Está en la página 1de 9

HOJA DE METRADOS

07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1.00 KM
07.02.00 TRANSPORTE DE MATERIALES GRANULARES D > 1.00 KM
SUB BASE (e = 0.20 m. y 0.225 m.)

CANTERAS : PEA FLOR 2 Km. 33+529


CERRO EL RIPIO Km. 44+115

PROGRESIVA LONGITUD LONGITUD ANCHO AREA AREA S/A ESPESOR VOLUMEN VOL SUEL DIST CG A CANTERA ACCESO DIST TOTAL MOMENTO OBSERVACIONES
KM KM REAL (m.) M M M2 M2 M M3 M3 KM KM KM M3 KM
0+000 1+000 1,000.00 1,000.00 8.1000 8100.00 316.70 0.200 1,683.34 2,339.84 33.029 0.03 33.059 77352.85651
1+000 2+000 1,000.00 1,000.00 8.1000 8100.00 316.94 0.200 1,683.39 2,339.91 32.029 0.03 32.059 75015.15289
2+000 3+000 1,000.00 980.00 8.1000 7938.00 772.45 0.200 1,742.09 2,421.51 31.029 0.03 31.059 75209.5269 Badn Km. 2+518 de 20 m.
3+000 4+000 1,000.00 1,000.00 8.1000 8100.00 727.90 0.200 1,765.58 2,454.16 30.029 0.03 30.059 73769.48122
4+000 5+000 1,000.00 1,000.00 8.1000 8100.00 530.14 0.200 1,726.03 2,399.18 29.029 0.03 29.059 69717.74024
5+000 6+000 1,000.00 965.00 8.1000 7816.50 268.20 0.200 1,616.94 2,247.55 28.029 0.03 28.059 63063.91005 Badn Km. 5+589 y 5+715 de 15 y 20 m.
6+000 7+000 1,000.00 970.00 8.1000 7857.00 407.83 0.200 1,652.97 2,297.62 27.090 0.03 27.120 62311.52871 Badn Km. 6+184 de 30 m.
7+000 8+000 1,000.00 975.00 8.1000 7897.50 882.74 0.200 1,756.05 2,440.91 26.029 0.03 26.059 63607.58822 Badn Km. 7+675 de 25 m.
8+000 9+000 1,000.00 985.00 8.1000 7978.50 595.90 0.200 1,714.88 2,383.68 25.029 0.03 25.059 59732.71731 Badn Km. 8+386 de 15 m.
9+000 10+000 1,000.00 1,000.00 8.1000 8100.00 812.07 0.200 1,782.41 2,477.56 24.029 0.03 24.059 59607.50681
10+000 11+000 1,000.00 975.00 8.1000 7897.50 318.65 0.200 1,643.23 2,284.09 23.029 0.03 23.059 52668.82439 Badn Km. 10+277 de 25 m.
11+000 12+000 1,000.00 1,000.00 8.1000 8100.00 325.34 0.200 1,685.07 2,342.24 22.029 0.03 22.059 51667.57187
12+000 13+000 1,000.00 970.00 8.1000 7857.00 226.11 0.200 1,616.62 2,247.10 21.029 0.03 21.059 47321.77535 Badn Km. 12+232 de 30 m.
13+000 14+000 1,000.00 970.00 8.1000 7857.00 591.59 0.200 1,689.72 2,348.71 20.029 0.03 20.059 47112.73417 Badn Km. 13+726 de 30 m.
14+000 15+000 1,000.00 1,000.00 8.1000 8100.00 753.42 0.200 1,770.68 2,461.25 19.029 0.03 19.059 46908.97823
15+000 16+000 1,000.00 980.00 8.1000 7938.00 740.98 0.200 1,735.80 2,412.76 18.029 0.03 18.059 43571.96855 Badn Km. 15+710 de 20 m.
16+000 17+000 1,011.04 1,011.04 8.1000 8189.42 1,085.29 0.200 1,854.94 2,578.37 17.029 0.03 17.059 43984.42222
17+000 18+000 1,000.00 1,000.00 8.1000 8100.00 829.89 0.200 1,785.98 2,482.51 16.029 0.03 16.059 39866.61878
18+000 19+000 1,000.00 1,000.00 8.1000 8100.00 595.43 0.200 1,739.09 2,417.33 15.029 0.03 15.059 36402.56554
19+000 20+000 1,000.00 1,000.00 8.1000 8100.00 405.93 0.200 1,701.19 2,364.65 24.615 5.5 30.115 71211.39078
20+000 21+000 1,000.00 982.75 8.1000 7960.28 980.83 0.200 1,788.22 2,485.63 23.615 5.5 29.115 72369.03564 Badn Km. 20+785 de 20 m.
21+000 22+000 1,005.59 962.42 8.1000 7795.60 1,031.75 0.200 1,765.47 2,454.00 22.615 5.5 28.115 68994.31841 Badn Km. 21+050 de 40 m.
22+000 23+000 1,000.00 980.00 8.1000 7938.00 1,101.27 0.200 1,807.85 2,512.92 21.615 5.5 27.115 68137.74608 Badn Km. 22+860 de 20 m.
23+000 24+000 1,000.00 930.00 8.1000 7533.00 882.25 0.200 1,683.05 2,339.44 20.615 5.5 26.115 61094.46254 Badn Km. 23+304, 23+507 y 23+738 de 20, 25 y 25 m.
24+000 25+000 1,028.68 934.48 8.1000 7569.29 805.22 0.200 1,674.90 2,328.11 19.615 5.5 25.115 58470.56362
25+000 26+000 1,000.00 1,000.00 8.1000 8100.00 293.12 0.200 1,678.62 2,333.29 18.615 5.5 24.115 56267.22469
26+000 27+000 1,000.00 970.00 8.1000 7857.00 686.26 0.200 1,708.65 2,375.03 17.615 5.5 23.115 54898.73246 Badn Km. 26+355 de 30 m.
27+000 28+000 1,000.00 1,000.00 8.1000 8100.00 561.81 0.200 1,732.36 2,407.98 16.615 5.5 22.115 53252.54803
28+000 28+981.29 981.29 981.29 8.1000 7948.45 725.15 0.200 1,734.72 2,411.26 15.624 5.5 21.124 50935.46727
28+981.29 29+301.086 319.80 319.80
29+301.086 30+000 673.70 698.91 8.4250 5888.35 264.34 0.300 1,845.81 2,565.67 14.477 5.5 19.977 51254.4279
30+000 31+000 1,000.00 980.00 8.4250 8256.50 362.60 0.300 2,585.73 3,594.16 13.615 5.5 19.115 68702.45824 Badn Km. 30+845 de 20 m.
31+000 32+000 1,000.00 1,000.00 8.4250 8425.00 79.38 0.300 2,551.31 3,546.33 12.615 5.5 18.115 64241.70382
32+000 33+000 1,000.00 1,000.00 8.4250 8425.00 417.17 0.300 2,652.65 3,687.18 11.615 5.5 17.115 63106.16939
33+000 34+000 1,000.00 1,000.00 8.4250 8425.00 701.79 0.300 2,738.04 3,805.87 10.615 5.5 16.115 61331.61809
34+000 35+000 1,000.00 1,000.00 8.4250 8425.00 355.99 0.300 2,634.30 3,661.67 9.615 5.5 15.115 55346.18483
35+000 36+000 1,000.00 1,000.00 8.4250 8425.00 17.97 0.300 2,532.89 3,520.72 8.615 5.5 14.115 49694.94149
36+000 37+000 1,000.00 1,000.00 8.4250 8425.00 35.99 0.300 2,538.30 3,528.23 7.615 5.5 13.115 46272.77357
37+000 38+000 991.46 991.46 8.4250 8353.04 389.81 0.300 2,622.86 3,645.77 6.615 5.5 12.115 44168.49525
38+000 39+000 1,000.00 980.00 8.4250 8256.50 404.93 0.300 2,598.43 3,611.82 5.615 5.5 11.115 40145.33829 Badn Km. 38+821 de 20 m.
39+000 40+000 1,000.00 965.00 8.4250 8130.13 510.30 0.300 2,592.13 3,603.06 4.615 5.5 10.115 36444.92383 Badn Km.39+388 y 39+840 de 15 y 20 m.
40+000 41+000 1,000.00 985.00 8.4250 8298.63 93.03 0.300 2,517.50 3,499.32 3.615 5.5 9.115 31896.30303 Badn Km. 40+965 de 15 m.
41+000 42+000 1,000.00 980.00 8.4250 8256.50 245.86 0.300 2,550.71 3,545.48 2.615 5.5 8.115 28771.60363 Badn Km. 41+361 de 20 m.
42+000 43+000 1,000.00 1,000.00 8.4250 8425.00 0.00 0.300 2,527.50 3,513.23 1.615 5.5 7.115 24996.59588
43+000 44+000 1,000.00 1,000.00 8.4250 8425.00 23.47 0.300 2,534.54 3,523.01 0.615 5.5 6.115 21543.21832
44+000 44+176.766 176.77 176.77 8.4250 1489.29 25.01 0.300 454.29 631.46 0.027 5.5 5.527 3490.090216

44,188.32 43,598.92 22,498.80 88,396.81 122,871.57 2395931.803

D<= 1 Km. 122,871.57


ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1.00 KM
07.02.00 TRANSPORTE DE MATERIALES GRANULARES D > 1.00 KM
SUB BASE (e = 0.20 m. y 0.225 m.)

CANTERAS : PEA FLOR 2 Km. 33+529


CERRO EL RIPIO Km. 44+115

PROGRESIVA LONGITUD LONGITUD ANCHO AREA AREA S/A ESPESOR VOLUMEN VOL SUEL DIST CG A CANTERA ACCESO DIST TOTAL MOMENTO OBSERVACIONES
KM KM REAL (m.) M M M2 M2 M M3 M3 KM KM KM M3 KM
D> 1 Km. 2,273,123.98
Dist Media = 19.50

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1.00 KM
07.02.00 TRANSPORTE DE MATERIALES GRANULARES D > 1.00 KM

BASE (e = 0.15 m.)

CANTERA PEA FLOR 1 Km. 32+695

PROGRESIVA LONGITUD LONGITUD ANCHO AREA AREA S/A ESPESOR VOLUMEN VOL SUE DIST CG A CANTERA ACCESO DIST TOTAL MOMENTO OBSERVACIONES
KM KM REAL (M.) M M M2 M2 M M3 M3 KM KM KM M3 KM
0+000 1+000 1,000.00 1,000.00 7.30 7,300.00 316.70 0.15 1,142.51 1,588.08 32.195 0.02 32.215 51,160.06
1+000 2+000 1,000.00 1,000.00 7.30 7,300.00 316.94 0.15 1,142.54 1,588.13 31.195 0.02 31.215 49,573.54
2+000 3+000 1,000.00 980.00 7.30 7,154.00 772.45 0.15 1,188.97 1,652.66 30.195 0.02 30.215 49,935.27 Badn Km. 2+518 de 20 m.
3+000 4+000 1,000.00 1,000.00 7.30 7,300.00 727.90 0.15 1,204.19 1,673.82 29.195 0.02 29.215 48,900.57
4+000 5+000 1,000.00 1,000.00 7.30 7,300.00 530.14 0.15 1,174.52 1,632.58 28.195 0.02 28.215 46,063.36
5+000 6+000 1,000.00 965.00 7.30 7,044.50 268.20 0.15 1,096.91 1,524.70 27.195 0.02 27.215 41,494.65 Badn Km. 5+589 y 5+715 de 15 y 20 m.
6+000 7+000 1,000.00 970.00 7.30 7,081.00 407.83 0.15 1,123.32 1,561.42 26.195 0.02 26.215 40,932.65 Badn Km. 6+184 de 30 m.
7+000 8+000 1,000.00 975.00 7.30 7,117.50 882.74 0.15 1,200.04 1,668.05 25.195 0.02 25.215 42,059.88 Badn Km. 7+675 de 25 m.
8+000 9+000 1,000.00 985.00 7.30 7,190.50 595.90 0.15 1,167.96 1,623.46 24.195 0.02 24.215 39,312.19 Badn Km. 8+386 de 15 m.
9+000 10+000 1,000.00 1,000.00 7.30 7,300.00 812.07 0.15 1,216.81 1,691.37 23.195 0.02 23.215 39,265.08
10+000 11+000 1,000.00 975.00 7.30 7,117.50 318.65 0.15 1,115.42 1,550.44 22.195 0.02 22.215 34,442.96 Badn Km. 10+277 de 25 m.
11+000 12+000 1,000.00 1,000.00 7.30 7,300.00 325.34 0.15 1,143.80 1,589.88 21.195 0.02 21.215 33,729.38
12+000 13+000 1,000.00 970.00 7.30 7,081.00 226.11 0.15 1,096.07 1,523.53 20.195 0.02 20.215 30,798.21 Badn Km. 12+232 de 30 m.
13+000 14+000 1,000.00 970.00 7.30 7,081.00 591.59 0.15 1,150.89 1,599.74 19.195 0.02 19.215 30,738.91 Badn Km. 13+726 de 30 m.
14+000 15+000 1,000.00 1,000.00 7.30 7,300.00 753.42 0.15 1,208.01 1,679.14 18.195 0.02 18.215 30,585.50
15+000 16+000 1,000.00 980.00 7.30 7,154.00 740.98 0.15 1,184.25 1,646.10 17.195 0.02 17.215 28,337.67 Badn Km. 15+710 de 20 m.
16+000 17+000 1,011.04 1,011.04 7.30 7,380.59 1,085.29 0.15 1,269.88 1,765.14 16.195 0.02 16.215 28,621.69
17+000 18+000 1,000.00 1,000.00 7.30 7,300.00 829.89 0.15 1,219.48 1,695.08 15.195 0.02 15.215 25,790.67
18+000 19+000 1,000.00 1,000.00 7.30 7,300.00 595.43 0.15 1,184.31 1,646.20 14.195 0.02 14.215 23,400.69
19+000 20+000 1,000.00 1,000.00 7.30 7,300.00 405.93 0.15 1,155.89 1,606.69 13.195 0.02 13.215 21,232.36
20+000 21+000 1,000.00 982.75 7.30 7,174.08 980.83 0.15 1,223.24 1,700.30 12.195 0.02 12.215 20,769.14 Badn Km. 20+785 de 20 m.
21+000 22+000 1,005.59 962.42 7.30 7,025.67 1,031.75 0.15 1,208.61 1,679.97 11.195 0.02 11.215 18,840.88 Badn Km. 21+050 de 40 m.
22+000 23+000 1,000.00 980.00 7.30 7,154.00 1,101.27 0.15 1,238.29 1,721.22 10.195 0.02 10.215 17,582.30 Badn Km. 22+860 de 20 m.
23+000 24+000 1,000.00 930.00 7.30 6,789.00 882.25 0.15 1,150.69 1,599.46 9.195 0.02 9.215 14,738.98 Badn Km. 23+304, 23+507 y 23+738 de 20, 25 y 25 m.
24+000 25+000 1,028.68 934.48 7.30 6,821.70 805.22 0.15 1,144.04 1,590.21 8.195 0.02 8.215 13,063.61
25+000 26+000 1,000.00 1,000.00 7.30 7,300.00 293.12 0.15 1,138.97 1,583.17 7.195 0.02 7.215 11,422.54

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1.00 KM
07.02.00 TRANSPORTE DE MATERIALES GRANULARES D > 1.00 KM

BASE (e = 0.15 m.)

CANTERA PEA FLOR 1 Km. 32+695

PROGRESIVA LONGITUD LONGITUD ANCHO AREA AREA S/A ESPESOR VOLUMEN VOL SUE DIST CG A CANTERA ACCESO DIST TOTAL MOMENTO OBSERVACIONES
KM KM REAL (M.) M M M2 M2 M M3 M3 KM KM KM M3 KM
26+000 27+000 1,000.00 970.00 7.30 7,081.00 686.26 0.15 1,165.09 1,619.47 6.195 0.02 6.215 10,065.03 Badn Km. 26+355 de 30 m.
27+000 28+000 1,000.00 1,000.00 7.30 7,300.00 561.81 0.15 1,179.27 1,639.19 5.195 0.02 5.215 8,548.36
28+000 28+981.29 981.29 981.29 7.30 7,163.42 725.15 0.15 1,183.29 1,644.77 4.204 0.02 4.224 6,947.49
28+981.29 29+301.086 319.80 319.80 0.00
29+301.086 30+000 673.70 698.91 7.675 5,364.16 264.34 0.20 1,688.55 2,347.09 3.057 0.02 3.077 7,221.99
30+000 31+000 1,000.00 980.00 7.675 7,521.50 362.60 0.20 2,365.23 3,287.67 2.195 0.02 2.215 7,282.19 Badn Km. 30+845 de 20 m.
31+000 32+000 1,000.00 1,000.00 7.675 7,675.00 79.38 0.20 2,326.31 3,233.58 1.195 0.02 1.215 3,928.80
32+000 33+000 1,000.00 1,000.00 7.675 7,675.00 417.17 0.20 2,427.65 3,374.43 0.195 0.02 0.215 725.50
33+000 34+000 1,000.00 1,000.00 7.675 7,675.00 701.79 0.20 2,513.04 3,493.12 0.805 0.02 0.825 2,881.83
34+000 35+000 1,000.00 1,000.00 7.675 7,675.00 355.99 0.20 2,409.30 3,348.92 1.805 0.02 1.825 6,111.78
35+000 36+000 1,000.00 1,000.00 7.675 7,675.00 17.97 0.20 2,307.89 3,207.97 2.805 0.02 2.825 9,062.51

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1.00 KM
07.02.00 TRANSPORTE DE MATERIALES GRANULARES D > 1.00 KM

BASE (e = 0.15 m.)

CANTERA PEA FLOR 1 Km. 32+695

PROGRESIVA LONGITUD LONGITUD ANCHO AREA AREA S/A ESPESOR VOLUMEN VOL SUE DIST CG A CANTERA ACCESO DIST TOTAL MOMENTO OBSERVACIONES
KM KM REAL (M.) M M M2 M2 M M3 M3 KM KM KM M3 KM
36+000 37+000 1,000.00 1,000.00 7.675 7,675.00 35.99 0.20 2,313.30 3,215.48 3.805 0.02 3.825 12,299.22
37+000 38+000 991.46 991.46 7.675 7,609.45 389.81 0.20 2,399.78 3,335.69 4.805 0.02 4.825 16,094.71
38+000 39+000 1,000.00 980.00 7.675 7,521.50 404.93 0.20 2,377.93 3,305.32 5.805 0.02 5.825 19,253.50 Badn Km. 38+821 de 20 m.
39+000 40+000 1,000.00 965.00 7.675 7,406.38 510.30 0.20 2,375.00 3,301.25 6.805 0.02 6.825 22,531.05 Badn Km.39+388 y 39+840 de 15 y 20 m.
40+000 41+000 1,000.00 985.00 7.675 7,559.88 93.03 0.20 2,295.87 3,191.26 7.805 0.02 7.825 24,971.62 Badn Km. 40+965 de 15 m.
41+000 42+000 1,000.00 980.00 7.675 7,521.50 245.86 0.20 2,330.21 3,238.99 8.805 0.02 8.825 28,584.08 Badn Km. 41+361 de 20 m.
42+000 43+000 1,000.00 1,000.00 7.675 7,675.00 0.00 0.20 2,302.50 3,200.48 9.805 0.02 9.825 31,444.67
43+000 44+000 1,000.00 1,000.00 7.675 7,675.00 23.47 0.20 2,309.54 3,210.26 10.805 0.02 10.825 34,751.09
44+000 44+176.77 176.77 176.77 7.675 1,356.71 25.01 0.20 414.52 576.18 11.393 0.02 11.413 6,575.91

44,188.32 43,598.92 69,173.86 96,151.66 1,092,074.05

D<= 1 Km. 96,151.66


D> 1 Km. 996,131.19
Dist Media = 11.36

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1 KM.
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D > 1 KM.

TRATAMIENTO SUPERFICIAL BI CAPA

CANTERA: SANTA CLARA Km. 44.115

PROGRESIVA LONGITUD LONGITUD ANCHO AREA SOBREANCHO TOTAL VOLUMEN VOL SUEL DIST CG A CANTERA ACCESO DIST TOTAL MOMENTO
KM KM REAL (M) M M M2 M2 M2 M3 M3 KM KM KM M3 KM
0+000 1+000 1,000.00 1,000.00 7.0375 7037.50 316.70 7354.20 235.33 327.11 44.065 6.80 50.87 16638.6951
1+000 2+000 1,000.00 1,000.00 7.0375 7037.50 316.94 7354.44 235.34 327.13 43.065 6.80 49.87 16312.1126
2+000 3+000 1,000.00 980.00 7.0375 6896.75 772.45 7669.20 245.41 341.13 42.065 6.80 48.87 16669.1228
3+000 4+000 1,000.00 1,000.00 7.0375 7037.50 727.90 7765.40 248.49 345.40 41.065 6.80 47.87 16532.8099
4+000 5+000 1,000.00 1,000.00 7.0375 7037.50 530.14 7567.64 242.16 336.61 40.065 6.80 46.87 15775.1633
5+000 6+000 1,000.00 965.00 7.0375 6791.19 268.20 7059.39 225.90 314.00 39.065 6.80 45.87 14401.6814
6+000 7+000 1,000.00 970.00 7.0375 6826.38 407.83 7234.21 231.49 321.78 38.065 6.80 44.87 14436.5448
7+000 8+000 1,000.00 975.00 7.0375 6861.56 882.74 7744.30 247.82 344.47 37.065 6.80 43.87 15110.0263
8+000 9+000 1,000.00 985.00 7.0375 6931.94 595.90 7527.84 240.89 334.84 36.065 6.80 42.87 14352.84
9+000 10+000 1,000.00 1,000.00 7.0375 7037.50 812.07 7849.57 251.19 349.15 35.065 6.80 41.87 14617.1176
10+000 11+000 1,000.00 975.00 7.0375 6861.56 318.65 7180.21 229.77 319.38 34.065 6.80 40.87 13051.2942
11+000 12+000 1,000.00 1,000.00 7.0375 7037.50 325.34 7362.84 235.61 327.50 33.065 6.80 39.87 13055.7525
12+000 13+000 1,000.00 970.00 7.0375 6826.38 226.11 7052.49 225.68 313.69 32.065 6.80 38.87 12191.738
13+000 14+000 1,000.00 970.00 7.0375 6826.38 591.59 7417.97 237.37 329.95 31.065 6.80 37.87 12493.5978
14+000 15+000 1,000.00 1,000.00 7.0375 7037.50 753.42 7790.92 249.31 346.54 30.065 6.80 36.87 12775.2016
15+000 16+000 1,000.00 980.00 7.0375 6896.75 740.98 7637.73 244.41 339.73 29.065 6.80 35.87 12184.2813
16+000 17+000 1,011.04 1,011.04 7.0375 7115.19 1,085.29 8200.48 262.42 364.76 28.065 6.80 34.87 12717.2712
17+000 18+000 1,000.00 1,000.00 7.0375 7037.50 829.89 7867.39 251.76 349.94 27.065 6.80 33.87 11850.7691
18+000 19+000 1,000.00 1,000.00 7.0375 7037.50 595.43 7632.93 244.25 339.51 26.065 6.80 32.87 11158.0858
19+000 20+000 1,000.00 1,000.00 7.0375 7037.50 405.93 7443.43 238.19 331.08 25.065 6.80 31.87 10549.9842
20+000 21+000 1,000.00 982.75 7.0375 6916.10 980.83 7896.93 252.70 351.26 24.065 6.80 30.87 10841.5036
21+000 22+000 1,005.59 962.42 7.0375 6773.03 1,031.75 7804.78 249.75 347.16 23.065 6.80 29.87 10367.8333
22+000 23+000 1,000.00 980.00 7.0375 6896.75 1,101.27 7998.02 255.94 355.75 22.065 6.80 28.87 10268.7794
23+000 24+000 1,000.00 930.00 7.0375 6544.88 882.25 7427.13 237.67 330.36 21.065 6.80 27.87 9205.44016
24+000 25+000 1,028.68 934.48 7.0375 6576.40 805.22 7381.62 236.21 328.33 20.065 6.80 26.87 8820.70879
25+000 26+000 1,000.00 1,000.00 7.0375 7037.50 293.12 7330.62 234.58 326.07 19.065 6.80 25.87 8433.69651
26+000 27+000 1,000.00 970.00 7.0375 6826.38 686.26 7512.64 240.40 334.16 18.065 6.80 24.87 8308.93825
27+000 28+000 1,000.00 1,000.00 7.0375 7037.50 561.81 7599.31 243.18 338.02 17.065 6.80 23.87 8066.78307
28+000 28+981.29 981.29 981.29 7.0375 6905.83 725.15 7630.98 244.19 339.43 15.624 6.80 22.42 7611.28679
28+981.29 29+301.086 319.80 319.80
29+301.086 30+000 673.70 698.91 7.3375 5128.28 264.34 5392.62 172.56 239.86 14.477 6.80 21.28 5103.58214
30+000 31+000 1,000.00 980.00 7.3375 7190.75 362.60 7553.35 241.71 335.97 13.615 6.80 20.42 6858.88896
31+000 32+000 1,000.00 1,000.00 7.3375 7337.50 79.38 7416.88 237.34 329.90 12.615 6.80 19.42 6405.0633
32+000 33+000 1,000.00 1,000.00 7.3375 7337.50 417.17 7754.67 248.15 344.93 11.615 6.80 18.42 6351.84399
33+000 34+000 1,000.00 1,000.00 7.3375 7337.50 701.79 8039.29 257.26 357.59 10.615 6.80 17.42 6227.38839
34+000 35+000 1,000.00 1,000.00 7.3375 7337.50 355.99 7693.49 246.19 342.21 9.615 6.80 16.42 5617.31863
35+000 36+000 1,000.00 1,000.00 7.3375 7337.50 17.97 7355.47 235.38 327.17 8.615 6.80 15.42 5043.34568
36+000 37+000 1,000.00 1,000.00 7.3375 7337.50 35.99 7373.49 235.95 327.97 7.615 6.80 14.42 4727.72842
37+000 38+000 991.46 991.46 7.3375 7274.83 389.81 7664.64 245.27 340.92 6.615 6.80 13.42 4573.4848
38+000 39+000 1,000.00 980.00 7.3375 7190.75 404.93 7595.68 243.06 337.86 5.615 6.80 12.42 4194.48033
39+000 40+000 1,000.00 965.00 7.3375 7080.69 510.30 7590.99 242.91 337.65 4.615 6.80 11.42 3854.24192
40+000 41+000 1,000.00 985.00 7.3375 7227.44 93.03 7320.47 234.25 325.61 3.615 6.80 10.42 3391.27392
41+000 42+000 1,000.00 980.00 7.3375 7190.75 245.86 7436.61 237.97 330.78 2.615 6.80 9.42 3114.29759
42+000 43+000 1,000.00 1,000.00 7.3375 7337.50 0.00 7337.50 234.80 326.37 1.615 6.80 8.42 2746.42038
43+000 44+000 1,000.00 1,000.00 7.3375 7337.50 23.47 7360.97 235.55 327.42 0.615 6.80 7.42 2427.78924
44+000 44+176.77 176.77 176.77 7.3375 1297.05 25.01 1322.06 42.31 58.81 0.027 6.80 6.83 401.463259

44,188.32 43,598.92 331,502.77 10,608.09 14,745.24 429,837.67

D<= 1 Km. 14,745.24


D> 1 Km. 415,078.60

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1 KM.
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D > 1 KM.

TRATAMIENTO SUPERFICIAL BI CAPA

CANTERA: SANTA CLARA Km. 44.115

PROGRESIVA LONGITUD LONGITUD ANCHO AREA SOBREANCHO TOTAL VOLUMEN VOL SUEL DIST CG A CANTERA ACCESO DIST TOTAL MOMENTO
KM KM REAL (M) M M M2 M2 M2 M3 M3 KM KM KM M3 KM
Dist Media = 29.15

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
07.00.00 TRANSPORTE
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D < = 1 KM.
07.01.00 TRANSPORTE DE MATERIALES GRANULARES D > 1 KM.

TRATAMIENTO SUPERFICIAL BI CAPA

OBSERVACIN

Badn Km. 2+518 de 20 m.

Badn Km. 5+589 y 5+715 de 15 y 20 m.


Badn Km. 6+184 de 30 m.
Badn Km. 7+675 de 25 m.
Badn Km. 8+386 de 15 m.

Badn Km. 10+277 de 25 m.

Badn Km. 12+232 de 30 m.


Badn Km. 13+726 de 30 m.

Badn Km. 15+710 de 20 m.

Badn Km. 20+785 de 20 m.


Badn Km. 21+050 de 40 m.
Badn Km. 22+860 de 20 m.
Badn Km. 23+304, 23+507 y 23+738 de 20, 25 y 25 m.

Badn Km. 26+355 de 30 m.

Badn Km. 30+845 de 20 m.

Badn Km. 38+821 de 20 m.


Badn Km.39+388 y 39+840 de 15 y 20 m.
Badn Km. 40+965 de 15 m.
Badn Km. 41+361 de 20 m.

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
SUB BASE BASE TRATAMIENTO VOL TOTAL
D<= 1 Km. 122,871.57 96,151.66 14,745.24 233,768.47
D> 1 Km. 2,273,123.98 996,131.19 415,078.60 3,684,333.77

También podría gustarte