Documentos de Académico
Documentos de Profesional
Documentos de Cultura
INNOVENTIONS
WEST CENTRAL
EAST
06/07/17
1
GLOBE
ILLUMINATIONS
PROJECT
LOCATION
A. DAO
A. DAO
DISCIPLINE SHEET COUNT: 1
ID-110 6/17/17 COVER, DRAWING INDEX SITE LOCATION MAP
CIVIL
DISCIPLINE SHEET COUNT: 6
XC-101 6/17/17 EXISTING CONDITIONS
XC-102 6/17/17 DEMOLITION PLAN & EROSION CONTROL PLAN
C-111 6/17/17 SITE PLAN
C-211 6/17/17 GRADING & DRAINAGE PLAN
C-221 6/17/17 POND ENLARGEMENT AND DETAILS
C-401 6/17/17 DETAILS
C-402 6/17/17 DETAILS
C-404 6/17/17 DETAILS
FRANCE
EPCOT
Reason: I have reviewed this
document
Contact Info: kklueh@heery.com
Date: 2017.06.20 15:00:38-04'00'
Location: Printed copies of this C WFR09-04
document are not considered
signed and sealed and the
signature must be verified on any
electronic copies.
BID & CONSTRUCT
06/07/17
1
CIVIL ENGINEERING LEAD:
A. DAO
A. DAO
FRANCE
EPCOT
C WFR09-04
LEGEND:
LIMIT OF WORK
TREES TO BE REMOVED
NOTES:
5
1. CONTRACTOR SHALL COORDINATE PHASING AND SEQUENCING OF THE WORK
WITH WDW REPRESENTATIVES.
2. FDOT TYPE III SILT FENCE SHALL BE CONSTRUCTED PRIOR TO EARTH MOVING
ACTIVITIES. THE SILT FENCE SHALL ENCOMPASS ALL DISTURBED AREAS AND
6 5 REMAIN IN PLACE UNTIL ALL CONSTRUCTION HAS CEASED AND DISTURBED
AREAS STABILIZED.
06/07/17
PLAN INSPECTION AND MAINTENANCE FORM AFTER EVERY INSPECTION.
1
11 6. ALL EXCESS MATERIAL IS TO BE REMOVED FROM THE SITE AND PROPERLY
DISPOSED BY THE CONTRACTOR.
5
7. ALL ON-SITE STORAGE OF MATERIALS IS SUBJECT TO THE APPROVAL OF THE SITE
CONSTRUCTION MANAGER.
EX. 9
SUBSTATION 3 8. PROTECT EXISTING INLETS DURING CONSTRUCTION. MAINTAIN DRAINAGE ON THE
SITE AT ALL TIMES DURING CONSTRUCTION.
8
9. GUARD POSTS, FENCE POSTS, BOLLARDS AND THEIR FOOTINGS SHALL BE
4 REMOVED COMPLETELY.
7
10. VENTS, MANHOLES, VAULTS, ETC. SHALL BE DISPOSED OF AS DIRECTED.
11. CLEAN OUTS, WATER VALVES, ETC. SHALL REMAIN AND PROTECTED.
6
12. ALL ABOVE GROUND UTILITIES, ELECTRIC PANELS, ETC. PRESENTLY SERVICING
EQUIPMENT TO BE REMOVED OR RELOCATED SHALL ALSO BE REMOVED AND
RELOCATED.
1 13. PROTECT OTHER ABOVE GROUND UTILITIES THAT ARE TO REMAIN DURING
CONSTRUCTION.
2
1. CONEX CONTAINERS TO BE REMOVED BY OTHERS PRIOR TO
6 CONSTRUCTION.
2. SHED TO BE REMOVED BY OTHERS PRIOR TO CONSTRUCTION.
10 3. ENTERTAINMENT TRAILER REMOVED AND RELOCATED TO THE NORTH.
4. EXISTING SWITCHGEAR TO BE RELOCATED COORDINATE WITH RCES.
5. TRAILERS AND SHEDS TO REMOVED AND REPLACED SOUTH OF
MOROCCO AS SHOWN.
6. CONEXES TO BE RELOCATED SOUTH OF MOROCCO.
7. RELOCATE DUMPSTERS AND RECYCLED BIN.
8. RELOCATE BAILER.
9. RELOCATE COMPACTOR
1 10. TRAILERS TO BE REMOVED BY OTHERS PRIOR TO CONSTRUCTION
11. EXISTING PAVING MAY REMAIN BUT WILL REQUIRE TRENCHING FOR
UTILITY RELOCATION AND DEMOLITION. SEE SHEET XC-103 AND C-301
FRANCE
EPCOT
C WFR09-04
LEGEND:
PAVING-DRIVEWAY,
SIDEWALKS ETC.
PROPOSED GRAVEL
PARKING AREA
NOTES:
1. SCOPE TO INCLUDE TEMPORARY
PAVING OF ALL FIRE ACCESS AND
DELIVERY ROADS. SEE DETAIL 8/C401.
06/07/17
(APPROX. 26 SPACES)
FI
RELOCATED BAILER
CE
1
S
S
RELOCATED COMPACTOR
AD
D
AD AN
RO SS
SS CE
CE AC
AC RY
RE E
FI LIV
MOROCCO
DE
REORIENT EXISTING TRAILERS AS SHOWN.
RECONNECT ALL UTILITIES
A. DAO
A. DAO
DRY DETENTION POND #1
SEE C-221
FRANCE
EPCOT
C WFR09-04
LEGEND
PROPOSED CONTOURS
99.05 PROPOSED SPOT ELEVATION
BS BOTTOM OF SWALE
ST INLET #1 ME MATCH EXISTING GRADE
GRATE 104.50 FUTURE WORK UNDER
I.E. 102.00 SEPARATE PACKAGE M.E.S. MITERED END SECTION
40 LF 10" DIA HP HIGH POINT
ST @ 0.50%
MATCH EX FUTURE WORK UNDER
ELEV 104.60 SEPARATE PACKAGE
104.60 +
ST INLET #2 MATCH EX
+
GRATE 104.50 ELEV 104.77
+
I.E. 101.80
36 LF 10" DIA + EX FFE 104.89
ST @ 0.50% MATCH EX
ST INLET #3 ELEV 104.60
GRATE 104.40 +
I.E. 101.62
1%
106 LF 15" DIA
06/07/17
EXISTING FFE
ST @ 1.0% 103.20
MATCH EX.
+ ELEV 100.4
+
100.70 + 0.5% +
1%
1
ST INLET #13 BEGIN SWALE, +101.22
GRATE 101.20 ELEV 100.1
I.E. 97.45 MATCH EX. +
N: 45229.95 ELEV 101.1
EX. HIGH POINT
E: 21963.05
SUBSTATION 100.90 101.16 +
SWALE @ 0.5% 0.5 102.00
65 LF 15" DIA TO INLET %
ST @ 2.1% +
ST INLET #14 HIGH POINT +
GRATE 99.00 100.60 101.8
I.E. 96.00 4%
N: 45179.71 +
E: 22010.07 + DM #3
0.5
%
HIGH POINT
3%
85 LF 15" DIA 100.30
ST @ 1.15%
BOTTOM OF
ST INLET #32
+ SWALE,
GRATE 97.50
ELEV 99.1
I.E. 95.19 SWALE @ 0.5%
ST INLET #15 N: 45109.37 91 LF 12" DIA ST @ 0.50% TO INLET
GRATE 97.70 E: 22032.33
I.E. 95.00
N: 45099.68 ST INLET #31
E: 21970.44 GRATE 97.50
%
CONTROL STRUCTURE #1 BOTTOM OF
0.5
I.E. 94.73
SEE C-221 60 LF 15" DIA N: 45047.39 SWALE,
N: 45026.75 ST @ 1.0% E: 22104.14 ELEV 98.60
E: 21928.06 ST MANHOLE
RIM 97.70
I.E. 94.40 +
66 LF 15" DIA ST @ 0.5%
N: 45045.39
E: 22015.92
CROSSING UTILITIES
ST @ 1.0% BOTTOM OF
0.5
A. DAO
A. DAO
C- 21
M.E.S. SWALE,
4
ST INLET #5
40
CONTROL
1.2
STRUCTURE #3 E: 22214.52
SEE C-221 + MATCH EX.
ELEV. 98.25
0.5% FFE
DRY DETENTION 99.25
POND #2.
SEE C-221
94.25 H.P.
DRY DETENTION
POND #1. SEE C-221
+ 1%
50 LF 15" DIA FFE
@ 0.40% 70 LF 15" DIA 101.5
@ 0.40%
99.05
M.E.S.
I.E. 93.90
N: 44852.50
E: 22139.99
E: 22189.27
40
Heery InternationalInc.
100 East Pine Street,
Suite 300,
Orlando, Florida 32801
design 407.992.6300
EB 0005176
AA 0002293
PROJECT #
FRANCE
EPCOT
C WFR09-04
TOP OF BERM ELEV. 98.50
0.5
0%
M.E.S. I.E. 93.70
06/07/17
0.5
0%
1
0.50%
0.5
0%
+ 3H : 1V
+ 94.25
0.5
0%
3H : 1V
3H : 1V
0.50%
0.5
0%
Heery InternationalInc.
100 East Pine Street,
Suite 300,
Orlando, Florida 32801
design 407.992.6300
EB 0005176
AA 0002293
PROJECT #
FRANCE
CORE DRILL OPENING IN EXISTING
EPCOT
INLET, I.E. 89.40
CONTROL STRUCTURE #2
FDOT TYPE D INLET
GRATE 97.00
I..E (NW) 93.50 3" (DIA ORIFICE) C WFR09-04
I.E. (NW) 90.00 (12" DIA STORM)
SEE DETAIL 22 SHEET C-404.
6" DIA. GALVANIZED STEEL
POST FILLED W/ CONC.
COLOR TO BE SELECTED
BY OWNER
3'-6"
FINISH GRADE
ASPHALT CONCRETE
4'-0"
#5 REBAR, TYP. CONCRETE FOOTING
06/07/17
1
1 1 2" SUPERPAVE TYPE SP 12.5
FRANCE
EPCOT
C WFR09-04
TRAFFIC FLOW
30'
-0"
MIN
.
FDOT #4 COARSE
AGGREGATE FILTERED WATER
STAKES (2x4 WOOD) MAX.
SPACING 3'-0" O.C.
6" U.V. RESISTANT BLACK
FILTER FABRIC
U.V. RESISTANT RUNOFF WATER
16"
BLACK FILTER FABRIC WITH SEDIMENT
DROP INLET
. WITH GRATE
MIN
-0"
20' OVER GEOTEXTILE BURIED FILTER FABRIC
SEPARATION 8" MIN. (4"x4" TRENCH)
FABRIC PLAN VIEW
CROSS-SECTION
NOTES:
06/07/17
1
CIVIL ENGINEERING LEAD:
A. DAO
A. DAO
FRANCE
EPCOT
C WFR09-04
BID & CONSTRUCT
06/07/17
1
CIVIL ENGINEERING LEAD:
A. DAO
A. DAO
FRANCE
EPCOT
C WFR09-04