| |Tech
HARDWARE AND COMMISSIONING CHECKLIST
HUAWEIRTN 950 MODEL NETWoRK3¢— [Nlahindira
Hardware & Commissioning Checklist
RTN 950
NETWORK EQUIPMENT INFORMATION
SITELOCALNAME = | LHEIS .SAN_RAFRELL
SITEREMOTENAME | | WO0\0_ San @arecL
MODEL RTN 910 7
ony
Version 3 HUAWE! Proprietary and Confidental Page 1 of 17Tech
HARDWARE AND COMMISSIONING CHECKLIST
HUAWEI RTN 950 MODEL NETwoRK3G— | [lahindra |
DISTRIBUTE RTN 910 GENERAL INFORMATION
SLOT
HARDWARE
‘SERIAL NUMBER
IDU sub-rack
CXPA
CXPA
IFE2
FEZ
Plu
FAN
OD
Main ODU.
Stand by ODU
Version
HUAWE! Proprietary and Confident Page 200 17HARDWARE AND COMMISSIONING CHECKLIST
HUAWEI RTN 950 MODEL NETWORK 3G.
CHAPTER!
HARDWARE INSTALLATION PROTOCOL
1. CABINET INSTALLATION INSPECTION
Tech
No parts on the cabinets are damaged or detached. No cables are
14 NO Aves TNA
damaged or snapped
4.2. | Verity hat the equipment metal supports don't have oxide trace | NO myes NA
1.3 | Eavomentinsats secordr the TSS andior customer Ie Rorseyes awa
‘The supports are positioned and spaced in accordance with the
1.4 | drawing of the installation holes, (This item applies to the cabinet | NO Reyes TNA
installation on the ESD floor.)
ui in This
11g | Al suppors are fixed to the lor correctly. (Ths item applies tothe] ee NA
cabinet installation on the ESD floor.)
7.6 | Alcomponents ofthe supports are installed correaty. (Thisitem | NG vee NA
applies to the cabinet installation on the ESD floor.)
Allfloor holders are installed at the same height. (This item applies
1.7 | to the cabinet installation on the ESD floor supported by floor |” NO fF yes TNA
holders.)
1.8. | Each cabinet is well insulated from the support o the floor. TNO gt ves TNA
4.9 | Alcabinet accessories are installed, nctusing front door. Baek | a
door, and side doors.
4.10] Te "2 labels, column labels, and product labels are atached to |e iy
the specified positions,
4.11 | Te ESD wrist sap is connected to the ESD bonding point on the | 6 oe ve NA
cabinet.
4.12 | Insulation is performed for shockoroof parts between multiple ows | 6 oe NA
of cabinets
i 1nd spring washers in a correct =
4.13] Allbots are fixed wit at washers and spring Nog yes TNA
order
1.14] The cabinets are stable and orderly. NO Fuyes [NA
Mahindra |HARDWARE AND COMMISSIONING CHECKLIST Tech
HUAWEIRTN 950MODELNETWoRK3G— | Mahindra
1.15 | The cabinet t's correctly aligned No yp NA
All cabinet side doors facing the aisle are aligned with the ertor less
than 5 mm.
No ypé NA
‘The surfaces of the cabinets are clean without any fingerprint or
1.17 | smudge. There is no dust, excessive cable tie ends or other NO yps NA
sundries either inside or outside each cabinet
1,18] All kinds of labels are correct, legible and intact. NO yps N/A
1.19] The front and back doors of the cabinets are easy to open or ciose.| NO yes N/A
1.20] The modules in one cabinet are aligned from the top down, NO vps NIA
1.21 | All the filer panets are installed. NO vps NA
4.22 | Al Subracks are installed in proper positions, end thelr DIP iS NO YES F NIA
‘Actual transmit status of the Stand by ODU | NOs YES NIAHARDWARE AND COMMISSIONING CHECKLIST
Tech
HUAWEIRTN 950MODELNETWoRK3c)— | [Mahindra
2.1 Microwave Protection
2.1.1 HSB Switching
‘Test Sub-item HSB Switching
Node No. Funetion Test E Conclusion
Configuration of the HSB protection
group
NOR YES F NIA
HSB switching
NOK ves PNA
HSB switching time
NOK YES TNA
Manual switching
NOR YES TNA
Configuration of the HSB protection
group
NO YES F NIA
HSB switching
HSB owitching time
PNOmYES NA
FNOB yes TNA
Manual switching
PNo mL YES PNA
Indexes:
Remarks.@ HARDWARE AND COMMISSIONING cHEcKUst | PECI
HUAWEI RTN 950 MODEL NETWORK 3G. Mahindra
CHAPTER Ill
DOCUMENTATION
DOCUMENTS
PERSON GHARGE NAME SIGuATURE
avencanone —[Ermon Wedviquer L
teaocomperusac | MIGUEL ZEVAUOS HORN A
EXECUTIONDATE versiON 3
Version 3 HUAWE! Proprietary anc Confidential Page 160 17