Está en la página 1de 2
MODALITY INSTALLATION PLANNING 09/18/02, REVISION 6 APPENDIX A PAGE AX23 POWER SPECIFICATIONS VOLTAGE TABLE A ALLOWABLE INPUT. VOLTAGES / CURRENT DEMAND, PHASE BALANCE, POWER, DEMAND. TABLE 8 MAXIMUM MOMENTARY POWER, DEMAND, DISTRIBUTION, TRANSFORMER CT HiSpeed Advantage RP, CT/i, (REV. DATE 09/26/00) PRIMARY. SOURCE IS REQUIRED FOR ALL INSIALLATIONS, RANGE. OF LINE VOLTAGES: “NOMINAL LINE VOLTAGE OF 380 TO 480, 5 PHASE, 50 OR 60 Hz RECOMMENDED POWER SUPPLY: DELTA OR WYE. WaXMUM DAILY VOLTAGE VARIATON MUST FALL WITHIN ONE OF THE RANGES IN “ABLE Nowa, | sasouure [CURRENT (awPS) IMUM, STANDARD votrace | “Rance” [wowentary [conmmuous| “Brorecrion’ 0-410 | 137 30 T10-& see-es2 | 130 29 110-4 zzo | sa6-4se | 125. 28 100-A aco | 4osa75 | ue 26 100-A aso | eas-a07 | nis 2s 90-n 420 | 42-si8 | 108 24 80-A (AIL CALCULATIONS BASED UPON NOWINAL VOLTAGE) PHASE —TO-PHASE VOLTAGES MUST BE WITHIN 42 PERCENT OF THE LOWEST PNASE~1O"PHASE VOLTAGE, WAXIMUY AL-OWABLE TRANSIENT VOLTAGE EXCURSIONS ARE 2. PERCENT O= RATED LUNE VOLTAGE ATA MAXIMUM DURATION Or 1 CYCLE AND FREQUENCY OF 10 TiMes PER SOUR COMING POWER MUST BEL TENN M Taste ers Gal SeB MEN Lge ie AN CAUSE, SCAN TRUSTS Git IN EXTREME TASTANCES, COMPONEN FAURE INTHE COMPUTER SUBSYSTEM, CONTINUOUS POWER DEMAND = 20 KVA (MAX DEMAND = 90 KVA) DeWANO wo ® POWER FACTOR AT DEMAND INCLUDES POWER FOR ENTIRE CT sysTeM, LINE. VOLTAGE, REGULATION AT MAX VUM POWER! D=MAND MUST 'BE LESS THAN OR EQUAL 70" @ PERCENT, E FOR A_SINGLE UNIT INSTALLATION, THE MINIMUM TRANSFORMER SIE ISSN 2S Kua "Ge GOES NOT RECOMMEND ‘USING A REGULATION ‘DEVICE NOTE: THE CT SYSTEM MUST NOT BE POWERED IN A MULTIPLE INSTALLATION WHERE FILM CHANGERS ARE USED. FIL CHANGERS. UTINIZE.A LARGE NUMBER OF HIGH POWERED. ELOSELY SPACED EXPOSURES Wh CH Vay COINCIDE: WITH HE CT SCAN, GE Medical Systems MODALITY INSTALLATION PLANNING 09/18/02, REVISION 6 APPENDIX A PAGE A~24 FEEDER TABLE FEEDER TABLE — CT HiSpeed Advantage RP, CT/i (© THE GROUNDING CONDUCTOR ( ) WILL BE A 1/0 MINIMUM OR SAVE SIZE AS THE Powem cezoen Wich EVER S ARGER. Tas GeOUND MLL RUN FROM The EQUIPMENT BACK. TO. THE FACILITY POWER SOURCE/MAN GROUNDING PONT AND ACWAYS. TRAVEL” IN ‘SAME" CONDUIT WiTH. TE FEEDERS. AND. NEUTRAL THE GENERAL ELECTRIC EQUIPMENT 1S SEING FED. SY A DELTA SECONDARY, IS RECOMMENDED THAT THE & PHASE ON THE SECONDARY 8. CONNECTED TO GROUND TO PREVENT DAMAGE To "hE ‘Sr Nor aROUGHT NTO THE: POWER DISTRIBUTION UN'T. * un tenon POWER SUPPLY VOLTAGE NEST [ssgcate | osgase [aeecase | aogcars | aacaar] sagzgie vara [179 [2 079 3K 3 070) rary | 1 cs | 20/70 3 3170) 150 ory |i ovo | 2 0/0 3 3.070) 179 | 1 c79 | 20/70 3 307) ve avo) + 70) | 1 70) 2 2 070) 300 79 (4/9) }1/0 (4/9) 1 21/0) 350 /o (3/0) 1 10/7) too /o (1/0) 1 107) REV. DATE: 09/12/02

También podría gustarte