PRESUPUESTO RESUMIDO Fecha : 02/06/10
01 BODEGA
01.01 ESTUDIOS, DISEOS
01.01 DISEO ARQUITECTONICO gl 1.0000 500,000.00 500,000.00
01.02 DISEO ESTRUCTURAL gl 1.0000 550,000.00 550,000.00
Total ESTUDIOS, DISEOS 1,050,000.00
01.02 PRELIMINARES
02.01 LOCALIZACION TRAZADO Y REPLANTEO dia 1.0000 505,247.00 505,247.00
02.02 DESCAPOTE TERRENO E=0.20 m3 20.0000 16,025.00 320,500.00
02.03 EXCAVACION MECANICA MATERIAL DE m3 20.0000 29,547.00 590,940.00
SITIO
02.04 RELLENO EN RECEBO B-200 COMPACTADO m3 20.0000 60,287.00 1,205,740.00
02.05 SEALIZACION Y DEMARCACION LOTES un 1.0000 250,000.00 250,000.00
INCLUYE LIMPIEZA (ROCERIA)
Total PRELIMINARES 2,872,427.00
01.03 CIMIENTOS EN CONCRETO
03.01 EXCAVACIN MANUAL PARA VIGAS Y m3 14.0000 15,850.00 221,900.00
ZAPATAS
03.02 RETIRO EN VOLQUETA DE MATERIAL m3 14.0000 20,326.00 284,564.00
PROVENIENTE DE LA EXCAVACIN DESDE EL
SITIO DE ACOPIO HASTA BOTADERO
AUTORIZADO (EN CASO DE NO SER
RETIRADO POR EL CONTRATANTE)
03.03 CONCRETO 2000 P.S.I. DE LIMPIEZA E=.05 m2 15.2100 24,835.00 377,740.00
03.04 CONCRETO CICLOPEO (40% PIEDRA 60% m3 4.5600 242,005.00 1,103,543.00
CONCRETO 3000 P.S.I.)
03.05 ZAPATAS CONCRETRO 3000 PSI + BOMBEO m3 4.5900 517,342.00 2,374,600.00
E=0.25 INCLUYE COMPACTACION DEL
MATERIAL DE RELLENO
03.06 VIGAS CIMIENTOS CONCRETRO 3000 PSI + m3 3.4200 517,342.00 1,769,310.00
BOMBEO E=0.40 INCLUYE COMPACTACION
DE MATERIAL DE RELLENO
03.07 SUMINISTRO E INSTALACION POLIETILENO ml 38.0000 2,055.00 78,090.00
03.08 PLACA CONTRAPISO CONCRETRO 3000 PSI + m2 121.0000 56,581.00 6,846,301.00
BOMBEO 0.10
Total CIMIENTOS EN CONCRETO 13,056,048.00
01.04 ESTRUCTURAS EN CONCRETO
04.01 COLUMNAS EN CONCRETRO 3000 PSI m3 3.4000 640,382.00 2,177,299.00
ACELERADO A 7 DIAS + BOMBEO INCLUYE
FORMALETA
04.02 VIGAS AEREAS CONCRETRO 3000 PSI m2 3.4200 517,342.00 1,769,310.00
INCLUYE FORMALETA
Total ESTRUCTURAS EN CONCRETO 3,946,609.00
01.05 ACEROS DE REFUERZO
05.01 ACERO 60000 kg 1,647.2600 2,797.00 4,607,386.00
05.02 MALLA ELECTRO SOLDADA .20X.20 kg 976.4700 3,128.00 3,054,398.00
Total ACEROS DE REFUERZO 7,661,784.00
01.06 MAMPOSTERIA
06.01 LADRILLO BLOQUE NUMERO 4 E=0.12 m2 137.0000 28,286.00 3,875,182.00
06.02 GRAFIL 4 MM kg 450.0000 2,745.00 1,235,250.00
06.03 ANCLAJE GRAFIL un 36.0000 9,330.00 335,880.00
Total MAMPOSTERIA 5,446,312.00
01.07 PISOS
PRODUCCIN TILAPIA EN CONSTRUCCIN BODEGA DE INSUMOS Pgina : 2
GEOMENBRANAS
PRESUPUESTO RESUMIDO Fecha : 02/06/10
SUBTOTAL 50,751,544.00