0.55 0.83 3/8" 1 3.45 3.45
4.50 3.20 14.40 3/8" 1 1.30 1.30
2.40 1.80 4.32 1/2" 1 1.80 1.80
4.50 1.80 8.10
4.50 3.20 14.40 3/8" 26 1.00 26.00
2.40 2.75 6.60 3/8" 26 8.50 221.00

Pgina 55 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
4.50 2.95 13.28 3/8" 26 8.45 219.70
1.60 1.20 1.92 3/8" 26 8.45 219.70
2.20 1.20 2.64 3/8" 26 3.75 97.50
2.40 2.85 6.84 3/8" 26 1.00 26.00
3.00 2.85 8.55 1/2" 26 3.50 91.00
0.50 2.70 1.35 1/2" 26 2.15 55.90
1.55 0.45 0.70 1/2" 26 3.50 91.00
4.50 3.20 14.40 1/2" 26 2.15 55.90
2.70 3.15 8.51 1/2" 26 3.50 91.00
1.80 3.15 5.67 1/2" 26 2.15 55.90
2.40 4.70 11.28
3.00 4.70 14.10 3/8" 4 3.00 12.00
0.95 4.70 4.47 3/8" 4 0.95 3.80
3/8" 4 0.95 3.80
3/8" 9 3.00 27.00
3/8" 9 0.95 8.55
3/8" 9 0.95 8.55
3/8" 3 3.00 9.00
3/8" 3 0.95 2.85
3/8" 3 0.95 2.85
3/8" 9 3.00 27.00
3/8" 9 0.95 8.55
3/8" 9 0.95 8.55
3/8" 8 3.00 24.00
3/8" 8 0.95 7.60
3/8" 8 0.95 7.60
3/8" 7 3.00 21.00
3/8" 7 0.95 6.65
3/8" 7 0.95 6.65
3/8" 5 3.00 15.00
3/8" 5 0.95 4.75
3/8" 5 0.95 4.75
3/8" 8 3.00 24.00
3/8" 8 0.95 7.60
3/8" 8 0.95 7.60
3/8" 8 3.00 24.00
3/8" 8 0.95 7.60
3/8" 8 0.95 7.60
3/8" 4 3.00 12.00

Pgina 56 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 4 0.95 3.80
3/8" 4 0.95 3.80
3/8" 9 3.20 28.80
3/8" 9 1.35 12.15
3/8" 9 1.35 12.15
1/2" 9 4.90 44.10

Pabelln 3 pisos 1.40 3.60 5.04 3/8" 6 1.20 7.20


3.90 3.60 14.04 3/8" 6 1.20 7.20
2.55 2.12 5.41 3/8" 6 3.20 19.20
2.55 1.33 3.39 3/8" 6 4.75 28.50
1.40 0.85 1.19
0.85 0.30 0.26 3/8" 6 1.35 8.10
3.90 2.40 9.36 3/8" 6 1.35 8.10
2.55 2.40 6.12 1/2" 6 4.50 27.00
2.05 3.60 7.38
2.40 3.60 8.64 3/8" 7 1.20 8.40
0.80 2.60 2.08 3/8" 7 1.20 8.40
1.75 2.30 4.03 3/8" 7 1.75 12.25
4.50 2.30 10.35 3/8" 7 2.35 16.45
2.40 0.95 2.28 3/8" 7 1.60 11.20
4.50 0.95 4.28 3/8" 7 2.20 15.40
2.40 3.20 7.68 3/8" 7 3.80 26.60
1.45 3.20 4.64 1/2" 7 4.70 32.90
1.20 3.20 3.84 1/2" 7 4.50 31.50
4.50 2.05 9.23
4.50 0.90 4.05 3/8" 4 1.20 4.80
4.00 2.05 8.20 3/8" 4 1.75 7.00
4.00 2.40 9.60 3/8" 4 2.35 9.40
4.00 1.55 6.20 3/8" 4 3.40 13.60
4.00 1.20 4.80 3/8" 4 1.60 6.40
1.45 1.20 1.74 3/8" 4 4.50 18.00
1.80 2.10 3.78 3/8" 4 1.20 4.80
2.45 1.20 2.94 3/8" 4 3.80 15.20
3.65 1.75 6.39 3/8" 4 5.55 22.20
4.50 2.35 10.58 1/2" 4 4.25 17.00
4.25 0.95 4.04 1/2" 4 4.70 18.80

3/8" 3 1.55 4.65

Pgina 57 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 3 3.10 9.30
3/8" 3 1.75 5.25
3/8" 3 2.35 7.05
3/8" 3 1.45 4.35
3/8" 3 1.95 5.85
3/8" 3 1.85 5.55
3/8" 3 1.60 4.80
3/8" 3 2.10 6.30
3/8" 3 1.20 3.60
3/8" 3 2.05 6.15
3/8" 3 8.95 26.85
1/2" 3 4.65 13.95
1/2" 3 4.30 12.90

3/8" 5 0.90 4.50


3/8" 5 2.50 12.50
3/8" 5 2.80 14.00
3/8" 5 1.65 8.25
3/8" 5 1.85 9.25
3/8" 5 2.10 10.50
3/8" 5 1.60 8.00
3/8" 5 1.20 6.00
3/8" 5 9.20 46.00
3/8" 5 5.80 29.00
1/2" 5 4.10 20.50

3/8" 7 0.80 5.60


3/8" 7 1.65 11.55
3/8" 7 4.15 29.05
3/8" 7 1.65 11.55
3/8" 7 1.85 12.95
3/8" 7 3.25 22.75
3/8" 7 0.80 5.60
3/8" 7 10.20 71.40
3/8" 7 10.00 70.00

3/8" 2 1.30 2.60


3/8" 2 2.05 4.10
3/8" 2 1.65 3.30

Pgina 58 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 2 2.30 4.60
3/8" 2 0.90 1.80
3/8" 2 3.10 6.20
1/2" 2 2.75 5.50
1/2" 2 9.70 19.40

2do piso
Pabelln 2 pisos 3.20 1.08 3.46 2 3/8" 1 1.00 2.00
3.20 1.08 3.46 2 3/8" 1 1.00 2.00
3.20 1.08 3.46 2 3/8" 1 3.85 7.70
3.20 1.08 3.46
3.20 1.08 3.46 5 3/8" 1 1.00 5.00
3.20 1.08 3.46 5 3/8" 1 1.00 5.00
3.20 1.08 3.46 5 3/8" 1 2.15 10.75
1.12 2.00 2.24 5 3/8" 1 7.20 36.00
0.90 2.00 1.80
1.12 2.00 2.24 3/8" 1 1.80 1.80
0.90 2.00 1.80 3/8" 1 3.40 3.40
1.12 2.00 2.24 3/8" 1 2.20 2.20
0.90 2.00 1.80 1/2" 1 5.40 5.40
1.12 2.00 2.24
0.90 2.00 1.80 3/8" 1 1.00 1.00
1.12 2.00 2.24 3/8" 1 3.50 3.50
0.90 2.00 1.80 3/8" 1 2.15 2.15
1.12 2.00 2.24 3/8" 1 3.50 3.50
0.90 2.00 1.80 3/8" 1 2.15 2.15
1.12 2.00 2.24 3/8" 1 3.50 3.50
0.90 2.00 1.80 3/8" 1 2.15 2.15
2.60 1.20 3.12 3/8" 1 1.20 1.20
3.20 0.93 2.98 3/8" 1 8.50 8.50
3.20 0.93 2.98 3/8" 1 8.45 8.45
3.20 0.93 2.98 3/8" 1 8.45 8.45
3.20 0.93 2.98 3/8" 1 3.70 3.70
3.20 0.93 2.98
3.20 0.93 2.98 3/8" 1 1.00 1.00
3.20 0.93 2.98 3/8" 1 3.50 3.50
3.95 1.20 4.74 3/8" 1 2.15 2.15
3.95 1.20 4.74 3/8" 1 3.50 3.50
3.95 1.20 4.74 3/8" 1 2.25 2.25

Pgina 59 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2.40 2.35 5.64 3/8" 1 2.15 2.15
3.10 2.40 7.44 3/8" 1 1.90 1.90
3.73 2.40 8.95 3/8" 1 2.60 2.60
3.10 2.40 7.44 3/8" 1 1.20 1.20
2.70 2.40 6.48 3/8" 1 8.50 8.50
3.20 1.08 3.46 3/8" 1 8.50 8.50
3.20 1.08 3.46 3/8" 1 6.80 6.80
3.20 1.08 3.46 1/2" 1 5.35 5.35
3.20 1.08 3.46
3.20 1.08 3.46 3/8" 2 2.85 5.70
2.85 0.50 1.43 3/8" 2 3.50 7.00
1.50 0.55 0.83 3/8" 2 2.15 4.30
4.70 1.05 4.94 3/8" 2 3.50 7.00
3.20 0.93 2.98 3/8" 2 2.15 4.30
3.20 0.93 2.98 3/8" 2 3.50 7.00
3.20 0.93 2.98 3/8" 2 2.15 4.30
3.20 0.93 2.98 3/8" 2 1.00 2.00
3.20 0.93 2.98 3/8" 2 2.00 4.00
2.85 3.15 8.98 3/8" 2 8.45 16.90
4.70 3.00 14.10 3/8" 2 8.45 16.90
1.12 2.00 2.24 3/8" 2 8.45 16.90
0.90 2.00 1.80 3/8" 2 3.75 7.50
1.12 2.00 2.24
0.90 2.00 1.80 3/8" 2 2.85 5.70
1.12 2.00 2.24 3/8" 2 3.50 7.00
0.90 2.00 1.80 3/8" 2 2.15 4.30
1.12 2.00 2.24 3/8" 2 3.50 7.00
0.90 2.00 1.80 3/8" 2 2.15 4.30
1.12 2.00 2.24 3/8" 2 3.50 7.00
0.90 2.00 1.80 3/8" 2 2.15 4.30
3.95 1.20 4.74 3/8" 2 1.00 2.00
3.95 1.20 4.74 3/8" 2 2.00 4.00
2.60 1.25 3.25 3/8" 2 8.45 16.90
2.40 0.67 1.61 3/8" 2 8.45 16.90
3/8" 2 8.45 16.90
3/8" 2 3.75 7.50
1/2" 2 5.40 10.80
2 3/8" 4 3.00 24.00
2 3/8" 4 2.90 23.20

Pgina 60 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2 3/8" 5 4.20 42.00
2 3/8" 5 4.20 42.00
2 3/8" 5 4.20 42.00
2 3/8" 5 4.20 42.00
1 3/8" 5 4.20 21.00
1 3/8" 5 4.20 21.00
2 3/8" 5 2.65 26.50
2 3/8" 5 2.65 26.50
2 3/8" 5 2.65 26.50
2 3/8" 5 2.65 26.50
1 3/8" 5 2.65 13.25
1 3/8" 5 2.65 13.25

3/8" 5 2.60 13.00


3/8" 5 1.90 9.50
3/8" 5 2.60 13.00
3/8" 5 1.20 6.00
3/8" 5 4.80 24.00
1/2" 5 5.40 27.00

3/8" 6 1.30 7.80


3/8" 6 1.30 7.80

3/8" 6 2.55 15.30


3/8" 6 0.95 5.70
3/8" 6 0.95 5.70

3/8" 19 2.55 48.45


3/8" 19 0.95 18.05
3/8" 19 0.95 18.05

3/8" 17 2.55 43.35


3/8" 17 0.95 16.15
3/8" 17 0.95 16.15
Pabelln 3 pisos
1.40 3.60 5.04 3/8" 6 1.20 7.20
1.85 3.60 6.66 3/8" 6 1.20 7.20
4.50 3.60 16.20 3/8" 6 3.20 19.20
1.40 0.85 1.19 3/8" 6 4.75 28.50

Pgina 61 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
0.86 1.05 0.90
1.85 2.40 4.44 3/8" 6 1.35 8.10
1.80 2.40 4.32 3/8" 6 1.35 8.10
2.45 2.40 5.88 1/2" 6 4.50 27.00
1.05 2.40 2.52
2.05 3.60 7.38 3/8" 7 1.20 8.40
2.40 3.60 8.64 3/8" 7 1.20 8.40
1.70 3.20 5.44 3/8" 7 1.75 12.25
0.86 0.45 0.39 3/8" 7 2.35 16.45
2.30 2.80 6.44 3/8" 7 1.60 11.20
2.95 2.80 8.26 3/8" 7 2.20 15.40
1.80 4.50 8.10 3/8" 7 3.80 26.60
2.45 4.50 11.03 1/2" 7 4.70 32.90
1.05 4.50 4.73 1/2" 7 4.50 31.50
1.80 0.90 1.62
2.05 4.00 8.20 3/8" 4 1.20 4.80
2.40 4.00 9.60 3/8" 4 1.75 7.00
2.80 4.00 11.20 3/8" 4 2.35 9.40
1.80 3.10 5.58 3/8" 4 3.40 13.60
2.45 4.25 10.41 3/8" 4 1.60 6.40
1.05 4.25 4.46 3/8" 4 4.50 18.00
4.50 2.35 10.58 3/8" 4 1.20 4.80
3/8" 4 3.80 15.20
3/8" 4 5.55 22.20
1/2" 4 4.25 17.00
1/2" 4 4.70 18.80

3/8" 3 1.55 4.65


3/8" 3 3.10 9.30
3/8" 3 1.75 5.25
3/8" 3 2.35 7.05
3/8" 3 1.45 4.35
3/8" 3 1.95 5.85
3/8" 3 1.85 5.55
3/8" 3 1.60 4.80
3/8" 3 2.10 6.30
3/8" 3 1.20 3.60
3/8" 3 2.05 6.15
3/8" 3 8.95 26.85

Pgina 62 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
1/2" 3 4.65 13.95
1/2" 3 4.30 12.90

3/8" 5 0.90 4.50


3/8" 5 2.50 12.50
3/8" 5 2.80 14.00
3/8" 5 1.65 8.25
3/8" 5 1.85 9.25
3/8" 5 2.10 10.50
3/8" 5 1.60 8.00
3/8" 5 1.20 6.00
3/8" 5 9.20 46.00
3/8" 5 5.80 29.00
1/2" 5 4.10 20.50

3/8" 7 0.80 5.60


3/8" 7 1.65 11.55
3/8" 7 4.15 29.05
3/8" 7 1.65 11.55
3/8" 7 1.85 12.95
3/8" 7 3.25 22.75
3/8" 7 0.80 5.60
3/8" 7 10.20 71.40
3/8" 7 10.00 70.00

3/8" 2 1.30 2.60


3/8" 2 2.05 4.10
3/8" 2 1.65 3.30
3/8" 2 2.30 4.60
3/8" 2 0.90 1.80
3/8" 2 3.10 6.20
1/2" 2 2.75 5.50
1/2" 2 9.70 19.40
3er piso
Pabelln 3 pisos
4.10 3.70 15.17 3/8" 5 1.20 6.00
3.40 3.50 11.90 3/8" 5 1.20 6.00
4.50 3.50 15.75 1/2" 5 4.70 23.50
0.85 4.10 3.49

Pgina 63 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
0.85 3.40 2.89 3/8" 5 1.20 6.00
2.40 4.40 10.56 3/8" 5 1.55 7.75
2.40 1.05 2.52 1/2" 5 2.60 13.00
2.05 3.75 7.69 1/2" 5 4.40 22.00
1.80 3.75 6.75
3.40 3.75 12.75 3/8" 4 1.20 4.80
1.15 0.95 1.09 3/8" 4 2.25 9.00
1.15 1.90 2.19 3/8" 4 2.20 8.80
3.00 1.90 5.70 3/8" 4 9.00 36.00
1.70 3.10 5.27 1/2" 4 4.70 18.80
2.80 3.10 8.68 1/2" 4 2.65 10.60
0.45 0.85 0.38
1.15 0.95 1.09 3/8" 1 1.20 1.20
1.15 2.00 2.30 3/8" 1 1.20 1.20
3.00 2.00 6.00 1/2" 1 4.70 4.70
1.15 0.95 1.09
1.15 0.60 0.69 3/8" 8 1.20 9.60
3.00 0.60 1.80 3/8" 8 9.00 72.00
4.50 2.25 10.13 3/8" 8 1.20 9.60
2.05 4.00 8.20 3/8" 8 1.20 9.60
2.40 4.00 9.60 1/2" 8 4.70 37.60
2.80 4.00 11.20 1/2" 8 2.25 18.00
1.05 4.50 4.73 1/2" 8 2.20 17.60
1.05 4.25 4.46 1/2" 8 2.65 21.20
1/2" 8 4.30 34.40

3/8" 2 3.15 6.30


3/8" 2 9.70 19.40
3/8" 2 1.45 2.90
3/8" 2 1.20 2.40
3/8" 2 1.20 2.40
3/8" 2 3.10 6.20
1/2" 2 3.25 6.50
1/2" 2 4.85 9.70
1/2" 2 4.30 8.60

3/8" 8 1.45 11.60


3/8" 8 1.45 11.60
3/8" 8 0.85 6.80

Pgina 64 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3/8" 8 0.85 6.80
3/8" 8 2.85 22.80
3/8" 8 0.85 6.80
3/8" 8 0.85 6.80
3/8" 8 2.85 22.80
3/8" 8 0.85 6.80
3/8" 8 0.85 6.80
3/8" 8 2.85 22.80
3/8" 8 1.20 9.60
3/8" 8 1.20 9.60
1/2" 8 4.30 34.40

3/8" 2 1.25 2.50


3/8" 2 2.75 5.50
3/8" 2 2.30 4.60
3/8" 2 0.90 1.80
3/8" 2 7.80 15.60
1/2" 2 4.95 9.90

3/8" 10 1.20 12.00


3/8" 10 1.20 12.00
1/2" 10 4.85 48.50

1033.56 SUBTOTALES (ml) = 0.00 0.00 4306.65 1290.25 0.00 0.00 0.00
SUBTOTALES (kg) = 0.00 0.00 2411.72 1277.35 0.00 0.00 0.00 3689.07

CONCRETO F'C=210 KG/CM2 = 1033.56 0.087 89.90 m3 (aligerado)


89.90 m3

ENCOFRADO = 1033.56 m (aligerado)


1,033.56 m

LADRILLOS 30x30x15cm = 1033.56 8.33 8611.00 und (aligerado)


8,611.00 m

acero de temperatura (1.00 Kg/m) 1033.56 1.00 1033.56 Kg (temperatura)


acero de refierzo en viguetas 3689.07 Kg (viguetas)

Pgina 65 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
total acero 4,723.00 Kg

LOSA MACIZA.- CONCRETO 210 KG/CM2


3er piso
Pabelln 2 pisos
techos teatina 12 2.20 1.80 0.10 4.75 12 2.20 1.80 47.52 12 3/8" 11 1.95 257.40
12 5.80 0.10 6.96 12 3/8" 9 2.20 237.60

Pabelln 3 pisos 4.90 2.05 0.20 2.01 4.90 2.05 10.05 3/8" 11 5.60 61.60
1.05 1.55 0.20 0.33 1.05 1.55 1.63 3/8" 11 5.60 61.60
3/8" 24 2.95 70.80
3/8" 24 2.95 70.80
3/8" 7 1.95 13.65
3/8" 7 1.95 13.65
3/8" 5 2.45 12.25
3/8" 5 2.45 12.25
4.90 2.05 0.20 2.01 4.90 2.05 10.05 3/8" 11 5.60 61.60
1.05 1.55 0.20 0.33 1.05 1.55 1.63 3/8" 11 5.60 61.60
3/8" 24 2.95 70.80
3/8" 24 2.95 70.80
3/8" 7 1.95 13.65
3/8" 7 1.95 13.65
3/8" 5 2.45 12.25
3/8" 5 2.45 12.25

TOTAL= 9.42 TOTAL= 77.83 SUBTOTALES (ml) = 0.00 0.00 0.00 1128.20 0.00 0.00 0.00 0.00
SUBTOTALES (kg) = 0.0 0.0 0.0 631.8 0.0 0.0 0.0 0.0 632.00

ESCALERA.- CONCRETO 210 KG/CM2


Escalera
1er tramo 0.50 1.15 2.00 1.15 3/8" 10 1.45 14.50
2.80 0.24 2.00 1.34 2.80 2.00 5.60 1/2" 10 4.65 46.50
3.00 0.30 0.90 3/8" 10 4.65 46.50

Pgina 66 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
3.00 0.30 0.90 3/8" 24 2.00 48.00
11 0.15 2.00 3.30
1.63 0.15 4.45 1.08 1.63 4.45 7.23 3/8" 22 2.10 46.20
1.20 0.15 4.45 0.80 4.45 2.70 12.02 3/8" 22 2.10 46.20
3/8" 16 4.45 71.20
3/8" 14 1.50 21.00
3/8" 4 4.45 17.80
2do tramo 3.40 0.24 2.00 1.63 3.40 2.00 6.80 1/2" 10 4.65 46.50
3.50 0.30 1.05 3/8" 10 4.65 46.50
3.50 0.30 1.05 3/8" 24 2.00 48.00
11 0.15 2.00 3.30
3er tramo 3.40 0.24 2.00 1.63 3.40 2.00 6.80 1/2" 10 4.65 46.50
3.50 0.30 1.05 3/8" 10 4.65 46.50
3.50 0.30 1.05 3/8" 24 2.00 48.00
11 0.15 2.00 3.30
1.63 0.15 4.45 1.08 1.63 4.45 7.23 3/8" 16 4.45 71.20
1.20 0.15 4.45 0.80 4.45 2.70 12.02 3/8" 14 1.50 21.00
3/8" 4 4.45 17.80
4to tramo 3.40 0.24 2.00 1.63 3.40 2.00 6.80 1/2" 10 4.65 46.50
3.50 0.30 1.05 3/8" 10 4.65 46.50
3.50 0.30 1.05 3/8" 24 2.00 48.00
11 0.15 2.00 3.30

TOTAL= 11.16 TOTAL= 85.79 SUBTOTALES (ml) = 0.00 0.00 0.00 704.90 186.00 0.00 0.00 0.00
SUBTOTALES (kg) = 0.0 0.0 0.0 394.7 184.1 0.0 0.0 0.0 579.00

CISTERNA.- CONCRETO 210 KG/CM2


Base 4.40 2.40 0.15 1.58 2 3/8" 22 2.80 123.20
2 3/8" 13 4.80 124.80
Techo 4.40 2.40 0.15 1.58 4.40 2.40 10.56 2 3/8" 22 2.80 123.20
2 3/8" 13 4.80 124.80
Muros 4.40 2.45 0.15 1.62 4.40 2.45 10.78 2 3/8" 23 4.05 186.30
4.00 2.45 9.80 2 3/8" 23 4.05 186.30

Pgina 67 de 68
OBRAS DE CONCRETO ARMADO
PROYECTO: CONSTRUCCION DEL NUEVO MODULO TBC HOSPITAL CAYETANO HEREDIA
UBICACION: RIMAC - LIMA - LIMA 0.22 0.22 0.25 0.56 0.99 1.55 2.24 3.97
CONCRETO ENCOFRADO FIERRO LONGITUD (ML) total

CANT

CANT

CANT
PARTIDA MEDIDAS M3 MEDIDAS M2 DIAM CANT LONG 8mm N8 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
2 3/8" 13 5.20 135.20
2 3/8" 13 5.20 135.20
4.40 2.45 0.15 1.62 4.40 2.45 10.78 2 3/8" 23 4.05 186.30
4.00 2.45 9.80 2 3/8" 23 4.05 186.30
2 3/8" 13 5.20 135.20
2 3/8" 13 5.20 135.20
2.00 2.45 0.15 0.74 2.40 2.45 5.88 2 3/8" 11 4.05 89.10
2.00 2.45 4.90 2 3/8" 11 4.05 89.10
2 3/8" 13 2.80 72.80
2 3/8" 13 2.80 72.80
2.00 2.45 0.15 0.74 2.40 2.45 5.88 2 3/8" 11 4.05 89.10
2.00 2.45 4.90 2 3/8" 11 4.05 89.10
2 3/8" 13 2.80 72.80
2 3/8" 13 2.80 72.80

TOTAL= 7.87 TOTAL= 73.28 SUBTOTALES (ml) = 0.00 0.00 0.00 2429.60 0.00 0.00 0.00 0.00
SUBTOTALES (kg) = 0.0 0.0 0.0 1360.6 0.0 0.0 0.0 0.0 1361.00

Pgina 68 de 68