METODO ESTATICO EQUIVALENTE

Vigas

V7= (0.25m)(0.50m)(7m)(2.4ton/m3)= 2.1ton


V4= (0.25m)(0.50m)(7m)(2.4ton/m3)= 1.2ton
V5= (0.25m)(0.50m)(8m)(2.4ton/m3)= 1.5ton

Vigas del eje #4

V7= (0.25m)(0.70m)(7m)(2.4ton/m3)= 2.94ton

Columnas

C-1(3)= (0.40m)(0.40m)(3m)(2.4ton/m3)= 1.152ton


C-1(4)= (0.40m)(0.40m)(4m)(2.4ton/m3)= 1.536ton

Losa de entrepiso

LE= (21m)(13m)(0.15)(2.4ton/m3)= 98.28ton

Centro de masa
[(1.2)(2)(21+14+7)]+[(1.5)(21+14+7)]+[(1.152)(4)(21+14+7)]+[(98.28)(10.5)]
x= [(1.2)(2)(4)]+[(1.5)(4)]+[(1.152)(16)]+98.28

x=10.5m
[(2.1)(3)(13+9+4)]+[(1.152)(4)(13+9+4)]+[(98.28)(6.5)]
y= [(2.1)(3)(3)]+[(2.94)(3)]+[(1.152)(16)]+98.28

y= 6.3865m

Centro de gravedad

(10.5m ,6.5m)

Centro de masa

(10.5m,6.38m)

Peso de la estructura (CV)


Carga viva para azotea= 640kg/m2
Carga viva para entrepiso(Edificio de oficina)= 790kg/m2
Azotea

(21)(13m)(640kg/m2)= 174,720kg= 175ton

Entrepiso

(21m)(13m)(790kg/m2)= 215,670kg= 216ton

Carga total

175ton+[(216ton)(7emtrepisos)]= 1,687ton

Condiciones de regularidad

25
= = 1.92 < 2.5
13
21
= = 1.61 < 2.5
13
Excentricidad torsional

1
100 = 7.69% < 10%
13
Coeficiente ssmico

(2.7 )
=

0=0.2
=2
S=1
Para Csx Q=1
Para Csy Q=1.5
1(2.7 0.2)
= = 0.27
(1)(2)

1(2.7 0.2)
= = . 18
(1.5)(2)

0.18 es menor a s(0 ), trabajar con Csy: 0.20


NIVEL HI WI WIHI FSXI VXI FSYI VYI
8 25 175 4375 82.9249 82.9249 61.4258 61.4258
azotea
7 22 216 4752 90.0706 172.9955 66.7190 128.1448
6 19 216 4104 77.7883 250.7838 57.6209 185.7657
5 16 216 3456 65.5059 316.2897 48.5229 234.2886
4 13 216 2808 53.2235 369.5132 39.4248 273.7134
3 10 216 2160 40.9412 410.4544 30.3268 304.0402
2 7 216 1512 28.6588 439.1132 21.2287 325.2689
1 4 216 864 16.3764 455.4896 12.1307 337.3996
1,687 24,031.000

Imagen 1
Calculo de inercia

Vigas

Iv(eje4)= 1/12(25cm)(70)3=714,583.3333cm4= 7.14583 103 4


Iv= 1/12(25cm)(50)3 = 260,416.66674 = 7.14583 103 4

Columnas
= 1/12(40)4 = 213333.33334 = 2.13333 103 4

Losa de entrepiso

= 1/12(1300)(2100)3 = 1.003275 1012 4


= 1/12(2100)(1300)3 = 384,475,000,0004

Rigidez relativa Eje X

714,583.33334
7( 4) = = 1020.83333
700
260,416.66674
7 = = 372.02383
700
Rigidez relativa Eje Y

260,416.66674
4 = = 651.041653
400
260,416.66674
5 = = 520.833323
500
Columnas

213,333.3334
3 = = 711.11113
300
213,333.3334
4 = = 533.33333
400

Calculo de la rigidez por la ecuacin de Wilbor

48
1 =
(4)(300) 600 600
300 [ ] + [3 372.0238] + [1,116.0714]
(4)(711.1111)
R1=0.1069E

R1=R2=R3

48
4 =
(4)(300) 600 600
300 [ ] + [3 1020.8333] + [3,062.499]
(4)(711.1111)

R4=0.1966E

RA=1.5E

RA=RD

48
=
(4)(300) 600 600
300 [ ]+[ ] + [1822.9166]
(4)(711.1111) (651.0416)(2) + 520.8333

RB=0.1481E

RB=RC

Calculo del centro torsional

(1.5)(21) + (0.1481)(14) + (0.14812)(7)


= = 10.5
(1.5)(2) + (0.1481)(2)

(0.1069)(13) + (0.1069)(9) + (0.1069)(4)


= = 5.3728
(0.1069)(3) + 0.1966

Determinacin de la excentricidad

Csy= Ycm YT

Csx=10.5 10.5 = 0

Csy=6.3865-5.3728= 1.0137m

eDy=1.5(1.0137)+0.1(13)= 2.8205m

eDy=(1.0137)-0.1(13)= -0.2863m

eDx=1.5(0)+0.1(21)= 2.1m

eDx=(0)-0.1(21)= -2.1m
Nivel 8

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(82.9249ton)(2.8205m)=233.8938 ton-m

MTY=(61.4258ton)(2.1m)=128.9941 ton-m

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(82.9249)(0.1069)
1 = = 17.1364
0.5173
V1X=V2X=V3X

(82.9249)(0.1069)
4 = = 31.5156
0.5173
(61.4258)(1.5)
= = 27.9530
3.2962
VAy=VDy

(61.4258)(0.1036)
= = 2.7598
3.2962
VBy=VCy

Imagen 2

CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt
XAt=-10.5m
XBt=-3.5m
XCt=3.5m
XDt=10.5m

Yt=Yi-Yt

Y1t=7.6272m
Y2t=3.6272m
Y3t=-1.3728m
Y4t=-5.3728m

11 2

0.1069(7.6272)2 = 6.2188m2
0.1069(3.6272)2 = 1.4064m2
0.1069(1.3728)2 = 0.2014m2
5.67522
0.1966(5.3728)2 =
= 13.50192

1.5(10.5)2 = 165.375m2
0.1481(3.5)2 = 1.8142m2
0.1481(3.5)2 = 1.8142m2
165.375m2
1.5(10.5)2 =
= 334.8803

= ( 2 + 2 )

= 347.8803m2


=
( 2 + 2 )

(0.1069)(7.6272)
1 = (233.7445) = 0.5481
347.8803
(0.1069)(3.6272)
2 = (233.7445) =0.2606
347.8803

(0.1069)(1.3728)
3 = (233.7445) = 9.8603 2
347.8803
(0.1966)(5.3728)
4 = (233.7445) = 0.7101
347.8803
(1.5)(10.5)
= (128.9941) = 5.8401
347.8803
(0.1481)(3.5)
= (128.9941) = 0.1922
347.8803
(0.1481)(3.5)
= (128.9941) = 0.1922
347.8803
(1.5)(10.5)
= (128.9941) = 5.8401
347.8803

Imagen



( 2 + )

(0.1069)(7.6272)
= (128.9941) =0.3023ton
347.8803

(0.1069)(3.626)
= (128.9941) = 0.1437
347.8803
(0.1069)(1.374)
= (128.9941) = 0.54462
347.8803
(0.1966)(5.374)
= (128.9941) = 0.3917
347.8803
(1.5)(10.5)
1 = (233.7445) = 10.5893
347.8803

(0.1481)(3.5)
2 = (233.7445) = 0.3485
347.8803

(0.1481)(3.5)
3 = (233.7445) =0.3485
347.8803

(1.5)(10.5)
4 = (233.7445) =10.5893
347.8803

VxSismica=VDIRx+VIxT

V1X=17.1364+0.5478=17.6846 ton
V2X=17.1364+0.2606=17.3971 ton
V3X=17.1364+(-9.8603E-2)=17.0377 ton
V4X=61.8107+(-0.7101)=30.6879 ton

VySismica=VDIRy+VIyT

VAY=27.9530+(-5.8400)=22.1129 ton
VBY=2.7598+(-0.1922)=2.5676 ton
VCY=2.7598+(0.1922)=2.9521 ton
VDY=27.9530+(5.8400)=33.7931

Calculo del cortante total


Vix= +0.3

V1X=17.6846+0.3(1.5473)=17.7753 ton
V2X=17.3971+0.3(0.6858)=17.4403 ton
V3X=17.0377+0.3(-0.2988)=17.0214 ton
V4X=30.6879+0.3(-1.9342)=30.6879

VAY=22.1126+0.3(-10.5824)=18.9361 ton
VBY=2.5676+0.3(-0.3483)=2.4631 ton
VCY=2.9521+0.3(0.3483)=3.0567 ton
VDY=33.7931+0.3(10.5824)=36.9699 ton
Nivel 7

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(363.2795)(4.3645m)=1585.5334

MTY=(269.0959)(1.5)=403.6439

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(363.2795)(0.1405)
1 = = 77.8416
0.6557
V1X=V2X=V3X

(363.2795)(0.2342)
4 = = 129.7546
0.6557
(269.0959)(1.5)
= = 125.8555
3.2072
VAy=VDy

(269.0959)(0.1036)
= = 8.6924
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027


=
( 2 + 2 )

(0.1405)(12.5719)
1 = (1585.5334) = 12.7589
219.5027
(0.1405)(5.5719)
2 = (1585.5334) = 5.6548
219.5027
(0.1405)(2.4281)
3 = (1585.5334) = 2.4642
219.5027
(0.2342)(9.4281)
4 = (1585.5334) = 15.9495
219.5027

(1.5)(7.5)
= (403.6439) = 20.6876
219.5027
(0.1036)(3.5)
= (403.6439) = 0.6668
219.5027

(0.1036)(3.5)
= (403.6439) =0.6668
219.5027

(1.5)(7.5)
= (403.6439) =20.6876
219.5027
(0.1405)(12.5719)
1 = (403.6439) =3.2481
219.5027

(0.1405)(5.5719)
2 = (403.6439) =1.4396
219.5027

(0.1405)(2.4281)
3 = (403.6439) = 0.6273
219.5027
(0.2342)(9.4281)
4 = (403.6439) = 4.0604
219.5027

(1.5)(7.5)
= (1585.5334) = 81.2621
219.5027
(0.1036)(3.5)
= (1585.5334) = 2.6192
219.5027
(0.1036)(3.5)
= (1585.5334) =2.6192
219.5027

(1.5)(7.5)
= (1585.5334) =81.2621
219.5027

V1X=77.8416+12.7589=90.6005
V2X=77.8416+5.6548=83.4964
V3X=77.8416+(-2.4642)=75.3774
V4X=129.7546+(-15.9495)=113.8051

VAY=125.8555+(-20.6876)=105.1679
VBY=8.6924+(-0.6668)=8.0256
VCY=8.6924+0.6668=9.3592
VDY=125.8555+20.6876=146.5431

V1X=90.6005+0.3(3.2481)=91.5749
V2X=83.4964+0.3(1.4396)=83.9283
V3X=75.3774+0.3(-0.6273)=75.1892
V4X=113.8051+0.3(-4.0604)=112.5870

VAY=105.1679+0.3(-81.2621)=80.7893
VBY=8.0256+0.3(-2.6192)=7.2398
VCY=9.3592+0.3(2.6192)=10.1450
VDY=146.5431+0.3(81.2621)=170.9217
Nivel 7

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(530.6779)(4.3645m)=2316.1437

MTY=(393.0947)(1.5)=589.6421

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(530.6779)(0.1405)
1 = = 113.7109
0.6557
V1X=V2X=V3X

(530.6779)(0.2342)
4 = = 189.5452
0.6557
(393.0947)(1.5)
= = 183.8495
3.2072
VAy=VDy

(393.0947)(0.1036)
= = 12.6979
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027


=
( 2 + 2 )

(0.1405)(12.5719)
1 = (2316.1437) = 18.6382
219.5027
(0.1405)(5.5719)
2 = (2316.1437) = 8.2605
219.5027
(0.1405)(2.4281)
3 = (2316.1437) = 3.5997
219.5027
(0.2342)(9.4281)
4 = (2316.1437) = 23.2990
219.5027

(1.5)(7.5)
= (589.6421) = 30.2205
219.5027
(0.1036)(3.5)
= (589.6421) = 0.9740
219.5027
(0.1036)(3.5)
= (589.6421) =0.9740
219.5027

(1.5)(7.5)
= (589.6421) =30.2205
219.5027
(0.1405)(12.5719)
1 = (589.6421) =4.7449
219.5027

(0.1405)(5.5719)
2 = (589.6421) =2.1029
219.5027

(0.1405)(2.4281)
3 = (589.6421) = 0.9164
219.5027
(0.2342)(9.4281)
4 = (589.6421) = 5.9314
219.5027

(1.5)(7.5)
= (2316.1437) = 118.7075
219.5027

(0.1036)(3.5)
= (2316.1437) = 3.8261
219.5027

(0.1036)(3.5)
= (2316.1437) =3.8261
219.5027

(1.5)(7.5)
= (2316.1437) =118.7075
219.5027

V1X=113.7109+18.6382=132.3491
V2X=113.7109+8.2605=121.9714
V3X=113.7109+(-3.5997)=110.1112
V4X=189.5452+(-23.2990)=166.2462

VAY=183.8495+(-30.2205)=153.6290
VBY=12.6979+(-0.9740)=11.7239
VCY=12.6979+0.9740=13.6719
VDY=183.8495+30.2205=214.0700

V1X=132.3491+0.3(4.7449)=133.7726
V2X=121.9714+0.3(2.1029)=122.6023
V3X=110.1112+0.3(-0.9164)=109.8363
V4X=166.2462+0.3(-5.9314)=164.4668

VAY=153.6290+0.3(-118.7075)=118.0168
VBY=11.7239+0.3(-3.8261)=10.5761
VCY=13.6719+0.3(3.8261)=14.8197
VDY=214.0700+0.3(118.7075)=249.6823
Nivel 6

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(675.2492)(4.3645m)=2947.1251

MTY=(500.1846)(1.5)=750.2769

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(675.2492)(0.1405)
1 = = 144.6889
0.6557
V1X=V2X=V3X

(675.2492)(0.2342)
4 = = 241.1825
0.6557
(500.1846)(1.5)
= = 233.9352
3.2072
VAy=VDy

(500.1846)(0.1036)
= = 16.1571
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027


=
( 2 + 2 )
(0.1405)(12.5719)
1 = (2947.1251) =23.7157ton
219.5027

(0.1405)(5.5719)
2 = (2947.1251) =10.5109ton
219.5027

(0.1405)(2.4281)
3 = (2947.1251) = 4.5804
219.5027
(0.2342)(9.4281)
4 = (2947.1251) = 29.6463ton
219.5027
(1.5)(7.5)
= (750.2769) = 38.4534ton
219.5027

(0.1036)(3.5)
= (750.2769) = 1.2394ton
219.5027

(0.1036)(3.5)
= (750.2769) =1.2394ton
219.5027

(1.5)(7.5)
= (750.2769) =38.4534ton
219.5027
(0.1405)(12.5719)
1 = (750.2769) =6.0375ton
219.5027

(0.1405)(5.5719)
2 = (750.2769) =2.6758ton
219.5027

(0.1405)(2.4281)
3 = (750.2769) = 1.1661ton
219.5027

(0.2342)(9.4281)
4 = (750.2769) = 7.5473ton
219.5027

(1.5)(7.5)
= (2947.1251) = 151.0467ton
219.5027

(0.1036)(3.5)
= (2947.1251) = 4.8684ton
219.5027

(0.1036)(3.5)
= (2947.1251) =4.8684ton
219.5027

(1.5)(7.5)
= (2947.1251) =151.0467ton
219.5027

V1X=144.6889+23.7157=168.4046ton
V2X=144.6889+10.5109=155.1998ton
V3X=144.6889+(-4.5804)=140.1085ton
V4X=241.1825+(-29.6463)=211.5362ton

VAY=233.9352+(-38.4534)=195.4818ton
VBY=16.1571+(-1.2394)=14.9177ton
VCY=16.1571+(-1.2394)=17.3965ton
VDY=233.9352+38.4534=272.3886ton

V1X=168.4046+0.3(6.0375)=170.2159ton
V2X=155.1998+0.3(2.6758)=156.0025ton
V3X=140.1085+0.3(-1.1661)=139.7587ton
V4X=211.5362+0.3(-7.5473)=209.2720ton

VAY=195.4818+0.3(-151.0467)=150.1678ton
VBY=14.9177+0.3(-4.8684)=13.4572ton
VCY=17.3965+0.3(4.8684)=18.8570ton
VDY=272.3886+0.3(151.0467)=317.7026ton
Nivel 5

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(796.9935)(4.3645m)=3478.4781ton/m

MTY=(590.3655)(1.5)=885.5483ton/m

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(796.9935)(0.1405)
1 = = 170.7756
0.6557
V1X=V2X=V3X

(796.9935)(0.2342)
4 = = 284.6666
0.6557
(590.3655)(1.5)
= = 276.1126
3.2072
VAy=VDy

(590.3655)(0.1036)
= = 19.0702
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027m2


=
( 2 + 2 )
(0.1405)(12.5719)
1 = (3478.4781) =27.9915ton
219.5027

(0.1405)(5.5719)
2 = (3478.4781) =12.4059ton
219.5027

(0.1405)(2.4281)
3 = (3478.4781) = 5.4062ton
219.5027

(0.2342)(9.4281)
4 = (3478.4781) = 34.9913ton
219.5027
(1.5)(7.5)
= (885.5483) = 45.3863ton
219.5027

(0.1036)(3.5)
= (885.5483) = 1.4629ton
219.5027

(0.1036)(3.5)
= (885.5483) =1.4629ton
219.5027

(1.5)(7.5)
= (885.5483) =45.3863ton
219.5027
(0.1405)(12.5719)
1 = (885.5483) =7.1261ton
219.5027

(0.1405)(5.5719)
2 = (885.5483) =3.1583ton
219.5027

(0.1405)(2.4281)
3 = (885.5483) = 1.3763ton
219.5027

(0.2342)(9.4281)
4 = (885.5483) = 8.9081ton
219.5027

(1.5)(7.5)
= (3478.4781) = 178.2797ton
219.5027

(0.1036)(3.5)
= (3478.4781) = 5.7462ton
219.5027

(0.1036)(3.5)
= (3478.4781) = 5.7462ton
219.5027

(1.5)(7.5)
= (3478.4781) = 178.2797ton
219.5027

V1X=170.7756+27.9915=198.7671ton
V2X=170.7756+12.4059=183.1815ton
V3X=170.7756+(-5.4062)=165.3694ton
V4X=284.6666+(-34.9913)=249.6753ton

VAY=276.1126+(-45.3863)=230.7263ton
VBY=19.0702+(-1.4629)=17.6073ton
VCY=19.0702+1.4629=20.5331ton
VDY=276.1126+45.3863=321.4989ton

V1X=198.7671+0.3(7.1261)=200.9049ton
V2X=183.1815+0.3(3.1583)=184.1290ton
V3X=165.3694+0.3(-1.3763)=164.9565ton
V4X=249.6753+0.3(-8.9081)=247.0029ton

VAY=230.7263+0.3(-178.2797)=177.2424ton
VBY=17.6073+0.3(-5.7462)=15.8034ton
VCY=20.5331+0.3(5.7462)=22.2570ton
VDY=321.4989+0.3(178.2797)=374.9828ton
Nivel 4

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(895.9104)(4.3645m)=3910.2009ton/m

MTY=(663.6375)(1.5m)=995.4563ton/m

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(895.9104)(0.1405)
1 = = 191.9710
0.6557
V1X=V2X=V3X

(895.9104)(0.2342)
4 = = 319.9973
0.6557
(663.6375)(1.5)
= = 310.3817
3.2072
VAy=VDy

(663.6375)(0.1036)
= = 21.4370
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027


=
( 2 + 2 )

(0.1405)(12.5719)
1 = (3910.2009) = 31.4656
219.5027
(0.1405)(5.5719)
2 = (3910.2009) =13.9457
219.5027

(0.1405)(2.4281)
3 = (3910.2009) = 6.0772
219.5027

(0.2342)(9.4281)
4 = (3910.2009) = 39.3342
219.5027
(1.5)(7.5)
= (995.4563) = 51.0193ton
219.5027

(0.1036)(3.5)
= (995.4563) = 1.6444ton
219.5027

(0.1036)(3.5)
= (995.4563) =1.6444ton
219.5027

(1.5)(7.5)
= (995.4563) =51.0193ton
219.5027
(0.1405)(12.5719)
1 = (995.4563) =8.0105ton
219.5027

(0.1405)(5.5719)
2 = (995.4563) =3.5503
219.5027

(0.1405)(2.4281)
3 = (995.4563) = 1.5471
219.5027
(0.2342)(9.4281)
4 = (995.4563) = 10.0137ton
219.5027

(1.5)(7.5)
= (3910.2009) = 200.4065ton
219.5027

(0.1036)(3.5)
= (3910.2009) = 6.4593ton
219.5027

(0.1036)(3.5)
= (3910.2009) =6.4593ton
219.5027

(1.5)(7.5)
= (3910.2009) =200.4065ton
219.5027

V1X=191.9710+31.4656=223.4366ton
V2X=191.9710+13.9457=205.9167ton
V3X=191.9710+(-6.0772)=185.8938ton
V4X=319.9973+(-39.3342)=280.6631ton

VAY=310.3817+(-51.0193)=259.3624ton
VBY=21.4370+(-1.6444)=19.7926ton
VCY=21.4370+1.6444=23.0814ton
VDY=310.3817+51.0193=361.4010ton

V1X=223.4366+0.3(8.0105)=225.8398ton
V2X=205.9167+0.3(3.5503)=206.9818ton
V3X=185.8938+0.3(-1.5471)=185.4297ton
V4X=280.6631+0.3(-10.0137)=277.6590ton

VAY=259.3624+0.3(-200.4065)=199.2405ton
VBY=19.7926+0.3(-6.4593)=17.8548ton
VCY=23.0814+0.3(6.4593)=25.0192ton
VDY=361.4010+0.3(200.4065)=421.5230ton
Nivel 3

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(972.0009)(4.3645m)=4242.2979ton/m

MTY=(720.0006)(1.5)=1080.0009ton/m

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(972.0009)(0.1405)
1 = = 208.2753
0.6557
V1X=V2X=V3X

(972.0009)(0.2342)
4 = = 347.1749
0.6557
(720.0006)(1.5)
= = 336.7426
3.2072
VAy=VDy

(720.0006)(0.1036)
= = 23.2577
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027


=
( 2 + 2 )
(0.1405)(12.5719)
1 = (4242.2979) =34.1380ton
219.5027

(0.1405)(5.5719)
2 = (4242.2979) =15.1301ton
219.5027

(0.1405)(2.4281)
3 = (4242.2979) = 6.5933ton
219.5027

(0.2342)(9.4281)
4 = (4242.2979) = 42.6749ton
219.5027
(1.5)(7.5)
= (1080.0009) = 55.3524ton
219.5027

(0.1036)(3.5)
= (1080.0009) = 1.7841ton
219.5027

(0.1036)(3.5)
= (1080.0009) =1.7841ton
219.5027

(1.5)(7.5)
= (1080.0009) =55.3524ton
219.5027
(0.1405)(12.5719)
1 = (1080.0009) =8.6908ton
219.5027

(0.1405)(5.5719)
2 = (1080.0009) =3.8518ton
219.5027

(0.1405)(2.4281)
3 = (1080.0009) = 1.6785ton
219.5027

(0.2342)(9.4281)
4 = (1080.0009) = 10.8641ton
219.5027

(1.5)(7.5)
= (4242.2979) = 217.4272ton
219.5027

(0.1036)(3.5)
= (4242.2979) = 7.0079ton
219.5027

(0.1036)(3.5)
= (4242.2979) =7.0079ton
219.5027

(1.5)(7.5)
= (4242.2979) =217.4272ton
219.5027

V1X=208.2753+34.1380=242.4133ton
V2X=208.2753+15.1301=223.4054ton
V3X=208.2753+(-6.5933)=201.6820ton
V4X=347.1749+(-42.6749)=304.5000ton

VAY=336.7426+(-55.3524)=281.3902ton
VBY=23.2577+(-1.7841)=21.4736ton
VCY=23.2577+1.7841=25.0418ton
VDY=336.7426+55.3524=392.0950ton

V1X=242.4133+0.3(8.6908)=245.0205ton
V2X=223.4054+0.3(3.8518)=224.5609ton
V3X=201.6820+0.3(-1.6785)=201.1785ton
V4X=304.5000+0.3(-10.8641)=301.2408ton

VAY=281.3902+0.3(-217.4272)=216.1620ton
VBY=21.4736+0.3(-7.0079)=19.3712ton
VCY=25.0418+0.3(7.0079)=27.1442ton
VDY=392.0950+0.3(217.4272)=457.3232ton
Nivel 2

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(1025.2640)(4.3645m)=4474.7647ton/m

MTY=(759.4548)(1.5)=1139.1822ton/m

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(1025.2640)(0.1405)
1 = = 219.6883
0.6557
V1X=V2X=V3X

(1025.2640)(0.2342)
4 = = 366.1992
0.6557
(759.4548)(1.5)
= = 355.1952
3.2072
VAy=VDy

(759.4548)(0.1036)
= = 24.5322
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027


=
( 2 + 2 )

(0.1405)(12.5719)
1 = (4474.7647) = 36.0087
219.5027
(0.1405)(5.5719)
2 = (4474.7647) =15.9592ton
219.5027

(0.1405)(2.4281)
3 = (4474.7647) = 6.9546ton
219.5027

(0.2342)(9.4281)
4 = (4474.7647) = 45.0134ton
219.5027
(1.5)(7.5)
= (1139.1822) = 58.3856ton
219.5027

(0.1036)(3.5)
= (1139.1822) = 1.8818ton
219.5027

(0.1036)(3.5)
= (1139.1822) =1.8818ton
219.5027

(1.5)(7.5)
= (1139.1822) =58.3856ton
219.5027
(0.1405)(12.5719)
1 = (1139.1822) =9.1671ton
219.5027

(0.1405)(5.5719)
2 = (1139.1822) =4.0629ton
219.5027

(0.1405)(2.4281)
3 = (1139.1822) = 1.7705ton
219.5027

(0.2342)(9.4281)
4 = (1139.1822) = 11.4595ton
219.5027

(1.5)(7.5)
= (4474.7647) = 229.3416ton
219.5027

(0.1036)(3.5)
= (4474.7647) = 7.3919ton
219.5027

(0.1036)(3.5)
= (4474.7647) =7.3919ton
219.5027

(1.5)(7.5)
= (4474.7647) =229.3416ton
219.5027

V1X=219.6883+36.0087=255.6970ton
V2X=219.6883+15.9592=235.6475ton
V3X=219.6883+(-6.9546)=212.7337ton
V4X=366.1992+(-45.0134)=321.1858ton

VAY=355.1952+(-58.3856)=296.8096ton
VBY=24.5322+(-1.8818)=22.6504ton
VCY=24.5322+1.8818=26.4140ton
VDY=355.1952+58.3856=413.5808ton

V1X=255.6970+0.3(9.1671)=258.4471ton
V2X=235.6475+0.3(4.0629)=236.8664ton
V3X=212.7337+0.3(-1.7705)=212.2026ton
V4X=321.1858+0.3(-11.4595)=317.7480ton

VAY=296.8096+0.3(-229.3416)=228.0071ton
VBY=22.6504+0.3(-7.3919)=20.4328ton
VCY=26.4140+0.3(7.3919)=28.6316ton
VDY=413.5808+0.3(229.3416)=482.3833ton
Nivel 1

MTX=Vx*eDy

MTY=Vy*eDx

MTX=(1055.7001)(4.3645m)=4607.6031ton/m

MTY=(782)(1.5)=1173ton/m

CALCULO DEL CORTANTE EN SU DIRECCION DE ANALISIS

(1055.7001)(0.1405)
1 = = 226.2099
0.6557
V1X=V2X=V3X

(1055.7001)(0.2342)
4 = = 377.0703
0.6557
(782)(1.5)
= = 365.7396
3.2072
VAy=VDy

(782)(0.1036)
= = 25.2604
3.2072
VBy=VCy
CALCULO DEL CORTANTE POR TORSION EN LOS MARCOS

Xit=xi-xt

XAt=-7.5m
XBt=-3.5m
XCt=3.5m
XDt=7.5m

Yt=Yi-Yt

Y1t=12.5719m
Y2t=5.5719m
Y3t=-2.4281m
Y4t=-9.4281m

11 2

0.1405(12.5719)2 = 22.2064
0.1405(5.5719)2 = 4.3620
0.1405(2.4281)2 = 0.8283
20.8178
0.3785(9.4281)2 =
= 48.2145

1.5(7.5)2 = 84.3750
0.1036(3.5)2 = 1.2691
0.1036(3.5)2 = 1.2691
84.3750
1.5(7.5)2 =
= 171.2882

= ( 2 + 2 )

= 48.2145+171.2882= 219.5027


=
( 2 + 2 )
(0.1405)(12.5719)
1 = (4607.6031) =37.0777ton
219.5027

(0.1405)(5.5719)
2 = (4607.6031) =16.4329ton
219.5027

(0.1405)(2.4281)
3 = (4607.6031) = 7.1611ton
219.5027

(0.2342)(9.4281)
4 = (4607.6031) = 46.3496ton
219.5027
(1.5)(7.5)
= (1173) = 60.1189ton
219.5027

(0.1036)(3.5)
= (1173) = 1.9377ton
219.5027

(0.1036)(3.5)
= (1173) = 1.9377ton
219.5027

(1.5)(7.5)
= (1173) = 60.1189ton
219.5027
(0.1405)(12.5719)
1 = (1173) =9.4392ton
219.5027

(0.1405)(5.5719)
2 = (1173) =4.1835ton
219.5027

(0.1405)(2.4281)
3 = (1173) = 1.8231ton
219.5027

(0.2342)(9.4281)
4 = (1173) = 11.7997ton
219.5027

(1.5)(7.5)
= (4607.6031) = 236.1499ton
219.5027

(0.1036)(3.5)
= (4607.6031) = 7.6114ton
219.5027

(0.1036)(3.5)
= (4607.6031) = 7.6114ton
219.5027

(1.5)(7.5)
= (4607.6031) = 236.1499ton
219.5027

V1X=226.2099+37.0777=263.2876ton
V2X=226.2099+16.4329=242.6428ton
V3X=226.2099+(-7.1611)=219.0488ton
V4X=377.0703+(-46.3496)=330.7207ton

VAY=365.7396+(-60.1189)=305.6207ton
VBY=25.2604+(-1.9377)=23.3227ton
VCY=25.2604+1.9377=27.1981ton
VDY=365.7396+60.1189=425.8585ton

V1X=263.2876+0.3(9.4392)=266.1194ton
V2X=242.6428+0.3(4.1835)=243.8979ton
V3X=219.0488+0.3(-1.8231)=218.5019ton
V4X=330.7207+0.3(-11.7997)=327.1808ton

VAY=305.6207+0.3(-236.1499)=234.7757ton
VBY=23.3227+0.3(-7.6114)=21.0393ton
VCY=27.1981+0.3(7.6114)=29.4815ton
VDY=425.8585+0.3(236.1499)=496.7035ton