Documentos de Académico
Documentos de Profesional
Documentos de Cultura
City
Phone:Off.
PIN
Res
Founder Chairman :
Late Mr. A. Nagabhushan Rao Quantity Surveying,
Fax
Ex-Officio :
Mr. H. Viswanatha Rao
Mr. H.K. Nanjundaswamy
Estimation, Costing
E-mail Mr. Umesh B. Rao,
Date Signature
1st Floor , UVCE Alumni Association Building ,
Please draw local cheque or D. D. in favour of
K R Circle, Bangalore 560 001.
INSTRUCT Bangalore only,
Ph: 080 -22243257 , 22294291 , 22106047
Outstation cheque not accepted. Mob: 8494943501& 8494943503
Photo copies of the form may be used Email : director@instructindia.org, admin@instructindia.org INSTITUTE FOR RESEARCH, DEVELOPMENT AND
Website: www.instructindia.org TRAINING OF CONSTRUCTION TRADES AND MANAGEMENT
INTRODUCTION COURSE COVERAGE
Quantity Surveying: Quantity Surveying is the G Introduction: Quantity Surveyor as a coveted FACULTY
profession-Global Scenario
earlier term adopted for working out or Faculty members for this course will be experts from
G Mensuration : Basic Formulae & Practical leading Professionals, Consultancy Firms of
measuring quantities of a building or a work, Applications to Civil Engineering Measurements Construction Industry.
based on a standard method of measurements G Types of Estimates:
priced give the estimated cost of a building or B) Detailed & their Methodologies WHO CAN BE BENEFIT :
G Use of CBRI Formulae & Building Cost Index for Executives, Project Planning Engineers, Quantity
the work to reasonable degree of accuracy. In estimations Surveyors, Construction Site & project Engineers &
order words we record or measure, all the All Civil Engineer Diploma / Graduates & AMIE
G Methods of Estimating & Tendering
students Architects, Builders & Developers,
materials & labour involved in the construction G Factor influencing finalization of Tender Consultants and Engineers also can be attend this
course.
of a building or a work, so that we have G Data Required for Estimates
quantities in appropriate units against which G Tenders: Clauses of Contract Discussion with
examples, like Escalation, Labour Laws, Safety COURSE FEE :
prices can be appended. Today, QS envisages Codes, General& Special Conditions & their Rs. 10,000/- (Service Tax Extra)
Implications FIDIC Clauses (Course fee includes Pen, Pad, copy of the course
a lot more of activities.
G Principles of Depreciation, Costing & Hire material, refreshments)
Charges for Machinery
G Types of Contracts , Valid Contracts .
Concession :
Role of Quantity Surveyor : Quantity
10% per participant for those organizations who
G Breach of Contract and Arbitration
Surveyors can offer their services to the project deputes 3 or more participants
G Mode of Measurement: as per BIS for various
term on all aspects of project like planning, 10% Discount for Member - INSTRUCT ,
components of Building. ACCE(I), ICI
Cash Flow Management, Estimating at all G Bill of Quantities 10% Discount for & Students from Engineering
steps of projects, quantifying, cost control, and G Analysis of Rates for estimating quoting and Colleges
working out substituted and non tendering items
Risk Analysis & Strategic Management. They
G Specification and its interrelationship with rate
are also thorough in quality aspects of analysis
6 Weeks Evening Course
construction and specifications needed to work G Lean Construction (Principles)
out the realistic rate analysis. G Working Capital, S Curves & Budgeting. 30 May 2016 to 11 July 2016
G Estimation of Service components likes, 6.30 pm to 8.30 pm (Monday to Friday)
Plumbing
Quantity Surverying are need by Architects, at INSTRUCT LECTURE HALL
Electrical 1st Floor, UVCE Alumni Association Building,
Consultants, Contractors, etc...
HVAC K.R. Circle, Bangalore-560 001
G Methods of Valuation: brief discussion