Está en la página 1de 2

OBRA: Rehabilitacion y Mejoramiento de la Carretera Pte.

Paucartambo - Oxapampa

REQUERIMIENTO DE EQUIPO MENSUAL


CLIENTE: MTC- Provias Nacional
LUGAR: Pasco - Oxapampa - Oxapampa
CONTRATISTA: Constructora Malaga Hnos. S.A.

ITEM DESCRIPCION Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06
COMBUSTIBLE A CONSUMIR
49.03 Autohormigonera 3500 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,707.68 1,707.68 1,707.68 1,707.68 1,707.68 1,707.68 1,707.68
49.04 Barredora mecanica 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 227.19 528.63 528.63 528.63 528.63 301.44 0.00
49.05 Camin Cisterna 5 0.00 0.00 0.00 913.25 2,067.05 2,067.05 3,175.65 7,509.85 7,509.85 7,509.85 6,479.55 5,566.30 2,134.60 2,134.60
49.06 Camin Imprimador, 178-210HP,1800 gal 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 302.92 704.84 704.84 704.84 704.84 401.92 0.00
49.07 Camin Plataforma 5 0.00 0.00 2,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 2,000.00 1,000.00 1,000.00 1,000.00 1,000.00
49.08 Camin Volquete 330HP, 15 M3 5 0.00 0.00 15,219.15 17,295.70 18,012.20 18,012.20 22,446.60 31,420.80 32,413.00 30,206.80 20,199.90 12,698.85 4,144.10 2,134.60
49.09 Camioneta 1 0.00 0.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 600.00 600.00 400.00
49.10 Cargador Frontal s/llantas 160HP 4.5 0.00 0.00 3,637.26 3,637.26 2,926.76 2,926.76 2,926.76 4,757.89 1,125.77 1,125.77 0.00 0.00 0.00 0.00
49.11 Compresora Neumtica 350PCM 5 0.00 0.00 438.40 438.40 438.40 438.40 438.40 438.40 438.40 438.40 0.00 0.00 0.00 0.00
49.12 Esparcidora de agregados 7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 703.36 703.36 703.36 703.36 703.36 0.00
49.13 Grupo Electrogeno 7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,424.22 0.00 0.00 0.00 0.00 0.00 0.00
49.14 Martillo perforador 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.15 Mezcladora de Concreto 11-12 pie3 0.5 0.00 0.00 0.00 365.31 365.31 365.31 365.31 365.31 365.31 365.31 365.31 0.00 0.00 0.00
49.16 Motobomba 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.17 Motoniveladora 125HP 5 0.00 0.00 0.00 0.00 1,153.80 1,153.80 2,262.40 4,462.00 4,462.00 4,462.00 3,431.70 3,431.70 0.00 0.00
49.18 MOTOSOLDADORA 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.19 NIVEL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.2 Planta de asfalto 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.21 Planta de Chancado 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.22 Excavadora s/orugas 170-250HP 1.1-2.75 yd3 6 0.00 0.00 3,823.62 3,823.62 3,823.62 3,823.62 3,823.62 5,248.74 5,248.74 4,427.16 1,425.12 0.00 0.00 0.00
49.23 Rodillo Neumtico 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.44 301.44 301.44 301.44 301.44 0.00
49.24 Rodillo Tandem 9 ton 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.44 301.44 301.44 301.44 301.44 0.00
49.25 Rodillo Vibratorio Liso Autoprop. 10 ton 3 0.00 0.00 0.00 0.00 1,384.53 1,384.53 2,714.85 5,073.75 5,073.75 5,073.75 3,837.36 3,837.36 0.00 0.00
49.26 Retroexcavadora s/llantas 4 0.00 0.00 234.76 434.76 2,124.16 2,124.16 2,124.16 2,124.16 2,124.16 1,689.40 1,689.40 0.00 0.00 0.00
49.27 Sierra Circular 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.31 TEODOLITO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.32 Track drill 7 0.00 0.00 613.76 613.76 613.76 613.76 613.76 613.76 613.76 613.76 0.00 0.00 0.00 0.00
49.33 Tractor S/orugas 280HP 7 0.00 0.00 3,502.38 3,502.38 4,903.15 4,903.15 4,903.15 6,327.37 3,502.38 3,502.38 0.00 0.00 0.00 0.00
49.34 TRAYLER CAMA BAJA 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.35 Zaranda 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.36 ZARANDA VIBRATORIA 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.37 Tractor S/orugas 160HP 5 0.00 0.00 219.20 219.20 1,373.00 1,373.00 1,373.00 2,403.30 2,403.30 2,403.30 1,153.80 1,153.80 0.00 0.00

9 Minibus 2 0.00 0.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00 1,200.00 1,200.00 1,200.00 800.00 800.00 800.00
10 Bus 45 pasajeros 3
Total Galones 546,009.50 0.00 0.00 32,688.53 38,243.64 46,185.74 46,185.74 54,167.66 81,407.35 76,127.81 70,665.27 46,429.53 33,335.40 12,395.98 8,176.88
Total S/ 10.4 0.00 0.00 339,960.71 397,733.86 480,331.64 480,331.64 563,343.61 846,636.39 791,729.17 734,918.76 482,867.11 346,688.16 128,918.19 85,039.55
OBRA: Rehabilitacion y Mejoramiento de la Carretera Pte. Paucartambo - Oxapampa

REQUERIMIENTO DE EQUIPO MENSUAL


CLIENTE: MTC- Provias Nacional
LUGAR: Pasco - Oxapampa - Oxapampa
0

ITEM DESCRIPCION Nov-05 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07


COMBUSTIBLE A CONSUMIR
49.03 Autohormigonera 3500 4 0.00 0.00 0.00 0.00 1,547.84 3,095.64 3,095.64
49.04 Barredora mecanica 3 0.00 0.00 0.00 0.00 0.00 434.61 781.23
49.05 Camin Cisterna 5 0.00 0.00 0.00 0.00 3,132.65 8,691.75 7,493.90
49.06 Camin Imprimador, 178-210HP,1800 gal 4 0.00 0.00 0.00 0.00 0.00 579.48 1,041.64
49.07 Camin Plataforma 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.08 Camin Volquete 330HP, 15 M3 5 0.00 0.00 0.00 6,391.30 15,526.30 26,449.50 21,674.15
49.09 Camioneta 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.10 Cargador Frontal s/llantas 160HP 4.5 0.00 0.00 0.00 862.33 2,453.72 378.90 0.00
49.11 Compresora Neumtica 350PCM 5 0.00 0.00 0.00 153.50 204.70 153.50 0.00
49.12 Esparcidora de agregados 7 0.00 0.00 0.00 0.00 0.00 0.00 808.78
49.13 Grupo Electrogeno 7 0.00 0.00 0.00 836.22 836.22 0.00 0.00
49.14 Martillo perforador 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.15 Mezcladora de Concreto 11-12 pie3 0.5 0.00 0.00 0.00 0.00 109.99 109.99 0.00
49.16 Motobomba 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.17 Motoniveladora 125HP 5 0.00 0.00 0.00 0.00 922.85 4,547.20 3,624.35
49.18 MOTOSOLDADORA 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.19 NIVEL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.2 Planta de asfalto 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.21 Planta de Chancado 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.22 Excavadora s/orugas 170-250HP 1.1-2.75 yd3 6 0.00 0.00 0.00 1,116.60 2,580.36 1,985.58 266.28
49.23 Rodillo Neumtico 3 0.00 0.00 0.00 0.00 0.00 0.00 346.62
49.24 Rodillo Tandem 9 ton 3 0.00 0.00 0.00 0.00 0.00 0.00 346.62
49.25 Rodillo Vibratorio Liso Autoprop. 10 ton 3 0.00 0.00 0.00 0.00 553.71 3,815.64 3,261.93
49.26 Retroexcavadora s/llantas 4 0.00 0.00 0.00 0.00 1,084.88 101.44 76.08
49.27 Sierra Circular 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.31 TEODOLITO 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.32 Track drill 7 0.00 0.00 0.00 214.90 286.58 214.90 0.00
49.33 Tractor S/orugas 280HP 7 0.00 0.00 0.00 1,303.47 1,029.56 589.40 0.00
49.34 TRAYLER CAMA BAJA 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.35 Zaranda 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.36 ZARANDA VIBRATORIA 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49.37 Tractor S/orugas 160HP 5 0.00 0.00 0.00 0.00 2,002.05 922.85 0.00

9 Minibus 2 0.00 0.00 1,600.00 1,600.00 0.00 0.00


10 Bus 45 pasajeros 3
Total Galones 141,237.34 0.00 0.00 0.00 12,478.33 33,871.41 52,070.39 42,817.22
Total S/ 10.4 0.00 0.00 0.00 129,774.58 352,262.66 541,532.00 445,299.09
Gasolina - galones 1,000.00 300.00 300.00 300.00 100