Está en la página 1de 22

Y= 100 (d/D)^0.

5
Sand
% PASA % RETENIDO
Gravel
d mm D
100
1 25 100
3/4" 19 100 90

3/8" 9.5 71 29 80
No. 4 4.75 50 50 70
No.8 2.36 35 65 60
No.16 1.19 25 75 50
No. 30 0.6 18 82
40
No. 50 0.3 12.5 87.5
30
No. 100 0.15 8.8 91.2
MF Fuller 4.797 20
10
arena % PASA % RETENIDO 0
0.025 0.25
1" 25
3/4" 19 100 0
3/8" 9.5 100 0
No.4 4.75 100 0
No.8 2.36 93.44 6.56
No. 16 1.19 84.08 15.92 modulo finura
No. 30 (m) 0.6 56.4 43.6 arena 2.41
No. 50 0.3 21.8 78.2 vidrio 3.29
No. 100 0.15 7.2 92.8 grava 6.81
fondo Mfinura 2.37 3/4" escoria 6.65

vidrio transparente % PASA % RETENIDO


3/4" 19 100 0.00 t1: proporcion de arena t1+t2+t3=
3/8" 9.5 100 0.00 t1+t2=
No.4 4.75 100 0.00 t1=
No.8 2.36 68.5666667 31.43 t2=
No. 16 1.19 44.4666667 55.53 t3=
No. 30 (m) 0.6 28.8 71.20 t4=
No. 50 0.3 17.8 82.20
No. 100 0.15 10.6666667 89.33 ajuste granulometrico
fondo Mfinura 3.30 %pasa acumulado
arena vidrio
vidrio verde % PASA 1 1/2" 100 100
3/4" 19 100 0.00 1" 100 100
3/8" 9.5 100 0.00 3/4" 100 100
No.4 4.75 100.0 0.00 3/8" 100 100
No.8 2.36 54.2 45.80 No.4 96.24 100
No. 16 1.19 30.7 69.27 No.8 93.44 68.7666667
No. 30 (m) 0.6 19.2 80.77 No. 16 84.08 46.2666667
No. 50 0.3 12.0 88.00 No. 30 (m) 56.4 31.3666667
No. 100 0.15 7.7 92.30 No. 50 21.8 19.8666667
fondo Mfinura 3.76 No. 100 7.2 11.9666667
fondo

escoria % PASA % RETENIDO


1" 25 100 0.00
3/4" 19 81.52 18.48
3/8" 9.5 42.048 57.95
No.4 4.75 11.796 88.20
No.8 2.36 0 100.00
No. 16 1.19 0 100
No. 30 (m) 0.6 100
No. 50 0.3 100
No. 100 0.15 100
fondo Mfinura 6.65

grava % PASA % RETENIDO


39.1 100 0
1" 25 100 0
3/4" 19 92.7 7.30
3/8" 9.5 18.9 81.10
No.4 4.75 1.4 98.60
No.8 2.36 1.1 98.90
No. 16 1.19 1.1 98.90
No. 30 (m) 0.6 1.1 98.90
No. 50 0.3 1.1 98.90
No. 100 0.15 1.1 98.90
fondo Mfinura 6.82
Sand TRGG EAFS
proporciones de los agregados en la mezcla
Gravel GRGG Ful l er 3/4
100
90
80
70
60
50
40
30
20
10
0
5 0.25 2.5 25

MFfuller
2.19 1
2.18 2
4.797 3
5.208 4
n=4

77.8197518
33.8339439
42.6769065
-8.8429626
43.9858078
22.1802482

escoria grava t1 t2 t3 t4 total ajuste

100 100 42.7 -8.8 44.0 22.2 100.0


81.52 96.475 42.7 -8.8 35.9 21.4 91.1
42.048 39.675 42.7 -8.8 18.5 8.8 61.1
16.228 3.14 41.1 -8.8 7.1 0.7 40.1
11.796 0.95 39.9 -6.1 5.2 0.2 39.2
0 0 35.9 -4.1 0.0 0.0 31.8
24.1 -2.8 0.0 0.0 21.3
9.3 -1.8 0.0 0.0 7.5
3.1 -1.1 0.0 0.0 2.0
dos en la mezcla
porcentaje pasa
d mm D No. 8 No. 4 3/8" 3/4"
2.36 4.75 9.5 19
1 25
3/4" 19 100
3/8" 9.5 100 71
No. 4 4.75 100 71 50
No.8 2.36 100 70 50 35
No.16 1.19 71 50 35 25
No. 30 0.6 50 36 25 18
No. 50 0.3 36 25 18 13
No. 100 0.15 25 18 13 9
% ret
No. 8 100 0
71.0096675 28.9903325
50.4219484 49.5780516
35.6537016 64.3462984
25.2109742 74.7890258
MFfuller 2.18
% ret
No. 4 100 0
70.4870275 29.5129725 100
50.0526039 49.9473961 90
35.5409327 64.4590673 80
25.1312345 74.8687655 70
2.19 60
50
40
30
20
10
0
0.025
1" %ret
25 75
100 0
87 12.8220211
62 38.35586
44 56.4110106
31 69.275417
22 78.1825758
15 84.5080666
11 89.0455488
8 92.2540333
MFFuller 5.20854533

arena vidri o trans parente arena


es cori a grava Grava
vi dri o verde
100
100
90
90
80
80
70
70
60 60

50 50

40 40
30 30
20 20
10
10
0
0.025 0.25 2.5 25 0
0.025 0.25
arena vi dri o tra ns parente EAFS
Grava Vi dri o verde
100

90

80

70

60

50

40

30

20

10

0
0.025 0.25 2.5 25
Y= 100 (d/D)^0.5
100
% PASA % RETENIDO
90
d mm D
80
1 25 100
70
3/4" 19 100
3/8" 9.5 71 29 60

No. 4 4.75 50 50 50
No.8 2.36 35 65 40
No.16 1.19 25 75 30
No. 30 0.6 18 82 20
No. 50 0.3 12.5 87.5 10
No. 100 0.15 8.8 91.2 0
0.025 0.25
MF Fuller 4.797
Ful l er 19 mm
es cori a
arena % PASA % RETENIDO
ajuste granul o
1" 25
3/4" 19 100 0
3/8" 9.5 100 0
No.4 4.75 96.24 3.76
No.8 2.36 93.44 6.56
No. 16 1.19 84.08 15.92 modulo finura
No. 30 (m) 0.6 56.4 43.6 arena 2.41
No. 50 0.3 21.8 78.2 vidrio
No. 100 0.15 7.2 92.8 grava 6.63
fondo Mfinura 2.41 3/4" escoria 6.65

vidrio transparente % PASA % RETENIDO


3/4" 19 100 0.00 t1: proporcion de arena t1+t2+t3=
3/8" 9.5 100 0.00 t1+t2=
No.4 4.75 100 0.00 t1=
No.8 2.36 68.7666667 31.23 t2=
No. 16 1.19 46.2666667 53.73 t3=
No. 30 (m) 0.6 31.3666667 68.63 t4=
No. 50 0.3 19.8666667 80.13
No. 100 0.15 11.9666667 88.03 ajuste granulometrico
fondo Mfinura 3.22 %pasa acumulado
arena vidrio
vidrio verde % PASA 1 1/2" 100 100
3/4" 19 100 0.00 1" 100 100
3/8" 9.5 100 0.00 3/4" 100 100
No.4 4.75 99.6 0.43 3/8" 100 100
No.8 2.36 54.2 45.80 No.4 96.24 100
No. 16 1.19 30.7 69.27 No.8 93.44 68.7666667
No. 30 (m) 0.6 19.2 80.77 No. 16 84.08 46.2666667
No. 50 0.3 12.0 88.00 No. 30 (m) 56.4 31.3666667
No. 100 0.15 7.7 92.30 No. 50 21.8 19.8666667
fondo Mfinura 3.76 No. 100 7.2 11.9666667
fondo

escoria % PASA % RETENIDO


1" 25 100 0.00
3/4" 19 81.52 18.48
3/8" 9.5 42.048 57.95
No.4 4.75 11.796 88.20
No.8 2.36 0 100.00
No. 16 1.19 0 100
No. 30 (m) 0.6 100
No. 50 0.3 100
No. 100 0.15 100
fondo Mfinura 6.65

grava % PASA % RETENIDO


39.1 100 0
1" 25 100 0
3/4" 19 96.475 3.53
3/8" 9.5 39.675 60.33
No.4 4.75 0.95 99.05
No.8 2.36 0 100.00
No. 16 1.19 0 100
No. 30 (m) 0.6 100
No. 50 0.3 100
No. 100 0.15 100
fondo Mfinura 6.63
100
proporciones de los agregados en la mezcla
90
80
70
60
50
40
30
20
10
0
5 0.25 2.5 25
Ful l er 19 mm arena
es cori a grava
ajuste granul ometri co

MFfuller
2.19 1

4.797 2
5.208 3
n=4

100
77.8197518
33.8018021
44.0179496
22.1802482
0

escoria grava t1 t2 t3 t4 total ajuste

100 100 33.8 44.0 22.2 0.0 100.0


81.52 96.475 33.8 44.0 18.1 0.0 95.9
42.048 39.675 33.8 44.0 9.3 0.0 87.1
16.228 3.14 32.5 44.0 3.6 0.0 80.1
11.796 0.95 31.6 30.3 2.6 0.0 64.5
0 0 28.4 20.4 0.0 0.0 48.8
19.1 13.8 0.0 0.0 32.9
7.4 8.7 0.0 0.0 16.1
2.4 5.3 0.0 0.0 7.7
dos en la mezcla